CN113071863A - Novel assembly type corrugated steel pipe floor - Google Patents

Novel assembly type corrugated steel pipe floor Download PDF

Info

Publication number
CN113071863A
CN113071863A CN202110211710.9A CN202110211710A CN113071863A CN 113071863 A CN113071863 A CN 113071863A CN 202110211710 A CN202110211710 A CN 202110211710A CN 113071863 A CN113071863 A CN 113071863A
Authority
CN
China
Prior art keywords
pipe
finished product
construction
corrugated pipe
corrugated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110211710.9A
Other languages
Chinese (zh)
Inventor
林强
杨元红
尹俊宏
李四金
刘四德
杨炳发
唐俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN202110211710.9A priority Critical patent/CN113071863A/en
Publication of CN113071863A publication Critical patent/CN113071863A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/30Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
    • B65G65/34Emptying devices
    • B65G65/40Devices for emptying otherwise than from the top
    • B65G65/42Devices for emptying otherwise than from the top using belt or chain conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D88/00Large containers
    • B65D88/26Hoppers, i.e. containers having funnel-shaped discharge sections
    • B65D88/28Construction or shape of discharge section
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G21/00Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/30Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
    • B65G65/32Filling devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention provides a novel assembled steel corrugated pipe ground working device, and belongs to the technical field of municipal engineering construction. The novel assembled steel corrugated pipe ground is made including finished product feed bin, bellows, backfill material, concrete layer, unloading pipe, dispenser, band conveyer. According to the invention, the construction materials such as sand and stone are stored in the finished product bin, the corrugated pipe is arranged at the bottom of the finished product bin, and the belt conveyor is arranged in the corrugated pipe to convey the construction materials, so that the construction quantity of reinforced concrete is reduced, the construction is rapid, the occupied area is small, the installation is convenient, the construction period is short, the construction can be put into use earlier, the dismounting is convenient, the recycling can be realized, the deformation resistance is strong, the environment is protected, the carbon is low, the use of conventional building materials such as cement, sand and stone, reinforcing steel bars and the like is reduced or abandoned, and the environment protection.

Description

Novel assembly type corrugated steel pipe floor
Technical Field
The invention belongs to the technical field of municipal engineering, and particularly relates to a novel assembled corrugated steel pipe floor.
Background
A trestle type stock yard is usually adopted for storing gravel aggregates in a large-scale gravel production system, in order to ensure the continuity of concrete production and meet the requirements of thousands of cubes in monthly casting strength and temperature control, a finished product stock bin of a concrete mixing system is usually used for feeding, concrete pavement is arranged at the bottom of the stock yard, aggregate taking and conveying work is completed through a feeder and a rubber belt machine which are arranged inside the pavement, and the trestle type gravel aggregate storage system has the advantages of large storage capacity, high mechanization degree and the like.
At present, a gravel system is traditionally used for making a ground of a reinforced concrete structure, aggregate is piled and conveyed through a finished product storage bin and the ground of a buried reinforced concrete structure, the ground adopting the form has the problems of large occupied area, long construction period, late use time and the like, and the construction is difficult to disassemble in the later period, so that the construction engineering is slowed down to a great extent.
Disclosure of Invention
In order to solve the problems in the background art, the invention provides a novel assembled steel corrugated pipe ground device, which solves the problems in the background art, and can realize quick construction, convenient installation, short construction period, early use, convenient disassembly and repeated utilization.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the utility model provides a novel pin-connected panel corrugated steel pipe ground is made, includes finished product feed bin, bellows, backfill, concrete layer, unloading pipe, dispenser and band conveyer, finished product feed bin below bury the bellows of pin-connected panel underground, the compaction has been filled to the peripheral layering in bellows outside, concrete layer has been pour between finished product feed bin and the backfill, finished product feed bin bottom is provided with the unloading pipe with bellows inner chamber intercommunication, the unloading pipe export stretches into bellows inner chamber, the dispenser is installed in the exit, band conveyer is installed to bellows inner chamber, band conveyer is located under the dispenser.
Furthermore, the backfill material adopts a structural backfill material.
Further, finished product feed bin bottom be chamfered table type structure, the unloading pipe is located chamfered table type structure bottom central point and puts.
Further, finished product feed bin bottom of storehouse constitute by a plurality of chamfer desk-top structure, the unloading pipe is all installed to every chamfer desk-top structure bottom central point.
The invention has the beneficial effects that:
1. according to the invention, the construction materials such as sand and stone are stored in the finished product bin, the corrugated pipe is arranged at the bottom of the finished product bin, and the belt conveyor is arranged in the corrugated pipe to convey the construction materials, so that the construction quantity of reinforced concrete is reduced, the construction is rapid, the occupied area is small, the installation is convenient, the construction period is short, the construction can be put into use earlier, the dismounting is convenient, the recycling can be realized, the deformation resistance is strong, the environment is protected, the carbon is low, the use of conventional building materials such as cement, sand and stone, reinforcing steel bars and the like is reduced or abandoned, and the environment protection.
2. The corrugated pipe is adopted as a main support body, has the characteristics of high strength, light weight and convenient installation, structural backfill materials are filled and compacted in layers at the periphery of the corrugated pipe, the periphery of the corrugated pipe is good in flexibility, uneven settlement and micro deformation can be borne, and the problem that the corrugated pipe is pressed and collapsed due to unbalanced local pressure after being used for a long time in the field is solved.
Drawings
FIG. 1 is a left side sectional view of the present invention;
FIG. 2 is a front sectional view of the present invention.
In the figure, 1-a finished product bin, 2-a corrugated pipe, 3-backfill, 4-a concrete layer, 5-a blanking pipe, 6-a feeder, 7-a belt conveyor, 8-an inspection manhole and 9-a belt feeding system.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, preferred embodiments of the present invention will be described in detail below to facilitate understanding of the skilled person.
As shown in fig. 1-2, a novel pin-connected panel corrugated steel pipe ground is made, including finished product feed bin 1, bellows 2, backfill 3, concrete layer 4, unloading pipe 5, dispenser 6 and band conveyer 7, finished product feed bin 1 below bury the bellows 2 of pin-connected panel underground, bellows 2 one side is provided with overhauls manhole 8, the later stage people of being convenient for can get into bellows 2 and carry out maintenance work, the peripheral layering packing compaction in bellows 2 outside has backfill 3, pour concrete layer 4 between finished product feed bin 1 and the backfill 3, this concrete layer 4 is when receiving big horizontal thrust, when the shovel of loader fill, can drop automatically, the later stage of being convenient for is dismantled. The main body of ground doing adopts pin-connected panel corrugated steel pipe, can increase according to the windrow height, increase corrugated steel pipe section thickness in standard pin-connected panel corrugated steel pipe section thickness appropriately, guarantee its security reliability, bellows 2 makes the main supporter as ground, have the characteristics of high strength, light weight, simple to operate, and bellows 2 peripheral layering is filled the compaction and has backfill 3, backfill 3 adopts structural backfill material, bellows 2 peripheral flexibility is good, pressure can be shared by peripheral backfill 3 during the pressurized, can bear inhomogeneous settlement and small deformation, avoid making the problem that local pressure is uneven and the pressurized collapses after long-time use in the ground, and, more traditional reinforced concrete structure makes ground, construction cost is reduced, construction progress has been accelerated, can put into use earlier, can repeatedly use after bellows 2 later stages are demolishd. A discharging pipe 5 communicated with the inner cavity of the corrugated pipe 2 is arranged at the bottom of the finished product bin 1, the outlet of the discharging pipe 5 extends into the inner cavity of the corrugated pipe 2, a feeder 6 is arranged at the outlet, the feeder 6 adopts the existing commercially available feeder, an arc door feeder or a vibration feeder can be selected, a belt conveyor 7 is installed in the inner cavity of a corrugated pipe 2, the belt conveyor 7 is located under a feeder 6, a factory-customized circular blanking pipe 5 is welded with a factory-customized corrugated steel pipe 2, the blanking pipe 5 extends into the corrugated steel pipe 2 by 10cm to 30 cm, the part of a vertical pipe of the blanking pipe 5 extending into the corrugated steel pipe 2 is connected with the feeder 6 through a bolt, the blanking pipe 5 is 90 cm higher than the top of the corrugated steel pipe 2, the top of the blanking pipe 5 is about 10cm higher than the ground level of a finished product bin 1, and the blanking pipe can be freely placed in and taken out without welding and connected with the bolt by adopting a sleeve type structure, replaceable, preferably, a wear-resistant lining steel plate is added in each blanking pipe 5 to prevent the welding seams between the blanking pipes 5 and the corrugated pipes 2 from being worn. Aggregate stocked in the finished product bin 1 is discharged through the discharging pipe 5, is guided and conveyed to the belt conveyor 7 through the feeder 6, and is transported through the belt conveyor 7. According to the invention, the finished product bin 1 is used for storing the construction materials such as sand and stone, the corrugated pipe 2 is arranged at the bottom of the finished product bin 1, the belt conveyor 7 is arranged in the corrugated pipe 2 for conveying the construction materials, the construction quantity of reinforced concrete is reduced, the construction is rapid, the occupied area is small, the installation is convenient, the construction period is short, the construction can be put into use earlier, the dismantling is convenient, the recycling can be realized, the deformation resistance is strong, the environment is protected, the low carbon is realized, the use of conventional building materials such as cement, sand and stone, reinforcing steel bars and the like is reduced or abandoned at all, the environment protection is facilitated, and the vegetation. Bellows 2 buries underground for defeated construction material carries the space to be a relatively inclosed space, and effective control noise, dust pollution can be better satisfy the environmental protection requirement, reach green construction requirement.
Finished product feed bin 1 transversely be separated into a plurality of bin by the partition wall, be chamfered table type structure at the bottom of the bin, guarantee that the blanking of bin bottom is smooth and can not long-pending material, unloading pipe 5 is located and puts at chamfered table type structure bottom central point, finished product feed bin 1 bin bottom comprises a plurality of chamfered table type structure, unloading pipe 5 is all installed to every chamfered table type structure bottom central point, each bin stores different construction material respectively, when needing to compare the batching, after calculating the volume of each material, then through the ration quantitative feed of corresponding dispenser 6, and carry to mix the material to mixing the material station by band conveyer 7, can effectively reduce mix material construction area, need not to dispose the loader between former tradition finished product feed bin and batching bin and make a round trip to pour the material, need not the loader, can effective control construction cost, accelerate the batching progress, avoided the noise that the loader caused by pouring simultaneously, Pollution of dust.
The construction and use process of the invention is as follows:
the construction process comprises the following steps: digging a groove according to the size of a corrugated pipe 2 on site, burying the corrugated pipe 2 after the groove base is qualified, arranging a later-stage maintenance manhole 8 at the front section after the corrugated pipe 2 is spliced, then filling backfill materials 3 at the periphery of the corrugated pipe 2 in a layered mode, reserving mounting holes of a blanking pipe 5 at the same time, pouring a layer of foundation concrete with the thickness of 10cm at the top of the backfill materials 3 to serve as a bottom plate of a finished product bin 1, then mounting the blanking pipe 5, determining the sizes of bins such as sand, small stones, medium stones, large stones and the like according to the production capacity of a field arrangement and mixing station, building the finished product bin 1, and finally completing the assembly of a belt conveyor 7 and the mounting of a feeder 6 in the corrugated pipe 2.
The use process comprises the following steps: unloading the aggregate to belt feeding system 9, then transporting the aggregate to finished product feed bin 1 top by belt feeding system 9 and pouring into finished product feed bin 1 and pile up, when needing to be according to than the batching, after calculating the volume of each material, then through the quantitative dosing of corresponding dispenser 6, the aggregate of finished product feed bin 1 pile up is through unloading pipe 5 unloading, and guide to band conveyer 7 through dispenser 6, it can to mix the material station to transport the aggregate of piling up through band conveyer 7.
Finally, it is noted that the above-mentioned preferred embodiments illustrate rather than limit the invention, and that, although the invention has been described in detail with reference to the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the scope of the invention as defined by the appended claims.

Claims (4)

1. The novel assembled corrugated steel pipe ground is characterized by comprising a finished product bin, a corrugated pipe, backfill materials, a concrete layer, a blanking pipe, a feeder and a belt conveyor, wherein the assembled corrugated pipe is embedded below the finished product bin, the backfill materials are filled and compacted on the periphery of the outer side of the corrugated pipe in a layered mode, the concrete layer is poured between the finished product bin and the backfill materials, the blanking pipe communicated with the inner cavity of the corrugated pipe is arranged at the bottom of the finished product bin, the outlet of the blanking pipe extends into the inner cavity of the corrugated pipe, the feeder is installed at the outlet of the blanking pipe, the belt conveyor is installed in the inner cavity of the corrugated pipe, and the belt conveyor is located under the feeder.
2. The novel assembled corrugated steel pipe floor as claimed in claim 1, wherein: the backfill material is a structural backfill material.
3. A novel assembled corrugated steel pipe floor as claimed in claim 1 or 2, wherein: the bottom of the finished product bin is of a chamfered table structure, and the discharging pipe is located in the center of the bottom end of the chamfered table structure.
4. A novel assembly type corrugated steel pipe floor as claimed in claim 3, wherein: finished product feed bin bottom of storehouse constitute by a plurality of chamfer desk-top structure, the unloading pipe is all installed to every chamfer desk-top structure bottom central point.
CN202110211710.9A 2021-02-25 2021-02-25 Novel assembly type corrugated steel pipe floor Pending CN113071863A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110211710.9A CN113071863A (en) 2021-02-25 2021-02-25 Novel assembly type corrugated steel pipe floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110211710.9A CN113071863A (en) 2021-02-25 2021-02-25 Novel assembly type corrugated steel pipe floor

Publications (1)

Publication Number Publication Date
CN113071863A true CN113071863A (en) 2021-07-06

Family

ID=76609987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110211710.9A Pending CN113071863A (en) 2021-02-25 2021-02-25 Novel assembly type corrugated steel pipe floor

Country Status (1)

Country Link
CN (1) CN113071863A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101293521A (en) * 2008-06-19 2008-10-29 上海市政工程设计研究总院 Container transportation method
CN203198069U (en) * 2013-05-03 2013-09-18 李建斌 Novel concrete batching machine
CN104128997A (en) * 2014-08-05 2014-11-05 中国水利水电第十四工程局有限公司 Automatic feeding system for novel mixing station
CN105064400A (en) * 2015-07-24 2015-11-18 中交第一公路勘察设计研究院有限公司 Urban comprehensive pipe rack of steel corrugated plate structure
CN106121683A (en) * 2016-08-31 2016-11-16 中国水利水电第十四工程局有限公司 A kind of tunnel penstock lower concrete constructing device
CN206765104U (en) * 2017-04-28 2017-12-19 北京鑫源诺美环保科技有限责任公司 Sunk type sandstone blending station
CN206913459U (en) * 2017-04-28 2018-01-23 北京鑫源诺美环保科技有限责任公司 With reference to the sunk type sandstone blending station in stock ground
CN207700222U (en) * 2017-12-28 2018-08-07 谷建廷 A kind of municipal underground pipeline lane
CN108505576A (en) * 2018-03-21 2018-09-07 中国五冶集团有限公司 A kind of slag soil transfer system in the municipal pipeline of underground
CN208867357U (en) * 2018-06-09 2019-05-17 中国建筑第七工程局有限公司 A kind of concrete agitation station sunk type proportioner
CN211690434U (en) * 2019-11-20 2020-10-16 中煤建筑安装工程集团有限公司 Novel underground gallery

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101293521A (en) * 2008-06-19 2008-10-29 上海市政工程设计研究总院 Container transportation method
CN203198069U (en) * 2013-05-03 2013-09-18 李建斌 Novel concrete batching machine
CN104128997A (en) * 2014-08-05 2014-11-05 中国水利水电第十四工程局有限公司 Automatic feeding system for novel mixing station
CN105064400A (en) * 2015-07-24 2015-11-18 中交第一公路勘察设计研究院有限公司 Urban comprehensive pipe rack of steel corrugated plate structure
CN106121683A (en) * 2016-08-31 2016-11-16 中国水利水电第十四工程局有限公司 A kind of tunnel penstock lower concrete constructing device
CN206765104U (en) * 2017-04-28 2017-12-19 北京鑫源诺美环保科技有限责任公司 Sunk type sandstone blending station
CN206913459U (en) * 2017-04-28 2018-01-23 北京鑫源诺美环保科技有限责任公司 With reference to the sunk type sandstone blending station in stock ground
CN207700222U (en) * 2017-12-28 2018-08-07 谷建廷 A kind of municipal underground pipeline lane
CN108505576A (en) * 2018-03-21 2018-09-07 中国五冶集团有限公司 A kind of slag soil transfer system in the municipal pipeline of underground
CN208867357U (en) * 2018-06-09 2019-05-17 中国建筑第七工程局有限公司 A kind of concrete agitation station sunk type proportioner
CN211690434U (en) * 2019-11-20 2020-10-16 中煤建筑安装工程集团有限公司 Novel underground gallery

Similar Documents

Publication Publication Date Title
CN207062980U (en) Mesh Retaining Wall
CN105201011B (en) A kind of compound anchored plate retaining wall and its construction method
CN113585290B (en) Deep foundation pit narrow fertilizer groove backfill construction method based on premixed fluidized solidified soil
CN109944610B (en) Method for rebuilding refuse landfill by using abandoned coal mine roadway
CN112343651A (en) Process and equipment for filling mining by using coal gangue
CN107842036A (en) Composite foundation reinforcement gabion baffling structure and construction method
CN215325715U (en) Novel assembly type corrugated steel pipe floor
JP2000154553A (en) Construction of tunnel
CN113071863A (en) Novel assembly type corrugated steel pipe floor
CN106906999B (en) Straw core mould production method and application in a kind of civil engineering
CN102102456B (en) Powdery material repository
CN217378901U (en) Subway steel encloses purlin backfill device behind one's back
CN204899360U (en) Modular square storehouse
CN210658434U (en) Retaining wall that reinforcing bar gabion and three-dimensional composite drainage network combine
CN211057836U (en) Cushion cap foundation backfill structure
CN211164462U (en) Residual soil field processing line in TRD construction method
CN108755732A (en) Energy conservation and environmental protection storage equipment ring foundation and its construction method
CN207348085U (en) Composite foundation reinforcement gabion baffling structure
CN202007562U (en) Powdery material storage warehouse
CN208183457U (en) A kind of rock-filling embankment
CN113086683A (en) Blending station underground assembly type steel pipe joint environment-friendly feeding system
CN102127889A (en) Method for constructing roadbed of reinforced concrete pavement of road
CN215562873U (en) Shallow foundation reinforcing structure
US20040179896A1 (en) Concrete receptacle assembly and method for using the same to creat synthetic riprap blocks
CN207062981U (en) A kind of Retaining Wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210706

RJ01 Rejection of invention patent application after publication