CN113202522B - Automatic construction device for anchor rod - Google Patents

Automatic construction device for anchor rod Download PDF

Info

Publication number
CN113202522B
CN113202522B CN202110481356.1A CN202110481356A CN113202522B CN 113202522 B CN113202522 B CN 113202522B CN 202110481356 A CN202110481356 A CN 202110481356A CN 113202522 B CN113202522 B CN 113202522B
Authority
CN
China
Prior art keywords
shaft
valve
rod
oil
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110481356.1A
Other languages
Chinese (zh)
Other versions
CN113202522A (en
Inventor
罗超
康红普
姜鹏飞
王子越
曹晓明
陈志良
韦尧中
刘畅
郭吉昌
杨建威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ccteg Coal Mining Research Institute Co ltd
Tiandi Science and Technology Co Ltd
Original Assignee
Ccteg Coal Mining Research Institute Co ltd
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ccteg Coal Mining Research Institute Co ltd, Tiandi Science and Technology Co Ltd filed Critical Ccteg Coal Mining Research Institute Co ltd
Priority to CN202110481356.1A priority Critical patent/CN113202522B/en
Publication of CN113202522A publication Critical patent/CN113202522A/en
Application granted granted Critical
Publication of CN113202522B publication Critical patent/CN113202522B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/04Supports for the drilling machine, e.g. derricks or masts specially adapted for directional drilling, e.g. slant hole rigs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • E21B19/086Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods with a fluid-actuated cylinder
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • E21B3/02Surface drives for rotary drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/008Anchoring or tensioning means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an automatic construction device for an anchor rod, which comprises a drilling box, a hydraulic oil cylinder, a signal detector and a controller, wherein the drilling box, the hydraulic oil cylinder and the signal detector are all arranged on a drilling frame. The hydraulic oil cylinder comprises a supporting oil cylinder and a drilling oil cylinder, the supporting oil cylinder is used for supporting the roadway wall and guiding the anchor rod, and the drilling oil cylinder is used for driving the drilling box to move in the direction close to or far away from the roadway wall. The signal detector comprises at least one of an oil pressure sensor and a laser ranging sensor and is used for detecting the drilling state of the drill box. The drill box drives the anchor rod to drill holes under the driving of the driver, the second shaft and the anchor rod are utilized for anchoring, and the anchor rod can be pre-tightened. The automatic construction device for the anchor rod has the advantages of good anchoring effect, high automation degree, high anchor rod supporting operation efficiency and low labor intensity of workers.

Description

Automatic construction device for anchor rod
Technical Field
The invention relates to the technical field of coal mine anchor rod construction, in particular to an anchor rod automatic construction device.
Background
The anchor rod construction process in the related art mainly comprises links of punching, installing stirring anchoring agent, installing tray, aligning ball pad, pre-tightening a rod tail nut and the like, corresponding construction equipment is an anchor rod drilling machine and a torque wrench, construction is manually completed by relying on manpower, and automatic construction of an anchor rod is difficult to realize. In addition, the anchor rod installation construction equipment in the related art is relatively independent and scattered, and the design and use objects are coal mine workers, so that the equipment cannot meet the requirement of automatic construction.
Disclosure of Invention
The present invention aims to solve at least to some extent one of the above technical problems.
Therefore, the embodiment of the invention provides the automatic construction device for the anchor rod, which can realize automatic drilling, automatic anchoring and automatic pre-tightening of the anchor rod, and the anchoring device and the drilling device are respectively integrated together, so that the automatic control is convenient, and the automatic construction device for the anchor rod has the advantages of good anchoring effect, high automation degree, high anchor rod supporting operation efficiency and low labor intensity of workers.
The automatic construction device for the anchor rod comprises:
drilling box, drilling box includes:
a base, a base seat and a base seat,
a first shaft rotatably mounted on the base, the first shaft having first and second ends opposite to each other in an axial direction thereof, the first shaft being provided with a first through hole penetrating therethrough in the axial direction thereof,
A driver coupled to the first shaft to drive rotation of the first shaft,
a second shaft movably inserted in the first through hole along the axial direction thereof, the second shaft having an initial position adjacent to the first end of the first shaft, at least a portion of the second shaft being in sealing engagement with the first through hole, the second shaft being provided with a plurality of second through holes penetrating along the axial direction thereof, a plurality of the second through holes being provided at intervals, each of the second through holes being provided with a check valve therein, and
the anchor rod comprises a rod body, a drill bit, a pre-tightening nut and a limiting block, wherein the rod body is coaxial with the first shaft, a third through hole which is communicated with each second through hole along the axial direction of the rod body is arranged on the rod body,
the rod body is spaced from the second shaft in the axial direction of the rod body, the rod body is arranged adjacent to the first end of the first shaft relative to the second shaft in the axial direction of the rod body, the limiting block is arranged between the pre-tightening nut and the second shaft in the axial direction of the rod body, the outer circumferential surface of the rod body is provided with external threads, the pre-tightening nut is in threaded fit on the rod body and is in sealing connection with the first shaft, the limiting block is movably arranged in the first through hole in the axial direction of the first shaft and is connected with the rod body, each of the pre-tightening nut and the limiting block is provided with a first surface and a second surface which are opposite in the axial direction of the rod body, when the first shaft drives the pre-tightening nut to rotate in a first direction, the first surface of the limiting block is abutted against the second surface of the pre-tightening nut so that the pre-tightening nut drives the rod body to rotate in the first direction, and when the first shaft drives the pre-tightening nut to rotate in a second direction opposite to the first direction, the first shaft can push the first end of the pre-tightening nut against the first shaft;
A hydraulic ram, the hydraulic ram comprising:
the support oil cylinder is used for supporting the roadway wall and guiding the anchor rod, and
the drilling oil cylinder is used for driving the drilling box to move in a direction close to or far away from the roadway wall;
a signal detector including at least one of an oil pressure sensor and a laser ranging sensor for detecting a drilling state of the drill box;
the drill frame, the drill box, the hydraulic oil cylinder and the signal detector are all arranged on the drill frame; and
and the controller can receive the feedback signal of the signal detector and is used for controlling the working state of the drilling oil cylinder.
According to the anchor rod automatic construction device provided by the embodiment of the invention, the drilling box can automatically pre-tighten the anchor rod, the anchor rod can be used for anchoring, and the support oil cylinder and the drilling machine oil cylinder can be used for actively drilling, so that the anchor rod automatic construction device has the advantages of high automation degree, simple structure, small volume and low cost.
In some embodiments, the anchor rod further comprises a flow mixer for mixing the anchoring agent, the rod body comprises a first section and a second section, the first section is adjacent to the second shaft in the axial direction of the rod body, the second section is far away from the second shaft in the axial direction of the rod body, the external thread is arranged on the outer circumferential surface of the first section, a spiral transverse rib is arranged on the second section, the flow mixer is arranged in a part, corresponding to the first section, of the third through hole, and the flow mixer comprises a central shaft and a spiral blade which are fixedly connected into a whole, the central shaft and the rod body are coaxially arranged, and the spiral blade is arranged around the central shaft.
In some embodiments, the anchor rod automated construction apparatus further comprises:
the water delivery device comprises a water injection pipe, an electromagnetic water ball valve is arranged on the water injection pipe, one end of the water injection pipe is connected with the water tank, and the other end of the water injection pipe is connected with the anchor rod through an anchor rod connecting pipe so as to cool and slag the anchor rod when the anchor rod is drilled;
an anchor pump, the anchor pump comprising:
an integrated cylinder having a piston chamber, a first plunger chamber, a second plunger chamber, a first inlet pipe, a first outlet pipe, a second inlet pipe, and a second outlet pipe, each of the first inlet pipe and the first outlet pipe being in communication with a bottom of the first plunger chamber, each of the second inlet pipe and the second outlet pipe being in communication with a bottom of the second plunger chamber, the first plunger chamber and the second plunger chamber being arranged at intervals in a left-right direction,
a first plunger, at least part of which extends into the first plunger chamber and which is movable in an up-and-down direction relative to the integrated cylinder so that the anchoring agent enters the bottom of the first plunger chamber from the first inlet pipe and is discharged from the first outlet pipe,
A second plunger, at least a portion of which protrudes into the second plunger chamber, and which is movable in an up-and-down direction with respect to the integrated cylinder so that the anchoring agent enters the bottom of the second plunger chamber from the second inlet tube and is discharged from the second outlet tube,
a linkage located above the integrated cylinder, each of the first and second plungers being connected to the linkage, and
the first piston rod is connected with the linkage piece, at least part of the first piston rod is positioned in the piston cavity, and the first piston rod can move up and down relative to the integrated cylinder body under the driving of hydraulic oil entering and exiting the piston cavity so as to drive the linkage piece to move up and down, so that each of the first plunger and the second plunger is driven to move up and down; and
a slurry delivery device, the slurry delivery device comprising:
the first reversing valve is used for controlling the up-and-down movement of the first piston rod,
a first storage tank for storing an anchor agent A component and a second storage tank for storing an anchor agent B component,
A first slurry inlet pipe and a first slurry injection pipe, one end of the first slurry inlet pipe is connected with the first storage tank, the other end of the first slurry inlet pipe is connected with the first inlet pipe, one end of the first slurry injection pipe is connected with the first outlet pipe, the other end of the first slurry injection pipe is connected with one of the plurality of second through holes so as to inject the anchoring agent A component in the first storage tank into the anchor rod through the first plunger cavity, thereby the anchoring agent A component is suitable for being injected into a roadway anchor rod hole through the anchor rod, and
the second grouting pipe and the second grouting pipe, the one end of second grouting pipe with the second bin links to each other, the other end of second grouting pipe with the second import pipe links to each other, the one end of second grouting pipe with the second outlet pipe links to each other, the other end of second grouting pipe links to each other with another in a plurality of second through-holes, so that will the anchor agent B component in the second bin is through the injection of second plunger chamber is in to the stock, thereby will the anchor agent B component is suitable for through the stock injection to tunnel stock downthehole.
In some embodiments, the anchor rod automated construction apparatus further comprises:
The second reversing valve is used for controlling a second piston rod of the drilling oil cylinder to extend or retract;
the third reversing valve is used for controlling the extension or retraction of a third piston rod of the support oil cylinder; and
the driver is a hydraulic motor, and the fourth reversing valve is used for controlling the hydraulic motor to rotate forward or reversely.
In some embodiments, the anchor rod automated construction apparatus further comprises:
the first one-way valve is arranged on the first grouting pipe so that the component A of the anchoring agent is injected into the anchor rod;
the second one-way valve is arranged on the second grouting pipe so that the component B of the anchoring agent is injected into the anchor rod;
the third one-way valve is arranged on the first slurry inlet pipe so that the component A of the anchoring agent enters the first plunger cavity; and
and the fourth one-way valve is arranged on the second slurry inlet pipe so that the B component of the anchoring agent enters the second plunger cavity.
In some embodiments, the anchor pump further comprises:
the oil inlet and outlet piece is fixed on one side of the integrated cylinder body and is provided with a first oil inlet and outlet and a second oil inlet and outlet so that hydraulic oil can enter and exit the piston cavity;
One end of the first oil inlet and outlet pipe is communicated with a rod cavity of the piston cavity, and the other end of the first oil inlet and outlet pipe is communicated with the first oil inlet and outlet port; and
and one end of the second oil inlet and outlet pipe is communicated with the rodless cavity of the piston cavity, and the other end of the second oil inlet and outlet pipe is communicated with the second oil inlet and outlet port.
In some embodiments, the first reversing valve has an oil inlet, a first working oil port, a second working oil port, and a drain port, the oil inlet is in communication with an oil source, the drain port is in communication with an oil tank, the first working oil port is in communication with the first oil inlet and outlet, and the second working oil port is in communication with the second oil inlet and outlet.
In some embodiments, the anchor rod automated construction apparatus further comprises:
the first balance valve is connected to an oil path between the support oil cylinder and the third reversing valve so as to maintain the extending or retracting state of the third piston rod of the support oil cylinder; and
and the second balance valve is connected to an oil path between the drilling oil cylinder and the second reversing valve so as to maintain the extending or retracting state of a second piston rod of the drilling oil cylinder.
In some embodiments, the anchor rod automated construction device further comprises an electrohydraulic proportional multi-way valve, the electrohydraulic proportional multi-way valve comprising:
a first oil inlet unit, which forms the second reversing valve,
a second oil inlet unit which forms the third reversing valve,
a third oil inlet unit forming the fourth reversing valve, an
The head unit and the tail unit are used for providing oil inlet and outlet channels and reversing signals for the first oil inlet unit, the second oil inlet unit and the third oil inlet unit;
the oil pressure sensor includes:
a first pressure sensor and a second pressure sensor, the first pressure sensor is arranged on one oil path between the support oil cylinder and the first balance valve, the second pressure sensor is arranged on the other oil path between the support oil cylinder and the first balance valve, so as to provide a pressure signal for the controller, thereby the controller controls the third reversing valve to reverse,
a third pressure sensor and a fourth pressure sensor, the third pressure sensor is arranged on one oil path between the drilling oil cylinder and the second balance valve, the fourth pressure sensor is arranged on the other oil path between the drilling oil cylinder and the second balance valve so as to provide a pressure signal for the controller, thereby the controller controls the second reversing valve to reverse, and
And a fifth pressure sensor provided on an oil path between the hydraulic motor and the fourth reversing valve to provide a pressure signal to the controller so that the controller controls the fourth reversing valve to reverse.
In some embodiments, the drilling carriage comprises a base plate and a support plate which are oppositely arranged in the left-right direction, the support plate is connected with a third piston rod of the support oil cylinder so as to support the roadway wall and guide the anchor rod, the base plate is used for positioning the drilling carriage, the laser ranging sensor is arranged on the base plate, and the laser ranging sensor is opposite to the drilling box in the left-right direction so as to measure the drilling distance and the drilling speed of the drilling box.
Drawings
Fig. 1 is a schematic flow chart of an automatic construction device for an anchor rod according to an embodiment of the present invention.
Fig. 2 is a schematic structural diagram of an automatic construction device for anchor rods according to an embodiment of the present invention.
Fig. 3 is a schematic front view of the drill boom.
Fig. 4 is a schematic front view of an anchor pump.
Fig. 5 is a schematic left-hand view of an anchor pump.
Fig. 6 is a schematic top view of an anchor pump.
Fig. 7 is a schematic perspective view of the drill box.
Fig. 8 is a schematic diagram of the front view of the drill box.
Fig. 9 is a schematic cross-sectional view of the drill box.
Fig. 10 is a partially enlarged view of fig. 9.
Fig. 11 is a schematic view of the construction of the anchor of fig. 7.
Fig. 12 is a schematic view of the second shaft of fig. 7 at an end remote from the anchor.
Fig. 13 is a front view of the check valve of fig. 9.
Fig. 14 is a sectional view A-A of fig. 13.
Fig. 15 is a top view of the check valve of fig. 9.
FIG. 16 is a schematic view of the structure of the rod body;
FIG. 17 is a schematic cross-sectional view of a rod body
Reference numerals:
an anchor pump 1000;
an integrated cylinder 100; a first plunger cavity 101; a second plunger chamber 102; a first inlet pipe 103; a first outlet tube 104; a second inlet pipe 105; a second outlet tube 106; a piston chamber 110; a rod cavity 111; a rodless cavity 112; a first piston rod 120; a sealing plug 121; a first connecting rod 122; a first plunger 130; a second connecting rod 131; a second plunger 140; a third connecting rod 141; a first guide seal cartridge 150; a second guide seal cartridge 160; a third guide seal cartridge 170; a cover plate 180; a screw 190;
a linkage 200; a first connection hole 201; a second connection hole 202; a third connection hole 203; a first nut 210; a second nut 220;
an oil inlet and outlet member 300; a first oil inlet/outlet 301; a second oil inlet and outlet port 302; a first oil inlet and outlet pipe 310; a second oil inlet and outlet pipe 320;
A first reversing valve 2100; an oil inlet 2110; a first working oil port 2120; a second working oil port 2130; an oil drain 2140; a speed valve 2200; a first relief valve 2300; second spill valve 2400;
a first grouting pipe 3100; a first check valve 3110; a second grouting pipe 3200; a second one-way valve 3210; a first slurry inlet pipe 3300; a third check valve 3310; a second slurry inlet tube 3400; fourth check valve 3410; a first storage tank 3500; a second storage tank 3600;
a drill frame 4000; a substrate 4100; support plate 4200;
a drill box 5000; hydraulic motor 5100; a water injection pipe 5200; anchor rod connecting tube 5300; a fifth pressure sensor 5400;
a seat 1; a base 1001; a mounting base 1002; a bearing 1003; a driver 2; a first transmission member 31; a second transmission member 32; a first seal 41; a second seal 42; a check valve 5; a valve chamber 50; a valve body 51; an inlet 511; an outlet 512; a spool 52; a spool body 521; a columnar connection segment 522; a ring magnet 53; a valve seat 54; a first end 55; a second end 56; a first stopper 57; a second limit portion 58; a magnet mounting plate 59; a rotation stopping frame 6; an elastic member 7; a baffle ring 8; an adjustment cylinder 801; an adjusting rack 802; a bolt 9; a stopper 91; a pretension nut 92; a center-aligning ball pad 93; a tray 94; a rod body 95; a first end 951; a second end 952; a third through hole 953; truncated cone hole section 9531; a first segment 954; a second segment 955; a drill 96; a mixer 97; a first shaft 10; a first end 11; a second end 12; a first through hole 13; a second shaft 20; a first end 21; a second end 22; a second through hole 23; a first portion 24; a second portion 25; a rotation stop block 26;
Support the cylinder 6000; a first balance valve 6100; a first pressure sensor 6200; a second pressure sensor 6300;
drilling oil cylinder 7000; a second balancing valve 7100; a third pressure sensor 7200; a fourth pressure sensor 7300;
electro-hydraulic proportional multi-way valve 8000; first 8100; a first oil inlet joint 8200; a second oil feed header 8300; a third oil feed header 8400; tail 8500.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings. The embodiments described below by referring to the drawings are illustrative and intended to explain the present invention and should not be construed as limiting the invention.
As shown in fig. 1 to 17, the automatic construction device for the anchor rod according to the embodiment of the invention comprises a drilling box 5000, a hydraulic cylinder, a signal detector, a drilling frame and a controller, wherein the drilling box 5000, the hydraulic cylinder and the signal detector are all arranged on the drilling frame.
As shown in fig. 1-3, the hydraulic ram includes a support ram 6000 and a drilling ram 7000.
The support cylinder 6000 is used for supporting the roadway wall and guiding the anchor rod. Drilling cylinder 7000 is used to drive drill box 5000 to move in a direction toward or away from the roadway wall. That is, the supporting cylinder 6000 is supported to the roadway wall, the drilling box 5000 drives the anchor rod to rotate, and the drilling cylinder 7000 drives the drilling box 5000 to drill.
As shown in fig. 1, the signal detector includes at least one of an oil pressure sensor and a laser ranging sensor, and is used to detect a drilling state of the drill box 5000. The controller can receive feedback signals from the signal detector and is used to control the operating state of the drilling cylinder 7000.
Therefore, the automatic construction device for the anchor rod can control the drill box 5000 to actively drill and retract.
As shown in fig. 7-17, the drill box 5000 includes a base 1, a driver 2, a first shaft 10, a second shaft 20, and a rock bolt 9.
The first shaft 10 is rotatably mounted on the base 1, the first shaft 10 having a first end 11 and a second end 12 opposite to each other in the axial direction thereof, the first shaft 10 being provided with a first through hole 13 penetrating therethrough in the axial direction thereof.
The driver 2 is connected to the first shaft 10 to drive the first shaft 10 to rotate, and the driver is a hydraulic tank.
The second shaft 20 is movably inserted in the first through hole 13 in the axial direction thereof, and the second shaft 20 has an initial position adjacent to the first end 11 of the first shaft 10. At least a part of the second shaft 20 is in sealing fit with the first through hole 13, a plurality of second through holes 23 penetrating along the axial direction of the second shaft 20 are arranged on the second shaft 20, the plurality of second through holes 23 are arranged at intervals, and a check valve 5 is arranged in each second through hole 23.
The anchor rod 9 includes a rod body 95, a drill 96, a pretension nut 92 and a stopper 91. The rod 95 is coaxial with the first shaft 10. The rod body 95 is provided with a third through hole 953 penetrating in the axial direction thereof, and the third through hole 953 can communicate with each of the second through holes 23.
The rod 95 is spaced apart from the second shaft 20 in the axial direction thereof, the rod 95 being disposed adjacent to the first end 11 of the first shaft 10 with respect to the second shaft 20 in the axial direction thereof, and the stopper 91 being located between the pretension nut 92 and the second shaft 20 in the axial direction of the rod 95.
The outer circumferential surface of the rod body 95 is provided with external threads, and the pre-tightening nut 92 is in threaded fit on the rod body 95 and is in sealing connection with the first shaft 10. The stopper 91 is movably provided in the first through hole 13 in the axial direction of the first shaft 10 and is connected to the rod body 95. Each of the pretension nut 92 and the stopper 91 has a first face and a second face that are opposed in the axial direction of the anchor rod 9. When the first shaft 10 drives the pretension nut 92 to rotate along the first direction, the first surface of the limiting block 91 abuts against the second surface of the pretension nut 92, so that the pretension nut 92 drives the rod body 95 to rotate along the first direction. When the first shaft 10 drives the pretension nut 92 to rotate in a second direction opposite to the first direction, the pretension nut 92 applies a pretension force to the rod body 95 back to the first end 11 of the first shaft 10, and the stopper 91 can push the second shaft 20 to move the second shaft 20 back to the first end 11 of the first shaft 10.
The process of the anchor rod supporting operation of the drill box is as follows:
first, the driver 2 is used to drive the first shaft 10 to rotate in a first direction, the pretension nut 92 is driven to rotate in the first direction by the first shaft 10, and the pretension nut 92 is used to drive the rod body 95 to rotate in the first direction, so that drilling is performed by the drill 96 of the anchor rod 9. During the drilling process, high pressure water is introduced into at least one second through hole 23 of the second shaft 20, which water enters the third through hole 953 through the check valve 5 and flows out from the drill bit 96 to discharge the cinder. The high-pressure water does not flow out due to the seal between the second shaft 20 and the first through hole 13 and the seal between the anchor rod 9 and the first through hole 13.
After the drilling is completed, the driver 2 stops rotating, and simultaneously, the high-pressure water is stopped from flowing into the second through hole 23. Into the at least one second through hole 23, an anchoring agent is led, which via the non-return valve 5 enters into the third through hole 953 and finally into the third through hole 953 of the shank 95 of the anchor rod 9 and the gap between the shank 95 and the surrounding rock. The anchoring agent does not flow out due to the seal between the second shaft 20 and the first through hole 13 and the seal between the anchor rod 9 and the first through hole 13. After a predetermined amount of anchoring agent is introduced into the borehole through the third through hole 953, the introduction of the anchoring agent into the third through hole 953 is stopped.
Finally, after the anchoring agent in the drilled hole is solidified, the driver 2 is used for driving the first shaft 10 to rotate along the second direction, and the first shaft 10 is used for driving the pre-tightening nut 92 to rotate along the second direction, so that the pre-tightening nut 92 applies pre-tightening tension to the rod body 95 back to the first end 11 of the first shaft 10, and pre-tightening of the anchor rod 9 is realized. During the pre-tightening process, each of the rod body 95 and the limiting block 91 moves towards the first end 11 of the first shaft 10, and the limiting block 91 can push the second shaft 20 to move away from the first end 11 of the first shaft 10, so that the second shaft 20 does not influence the pre-tightening of the anchor rod 9.
Therefore, drilling, anchoring and pre-tightening operations in the anchor rod supporting operation can be realized by utilizing the drilling box, a drill rod is not required to be disassembled in the operation process, and switching of different tools is not required. Compared with the anchor bolt supporting operation in the related art, the method not only effectively shortens the operation time and improves the anchor bolt supporting operation efficiency, but also reduces the labor intensity of workers.
When the anchoring agent is injected into the borehole through the second through hole 23, the anchoring agent flows into the borehole through the second through hole 23, the check valve 5, the first through hole 13 and the third through hole 953 in this order. According to the multifunctional anchor bolt support construction device 1000 provided by the embodiment of the invention, the second shaft 20 is utilized to move along the axial direction of the second shaft, and the initial position of the second shaft 20 can be arranged closer to the anchor bolt 9, so that the amount of anchoring agent in the first through hole 13 can be reduced, and the amount of the anchoring agent is saved; and the thickness of the anchoring agent in the first through hole 13 can be reduced, so that the first through hole 13 is prevented from being blocked by the anchoring agent solidified in the first through hole 13 after the anchoring agent is solidified, and the next operation of the multifunctional anchor bolt support construction device 1000 is prevented from being influenced.
Therefore, the automatic construction device for the anchor rod has the advantages of automatic pre-tightening, automatic anchoring and anchor rod supporting operation efficiency and low labor intensity.
According to the automatic construction device for the anchor rod, disclosed by the embodiment of the invention, the drilling box can be used for automatically pre-tightening the anchor rod, the anchor rod can be used for anchoring and injecting, and the support oil cylinder and the drilling machine oil cylinder can be used for actively drilling, so that the automatic construction device for the anchor rod has the advantages of high automation degree, high anchor rod supporting operation efficiency and low labor intensity of workers.
In some embodiments, as shown in fig. 16 and 17, the anchor rod further includes a flow mixer for mixing the anchoring agent. The rod body comprises a first section 954 and a second section 955, the first section 954 is adjacent to the second shaft in the axial direction of the rod body, the second section 955 is far away from the second shaft in the axial direction of the rod body, the external thread is arranged on the outer circumferential surface of the first section 954, and the second section 955 is provided with a spiral transverse rib. The mixer is disposed in a portion of the third through-hole corresponding to the first section 954, and the mixer includes a central shaft and a helical blade that are fixedly connected together, the central shaft and the rod are coaxially disposed, and the helical blade is disposed around the central shaft.
According to the automatic construction device for the anchor rod, disclosed by the embodiment of the invention, the spiral transverse rib is beneficial to drilling of the anchor rod, and the swirler can mix anchoring agents, so that the automatic construction device for the anchor rod has the advantages of high drilling efficiency and good anchoring effect.
In some embodiments, as shown in fig. 1-6, the anchor rod automatic construction device of the embodiment of the invention further comprises a water delivery device, an anchor injection pump and a slurry delivery device.
As shown in fig. 2, the water delivery device includes a water injection pipe 5200. Be equipped with electromagnetic water ball valve on the water injection pipe 5200, the one end of water injection pipe 5200 links to each other with the water tank, and the other end of water injection pipe 5200 passes through anchor rod connecting pipe 5300 with the stock and links to each other. Therefore, the water injection pipe 5200 can cool down and slag the anchor rod when the anchor rod is drilled, and safety and reliability are improved.
As shown in fig. 1 and 2, the slurry feeding device includes a first reversing valve 2100, a first storage tank 3500, a second storage tank 3600, a first slurry feed pipe 3300, a first slurry feed pipe 3100, a second slurry feed pipe 3400, and a second slurry feed pipe 3200.
As shown in fig. 1, a first reversing valve 2100 is used to control the up and down movement of the first piston rod 120, a first storage tank 3500 is used to store an anchor a component, and a second storage tank 3600 is used to store an anchor B component.
One end of the first grout pipe 3300 is connected with the first storage tank 3500, the other end of the first grout pipe 3300 is connected with the first inlet pipe, one end of the first grout pipe 3100 is connected with the first outlet pipe, and the other end of the first grout pipe 3100 is connected with one of the plurality of second through holes, so that the anchoring agent A component in the first storage tank 3500 is injected into the anchor rod through the first plunger cavity, and the anchoring agent A component is suitable for being injected into the anchor rod hole of the roadway through the anchor rod.
One end of the second grout pipe 3400 is connected with the second storage tank 3600, the other end of the second grout pipe 3400 is connected with the second inlet pipe, one end of the second grout pipe 3200 is connected with the second outlet pipe, and the other end of the second grout pipe 3200 is connected with the other one of the plurality of second through holes so as to inject the anchoring agent B component in the second storage tank 3600 into the anchor rod through the second plunger cavity, thereby being suitable for being injected into a roadway anchor rod hole through the anchor rod.
It will be appreciated that a roadway bolt hole is a hole drilled in the roadway wall by the bolt 9 through the drill bit 96.
As shown in fig. 4-6, the bolstering pump 1000 includes an integrated cylinder 100, a first plunger 130, a second plunger 140, a linkage 200, and a first piston rod 120.
As shown in fig. 4, the integrated cylinder 100 has a piston chamber 110, a first plunger chamber 101, a second plunger chamber 102, a first inlet pipe 103, a first outlet pipe 104, a second inlet pipe 105, and a second outlet pipe 106, each of the first inlet pipe 103 and the first outlet pipe 104 communicating with the bottom of the first plunger chamber 101, each of the second inlet pipe 105 and the second outlet pipe 106 communicating with the bottom of the second plunger chamber 102, the first plunger chamber 101 and the second plunger chamber 102 being arranged at intervals in the left-right direction.
The piston chamber 110 is located between the first plunger chamber 101 and the second plunger chamber 102 in the left-right direction, and the first plunger chamber 101 and the second plunger chamber 102 are bilaterally symmetrical about the center line of the piston chamber 110.
The first inlet pipe 103 and the first outlet pipe 104 are disposed opposite to each other in the left-right direction, and the second inlet pipe 105 and the second outlet pipe 106 are disposed opposite to each other in the left-right direction.
At least a portion of the first plunger 130 extends into the first plunger cavity 101 and the first plunger is movable in an up-down direction relative to the integrated cylinder 100 such that the anchoring agent enters the bottom of the first plunger cavity 101 from the first inlet tube 103 and exits from the first outlet tube 104.
At least a portion of the second plunger 140 protrudes into the second plunger chamber 102 and the second plunger is movable in an up-down direction relative to the integrated cylinder 100 so that the anchoring agent enters the bottom of the second plunger chamber 102 from the second inlet tube 105 and is discharged from the second outlet tube 106.
It will be appreciated that the first inlet tube 103, the first outlet tube 104, the second inlet tube 105 and the second outlet tube 106 may each be provided with a one-way valve to control the passage of one anchoring agent from the first inlet tube 103 into the bottom of the first plunger cavity 101 and out of the first outlet tube 104, and the passage of the other anchoring agent from the second inlet tube 105 into the bottom of the second plunger cavity 102 and out of the second outlet tube 106.
Specifically, as shown in fig. 1, the anchor rod automation construction device according to the embodiment of the present invention includes a first check valve 3110, a second check valve 3210, a third check valve 3310, and a fourth check valve 3410.
A first one-way valve 3110 is provided on the first grouting pipe 3100 for injection of the anchoring agent a component into the bolt. A second one-way valve 3210 is provided on the second grouting pipe 3200 so that the anchor B component is injected into the bolt. A third check valve 3310 is provided on the first feed tube 3300 for the passage of the anchoring agent a component into the first plunger cavity. A fourth one-way valve 3410 is provided on the second slurry inlet tube 3400 for the anchor B-component to enter the second plunger cavity.
The linkage 200 is located above the integrated cylinder 100, each of the first piston rod 120, the first plunger 130 and the second plunger 140 is connected to the linkage 200, at least part of the first piston rod 120 is located in the piston chamber 110, and the first piston rod 120 can move up and down relative to the integrated cylinder 100 under the driving of hydraulic oil flowing into and out of the piston chamber 110 so as to drive the linkage 200 to move up and down, thereby driving each of the first plunger 130 and the second plunger 140 to move up and down.
According to the automatic construction device for the anchor rod, provided by the embodiment of the invention, the first piston rod of the anchor injection pump 1000 drives the first plunger piston and the second plunger piston to move up and down under the control of the first reversing valve 2100, so that the A component and the B component of the anchoring agent can be pumped at the same time, and the volume ratio of the A component to the B component is 1:1.
The first piston rod, the first plunger and the second plunger are integrated on the integrated cylinder body, the size of the anchor injection pump 1000 is reduced, the first piston rod is driven by hydraulic oil and is not affected by air pressure, and the anchor injection pump is simple in structure, convenient to use, and low in manufacturing and maintenance cost.
In addition, the anchor rod automatic construction device provided by the embodiment of the invention can utilize the mixer 97 in the anchor rod to uniformly mix the component A and the component B of the anchoring agent in a ratio of 1:1, so that the component A and the component B of the anchoring agent are strictly injected into the anchor rod hole of the roadway according to the ratio of 1:1, and the anchoring effect can be improved.
Therefore, the anchor pump 1000 has the advantages of good anchor effect, high integration degree, simple structure, small volume and low cost.
As shown in fig. 4 to 6, the lower end of the first piston rod 120 of the anchoring pump 1000 is a sealing plug 121 extending into the piston chamber 110, the upper end of the first piston rod 120 is a first connecting rod 122 connected to the linkage 200, the upper end of the first plunger 130 is a second connecting rod 131 connected to the linkage 200, and the upper end of the second plunger 140 is a third connecting rod 141 connected to the linkage 200.
As shown in fig. 4, the linkage member 200 includes a first connection hole 201, a second connection hole 202, and a third connection hole 203.
The first connecting rod 122 extends into the first connecting hole 201 to connect with the linkage 200, and the length of the first connecting rod 122 extending into the first connecting hole 201 is adjustable.
Specifically, the first connecting rod 122 is a threaded rod, and the first connecting hole 201 is a threaded hole matched with the threaded rod so as to adjust the length of the second connecting rod 131 extending into the second connecting hole 202.
The second connection rod 131 protrudes into the second connection hole 202 to be connected with the linkage member 200. Specifically, the second connecting rod 131 passes through the second connecting hole 202, and the upper end of the second connecting rod 131 is provided with external threads and is matched with the first nut 210, the lower end of the second connecting rod 131 is provided with a first limiting part, the first nut 210 is located above the linkage member 200 and is stopped against the upper surface of the linkage member 200, and the first limiting part is located below the linkage member 200 and is stopped against the lower surface of the linkage member 200, so as to limit the length of the second connecting rod 131 extending into the second connecting hole 202.
The third connection rod 141 protrudes into the third connection hole 203 to be connected with the linkage member 200. Specifically, the third connecting rod 141 passes through the third connecting hole 203, and the upper end of the third connecting rod 141 is provided with an external thread and is matched with the second nut 220, the lower end of the third connecting rod 141 is provided with a second limiting portion, the second nut 220 is located above the linkage member 200 and is stopped against the upper surface of the linkage member 200, and the second limiting portion is located below the linkage member 200 and is stopped against the lower surface of the linkage member 200, so as to limit the length of the third connecting rod 141 extending into the third connecting hole 203.
According to the automatic construction device for the anchor rod of the embodiment of the invention, the length of the first connecting rod 122 of the anchor pump 1000 extending into the first connecting hole 201 is adjustable, that is, the height of the linkage member 200 relative to the first piston rod 120 can be adjusted, and the relative heights of the linkage member 200, the first plunger 130 and the second plunger 140 are unchanged. So that the strokes of the first plunger 130 and the second plunger 140 can be adjusted during one reciprocating stroke of the first plunger rod 120, thereby adjusting the volume of anchoring agent pumped by the anchoring pump 1000 of the embodiment of the present invention during one reciprocating stroke of the first plunger rod 120.
For example, as shown in fig. 4, the first piston rod 120 is kept stationary, and the length of the first connecting rod 122 extending into the first connecting hole 201, that is, the height of the linkage 200, is reduced, so that the first plunger 130 and the second plunger 140 are driven to move upwards, and a space is reserved at the bottoms of the first plunger cavity 101 and the second plunger cavity 102, and at this time, the sealing plug 121 of the first piston rod 120 is located at the lowest part of the piston cavity 110. When the first piston rod 120 works, the first plunger 130 and the second plunger 140 move up and down, the reserved space is always reserved, and the strokes of the first plunger and the second plunger are reduced, so that the volume of the anchoring agent pumped by the anchoring pump 1000 in the embodiment of the invention is reduced in one reciprocating stroke of the first piston rod 120.
As shown in fig. 4, the anchor pump 1000 further includes a first steering seal cartridge 150, a second steering seal cartridge 160, a third steering seal cartridge 170, and a cover plate 180.
The first guide sealing sleeve 150 is positioned in the piston chamber 110 and is provided at an upper portion of the piston chamber 110 so as to block the upper portion of the piston chamber 110, and the first piston rod 120 passes through the first guide sealing sleeve 150.
The second guide sealing sleeve 160 is located in the first plunger chamber 101 and is provided at an upper portion of the first plunger chamber 101 so as to seal off the upper portion of the first plunger chamber 101, and the first plunger passes through the second guide sealing sleeve 160.
A third guide gland 170 is located within the second plunger chamber 102 and is disposed in an upper portion of the second plunger chamber 102 so as to block the upper portion of the second plunger chamber 102, the second plunger passing through the third guide gland 170.
The cover plate 180 is disposed at the upper end of the integrated cylinder 100, and the cover plate 180 is fixedly connected with the integrated cylinder 100 through screws so as to limit the first guide sealing sleeve 150, the second guide sealing sleeve 160 and the third guide sealing sleeve.
According to the automatic construction device for the anchor rod, disclosed by the embodiment of the invention, the first guide sealing sleeve 150 of the anchor injection pump 1000 can avoid hydraulic oil leakage, the second guide sealing sleeve 160 can avoid anchoring agent leakage in the first plunger cavity 101, the third guide sleeve can avoid anchoring agent leakage in the second plunger cavity 102, and the cover plate 180 can limit the first guide sealing sleeve 150, the second guide sealing sleeve 160 and the third limit sealing sleeve.
In some embodiments, as shown in fig. 5 and 6, the anchor pump 1000 of the embodiment of the present invention further includes an oil inlet and outlet member 300, a first oil inlet and outlet pipe 310, and a second oil inlet and outlet pipe 320.
The oil inlet and outlet member 300 is fixed to one side of the integrated cylinder 100, and the oil inlet and outlet member 300 has a first oil inlet and outlet port 301 and a second oil inlet and outlet port 302. One end of the first oil inlet and outlet pipe 310 is communicated with the rod cavity 111 of the piston cavity 110, the other end of the first oil inlet and outlet pipe 310 is communicated with the first oil inlet and outlet port 301, one end of the second oil inlet and outlet pipe 320 is communicated with the rodless cavity 112 of the piston cavity 110, and the other end of the second oil inlet and outlet pipe 320 is communicated with the second oil inlet and outlet port 302 so that hydraulic oil can enter and exit the piston cavity 110.
The anchor injection pump 1000 uses a hydraulic system to replace a pneumatic system to drive the first plunger 130 and the second plunger 140 to work, is not influenced by the air pressure, and has a simple structure and is convenient to control.
In some embodiments, as shown in fig. 2, the anchor rod automated construction device of the embodiment of the present invention further includes a second reversing valve, a third reversing valve, and a fourth reversing valve. The second reversing valve is used to control the extension or retraction of the second piston rod of the drilling cylinder 7000. The third reversing valve is used for controlling the extension or retraction of a third piston rod of the support cylinder 6000. The fourth reversing valve is used to control the hydraulic motor 5100 to either forward or reverse.
In some embodiments, as shown in fig. 1, the first diverter valve 2100 has an oil inlet 2110, a first working port 2120, a second working port 2130, and a drain port 2140. The oil inlet 2110 communicates with the oil source P, the oil drain 2140 communicates with the oil tank T, the first working port 2120 communicates with the first oil inlet/outlet port 301, and the second working port 2130 communicates with the second oil inlet/outlet port 302. Thereby, the first direction valve 2100 can control the up-and-down movement of the first piston rod 120.
As shown in fig. 1, a speed regulating valve 2200 is arranged on an oil path between the oil inlet 2110 and the oil source P, a first overflow valve 2300 is arranged on an oil path between the first working oil port 2120 and the first oil inlet/outlet 301, and a second overflow valve 2400 is arranged on an oil path between the second working oil port 2130 and the second oil inlet/outlet 302.
The speed valve 2200 can define the flow and pressure of hydraulic oil entering the oil inlet 2110 to be constant, which is beneficial to the working stability of the first reversing valve 2100 and the anchor pump 1000.
First overflow valve 2300 and second overflow valve 2400 can avoid the pressure in the piston chamber of anchor pump 1000 too big, can protect anchor pump 1000, improves security and stability.
In some embodiments, as shown in fig. 2, the anchor rod automated construction apparatus of an embodiment of the present invention further includes a first balance valve 6100 and a second balance valve 7100. The first balance valve 6100 is connected to an oil passage between the support cylinder 6000 and the third reversing valve so as to maintain the extended or retracted state of the third piston rod of the support cylinder 6000. The second balance valve 7100 is connected to an oil path between the drilling cylinder 7000 and the second direction valve so as to maintain the extended or retracted state of the second piston rod of the drilling cylinder 7000.
In some embodiments, as shown in fig. 2, the anchor rod automation construction device of the embodiment of the present invention further includes an electrohydraulic proportional multi-way valve, where the electrohydraulic proportional multi-way valve includes a first oil inlet line 8200, a second oil inlet line 8300, a third oil inlet line 8400, a head line 8100, and a tail line 8500.
The first oil feed line 8200 forms a second reversing valve, the second oil feed line 8300 forms a third reversing valve, and the third oil feed line 8400 forms a fourth reversing valve. The head unit 8100 and the tail unit 8500 are used for providing oil inlet and outlet channels and reversing signals for the first oil inlet unit 8200, the second oil inlet unit 8300 and the third oil inlet unit 8400.
As shown in fig. 2, the oil pressure sensor includes a first pressure sensor 6200, a second pressure sensor 6300, a third pressure sensor 7200, a fourth pressure sensor 7300, and a fifth pressure sensor 5400.
The first pressure sensor 6200 is provided on one oil path between the support cylinder 6000 and the first balance valve 6100, and the second pressure sensor 6300 is provided on the other oil path between the support cylinder 6000 and the first balance valve 6100 to supply the second proportional valve 9000 with a pressure signal to control the third directional valve.
A third pressure sensor 7200 is provided on one oil path between the drilling cylinder 7000 and the second balance valve 7100, and a fourth pressure sensor 7300 is provided on the other oil path between the drilling cylinder 7000 and the second balance valve 7100 to provide a pressure signal to the second proportional valve 9000 to control the second reversing valve.
A fifth pressure sensor 5400 is provided on an oil line between the hydraulic motor 5100 and the fourth directional valve to provide a pressure signal to the second proportional valve 9000 to control the fourth directional valve.
It is understood that the electro-hydraulic proportional multi-way valve is connected with the oil source and the unloading oil tank. In addition, the specific structure of the electro-hydraulic proportional multi-way valve is well known to those skilled in the art, and will not be described in detail
In some embodiments, as shown in fig. 3, the drill stand includes a base plate and a support plate disposed opposite in a left-right direction. The support plate is connected with a third piston rod of the support cylinder 6000 so as to support the roadway wall and guide the anchor rod. The base plate is used for locating the drilling carriage, the laser ranging sensor is arranged on the base plate, and the laser ranging sensor is opposite to the drilling box in the left-right direction so as to measure the drilling distance and the drilling speed of the drilling box.
It can be understood that the distance of the drilling box is no longer changed when the laser ranging sensor detects that the drilling box is drilled, that is to say, the speed is zero, the drilling box is drilled to the limit position, and the drilling box is controlled to stop drilling or retract. Or the laser ranging sensor detects that the speed of the distance change of the drilling box in drilling is smaller than the normal speed, that is, the drilling speed of the drilling box is smaller than the normal speed, so that the hydraulic oil way is leaked or blocked, and the machine is stopped immediately for maintenance.
The structure of the drill box 5000 and its operation will be described in detail with reference to fig. 7 to 15 as an example.
The drill box 5000 includes a base 1, a driver 2, a first shaft 10, a second shaft 20 and a bolt 9.
The first shaft 10 is rotatably mounted on the base 1, the first shaft 10 having a first end 11 and a second end 12 opposite to each other in the axial direction thereof, the first shaft 10 being provided with a first through hole 13 penetrating therethrough in the axial direction thereof.
Specifically, as shown in fig. 7 to 10, the axial direction of the first shaft 10 is consistent with the left-right direction, the base 1 includes a base 1001 and a mount 1002, the mount 1002 is connected to the right end of the base 1001, a mounting hole is provided in the mount 1002, a first end 11 (right end) of the first shaft 10 is mounted in the mounting hole through a bearing 1003, and a second end 12 (left end) of the first shaft 10 is overhanging. Wherein the first shaft 10, the bearing 1003 and the mounting hole are all coaxially arranged. The left-right direction is shown by arrow B in fig. 2.
The driver 2 is connected to the first shaft 10 for driving the first shaft 10 in rotation, and the driver 2 is a hydraulic motor.
As shown in fig. 8 and 9, the drill box 5000 further includes a first transmission member 31 and a second transmission member 32, the first transmission member 31 is connected to the first shaft 10, the first transmission member 31 is connected to the driver 2, and the second transmission member 32 is connected to the second transmission member 32. Thereby, the connection of the drive 2 to the first shaft is facilitated by means of the first transmission member 31 and the second transmission member 32.
Preferably, each of the first and second transmission members 31 and 32 is a gear, and the first and second transmission members 31 and 32 are engaged.
The second shaft 20 is movably inserted in the first through hole 13 along the axial direction thereof, the second shaft 20 has an initial position adjacent to the first end 11 of the first shaft 10, at least a portion of the second shaft 20 is in sealing engagement with the first through hole 13, a plurality of second through holes 23 penetrating along the axial direction thereof are provided on the second shaft 20, the plurality of second through holes 23 are arranged at intervals, and a check valve 5 is provided in each of the second through holes 23.
Specifically, as shown in fig. 8, the second shaft 20 has a first end 21 and a second end 22 opposite to each other in the axial direction thereof, and the first end 21 of the second shaft 20 is disposed adjacent to the first end 11 of the first shaft 10 opposite to the second end 22 of the second shaft 20 in the axial direction thereof.
Preferably, as shown in fig. 11, three second through holes 23 of the second shaft 20 are provided, wherein one second through hole 23 is filled with high-pressure water, and the other two second through holes 23 are filled with the anchoring agent and the B component.
As shown in fig. 9 and 10, the drill box 5000 further includes a first seal 41, a first seal ring groove is provided on an outer peripheral surface of the second shaft 20, the first seal 41 is mounted in the first seal ring groove, and an outer peripheral surface of the first seal 41 is fitted to an inner peripheral surface of the first through hole 13.
Preferably, as shown in fig. 9 and 10, a first seal ring groove is provided adjacent the first end 21 of the second shaft 20. Thereby, the amount of the anchoring agent in the first through hole 13 can be further reduced, thereby further saving the amount of the anchoring agent.
As shown in fig. 7-9, the drill case 5000 further includes a return elastic member 7, the return elastic member 7 being installed between the base 1 and the second shaft 20 such that the return elastic member 7 provides a return elastic force to the second shaft 20 toward the first end 11 of the first shaft 10.
Thereby, after the anchor rod 9 is pre-tensioned, the second shaft 20 can return to the initial position under the action of the reset elastic member 7, so that the multifunctional anchor bolt supporting construction device 1000 performs the next working cycle, thereby being beneficial to further improving the anchor bolt supporting working efficiency of the multifunctional anchor bolt supporting construction device 1000.
It will be appreciated that the return spring 7 may not be provided, and the second shaft 20 may be manually returned to the initial position.
Preferably, as shown in fig. 9 and 10, the second shaft 20 includes a first portion 24 and a second portion 25, the first portion 24 is sealingly inserted into the first through hole 13, the second portion 25 protrudes out of the first through hole 13, one of the outer peripheral surface of the second portion 25 and the base 1 is provided with a rotation stop block 26, the other of the outer peripheral surface of the second portion 25 and the base 1 is provided with a rotation stop groove, the rotation stop block 26 is inserted into the rotation stop groove, and the return elastic member 7 is provided on the second portion 25.
For example, the drill box 5000 further includes a rotation stopping frame 6, the rotation stopping frame 6 is connected to the base 1, one of the outer peripheral surface of the second portion 25 and the base 1 is provided with a rotation stopping block 26, and the other of the outer peripheral surface of the second portion 25 and the base 1 is provided with a rotation stopping groove in which the rotation stopping block 26 is inserted. Of course, in other embodiments, the anti-rotation rack 6 may also be formed by a portion of the base 1.
Thereby, the second shaft 20 is conveniently mounted on the base 1 using the rotation stop block 26 and the rotation stop groove.
The second shaft 20 may also be located entirely within the first through hole 13, and the rotation stopping frame 6 is disposed on the base 1, the rotation stopping frame 6 extends into the first through hole 13, one of the second end 22 of the second shaft 20 and the rotation stopping frame 6 is provided with a rotation stopping block 26, and the other of the second end 22 of the second shaft 20 and the rotation stopping frame 6 is provided with a rotation stopping groove, and the rotation stopping block 26 is inserted into the rotation stopping groove.
Preferably, as shown in fig. 9, the anti-rotation block 26 is a spline and the anti-rotation groove is a spline groove.
Preferably, the drill box 5000 further includes a stop ring 8, the stop ring 8 is connected to the base 1, the stop ring 8 is spaced from the rotation stop block 26 in the axial direction of the second shaft 20, the stop ring 8 is sleeved on the second portion 25, the reset elastic member 7 is a compression spring, the rotation stop block 26 is provided on the outer peripheral surface of the second portion 25, and the compression spring is press-fitted between the rotation stop block 26 and the stop ring 8. Thereby, the installation of the return elastic member 7 is facilitated. The position of the baffle ring 8 in the axial direction of the second shaft 20 is adjustable so as to adjust the pretightening force of the compression spring.
Preferably, the drilling box 5000 further comprises an adjusting cylinder 801, the adjusting cylinder 801 is sleeved on the second portion 25, the adjusting cylinder 801 is connected with the base 1, external threads are arranged on the outer peripheral surface of the adjusting cylinder 801, and the baffle ring 8 is an adjusting nut matched with the adjusting cylinder 801. Thereby, the position adjustment of the retainer ring 8 is conveniently realized.
For example, the drill box 5000 further comprises an adjusting frame 802, the adjusting frame 802 is connected with the base 1, the adjusting cylinder 801 is connected with the adjusting frame 802, and the baffle ring 8 is matched with the adjusting cylinder 801. The distance between the stop ring 8 and the rotation stop block 26 can be adjusted by rotating the stop ring 8, so that the pretightening force of the pressure spring can be adjusted.
As shown in fig. 11, the anchor rod 9 includes a rod body 95, a drill 96, a pretension nut 92, and a stopper 91. The rod 95 is coaxial with the first shaft 10. The rod body 95 is provided with a third through hole 953 penetrating in the axial direction thereof, and the third through hole 953 can communicate with each of the second through holes 23. The third through-hole 953 and each of the second through-holes 23 can communicate through the check valve 5 means that: the third through-hole 953 communicates with the second through-hole 23 when the check valve 5 is opened under fluid pressure, and the third through-hole 953 does not communicate with the second through-hole 23 when the check valve 5 is closed.
Preferably, the third through hole 953 includes a frustoconical section 9531, the frustoconical section 9531 being provided at an end of the shaft body 95 adjacent the second shaft 20.
The rod 95 is spaced apart from the second shaft 20 in the axial direction thereof, the rod 95 being disposed adjacent to the first end 11 of the first shaft 10 with respect to the second shaft 20 in the axial direction thereof, and the stopper 91 being located between the pretension nut 92 and the second shaft 20 in the axial direction of the rod 95. The outer circumferential surface of the rod body 95 is provided with external threads, and the pre-tightening nut 92 is in threaded fit on the rod body 95 and is in sealing connection with the first shaft 10.
As shown in fig. 9 and 10, the drill box 5000 further includes a second seal member 42, a second seal ring groove is provided on an inner peripheral surface of the first through hole 13, the second seal member 42 is mounted in the second seal ring groove, and an inner peripheral surface of the second seal member 42 is bonded to an outer peripheral surface of the pretension nut 92.
The stopper 91 is movably provided in the first through hole 13 in the axial direction of the first shaft 10 and is connected to the rod body 95. Each of the pretension nut 92 and the stopper 91 has a first face and a second face that are opposed in the axial direction of the anchor rod 9. When the first shaft 10 drives the pretension nut 92 to rotate along the first direction, the first surface of the limiting block 91 abuts against the second surface of the pretension nut 92, so that the pretension nut 92 drives the rod body 95 to rotate along the first direction. When the first shaft 10 drives the pretension nut 92 to rotate in a second direction opposite to the first direction, the pretension nut 92 applies a pretension force to the rod body 95 back to the first end 11 of the first shaft 10, and the stopper 91 can push the second shaft 20 to move the second shaft 20 back to the first end 11 of the first shaft 10.
The limiting block 91 being capable of pushing the second shaft 20 so that the second shaft 20 moves away from the first end 11 of the first shaft 10 means that: when the first driving shaft drives the pre-tightening nut 92 to rotate along the first direction, the limiting block 91 does not move along the axial direction of the first shaft 10, and at this time, the limiting block 91 does not push the second shaft 20 to enable the second shaft 20 to move back to the first end 11; when the first driving shaft drives the pretension nut 92 to rotate along the second direction, the pretension nut 92 applies pretension force to the rod body 95, the pretension nut 92 moves opposite to the rod body 95 and the second end 12 of the first shaft 10, correspondingly, the stopper 91 and the rod body 95 move opposite to the first end 11 of the first shaft 10, and in the process that the stopper 91 moves opposite to the first end 11 of the first shaft 10, the stopper 91 can push the second shaft 20 to move opposite to the first end 11 of the first shaft 10.
The anchor 9 further includes a centering ball pad 93 and a tray 94, each of the centering ball pad 93 and the tray 94 being provided with a through hole through which the rod body 95 passes, the tray 94 being abutted against the centering ball pad 93. The tray 94 is used for being attached to surrounding rock, and the aligning ball pad 93 is used for adjusting the positioning direction of the tray 94. The pre-tightening nut 92 is used for continuously pressing the tray 94 to pre-tighten the anchor rod 9.
Specifically, the rod 95 includes a first end 951 and a second end 952 that are opposite in the axial direction thereof, the second end 952 of the rod 95 is disposed adjacent to the second shaft 20 opposite to the first end 951 of the rod 95 in the axial direction thereof, the drill 96 is disposed on the first end 951 of the rod 95, and the tray 94, the centering ball pad 93, the pretension nut 92, and the stopper 91 are disposed adjacent to the second end 952 of the rod 95.
The limiting block 91 may be a limiting nut, the limiting block 91 is in threaded fit on the rod body 95, when the pre-tightening nut 92 rotates along the first direction, the first surface of the pre-tightening nut 92 abuts against the second surface of the limiting block 91, and the rotation moment applied by the pre-tightening nut 92 to the limiting block 91 is smaller than the rotation moment required by rotation of the limiting block 91 relative to the rod body 95, so that the limiting block 91 can be limited to the movement of the pre-tightening nut 92 towards the second end 952 of the rod body 95, and the pre-tightening nut 92 drives the rod body 95 to rotate along the axial direction.
As shown in fig. 7 to 9, the check valve 5 includes a valve body 51, a valve body 52, and a ring magnet 53.
The valve body 51 has a valve chamber 50, an inlet 511 and an outlet 512 communicating with the valve chamber 50, the valve chamber 50 extending in the axial direction of the valve body 51, the inlet 511 and the outlet 512 being provided at both axial ends of the valve body 51, respectively, and a valve seat 54 being provided in the valve chamber 50.
The spool 52 is movably installed in the valve chamber 50 in the axial direction of the valve body 51, and the spool 52 has a first position disposed adjacent to the inlet 511 and a second position disposed adjacent to the outlet 512. Wherein when the valve element 52 is in the first position, the valve element 52 is stopped against the valve seat 54, and when the valve element 52 is in the second position, the valve element 52 is separated from the valve seat 54 so as to communicate the inlet 511 with the outlet 512.
A ring magnet 53 is installed in the valve chamber 50, the ring magnet 53 being coaxial with the valve body 51, at least a portion of the valve spool 52 being made of a ferromagnetic material so that the valve spool 52 moves from the second position to the first position by a magnetic force between it and the ring magnet 53.
Before the fluid is introduced into the second through hole 23, the fluid may be high-pressure water or an anchoring agent with a certain pressure, and the valve core 52 is kept at the first position by the magnetic force between the annular magnet 53 and the valve core 52, so that the valve core 52 and the valve seat 54 are stopped to form a linear seal. In operation, fluid is positively introduced into the valve chamber 50 of the check valve 5 from the inlet 511, and the valve element 52 is moved from the first position to the second position away from the valve seat 54 by the action of the magnetic force between the valve element 52 and the ring magnet 53 by the pressure of the fluid, whereby the inlet 511 of the check valve 5 communicates with the outlet 512 and the check valve 5 opens to form a fluid passageway for the fluid to flow through. When the fluid is stopped from being supplied to the inlet 511 of the check valve 5, the valve body 52 is moved from the second position to the first position by the magnetic force between the ring magnet 53 and the valve body 52, and the valve body 52 and the valve seat 54 are stopped to form a line seal, thereby preventing the fluid from flowing back.
The spool 52 of the check valve 5 is brought into line-tight contact with the valve seat 54 by the magnetic force between the spool 52 and the ring magnet 53, and therefore, it is not necessary to provide other members such as a spring and a spring seat between the spool 52 of the valve chamber 50 and the outlet 512. Thus, the radial dimension between the spool 52 of the check valve 5 and the outlet 512 may be equal everywhere, or the radial dimension between the spool 52 of the check valve 5 and the outlet 512 may be maximized at any section between the spool 52 of the check valve 5 and the outlet 512, adjacent to the outlet 512, so that the solidified fluid may be pushed out of the valve chamber 50 through the outlet 512 by a force toward the outlet 512. Further, when the fluid is transported next time using the multifunctional anchor bolt support construction device 1000, the fluid entering from the inlet 511 pushes the valve body 52 toward the outlet 512, the solidified fluid can be pushed out from the outlet 512 by the valve body 52, and finally the outlet 512 is communicated with the inlet 511, thereby ensuring smooth transport of the fluid.
Therefore, the check valve 5 has advantages such as good versatility.
The check valve 5 is described in detail below with reference to fig. 13 to 15. The check valve 5 includes a valve body 51, a spool 52, and a ring magnet 53.
The valve body 51 has a valve chamber 50, and an inlet 511 and an outlet 512 which communicate with the valve chamber 50, the valve chamber 50 extending in the axial direction of the valve body 51, the inlet 511 and the outlet 512 being provided at both ends of the valve body 51 in the axial direction, respectively.
Specifically, as shown in fig. 14, the valve body 51 has a first end 55 and a second end 56 opposite in the axial direction thereof, and the valve body 51 defines the valve chamber 50. The first end 55 of the valve body 51 is disposed adjacent the anchor rod 9 opposite the second end 56.
As shown in fig. 14, the first end 55 is provided with an upturned edge which encloses an inlet 511, the inlet 511 having a smaller diameter than the radial dimension of the valve chamber 50 adjacent the inlet 511. The outlet 512 is provided at the second end 56, the bore of the outlet 512 being equal to the radial dimension of the valve chamber 50 adjacent the outlet 512.
Preferably, as shown in fig. 14, a seal groove for mounting a seal ring is provided on the end surface of the turned-in edge away from the first end 55, and the seal groove is an annular groove. When the check valve 5 is used in connection with a pipe or other component, a sealing ring may be installed in the sealing groove to ensure tightness between the valve body 51 and the pipe or other component.
Of course, the bore of the outlet 512 may also be greater than the radial dimension of the valve chamber 50 adjacent the outlet 512. For example, the radial dimension of the valve chamber 50 adjacent the outlet 512 increases gradually in the direction from the inlet 511 to the outlet 512.
The spool 52 is movably installed in the valve chamber 50 in the axial direction of the valve body 51. The spool 52 has a first position disposed adjacent the inlet 511 and a second position disposed adjacent the outlet 512. A valve seat 54 is provided in the valve chamber 50, wherein the valve core 52 is stopped against the valve seat 54 when the valve core 52 is in the first position, and the valve core 52 is separated from the valve seat 54 when the valve core 52 is in the second position, so that the inlet 511 and the outlet 512 are communicated.
It is understood that the second position refers to a position of the valve spool 52 within the valve chamber 50 when the valve spool 52 is unseated from the valve seat 54, and thus the second position has a plurality.
The valve spool 52 includes a valve spool body 521, the valve spool body 521 being a truncated sphere, the valve spool body 521 including an arcuate surface and a planar surface, the arcuate surface being disposed adjacent the inlet 511 in an axially opposed plane of the valve body 51, the arcuate surface being in abutment with the valve seat 54 when the valve spool 52 is in the first position.
Therefore, compared with the valve core 52 being a complete sphere, the size of the line seal to the outlet 512 is facilitated to be reduced, the thickness of the fluid sealed to the outlet 512 is facilitated to be reduced, and the thickness of the solidified fluid in the valve cavity 50 is further facilitated to be reduced, so that when the multifunctional anchor rod support construction device 1000 is used for conveying the fluid next time, the valve core 52 is pushed by the fluid entering from the inlet 511, the solidified fluid is easier to be pushed out from the outlet 512 by the valve core 52, and smooth conveying of the fluid is ensured.
Preferably, the spool body 521 is a hemisphere. Of course, the valve body 521 may have other shapes such as a quarter sphere, a three-quarter sphere, and the like.
A ring magnet 53 is installed in the valve chamber 50, the ring magnet 53 being disposed coaxially with the valve body 51, at least a portion of the spool 52 being made of a ferromagnetic material so that the spool 52 moves from the second position to the first position by a magnetic force between the spool 52 and the ring magnet 53.
As shown in fig. 14, the check valve 5 further includes a magnet mounting plate 59, the ring magnet 53 being mounted on the magnet mounting plate 59, the magnet mounting plate 59 being mounted in the valve chamber 50 to mount the ring magnet 53 in the valve chamber 50. Thereby, the ring magnet 53 is conveniently mounted in the valve chamber 50 by the magnet mounting plate 59.
It will be appreciated that the ring magnet 53 may be mounted directly inside the valve chamber 50 without the magnet mounting plate 59.
As shown in fig. 14, the magnet mounting plate 59 is made of a ferromagnetic material so that the ring magnet 53 is mounted on the magnet mounting plate 59 by the magnetic force between it and the magnet mounting plate 59. Thus, the check valve 5 has a simple structure and facilitates the manufacturing of the check valve 5, as compared with the case where the ring magnet 53 is fixed to the magnet mounting plate 59 by fastening or welding.
Preferably, the valve body 51 is made of a non-ferromagnetic material.
As shown in fig. 14, the ring magnet 53 forms a valve seat 54. At this time, when the spool 52 is in the first position, the spool 52 is stopped against the ring magnet 53.
It will be appreciated that the magnet mounting plate 59 may also be an annular plate, the magnet mounting plate 59 being coaxial with the valve body 51, the magnet mounting plate 59 forming the valve seat 54. At this time, when the spool 52 is in the first position, the spool 52 is stopped against the magnet mounting plate 59.
Thus, the ring magnet 53 or the magnet mounting plate 59 forms the valve seat 54, which is advantageous in simplifying the structure of the check valve 5 and in manufacturing the check valve 5.
Of course, the valve seat 54 may be provided separately, and in this case, the valve seat 54 may be fixed to the valve body 51, the magnet mounting plate 59, or the ring magnet 53. At this time, each of the ring magnet 53 and the magnet mounting plate 59 may be composed of several parts, and a fluid passage for passing fluid is defined between the parts, and is in communication with the valve chamber 50.
As shown in fig. 14, one of the magnet mounting plate 59 and the valve body 51 is provided with a positioning boss, and the other of the magnet mounting plate 59 and the valve body 51 is provided with a positioning groove, and the positioning boss is fitted with the positioning groove.
For example, as shown in fig. 14, an inner flange is provided inside the valve body 51, a positioning groove is provided on the inner flange, a positioning boss is provided on the magnet mounting plate 59, and the positioning boss and the positioning groove are in insert fit to position the magnet mounting plate 59 on the valve body 51. Thereby, the magnet mounting plate 59 is conveniently mounted at a set position in the valve body 51.
Preferably, the positioning boss is an interference fit with the positioning groove, and the magnet mounting plate 59 is mounted on the valve body 51. Thus, the check valve 5 has a simple structure and is easy to manufacture, compared with the case where the magnet mounting plate 59 is connected to the valve body 51 by welding or fastening.
As shown in fig. 14, the check valve 5 further includes a stopper, the stopper is connected to the valve core 52, a first limiting portion 57 is provided on the stopper, a second limiting portion 58 is provided in the valve cavity 50, and when the valve core 52 is located at the second position, the first limiting portion 57 can be stopped against the second limiting portion 58. The first stopper 57 is located between the spool 52 and the inlet 511 in the axial direction of the valve body 51, and the second stopper 58 is located between the spool 52 and the first stopper 57 in the axial direction of the valve body 51.
The fact that the first limiting portion 57 can abut against the second limiting portion 58 when the spool 52 is located at the second position means that: when the valve body 52 is away from the valve seat 54 and is in the second position, the first stopper 57 may be in contact with the second stopper 58, and the first stopper 57 may not be in contact with the second stopper 58. Specifically, when the spool 52 just leaves the valve seat 54 and the gap between the spool 52 and the valve seat 54 is small, the spool 52 is located at the second position, but at this time the first stopper 57 is not in contact with the second stopper 58. When the valve body 52 is away from the valve seat 54 and the gap between the valve body 52 and the valve seat 54 is large, the valve body 52 is located at the second position, and at this time, the first stopper 57 is in contact with (stopped against) the second stopper 58, preventing the valve body 52 from continuing to move in a direction away from the valve seat 54.
Thus, when the spool 52 is in the second position, the limit position of the spool 52 can be limited by the abutment of the first limit position portion 57 and the second limit position portion 58 so that the spool 52 moves from the second position to the first position when the fluid delivery is completed.
It is to be understood that the first limiting portion 57 and the second limiting portion 58 may not be provided, and the limit position of the spool 52 may be limited by the magnetic force between the ring magnet 53 and the spool 52.
Preferably, the first limiting portion 57 is a plurality of stoppers, and each stopper is uniformly distributed around the axis of the valve body 51 at intervals. Thus, the integral structure formed by the valve core 52 and the first limiting block is symmetrical, so that when the valve core 52 moves along the axial direction of the valve body 51, the valve core 52 is prevented from deflecting in the radial direction of the valve body 51, and the stable flow of fluid in the valve body 51 is prevented from being influenced.
Specifically, spool 52 also includes a cylindrical connecting section 522. The stopper includes a first portion and a second portion, the first portion is in a block shape, the stopper is in the second portion, one end of the columnar connecting section 522 is connected to the valve core main body 521, the other end is connected to the first portion, and the stopper is disposed on an edge of the first portion.
Preferably, the second limiting portion 58 is a limiting ring. Thereby, the abutment of the second limiting portion 58 and the first limiting portion 57 is conveniently realized.
Of course, the second limiting portion 58 may also be a stopper.
Preferably, the columnar connecting section 522 and the limiting block are provided with blind holes, the orifices of the blind holes face the inlet 511, the bottoms of the blind holes are conical, and the tops of the conical holes face the outlet 512.
The operation of the above-described check valve 5 will be described below by taking fig. 13 to 15 as an example:
before the check valve 5 operates, the spool 52 is held in the first position by the magnetic force between the ring magnet 53 and the spool 52. When fluid enters the valve cavity 50 from the inlet 511 positively, a part of the fluid applies fluid pressure towards the first end 55 to the limiting block, another part of the fluid enters the valve cavity 50 to apply fluid pressure towards the first end 55 to the valve core main body 521, the direction of the fluid pressure received by the valve core 52 is opposite to that of the magnetic force, the fluid pressure is larger than the magnetic force, the valve core 52 moves towards the first end 55, the valve core 52 is separated from the valve seat 54, the valve core 52 is located at the second position, and the valve cavity 50 is communicated with the inlet 511 and the outlet 512 to form a fluid passage. When fluid flows in the reverse direction from the outlet 512 into the valve chamber 50, the fluid applies fluid pressure to the spool 52 toward the second end 56, and the direction of the fluid pressure to which the spool 52 is subjected is the same as the direction of the magnetic force. The valve element 52 moves toward the second end 56 under the combined action of fluid pressure and magnetic force, and eventually the valve element 52 and valve seat 54 stop forming a linear seal preventing backflow of fluid when the valve is in the first position. The fluid pressure herein refers to the pressure at which fluid is applied to the spool 52.
The detailed process of the drill box 5000 for performing the bolting operation is described in detail below with reference to fig. 7-15:
1) Drilling: the anchor bolt supporting operation cycle starts, the driver 2 rotates forward to drive the first transmission piece 31 to rotate forward, and the second transmission piece 32 rotates reversely under the drive of the first transmission piece 31 because the first transmission piece 31 is connected with the second transmission piece 32. Since the second transmission member 32 is connected to the rotation shaft, the rotation shaft is reversed (rotated in the first direction). Because the pre-tightening nut 92 is connected with the rotating shaft, under the combined action of the rotating shaft and the limiting block 91, the rod body 95 and the rotating shaft rotate together, and drill holes are drilled by using the drill 96 of the anchor rod 9. In this process, the second shaft 20 does not rotate together with the first shaft 10, and since the inner and outer sides of the second seal member 42 contact the first shaft 10 and the second shaft 20, respectively, the second shaft 20 receives torque generated by friction, and the second shaft 20 does not rotate under the effect of the rotation stopper 6. During the drilling process, only one second through hole 23 of the second shaft 20 transfers water into the third through hole 953 of the rod body 95 for removing the cinder. Due to the action of the first and second seals 41 and 42, it is ensured that the high-pressure water flow enters the third through hole 953 of the rod body 95 without outflow. When the limiting block 91 is clung to the pre-tightening nut 92, the pre-tightening nut 92 is clung to the aligning ball pad 93, the aligning ball pad 93 is clung to the tray 94, and the tray 94 is clung to the surrounding rock, the drilling is completed.
2) And (3) anchoring: after the drilling is completed, the driver 2 stops rotating, and the second through hole 23 in the second shaft 20 stops pumping water to the inside of the rod body 95; the other two second through holes 23 of the second shaft 20 pump the a component and the B component of the anchoring agent respectively, the anchoring agent of the two components is pumped into the third through hole 953 of the rod body 95 and the gap between the rod body 95 and the surrounding rock simultaneously, the a component and the B component of the anchoring agent can be ensured to enter the third through hole 953 of the rod body 95 without outflow due to the effect of the first sealing element 41 and the second sealing element 42, after the anchoring agent is pumped to a preset amount, the pumping is stopped, and the anchoring function is realized after the components of the anchoring agent are mixed and reacted.
3) And (3) pre-tightening: after the anchoring is completed, the driver 2 reverses, and drives the pre-tightening nut 92 to rotate through the first transmission member 31 and the second transmission member 32, at this time, the rotation direction of the pre-tightening nut 92 is the second direction, the rotation direction of the pre-tightening nut 92 is opposite to the rotation direction of the drilling process, and the pre-tightening nut 92 continuously extrudes the tray 94 tightly attached to the surrounding rock, so as to pre-tighten the anchor rod 9. During the pre-tightening process, the anchor rod 9 translates in a direction away from the surrounding rock relative to the first shaft 10, and the limiting block 91 at the tail of the anchor rod 9 contacts with the second shaft 20 and pushes the second shaft 20 to move away from the surrounding rock, so that the reset elastic piece 7 is compressed until the pre-tightening process is completed. After the pre-tightening is finished, the anchor rod 9 is separated from the first shaft 10, the second shaft 20 moves horizontally relative to the first shaft 10 under the action of the reset elastic member 7, the initial position is gradually restored, the reset elastic member 7 also restores the original installation length, and the pre-tightening force and the installation length of the reset elastic member 7 can be adjusted through the baffle ring 8.
After the above process steps are completed, the next working cycle is performed according to the construction requirement, and in each working cycle, the working principle of the drill box 5000 is consistent, and no description is repeated.
The drilling box 5000 can complete multiple steps of drilling, anchoring and pre-tightening, reduces labor intensity of workers, improves roadway support efficiency, is low in cost, simple in structure, convenient to install and maintain, and is suitable for coal roadway anchor bolt support operation.
In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a specific orientation, be configured and operated in a specific orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In the description of the present invention, the meaning of "plurality" means at least two, for example, two, three, etc., unless specifically defined otherwise.
In the present invention, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally formed; may be mechanically connected, may be electrically connected or may be in communication with each other; either directly or indirectly, through intermediaries, or both, may be in communication with each other or in interaction with each other, unless expressly defined otherwise. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art according to the specific circumstances.
In the present invention, unless expressly stated or limited otherwise, a first feature "up" or "down" a second feature may be the first and second features in direct contact, or the first and second features in indirect contact via an intervening medium. Moreover, a first feature being "above," "over" and "on" a second feature may be a first feature being directly above or obliquely above the second feature, or simply indicating that the first feature is level higher than the second feature. The first feature being "under", "below" and "beneath" the second feature may be the first feature being directly under or obliquely below the second feature, or simply indicating that the first feature is less level than the second feature.
For purposes of this disclosure, the terms "one embodiment," "some embodiments," "example," "a particular example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, schematic representations of the above terms are not necessarily directed to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, the different embodiments or examples described in this specification and the features of the different embodiments or examples may be combined and combined by those skilled in the art without contradiction.
While embodiments of the present invention have been shown and described above, it will be understood that the above embodiments are illustrative and not to be construed as limiting the invention, and that variations, modifications, alternatives and variations may be made to the above embodiments by one of ordinary skill in the art within the scope of the invention.

Claims (10)

1. An automatic construction equipment of stock, characterized by includes:
Drilling box, drilling box includes:
a base, a base seat and a base seat,
a first shaft rotatably mounted on the base, the first shaft having first and second ends opposite to each other in an axial direction thereof, the first shaft being provided with a first through hole penetrating therethrough in the axial direction thereof,
a driver coupled to the first shaft to drive rotation of the first shaft,
a second shaft movably inserted in the first through hole along the axial direction thereof, the second shaft having an initial position adjacent to the first end of the first shaft, at least a portion of the second shaft being in sealing engagement with the first through hole, the second shaft being provided with a plurality of second through holes penetrating along the axial direction thereof, a plurality of the second through holes being provided at intervals, each of the second through holes being provided with a check valve therein, and
the anchor rod comprises a rod body, a drill bit, a pre-tightening nut and a limiting block, wherein the rod body is coaxial with the first shaft, a third through hole which is communicated with each second through hole along the axial direction of the rod body is arranged on the rod body,
the rod body is spaced from the second shaft in the axial direction of the rod body, the rod body is arranged adjacent to the first end of the first shaft relative to the second shaft in the axial direction of the rod body, the limiting block is arranged between the pre-tightening nut and the second shaft in the axial direction of the rod body, the outer circumferential surface of the rod body is provided with external threads, the pre-tightening nut is in threaded fit on the rod body and is in sealing connection with the first shaft, the limiting block is movably arranged in the first through hole in the axial direction of the first shaft and is connected with the rod body, each of the pre-tightening nut and the limiting block is provided with a first surface and a second surface which are opposite in the axial direction of the rod body, when the first shaft drives the pre-tightening nut to rotate in a first direction, the first surface of the limiting block is abutted against the second surface of the pre-tightening nut so that the pre-tightening nut drives the rod body to rotate in the first direction, and when the first shaft drives the pre-tightening nut to rotate in a second direction opposite to the first direction, the first shaft can push the first end of the pre-tightening nut against the first shaft;
A hydraulic ram, the hydraulic ram comprising:
the support oil cylinder is used for supporting the roadway wall and guiding the anchor rod, and
the drilling oil cylinder is used for driving the drilling box to move in a direction close to or far away from the roadway wall;
a signal detector including at least one of an oil pressure sensor and a laser ranging sensor for detecting a drilling state of the drill box;
the drill frame, the drill box, the hydraulic oil cylinder and the signal detector are all arranged on the drill frame; and
and the controller can receive the feedback signal of the signal detector and is used for controlling the working state of the drilling oil cylinder.
2. The automated construction equipment for an anchor rod according to claim 1, wherein the anchor rod further comprises a flow mixer for mixing an anchoring agent, the rod body comprises a first section and a second section, the first section is adjacent to the second shaft in the axial direction of the rod body, the second section is far away from the second shaft in the axial direction of the rod body, the external thread is provided on the outer circumferential surface of the first section, the second section is provided with a spiral cross rib, the flow mixer is provided in a portion of the third through hole corresponding to the first section, the flow mixer comprises a central shaft and a spiral blade which are fixedly connected into a whole, the central shaft is coaxially arranged with the rod body, and the spiral blade is arranged around the central shaft.
3. The automated construction equipment for anchor rods of claim 2, further comprising:
the water delivery device comprises a water injection pipe, an electromagnetic water ball valve is arranged on the water injection pipe, one end of the water injection pipe is connected with the water tank, and the other end of the water injection pipe is connected with the anchor rod through an anchor rod connecting pipe so as to cool and slag the anchor rod when the anchor rod is drilled;
an anchor pump, the anchor pump comprising:
an integrated cylinder having a piston chamber, a first plunger chamber, a second plunger chamber, a first inlet pipe, a first outlet pipe, a second inlet pipe, and a second outlet pipe, each of the first inlet pipe and the first outlet pipe being in communication with a bottom of the first plunger chamber, each of the second inlet pipe and the second outlet pipe being in communication with a bottom of the second plunger chamber, the first plunger chamber and the second plunger chamber being arranged at intervals in a left-right direction,
a first plunger, at least part of which extends into the first plunger chamber and which is movable in an up-and-down direction relative to the integrated cylinder so that the anchoring agent enters the bottom of the first plunger chamber from the first inlet pipe and is discharged from the first outlet pipe,
A second plunger, at least a portion of which protrudes into the second plunger chamber, and which is movable in an up-and-down direction with respect to the integrated cylinder so that the anchoring agent enters the bottom of the second plunger chamber from the second inlet tube and is discharged from the second outlet tube,
a linkage located above the integrated cylinder, each of the first and second plungers being connected to the linkage, and
the first piston rod is connected with the linkage piece, at least part of the first piston rod is positioned in the piston cavity, and the first piston rod can move up and down relative to the integrated cylinder body under the driving of hydraulic oil entering and exiting the piston cavity so as to drive the linkage piece to move up and down, so that each of the first plunger and the second plunger is driven to move up and down; and
a slurry delivery device, the slurry delivery device comprising:
a first reversing valve for controlling the up-and-down movement of the first piston rod,
a first storage tank for storing an anchor agent A component and a second storage tank for storing an anchor agent B component,
A first slurry inlet pipe and a first slurry injection pipe, one end of the first slurry inlet pipe is connected with the first storage tank, the other end of the first slurry inlet pipe is connected with the first inlet pipe, one end of the first slurry injection pipe is connected with the first outlet pipe, the other end of the first slurry injection pipe is connected with one of the plurality of second through holes so as to inject the anchoring agent A component in the first storage tank into the anchor rod through the first plunger cavity, thereby the anchoring agent A component is suitable for being injected into a roadway anchor rod hole through the anchor rod, and
the second grouting pipe and the second grouting pipe, the one end of second grouting pipe with the second bin links to each other, the other end of second grouting pipe with the second import pipe links to each other, the one end of second grouting pipe with the second outlet pipe links to each other, the other end of second grouting pipe links to each other with another in a plurality of second through-holes, so that will the anchor agent B component in the second bin is through the injection of second plunger chamber is in to the stock, thereby will the anchor agent B component is suitable for through the stock injection to tunnel stock downthehole.
4. The automated construction equipment for a rock bolt according to claim 3, further comprising:
The second reversing valve is used for controlling a second piston rod of the drilling oil cylinder to extend or retract;
the third reversing valve is used for controlling the extension or retraction of a third piston rod of the support oil cylinder; and
the driver is a hydraulic motor, and the fourth reversing valve is used for controlling the hydraulic motor to rotate forward or reversely.
5. The automated construction equipment for a bolt according to claim 4, further comprising:
the first one-way valve is arranged on the first grouting pipe so that the component A of the anchoring agent is injected into the anchor rod;
the second one-way valve is arranged on the second grouting pipe so that the component B of the anchoring agent is injected into the anchor rod;
the third one-way valve is arranged on the first slurry inlet pipe so that the component A of the anchoring agent enters the first plunger cavity; and
and the fourth one-way valve is arranged on the second slurry inlet pipe so that the B component of the anchoring agent enters the second plunger cavity.
6. The automated construction equipment of claim 5, wherein the injection pump further comprises:
The oil inlet and outlet piece is fixed on one side of the integrated cylinder body and is provided with a first oil inlet and outlet and a second oil inlet and outlet so that hydraulic oil can enter and exit the piston cavity;
one end of the first oil inlet and outlet pipe is communicated with a rod cavity of the piston cavity, and the other end of the first oil inlet and outlet pipe is communicated with the first oil inlet and outlet port; and
and one end of the second oil inlet and outlet pipe is communicated with the rodless cavity of the piston cavity, and the other end of the second oil inlet and outlet pipe is communicated with the second oil inlet and outlet port.
7. The automated construction equipment of claim 6, wherein the first reversing valve has an oil inlet, a first working port, a second working port, and a drain port, the oil inlet is in communication with an oil source, the drain port is in communication with an oil tank, the first working port is in communication with the first oil inlet and outlet, and the second working port is in communication with the second oil inlet and outlet.
8. The automated construction equipment for a bolt according to claim 7, further comprising:
the first balance valve is connected to an oil path between the support oil cylinder and the third reversing valve so as to maintain the extending or retracting state of the third piston rod of the support oil cylinder; and
And the second balance valve is connected to an oil path between the drilling oil cylinder and the second reversing valve so as to maintain the extending or retracting state of a second piston rod of the drilling oil cylinder.
9. The automated construction equipment of claim 8, further comprising an electro-hydraulic proportional multi-way valve, the electro-hydraulic proportional multi-way valve comprising:
a first oil inlet unit, which forms the second reversing valve,
a second oil inlet unit which forms the third reversing valve,
a third oil inlet unit forming the fourth reversing valve, an
The head unit and the tail unit are used for providing oil inlet and outlet channels and reversing signals for the first oil inlet unit, the second oil inlet unit and the third oil inlet unit;
the oil pressure sensor includes:
a first pressure sensor and a second pressure sensor, the first pressure sensor is arranged on one oil path between the support oil cylinder and the first balance valve, the second pressure sensor is arranged on the other oil path between the support oil cylinder and the first balance valve, so as to provide a pressure signal for the controller, thereby the controller controls the third reversing valve to reverse,
A third pressure sensor and a fourth pressure sensor, the third pressure sensor is arranged on one oil path between the drilling oil cylinder and the second balance valve, the fourth pressure sensor is arranged on the other oil path between the drilling oil cylinder and the second balance valve so as to provide a pressure signal for the controller, thereby the controller controls the second reversing valve to reverse, and
and a fifth pressure sensor provided on an oil path between the hydraulic motor and the fourth reversing valve to provide a pressure signal to the controller so that the controller controls the fourth reversing valve to reverse.
10. The automated construction equipment for roof bolts according to any one of claims 4 to 9, wherein the drilling frame comprises a base plate and a support plate which are oppositely disposed in a left-right direction, the support plate is connected with a third piston rod of the support cylinder so as to support a roadway wall and guide the roof bolts, the base plate is used for positioning the drilling frame, the laser ranging sensor is provided on the base plate, and the laser ranging sensor is opposite to the drilling box in the left-right direction so as to measure a distance and a speed of drilling by the drilling box.
CN202110481356.1A 2021-04-30 2021-04-30 Automatic construction device for anchor rod Active CN113202522B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110481356.1A CN113202522B (en) 2021-04-30 2021-04-30 Automatic construction device for anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110481356.1A CN113202522B (en) 2021-04-30 2021-04-30 Automatic construction device for anchor rod

Publications (2)

Publication Number Publication Date
CN113202522A CN113202522A (en) 2021-08-03
CN113202522B true CN113202522B (en) 2023-06-20

Family

ID=77028231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110481356.1A Active CN113202522B (en) 2021-04-30 2021-04-30 Automatic construction device for anchor rod

Country Status (1)

Country Link
CN (1) CN113202522B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023249518A1 (en) * 2022-06-20 2023-12-28 Epiroc Rock Drills Aktiebolag Method and arrangement for stabilizing a feed system of a mining or construction work equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2006235837A1 (en) * 2001-04-06 2006-11-30 Minova Australia Pty Limited Rock Bolt Installation
CN105350994A (en) * 2015-10-28 2016-02-24 天地科技股份有限公司 Grouting anchor and using method thereof
CN109915186A (en) * 2019-03-29 2019-06-21 攀枝花学院 A kind of novel drilling anchor infuses the mounting process of integrated resin anchor
CN110374651A (en) * 2019-07-18 2019-10-25 北京交通大学 The double group material full length fastening devices of self-drilling type and anchoring construction method
CN111122237A (en) * 2020-02-18 2020-05-08 中国矿业大学(北京) Deep drilling sampling robot for space complex stratum and method thereof
CN111594246A (en) * 2020-07-08 2020-08-28 西南石油大学 Self-propelled hollow grouting resin anchor rod and use method thereof
CN112360501A (en) * 2020-09-28 2021-02-12 中煤科工开采研究院有限公司 Temporary support and drilling and grouting integrated anchor rod composite support system and construction method
CN112360505A (en) * 2020-09-28 2021-02-12 中煤科工开采研究院有限公司 Drilling, grouting, anchoring and pre-tightening integrated anchor rod supporting device and construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011005855A1 (en) * 2011-03-21 2012-09-27 Hilti Aktiengesellschaft rock bolt

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2006235837A1 (en) * 2001-04-06 2006-11-30 Minova Australia Pty Limited Rock Bolt Installation
CN105350994A (en) * 2015-10-28 2016-02-24 天地科技股份有限公司 Grouting anchor and using method thereof
CN109915186A (en) * 2019-03-29 2019-06-21 攀枝花学院 A kind of novel drilling anchor infuses the mounting process of integrated resin anchor
CN110374651A (en) * 2019-07-18 2019-10-25 北京交通大学 The double group material full length fastening devices of self-drilling type and anchoring construction method
CN111122237A (en) * 2020-02-18 2020-05-08 中国矿业大学(北京) Deep drilling sampling robot for space complex stratum and method thereof
CN111594246A (en) * 2020-07-08 2020-08-28 西南石油大学 Self-propelled hollow grouting resin anchor rod and use method thereof
CN112360501A (en) * 2020-09-28 2021-02-12 中煤科工开采研究院有限公司 Temporary support and drilling and grouting integrated anchor rod composite support system and construction method
CN112360505A (en) * 2020-09-28 2021-02-12 中煤科工开采研究院有限公司 Drilling, grouting, anchoring and pre-tightening integrated anchor rod supporting device and construction method

Also Published As

Publication number Publication date
CN113202522A (en) 2021-08-03

Similar Documents

Publication Publication Date Title
CN113187527B (en) Automatic construction method for anchor rod
CN113202522B (en) Automatic construction device for anchor rod
US9701003B2 (en) Hydraulic hammer having delayed automatic shutoff
CN103140329A (en) Lubrication system for a breaking tool
CN111344475B (en) Pumpable resin system, method of controlling the system, program product
CN114000901B (en) Full-automatic installation device of resin cartridge
CN115929369A (en) Multifunctional drilling box for anchor rod support
CN113294183B (en) Anchor rod construction assembly
CN113217051B (en) Multifunctional anchor bolt support construction device
CN113090307A (en) Anchor bolt support construction equipment
CN115822668A (en) Multifunctional anchor rod support drilling box
CN113090306A (en) Multifunctional anchor rod support construction equipment
CN113107559B (en) Multifunctional integrated anchor rod construction equipment
EP1626225B1 (en) System for feeding lubricant
CN113090308B (en) Anchor bolt support construction device
CN113175340B (en) Anchoring agent anchoring system
CN115807683A (en) Anchor bolt supporting device and construction method
EP3901410B1 (en) Apparatus for resin injection, mining machine and method
CN113202523B (en) Multifunctional integrated anchor rod construction device
CN118008419A (en) Double-channel bidirectional sealing type grouting reinforcement anchor rod after resin anchoring and construction method
CN215633060U (en) Anchoring agent pumping device
CN115726826A (en) Anchor grouting device and automatic construction method
CN115788529A (en) Anchor-grouting supporting equipment
CN118008420A (en) Double-channel unidirectional sealing type grouting reinforcement anchor rod after resin anchoring and construction method
AT388418B (en) Hydraulic power mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant