CN102409897A - Round coal yard barricade of concrete pilaster of steel plate wall - Google Patents
Round coal yard barricade of concrete pilaster of steel plate wall Download PDFInfo
- Publication number
- CN102409897A CN102409897A CN2011102397746A CN201110239774A CN102409897A CN 102409897 A CN102409897 A CN 102409897A CN 2011102397746 A CN2011102397746 A CN 2011102397746A CN 201110239774 A CN201110239774 A CN 201110239774A CN 102409897 A CN102409897 A CN 102409897A
- Authority
- CN
- China
- Prior art keywords
- barricade
- steel
- pilaster
- steel plate
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The invention discloses a round coal yard barricade of a concrete pilaster of a steel plate wall. The round coal yard barricade at least consists of reinforced concrete support pilasters and a side wall of steel plates and steel beams fixed on the support pilaster, wherein the support pilasters are uniformly annularly distributed; the steel beams are annularly fixed on all support pilaster, and the annularly arranged steel beams are connected with steel plates which are annularly arranged; the section of the support pilaster is made into a variable-section trapezoidal section with a small top and a big bottom; the annularly arranged steel plates are connected to the annularly arranged steel beams by intermittent welding; an embedded parts are embedded on the support pilasters; and the annularly arranged steel beams are fixedly connected on the support pilasters through the embedded part. The round coal yard barricade disclosed by the invention has a simple structure, is convenient to use and mount, saves material, reduces the use cost and prolongs the service life and the like.
Description
Technical field
What the present invention relates to is the wall-retaining structure of a kind of novel steam power station round sealed coal yard, belongs to power plant civil engineering structure technical field.
Background technology
Traditional circular coal yard wall-retaining structure has following several kinds:
The separate type barricade of 1 reinforced concrete soil zone pilaster and temperature joint;
2 steel concrete do not have pilaster integral seamless ring-plate barricade;
3 reinforced concrete soil zone pilaster integral seamless formula barricades;
4 reinforced concrete soil zone pilaster and ring beam integral seamless formula barricade;
Tradition separate type barricade calculates simple, but waste of material.Traditional integral barricade calculation of complex, especially temperature action is complicated, is difficult to accurate consideration; The Crack Control that the barricade arrangement of reinforcement is caused by temperature action, reinforcement stresses are 160N/mm
2About, not only actual reinforcing bar consumption is huge, and has potential security risk.
Summary of the invention
The object of the invention mainly is to implement the target of national energy-saving and emission-reduction, overcomes the deficiency that above-mentioned prior art exists, and a kind of easy construction is provided, the circular coal yard barricade of the steel plate wall concrete pilaster of material economy.
The objective of the invention is to accomplish through following technical scheme; The buttress that it is processed by steel concrete at least be fixed on the sidewall wall that steel plate on the said buttress adds girder steel and form; Described buttress is uniformly distributed with ringwise; Described girder steel hoop is fixed on all buttresses, and on described hoop girder steel, is connected with the steel plate that hoop is arranged.
The cross section of said buttress is made into up-small and down-big variable cross-section trapezoidal cross-section; Described hoop steel plate is connected on the described hoop girder steel through discontinuous welding in succession.
Be embedded with built-in fitting on the described buttress, described hoop girder steel is fixedly connected on the described buttress through described built-in fitting.
The present invention is owing to brought into play the tensile strength of concrete compressive strength and steel simultaneously, and comprehensive cost practices thrift about 30% than traditional form; Construction period practiced thrift 1 month than traditional structure; Have simple in structure, easy to install and use, can economical with materials, reduce use cost, increase characteristics such as application life.
Description of drawings
Fig. 1 is an overall structure sketch map of the present invention.
Fig. 2 is a partial structurtes sketch map of the present invention.
Fig. 3 is a layout plan of the present invention.
Fig. 4 is a sectional drawing of the present invention.
Fig. 5 is a node enlarged drawing of the present invention.
The specific embodiment
To combine below accompanying drawing to the present invention make detailed introduction: Fig. 1, shown in 2; The buttress 1 that the present invention is mainly processed by steel concrete be fixed on the sidewall wall that steel plate 2 on the said buttress 1 adds girder steel 3 and form; Described buttress 1 is uniformly distributed with ringwise; Described girder steel 3 hoops are fixed on all buttresses 1, and on described hoop girder steel 3, are connected with the steel plate 2 that hoop is arranged.
The cross section of buttress shown in the figure 1 is made into up-small and down-big variable cross-section trapezoidal cross-section; Described hoop steel plate 2 is connected on the described hoop girder steel 3 through discontinuous welding in succession.
Be embedded with built-in fitting on the buttress 1 of the present invention, described hoop girder steel 3 is fixedly connected on the described buttress 1 through described built-in fitting.
The present invention is because the barricade sidewall is stressed with stretch bending control, and the intensity of steel structure material is high, and temperature action is insensitive, does not have the crack problem of reinforced concrete structure simultaneously again, so can economical with materials.
The quantity of the buttress 1 of novel barricade according to the invention, preferably 36, total symmetry like this, concrete certainly quantity should be calculated definite by loading conditions such as the diameter of barricade and coal piling height.
The buttress 1 of said novel barricade adopts monolithic reinforced concrete structure, by the building-site casting and constructing.The pilaster of steel concrete can provide barricade required rigidity.According to the loading characteristic of buttress, be preferably made top little below big variable cross-section trapezoidal cross-section, like this can economical with materials.The concrete cross-sectional sizes of buttress is calculated by loading conditions such as the diameter of barricade and coal piling height and to be confirmed.
Adopt between the hoop girder steel 2 of novel barricade according to the invention and the hoop steel plate 3 intermittently to be welded to connect, accomplish through the field Welding construction.Hoop girder steel 2 is along the quantity of short transverse, and the thickness of the cross-sectional sizes of hoop girder steel 2 and hoop steel plate 3 is calculated by loading conditions such as the diameter of barricade and coal piling height and to confirm.
Being connected between the hoop girder steel 2 of said novel barricade and the buttress 1 preferably is employed in the buttress 1 and buries built-in fitting underground, is connected by field Welding between hoop girder steel 2 and the built-in fitting.
Claims (3)
1. the circular coal yard barricade of a steel plate wall concrete pilaster; The buttress that it is processed by steel concrete is at least formed with the sidewall wall that is fixed on the said buttress, be made up of steel plate and girder steel; It is characterized in that described buttress is uniformly distributed with ringwise; Described girder steel hoop is fixed on all buttresses, and on described hoop girder steel, is connected with the steel plate that hoop is arranged.
2. the circular coal yard barricade of steel plate wall concrete pilaster according to claim 1 is characterized in that the cross section of said buttress is made into up-small and down-big variable cross-section trapezoidal cross-section; Described hoop steel plate is connected on the described hoop girder steel through discontinuous welding in succession.
3. the circular coal yard barricade of steel plate wall concrete pilaster according to claim 1 and 2 is characterized in that being embedded with built-in fitting on the described buttress, and described hoop girder steel is fixedly connected on the described buttress through described built-in fitting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102397746A CN102409897A (en) | 2011-08-19 | 2011-08-19 | Round coal yard barricade of concrete pilaster of steel plate wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102397746A CN102409897A (en) | 2011-08-19 | 2011-08-19 | Round coal yard barricade of concrete pilaster of steel plate wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102409897A true CN102409897A (en) | 2012-04-11 |
Family
ID=45912202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102397746A Pending CN102409897A (en) | 2011-08-19 | 2011-08-19 | Round coal yard barricade of concrete pilaster of steel plate wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102409897A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102787740A (en) * | 2012-08-14 | 2012-11-21 | 中国大唐集团环境技术有限公司 | Combined stress foundation-less steel concrete retaining wall |
CN104746928A (en) * | 2015-04-08 | 2015-07-01 | 中船第九设计研究院工程有限公司 | Arc plate structural unit and air-pressure-resistant steel plate wall connected through same |
CN105257059A (en) * | 2015-09-28 | 2016-01-20 | 中国能源建设集团湖南省电力设计院有限公司 | Partially prefabricated prestressed coal retaining wall for circular coal yards and method for constructing partially prefabricated prestressed coal retaining wall |
CN105257057A (en) * | 2015-09-28 | 2016-01-20 | 中国能源建设集团湖南省电力设计院有限公司 | Coal retaining wall with steel-concrete combination structures for circular coal yards and method for constructing coal retaining wall |
CN106731547A (en) * | 2017-02-27 | 2017-05-31 | 大唐环境产业集团股份有限公司 | A kind of desulfuration absorbing tower bottom steel frame and preparation method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5588786A (en) * | 1989-05-04 | 1996-12-31 | Marylyn House | Combination retaining wall and method of construction |
CN201605860U (en) * | 2009-07-15 | 2010-10-13 | 广东省电力设计研究院 | Novel coal retaining wall structure for circular coal storage structure |
CN202249157U (en) * | 2011-08-19 | 2012-05-30 | 浙江省电力设计院 | Round coal yard retaining wall with concrete wall columns and steel plate wall |
-
2011
- 2011-08-19 CN CN2011102397746A patent/CN102409897A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5588786A (en) * | 1989-05-04 | 1996-12-31 | Marylyn House | Combination retaining wall and method of construction |
CN201605860U (en) * | 2009-07-15 | 2010-10-13 | 广东省电力设计研究院 | Novel coal retaining wall structure for circular coal storage structure |
CN202249157U (en) * | 2011-08-19 | 2012-05-30 | 浙江省电力设计院 | Round coal yard retaining wall with concrete wall columns and steel plate wall |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102787740A (en) * | 2012-08-14 | 2012-11-21 | 中国大唐集团环境技术有限公司 | Combined stress foundation-less steel concrete retaining wall |
CN102787740B (en) * | 2012-08-14 | 2015-10-07 | 中国大唐集团环境技术有限公司 | Combination stressed foundation-free steel concrete stock retaining wall |
CN104746928A (en) * | 2015-04-08 | 2015-07-01 | 中船第九设计研究院工程有限公司 | Arc plate structural unit and air-pressure-resistant steel plate wall connected through same |
CN105257059A (en) * | 2015-09-28 | 2016-01-20 | 中国能源建设集团湖南省电力设计院有限公司 | Partially prefabricated prestressed coal retaining wall for circular coal yards and method for constructing partially prefabricated prestressed coal retaining wall |
CN105257057A (en) * | 2015-09-28 | 2016-01-20 | 中国能源建设集团湖南省电力设计院有限公司 | Coal retaining wall with steel-concrete combination structures for circular coal yards and method for constructing coal retaining wall |
CN105257059B (en) * | 2015-09-28 | 2017-08-25 | 中国能源建设集团湖南省电力设计院有限公司 | A kind of partial precast prestressing force coal bulkhead of circular coal yard and its construction method |
CN105257057B (en) * | 2015-09-28 | 2017-10-31 | 中国能源建设集团湖南省电力设计院有限公司 | A kind of circular coal yard steel-concrete combined structure coal-stopping wall and its construction method |
CN106731547A (en) * | 2017-02-27 | 2017-05-31 | 大唐环境产业集团股份有限公司 | A kind of desulfuration absorbing tower bottom steel frame and preparation method thereof |
CN106731547B (en) * | 2017-02-27 | 2023-07-21 | 大唐环境产业集团股份有限公司 | Desulfurizing absorption tower bottom steel frame and manufacturing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746422B (en) | A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method | |
WO2017045223A1 (en) | Prefabricated pier column member with steel-concrete composite structure | |
CN103074941B (en) | Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end | |
CN203271243U (en) | Chimney titanium plate steel inner barrel reverse installation construction device of thermal power plant | |
CN102383420B (en) | High-strength concrete prefabricated pile doped with fiber-reinforced plastic bar | |
CN209654051U (en) | A kind of inscribed lining cutting piece in steel corrugated plating Combined concrete tunnel | |
CN102409897A (en) | Round coal yard barricade of concrete pilaster of steel plate wall | |
CN108951653B (en) | Foundation pit row pile supporting pile soil reinforcing method | |
CN210798990U (en) | Corrugated steel lining combined member for tunnel | |
CN204097864U (en) | A kind of bridge prefabrication hollow pier stud delay-pour joint structure | |
CN202208916U (en) | High-strength concrete prefabricated pile | |
CN202249157U (en) | Round coal yard retaining wall with concrete wall columns and steel plate wall | |
CN102776880A (en) | Prefabricated concrete irregular-shaped pile | |
CN204662946U (en) | A kind of formwork system of silo inner funnel | |
CN106638265B (en) | A kind of steel reinforced concrete beam rigid framed structure arch bridge | |
CN102102456B (en) | Powdery material repository | |
CN201981549U (en) | Precast electric pole pile | |
CN203007933U (en) | Compound reinforcing bar non-round concrete precast pile | |
CN202627615U (en) | Round coal-yard coal bulkhead | |
CN103375041A (en) | Coal bulkhead of circular coal yard | |
CN205502243U (en) | Steel I -column with built -in fitting rigid coupling | |
CN205502058U (en) | Pin -connected panel tower crane foundation | |
CN203939023U (en) | Anti-seismic prefabricated concrete triangle solid pile | |
CN201065531Y (en) | Longitudinal ring interlaced ridge type pipe pile | |
CN104265005A (en) | Steel plate and steel bar combined beam top reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120411 |