CN202007562U - Powdery material storage warehouse - Google Patents

Powdery material storage warehouse Download PDF

Info

Publication number
CN202007562U
CN202007562U CN2011200048765U CN201120004876U CN202007562U CN 202007562 U CN202007562 U CN 202007562U CN 2011200048765 U CN2011200048765 U CN 2011200048765U CN 201120004876 U CN201120004876 U CN 201120004876U CN 202007562 U CN202007562 U CN 202007562U
Authority
CN
China
Prior art keywords
wall
material storage
mentioned
granular material
establish
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200048765U
Other languages
Chinese (zh)
Inventor
于洪阳
孙丙春
吕晓光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN HENGXIANG FLY ASH UTILIZATION Co Ltd
Original Assignee
DALIAN HENGXIANG FLY ASH UTILIZATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN HENGXIANG FLY ASH UTILIZATION Co Ltd filed Critical DALIAN HENGXIANG FLY ASH UTILIZATION Co Ltd
Priority to CN2011200048765U priority Critical patent/CN202007562U/en
Application granted granted Critical
Publication of CN202007562U publication Critical patent/CN202007562U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A powdery material storage warehouse is characterized in that walls which are arranged on two sides of stone masonry and lower ring beams, connected with wall columns and have the height the same with the wall columns are formed by reinforced concrete shearing walls with thickness increased gradually from bottom to top and brick walls arranged on tops of the reinforced concrete shear walls. Upper ring beams are arranged on tops of the wall columns and the brick walls and welded with embedded parts, a grid mesh truss of roof of the storage warehouse is arranged on the tops of the upper ring beams and vertical columns, two spiral steel plate bin rolled plates which are split in the middle, are arched and are parallel to each other are arranged on the truss, each two single edges of the rolled plates are arranged on the upper ring beams and welded with the embedded parts, each two adjacent edges of the two spiral steel plate bin rolled plates are arranged on internal vertical columns, and through holes with covers are arranged on the two spiral steel plate rolled plates intermittently. The powdery material storage warehouse is low in manufacturing cost, has cost one third lower than that of an existing storage warehouse in the same scale, is high in storage capacity and is a large-scale warehouse capable of storing 90,000 tons of powdery materials. Further, the foundation of the powdery material storage warehouse, which is made of powdery ash, is quite firm; the earth bearing capacity of the foundation is over 15 tons/m2, and thereby the foundation is stable, labor-saving and earth-saving.

Description

The granular material storage vault
Technical field the utility model relates to the storage vault in a kind of warehouse, particularly granular material.
Background technology granular material moisture-sensitive caking, so it stores higher than the unclassified stores requirement.At present, all be the big tank stores that is built into sealing with cement generally.Its weak point is: the cost height.
Utility model content the utility model purpose is to provide a kind of and can guarantees the granular material quality, and the low granular material storage vault of cost.
Storage vault of the present utility model mainly is made of ground, wall column, body of wall and top, storehouse.Wherein, establish stone in the zanjon of ground and build by laying bricks or stones, filling concrete mortar or wet fly-ash between this stone.Establish wet-discharged coal ash and compacting around the ground.Be preferably on the above-mentioned wet-discharged coal ash top and spread a layer of clay, become floating dust to prevent dried flyash.Build by laying bricks or stones at above-mentioned stone and to set collar tie beam.This stone build by laying bricks or stones and lower ring beam on establish wall column and body of wall.Wherein, being interrupted the wall column that is provided with is the steel concrete cylinder.Be provided with the straining beam that is fixed on the lower ring beam between this wall column, preferably the straining beam two ends are fixed with the end of some Zhi Laliang respectively, and the other end of these straining beams links to each other with the lower ring beam of wall column respectively, to prevent that material is full of back wall and outwards rises.And be located at that stone is built by laying bricks or stones and lower ring beam on both sides link to each other with wall column and with the contour body of wall of wall column by several sections thickness different and from the bottom to top thickness steel concrete from big to small shear that brick wall on wall and their tops forms.Establish collar tie beam at above-mentioned wall column and brick wall top, be welded with built-in fitting on this on the collar tie beam.In the space that above-mentioned body of wall surrounds, establish some discontinuously in addition and the contour inner column of body of wall.On last collar tie beam and inner column top, be provided with the square grid shape truss on top, storehouse, cut the sharp general storehouse roll bending that is two arches arranged side by side in the middle of on above-mentioned truss, establishing, two monolateral placing on the collar tie beam, welded together with built-in fitting, two adjacent limits of roll bending, the sharp general storehouse of two halves place on the inner column, preferably establish the angle bar that opening makes progress on the inner column top, the adjacent limit of roll bending, the sharp general storehouse of two halves is fixed thereon.It is coupled to be provided with the upper end discontinuously on the roll bending of the sharp general storehouse of above-mentioned two halves, and the suspension rod that the lower end links to each other with truss makes sharp general storehouse roll bending more firm.That is interrupted on the roll bending of the sharp general storehouse of above-mentioned two halves in addition is provided with through hole with a lid, by this hole, the granular material in the tank car is carried in the storehouse.
The utility model compared with prior art has following advantage:
1, cost is low, compares cost low 1/3 with the thesaurus cost of existing same scale.
2, reserves are big, can build floor space 7000m 2X 12m, the big storehouse that can deposit 90,000 tons of granular materials.
3, do ground, solid especially with the powdery ash, 15 tons/m of earth bearing strength 2More than, stable, save money, economize soil.
Description of drawings
Fig. 1 is that the utility model master looks the section simplified schematic diagram.
Fig. 2 is the utility model wall column cross section simplified schematic diagram.
Fig. 3 is the utility model wall section simplified schematic diagram.
Fig. 4 is the simplified schematic diagram of overlooking of the utility model straining beam.
Fig. 5 is roll bending junction, the sharp general storehouse of a utility model two halves section simplified schematic diagram.
The specific embodiment is in the schematic diagram of Fig. 1, Fig. 2 and granular material storage vault shown in Figure 3, and ground has 1.5 meters dark ditches approximately, in establish granite bar shaped stone and build 1 by laying bricks or stones, filling concrete mortar between this granite.Establish the wet-discharged coal ash 2 and the compacting of wide 0.5-1 rice, dark 7-8 rice around the ground.On above-mentioned wet-discharged coal ash top, spread a layer of clay 3.Build by laying bricks or stones at above-mentioned stone and to set collar tie beam 4.This stone build by laying bricks or stones and lower ring beam on establish a steel concrete wall column 5 every 7 meters, its size is 1200x600mm.Be provided with the shaped steel straining beam 6 that is fixed on the lower ring beam between this wall column, the straining beam two ends are fixed with the end of some Zhi Laliang 7 respectively, and the other end of these straining beams links to each other with the lower ring beam of wall column respectively, as shown in Figure 4.Be located at that stone is built by laying bricks or stones and lower ring beam on both sides link to each other with wall column and with the contour body of wall bottom of wall column be that the steel concrete that 400mm is thick, 3 meters high is sheared wall 8, shear at the thick steel concrete of above-mentioned 400mm and establish the steel concrete that 350mm is thick, 3 meters are high on the wall again and shear wall 9.Shear at the thick steel concrete of above-mentioned 350mm and to establish the steel concrete that 250mm is thick, 3 meters high on the wall again and shear wall 10.Shear on the wall top at the thick steel concrete of 250mm at last and establish thick, the 3 meters high brick walls 11 of a brick.Establish collar tie beam 12 at above-mentioned wall column and brick wall top, be welded with built-in fitting 13 on this on the collar tie beam.In the space that above-mentioned body of wall surrounds, establish the some inner columns 14 contour in addition discontinuously with body of wall.There is the square grid shape truss 15 that is located on collar tie beam and the inner column top on top, above-mentioned storehouse, cut the sharp general storehouse roll bending 16 that is two arches arranged side by side in the middle of on above-mentioned truss, establishing, two monolateral placing on the collar tie beam, welded together with built-in fitting, two adjacent limits of roll bending, the sharp general storehouse of two halves place on the inner column, and establish the angle bar 17 that opening makes progress on the inner column top, and the adjacent limit of roll bending, the sharp general storehouse of two halves is fixed thereon, and the rotten filler 18 of setting up defences between them, as shown in Figure 5.It is coupled to be provided with the upper end discontinuously on the roll bending of the sharp general storehouse of above-mentioned two halves, the suspension rod 19 that the lower end links to each other with truss.On the roll bending of the sharp general storehouse of above-mentioned two halves, be provided with through hole with a lid discontinuously in addition.

Claims (7)

1. granular material storage vault, establishing stone in the zanjon of its ground builds by laying bricks or stones, filling concrete mortar or wet fly-ash between this stone, build by laying bricks or stones at above-mentioned stone and to set collar tie beam, this stone build by laying bricks or stones and lower ring beam on establish wall column and body of wall, being interrupted the wall column that is provided with is the steel concrete cylinder, it is characterized in that: be located at that stone is built by laying bricks or stones and lower ring beam on both sides link to each other with wall column and with the contour body of wall of wall column be that the brick wall sheared on wall and their tops of thickness steel concrete is from big to small formed from the bottom to top, establish collar tie beam at above-mentioned wall column and brick wall top, should go up on the collar tie beam and be welded with built-in fitting, in the space that above-mentioned body of wall surrounds, establish the inner column contour in addition discontinuously with body of wall, on last collar tie beam and inner column top, be provided with the square grid shape truss on top, storehouse, cut the sharp general storehouse roll bending that is two arches arranged side by side in the middle of on above-mentioned truss, establishing, two monolateral placing on the collar tie beam, welded together with built-in fitting, two adjacent limits of roll bending, the sharp general storehouse of two halves place on the inner column, and that is interrupted on the roll bending of the sharp general storehouse of above-mentioned two halves in addition is provided with through hole with a lid.
2. granular material storage vault according to claim 1 is characterized in that: be provided with the straining beam that is fixed on the lower ring beam between the above-mentioned wall column.
3. granular material storage vault according to claim 2 is characterized in that: the straining beam two ends are fixed with the end of Zhi Laliang respectively, and the other end of these straining beams links to each other with the lower ring beam of wall column respectively.
4. granular material storage vault according to claim 1 and 2 is characterized in that: establish the angle bar that opening makes progress on the inner column top, the adjacent limit of roll bending, the sharp general storehouse of two halves is fixed thereon.
5. granular material storage vault according to claim 4 is characterized in that: it is coupled to be provided with the upper end discontinuously on the roll bending of the sharp general storehouse of above-mentioned two halves, the suspension rod that the lower end links to each other with truss.
6. granular material storage vault according to claim 1 is characterized in that: establish wet-discharged coal ash and compacting around the ground.
7. granular material storage vault according to claim 6 is characterized in that: spread a layer of clay on above-mentioned wet-discharged coal ash top.
CN2011200048765U 2011-01-04 2011-01-04 Powdery material storage warehouse Expired - Lifetime CN202007562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200048765U CN202007562U (en) 2011-01-04 2011-01-04 Powdery material storage warehouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200048765U CN202007562U (en) 2011-01-04 2011-01-04 Powdery material storage warehouse

Publications (1)

Publication Number Publication Date
CN202007562U true CN202007562U (en) 2011-10-12

Family

ID=44749218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200048765U Expired - Lifetime CN202007562U (en) 2011-01-04 2011-01-04 Powdery material storage warehouse

Country Status (1)

Country Link
CN (1) CN202007562U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102102456A (en) * 2011-01-04 2011-06-22 大连恒翔粉煤灰综合利用有限公司 Powdery material repository
CN106013229A (en) * 2016-06-24 2016-10-12 长安大学 Free standing brick setting aseismatic cave dwelling and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102102456A (en) * 2011-01-04 2011-06-22 大连恒翔粉煤灰综合利用有限公司 Powdery material repository
CN102102456B (en) * 2011-01-04 2012-09-19 大连恒翔粉煤灰综合利用有限公司 Powdery material repository
CN106013229A (en) * 2016-06-24 2016-10-12 长安大学 Free standing brick setting aseismatic cave dwelling and construction method thereof
CN106013229B (en) * 2016-06-24 2018-06-01 长安大学 A kind of method of construction of stand alone type brick setting antidetonation cave dwelling

Similar Documents

Publication Publication Date Title
CN207062980U (en) Mesh Retaining Wall
CN203256699U (en) Construction structure for water passing earth-rock dam
CN103572966B (en) The construction method of silo funnel liner
CN102102456B (en) Powdery material repository
CN102146680B (en) Packaged-type reinforced gabion retaining wall and construction method thereof
CN202007562U (en) Powdery material storage warehouse
CN102409897A (en) Round coal yard barricade of concrete pilaster of steel plate wall
CN104947948B (en) A kind of reinforcement means of rammed earth body of wall
CN107960216A (en) A kind of multi-functional intelligence grain storehouse
CN210264105U (en) Corrugated cast-in-place reinforced concrete tank
CN106639452A (en) Lightweight-steel-structure grain storing granary
CN106906999A (en) Straw core mould preparation method and application in a kind of civil engineering
CN202627615U (en) Round coal-yard coal bulkhead
CN206646521U (en) A kind of compound full Grouted bolt supporting construction of campshed
CN214887131U (en) Coal slime pier column
CN201507118U (en) Large-volume concrete hopper for construction of high-rise building or multi-storey basement
CN202249157U (en) Round coal yard retaining wall with concrete wall columns and steel plate wall
CN204343487U (en) A kind of cast-in-situ thermal-insulated bearing wall
CN209066483U (en) A kind of assembled ecology retaining wall
CN108755732A (en) Energy conservation and environmental protection storage equipment ring foundation and its construction method
CN207672414U (en) A kind of bridge
CN201671102U (en) Foundation structure of large-load industrial building
CN205100167U (en) Utilize dam structure of high moisture content morals and manners material
CN202039383U (en) Wrapped type reinforced gabion retaining wall
CN202483229U (en) Steel structural storage tank

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20111012

Effective date of abandoning: 20130227

RGAV Abandon patent right to avoid regrant