CN207062980U
CN207062980U CN201721005494.8U CN201721005494U CN207062980U CN 207062980 U CN207062980 U CN 207062980U CN 201721005494 U CN201721005494 U CN 201721005494U CN 207062980 U CN207062980 U CN 207062980U
Authority
CN
China
Prior art keywords
bottom plate
riser
retaining wall
wall
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721005494.8U
Other languages
Chinese (zh)
Inventor
刘泽
蒋梅东
何矾
黄天棋
陈丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University of Science and Technology
Original Assignee
Hunan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology filed Critical Hunan University of Science and Technology
Priority to CN201721005494.8U priority Critical patent/CN207062980U/en
Application granted granted Critical
Publication of CN207062980U publication Critical patent/CN207062980U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of mesh Retaining Wall, including multiple retaining wall units being arranged side by side, each retaining wall unit includes bottom plate and riser, bottom plate and riser are reinforced concrete structure, the bottom plate is lain on ground, bottom plate is provided with multiple vertical filling holes, and riser bottom, which is arranged on bottom plate, forms wall, and riser laterally fills hole provided with multiple.Bottom plate and riser of the present utility model are reinforced concrete structure, can carry out assembling construction at the scene, have the advantages of member unit reliable in quality, site operation is simple, efficiency of construction is high;Filled in the mesh that bottom plate bankets side and be compacted gravel matter filler, while baseboard material consumption is reduced, improve the coefficient of friction between bottom plate and ground.

Description

Mesh Retaining Wall
Technical field
The retaining wall in civil engineering is the utility model is related to, more particularly to a kind of mesh Retaining Wall.
Background technology
Retaining wall is one of major project measure for ensureing slope soil stability, in railway, highway, municipal administration, water conservancy, ore deposit Mountain, room are built and geological disaster is punished and largely used in engineering.The structure type of retaining wall is relatively more at present, such as gravity type The application of retaining wall, reinforced earth retaining wall, grappling plate type retaining wall, cantilever counterfort retaining wall etc., wherein gravity retaining wall is most To be extensive, it has the advantages that simple in construction, convenient material drawing, construction technology are simple, but gravity retaining wall consumption of materials it is big, Labor strength is high, mechanization degree is low, construction quality is difficult to be guaranteed, later stage disease is more;Cantilever counterfort retaining wall And the panel of reinforced earth bulkhead uses(Reinforcing bar)Concrete structure, have from heavy and light the advantages of, but general is also cast-in-site Make, execution conditions are poor, and construction quality is poor, it is impossible to load is immediately subjected to, so as to influence project progress, and after casting and constructing also Want periodic maintenance.In addition, metope gray is adjusted after the construction of these retaining walls, it is difficult to carries out ecological afforestation, landscape effect is poor.
The content of the invention
In order to solve the above-mentioned technical problem, the utility model provide it is a kind of it is simple in construction, cost is low, reliable in quality, construction Convenient mesh Retaining Wall.
The technical scheme that the utility model solves the above problems is:A kind of mesh Retaining Wall, including it is multiple simultaneously The retaining wall unit set is arranged, each retaining wall unit includes bottom plate and riser, and bottom plate and riser are armored concrete knot Structure, the bottom plate are lain on ground, and bottom plate is provided with multiple vertical filling holes, and riser bottom is arranged on bottom plate and forms wall Body, riser are provided with multiple laterally filling holes.
Above-mentioned mesh Retaining Wall, the plate upper surface are reserved with bolt, bolt and reinforcement welding in bottom plate Together, the riser bottom is reserved with bolt hole, and the position of bolt hole is corresponding with the position of bolt on bottom plate.
Above-mentioned mesh Retaining Wall, riser bottom side of banketing are convexly equipped with fixed block, and fixed block is provided with more The individual bolt hole.
Above-mentioned mesh Retaining Wall, the bottom plate banket the wall heel point that side is wall, and bottom plate opposite side is wall It is assembling beam between the toe of wall part of body, toe of wall part and wall heel point, the bolt is on assembling beam.
Above-mentioned mesh Retaining Wall, the bottom plate banket side vertical filling hole in fill gravel matter filler, gravel Cement mortar is marked between the rubble gap of stone matter filler.
Above-mentioned mesh Retaining Wall, the bottom plate bankets side and riser bankets, and side is equipped with one layer of GSZ.
The beneficial effects of the utility model are:
1st, bottom plate and riser of the present utility model are reinforced concrete structure, can carry out assembling construction at the scene, have The advantages of member unit reliable in quality, site operation are simple, efficiency of construction is high.
2nd, the utility model fills in the mesh that bottom plate bankets side and is compacted gravel matter filler, disappears reducing baseboard material While consumption, the coefficient of friction between bottom plate and ground can be improved.
3rd, can be sought after the completion of the utility model construction by carrying out ecological afforestation in riser and the mesh of bottom plate toe of wall part Make engineering landscape.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is top view of the present utility model.
Fig. 3 is the structural representation of Fig. 1 bottom plates.
Fig. 4 is the structural representation of riser in Fig. 1.
Fig. 5 is the utility model assembled in situ construction drawing.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
As Figure 1-Figure 4, the utility model includes multiple retaining wall units being arranged side by side, and each retaining wall unit is equal Including bottom plate 2 and riser 1, bottom plate 2 and riser 1 are reinforced concrete structure, and the bottom plate 2 is lain on ground 6, bottom plate 2 Be provided with multiple vertical filling holes 7, the bottom plate 2 banket side vertical filling hole 7 in fill gravel matter filler, gravel matter filler Rubble gap between be marked with cement mortar, while 2 material consumption of bottom plate is reduced, improve the friction between bottom plate 2 and ground 6 Coefficient.The installation of the bottom of riser 1 forms wall on a base plate 2, and riser 1 is provided with multiple laterally filling holes 8.
The bottom plate 2 bankets the wall heel point that side is wall, and the opposite side of bottom plate 2 is the toe of wall part of wall, toe of wall part Be assembling beam 9 between wall heel point, assemble and be reserved with bolt 10 on beam 9, bolt 10 together with reinforcement welding in bottom plate 2, The bottom of riser 1 side of banketing is convexly equipped with fixed block 11, and fixed block 11 is provided with multiple bolts hole 12, the position of bolt hole 12 with The position of bolt 10 is corresponding on bottom plate 2, and bolt hole 12 is shaped by steel bushing, and steel bushing passes through electric welding and bar connecting in riser 1.
The bottom plate 2 bankets side and riser 1 bankets, and side is equipped with one layer of GSZ 3.It can be used if necessary after riser 1 Ecology bag 4 fills Nutrition Soil code and is built into interior wall, prevents filler from being spilt from the horizontal filling hole 8 of riser 1.It can be adopted after the completion of construction Filled with transverse direction the methods of broadcasting branch, sow grass seeds by duster by riser 1 in the vertical filling hole 7 of hole 8 and the toe of wall part of bottom plate 2 and carry out ecology Greening.
Assembling process of the present utility model is as follows:In Fig. 5(a)It is shown, it is prefabricated in precasting yard punching block by design drawing Riser 1 and bottom plate 2, and conserved by reinforced concrete structure regulations requirement, stack, treat that retaining wall is laid work point ground 6 and reached Riser 1 and bottom plate 2 are transported to work point to after requiring;(b)It is shown, first with crane by the unit of bottom plate 2 in place;(c)It is shown, then Riser 1 is lifted, bottom plate 2 and riser 1 is in orthogonal state to be spliced;(d)It is shown, the bolt 10 in bottom plate 2 is inserted Enter into the bolt hole 12 in riser 1, refill top nut, pad after casting cement mortar into bolt hole 12 and twist nut Tightly;(e)It is shown, concrete is poured into a mould in the junction of bolt 10, forms protective layer, filling gravel matter in hole 7 is vertically filled to bottom plate 2 Filler, compacting, and inject cement mortar between rubble gap;Finally, banketed in retaining wall on side bottom plate 2 and the inner side of riser 1 is spread If can be to being backfilled with backfill 5 after wall after one layer of GSZ 3, backfill 5 forms retaining wall after being compacted wall.

Claims (6)

  1. A kind of 1. mesh Retaining Wall, it is characterised in that:Including multiple retaining wall units being arranged side by side, each earth-retaining Wall unit includes bottom plate and riser, and bottom plate and riser are reinforced concrete structure, and the bottom plate is lain on ground, bottom plate Multiple vertical filling holes are provided with, riser bottom, which is arranged on bottom plate, forms wall, and riser laterally fills hole provided with multiple.
  2. 2. mesh Retaining Wall according to claim 1, it is characterised in that:The plate upper surface is reserved with spiral shell Bolt, for bolt together with reinforcement welding in bottom plate, the riser bottom is reserved with bolt hole, spiral shell on the position of bolt hole and bottom plate The position of bolt is corresponding.
  3. 3. mesh Retaining Wall according to claim 2, it is characterised in that:The riser bottom is banketed side projection There is fixed block, fixed block is provided with multiple bolts hole.
  4. 4. mesh Retaining Wall according to claim 2, it is characterised in that:The bottom plate bankets side as wall Wall heel point, bottom plate opposite side are the toe of wall part of wall, are to assemble beam, the bolt position between toe of wall part and wall heel point In on assembling beam.
  5. 5. mesh Retaining Wall according to claim 1, it is characterised in that:The bottom plate the vertical of side that banket is filled out Filling gravel matter filler in hole is filled, cement mortar is marked between the rubble gap of gravel matter filler.
  6. 6. mesh Retaining Wall according to claim 4, it is characterised in that:The bottom plate bankets side and riser is filled out Native side is equipped with one layer of GSZ.
CN201721005494.8U 2017-08-12 2017-08-12 Mesh Retaining Wall Expired - Fee Related CN207062980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721005494.8U CN207062980U (en) 2017-08-12 2017-08-12 Mesh Retaining Wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721005494.8U CN207062980U (en) 2017-08-12 2017-08-12 Mesh Retaining Wall

Publications (1)

Publication Number Publication Date
CN207062980U true CN207062980U (en) 2018-03-02

Family

ID=61520679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721005494.8U Expired - Fee Related CN207062980U (en) 2017-08-12 2017-08-12 Mesh Retaining Wall

Country Status (1)

Country Link
CN (1) CN207062980U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661072A (en) * 2018-07-19 2018-10-16 中国电建集团贵阳勘测设计研究院有限公司 Ecological assembled weighing cavity retaining structure
CN109208635A (en) * 2018-11-16 2019-01-15 中建五局土木工程有限公司 A kind of construction method of reinforced earth retaining wall structure and barricade
CN109440814A (en) * 2018-11-29 2019-03-08 上海市城市建设设计研究总院(集团)有限公司 L-type is bolted prefabricated retaining wall
CN109853613A (en) * 2019-04-02 2019-06-07 中昇东浩(广州)建设有限公司 A kind of assembled Ecological Retaining Wall and installation method
CN109898551A (en) * 2019-03-15 2019-06-18 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall using bolt block connection type
CN109898550A (en) * 2019-03-15 2019-06-18 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall being connected by screw bolts mode
CN110055997A (en) * 2019-03-15 2019-07-26 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall using grouting anchor connection mode
CN111749267A (en) * 2020-06-03 2020-10-09 安徽省交通规划设计研究总院股份有限公司 Industrialized UHPC cantilever retaining wall and construction method thereof
CN113914359A (en) * 2021-10-28 2022-01-11 广东科能工程管理有限公司 Segmental prefabricated assembled cantilever retaining wall

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661072A (en) * 2018-07-19 2018-10-16 中国电建集团贵阳勘测设计研究院有限公司 Ecological assembled weighing cavity retaining structure
CN109208635A (en) * 2018-11-16 2019-01-15 中建五局土木工程有限公司 A kind of construction method of reinforced earth retaining wall structure and barricade
CN109440814A (en) * 2018-11-29 2019-03-08 上海市城市建设设计研究总院(集团)有限公司 L-type is bolted prefabricated retaining wall
CN109898551A (en) * 2019-03-15 2019-06-18 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall using bolt block connection type
CN109898550A (en) * 2019-03-15 2019-06-18 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall being connected by screw bolts mode
CN110055997A (en) * 2019-03-15 2019-07-26 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall using grouting anchor connection mode
CN109853613A (en) * 2019-04-02 2019-06-07 中昇东浩(广州)建设有限公司 A kind of assembled Ecological Retaining Wall and installation method
CN111749267A (en) * 2020-06-03 2020-10-09 安徽省交通规划设计研究总院股份有限公司 Industrialized UHPC cantilever retaining wall and construction method thereof
CN113914359A (en) * 2021-10-28 2022-01-11 广东科能工程管理有限公司 Segmental prefabricated assembled cantilever retaining wall

Similar Documents

Publication Publication Date Title
CN207062980U (en) Mesh Retaining Wall
CN105201011B (en) A kind of compound anchored plate retaining wall and its construction method
CN102966119B (en) Geogrid reinforced wall and construction method thereof
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN105155558A (en) Combined retaining structure and construction method thereof
CN109371989B (en) A kind of combined type retaining structure and its construction method suitable for stability of slope supporting
CN201158826Y (en) Earth work grille reinforced retaining wall
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN104790428B (en) Ultrahigh integrated plastic-steel grid reinforced soil abutment retaining wall structure and construction method thereof
CN107100180A (en) Superelevation light supporting structure and improvement high roadbed, the method for high slope engineering
CN203174619U (en) Reverse raft concrete terrace
CN210315102U (en) Slope protection reinforced roadbed structure of composite ecological decoration panel
CN110700291A (en) Combined retaining structure and construction method thereof
CN110374111B (en) Slope releasing and steel pipe pile anchor cooperative supporting system
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN102926398A (en) Construction method of inclined column type corrosion resistant foundation for power line in salt lake area
CN104895111B (en) The construction method of integrated pipe canal in weak soil ground
CN105201012A (en) Casting cable trench after assembly of L-shaped precast concrete and construction method of casting cable trench
RU2392387C2 (en) Device and method for reinforcement of mast base
CN215976664U (en) Rigid pile composite foundation treatment structure of lower horizontal pipe gallery structure
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN204919602U (en) Compound anchored retaining wall by tie rods
KR101838244B1 (en) Cast-in-place reinforced top pile and construction method thereof
CN1202319C (en) Constructive method for composite foundation
CN202899153U (en) Oblique column type anti-corrosion foundation device for power transmission line of salt-lake region

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302

Termination date: 20200812