CN113070611A CN202110293249.6A CN202110293249A CN113070611A CN 113070611 A CN113070611 A CN 113070611A CN 202110293249 A CN202110293249 A CN 202110293249A CN 113070611 A CN113070611 A CN 113070611A
Authority
CN
China
Prior art keywords
connecting rod
welding
equipment
end equipment
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110293249.6A
Other languages
Chinese (zh)
Other versions
CN113070611B (en
Inventor
朱尚富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Beiyi Vehicle Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110293249.6A priority Critical patent/CN113070611B/en
Publication of CN113070611A publication Critical patent/CN113070611A/en
Application granted granted Critical
Publication of CN113070611B publication Critical patent/CN113070611B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/003Cooling means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

The invention relates to cooling equipment, in particular to post-welding rapid cooling equipment for manufacturing high-end equipment. The invention aims to provide post-welding rapid cooling equipment for manufacturing high-end equipment, which has a good temperature control effect, can improve the welding strength by cooling points, reduce the loss, effectively protect a sealing assembly inside a welding part and does not influence the quality of a welding seam. A post-welding rapid cooling device for manufacturing high-end equipment comprises a base, a placing assembly, a sprinkling assembly and the like; the base top is equipped with places the subassembly, and the base top is equipped with the watering subassembly, and the watering subassembly is located and places the subassembly top. According to the invention, the first connecting rod contacts the right button for the first time, the spray head is opened, the high-temperature metal is cooled, and when the first connecting rod contacts the left button, the second contact is carried out, so that the spray head is closed.

Description

High-end equipment is made with welding back rapid cooling equipment
Technical Field
The invention relates to cooling equipment, in particular to post-welding rapid cooling equipment for manufacturing high-end equipment.
Background
In the early stage, two metals were soldered by heating a low melting point tin-lead alloy with a hot iron, and the two metals were joined together by forging after heating to a red hot state. The welding technology has penetrated into various fields of manufacturing industry, the metal processing technology formed by welding and other methods such as metal cutting processing, pressure processing, casting, heat treatment, cooling and the like has become a basic production means of various departments in the industries such as automobiles, ships, airplanes, aerospace, atomic energy, petroleum, chemical engineering, electronics and the like, and directly influences the quality, reliability and service life of products, the production cost, efficiency and the reaction speed of the market, wherein the welding process plays a crucial role, but most welding cooling devices on the market have the problems that the welding parts crack due to the fact that the cooling speed is too high, the welding strength is reduced too low, point cooling cannot be realized, the cooling range cannot be flexibly controlled, the loss is large and the like.
Therefore, a post-welding rapid cooling device for manufacturing high-end equipment, which has a good temperature control effect, can cool the point to improve the welding strength, reduce the consumption, effectively protect the sealing assembly inside the welded part, and does not affect the quality of the welding seam, needs to be designed.
Disclosure of Invention
In order to overcome the defects of low welding strength, incapability of flexibly controlling the cooling range and large loss, the invention aims to provide the post-welding rapid cooling equipment for manufacturing high-end equipment, which has a good temperature control effect, improves the welding strength by point cooling, reduces the loss, effectively protects a sealing assembly in a welding part and does not influence the quality of a welding seam.
The technical scheme of the invention is as follows: the utility model provides a high-end equipment is made with welding back rapid cooling equipment, including: the device comprises a base and a placing component, wherein the placing component is arranged on the base; the base is provided with a water sprinkling assembly.
Further illustratively, the placement module comprises: the base is provided with a first support frame; the first support frame is provided with a placing plate; the baffle is symmetrically arranged on the placing plate.
Further illustratively, the sprinkler assembly includes: the base is provided with a second support frame; the second support frame is provided with a second slide rail; the sprayer is arranged on one side of the first sliding rail in a sliding mode; the nozzle is connected with a first connecting rod; the button, the symmetry is equipped with the button on the second support frame, and the button is mutually supported with first connecting rod.
Further explaining, still including the locating component, the locating component includes: the stop lever is arranged between one sides of the baffles in a sliding manner; the handle is arranged on the stop lever; the stop lever is symmetrically and slidably provided with a second connecting rod, and the second connecting rod is slidably matched with the baffle; the handle is provided with a third connecting rod in a sliding manner; the pull ropes are connected between the second connecting rod and the third connecting rod; first springs are connected between the first connecting rod and the stop lever.
Further explaining, still include and wipe the dry subassembly, wipe dry subassembly including: the second support frame is symmetrically provided with a first guide rod; the supporting plate is arranged between the first guide rods in a sliding mode; the supporting plate is provided with a sponge block; the second springs are connected between the supporting plate and the first guide rod and sleeved on the first guide rod; the supporting plate is symmetrically provided with second guide rods; the second guide rod is provided with a wedge block in a sliding manner; third springs are connected between the wedge-shaped blocks and the supporting plate and sleeved on the second guide rods; the first connecting rod is symmetrically provided with a first connecting rod; the fifth connecting rod is symmetrically arranged on the second supporting frame, the fourth connecting rod and the fifth connecting rod are matched with each other, and the wedge-shaped block and the fifth connecting rod are in sliding fit.
Further explain, still include the air-cooled subassembly, the air-cooled subassembly includes: the first sliding rail is symmetrically provided with a supporting rod; the protective covers are uniformly arranged on the supporting rod at intervals; the fan blade is arranged in the protective cover in a rotating mode.
Further, the device also comprises a driving assembly, wherein the driving assembly comprises: the motor is arranged on one side of the second support frame; the output shaft of the motor is connected with a first belt pulley; a second belt pulley is rotatably arranged on one side of the second support frame; the transmission belt is connected between the first belt pulley and the second belt pulley; a sixth connecting rod is arranged on one side of the transmission belt; and the first connecting rod is provided with a first slide rail, and the first slide rail is connected with the sixth connecting rod in a sliding manner.
Further, the motor is connected by bolts.
The beneficial effects are that: 1. according to the invention, the first connecting rod contacts the right button for the first time, the spray head is opened, the high-temperature metal is cooled, and when the first connecting rod contacts the left button, the second contact is performed, so that the spray head is closed, and the effects of short processing period and easiness in control are achieved.
2. According to the fan blade cooling device, the fan blades rotate to dissipate heat, the protective cover protects the fan blades, and the effect of improving cooling quality is achieved.
3. According to the invention, the first connecting rod moves rightwards to drive the wedge-shaped block and the sponge block below the supporting plate to move rightwards, when the first connecting rod is contacted with the left button again, the spray head switch is turned on again to cool the high-temperature metal for the second time, and the sponge block wipes water and impurities on the metal, so that the effects of cooling the spot and improving the cooling welding strength are achieved.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic perspective view of the placement module of the present invention.
Fig. 3 is a perspective view of the sprinkler assembly of the present invention.
Fig. 4 is an enlarged schematic view of the structure of the present invention a.
FIG. 5 is a schematic cross-sectional view of the placement module and the positioning module of the present invention.
FIG. 6 is an enlarged schematic view of the present invention B.
Fig. 7 is a schematic perspective view of the drying assembly of the present invention.
FIG. 8 is a schematic cross-sectional view of an air-cooled assembly according to the present invention.
Fig. 9 is a schematic perspective view of the driving assembly of the present invention.
The meaning of the reference symbols in the figures: 1: base, 2: placement assembly, 21: first support bracket, 22: placing plate, 23: baffle, 3: sprinkler assembly, 31: second support, 32: first slide rail, 33: head, 34: first link, 35: button, 4: positioning assembly, 41: stopper rod, 42: a handle, 43: a pull cord, 44: second link, 45: first spring, 46: third link, 5: wiping assembly, 51: first guide bar, 52: support plate, 53: sponge block, 54: second spring, 55: second guide bar, 56: wedge block, 57: third spring, 58: fourth link, 59: fifth link, 6: air-cooled assembly, 61: support rod, 62: protective cover, 63: fan blade, 7: drive assembly, 71: motor, 72: first pulley, 73: second pulley, 74: drive belt, 75: sixth link, 76: a second slide rail.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
A post-welding rapid cooling device for manufacturing high-end equipment is shown in figures 1-4 and comprises a base 1, a placing component 2 and a sprinkling component 3, wherein the placing component 2 is arranged at the top of the base 1, the sprinkling component 3 is arranged at the top of the base 1, and the sprinkling component 3 is positioned at the top of the placing component 2.
People place the high temperature metal that the welding was accomplished on placing subassembly 2, remove watering subassembly 3 and carry out the watering cooling to high temperature metal, reach simple structure easy and simple to handle's effect.
The placing assembly 2 comprises a first support frame 21, a placing plate 22 and a baffle 23, the first support frame 21 is arranged at the top of the base 1, the placing plate 22 is arranged at the top of the first support frame 21, and the baffle 23 is symmetrically arranged on the placing plate 22 in a left-right mode.
The sprinkling assembly 3 comprises a second support frame 31, a first slide rail 32, a spray head 33, a first connecting rod 34 and a button 35, the second support frame 31 is arranged in the middle of the top of the base 1, the first slide rail 32 is arranged on the upper portion of the second support frame 31, the spray head 33 is arranged on the right side of the first slide rail 32 in a sliding mode, the first connecting rod 34 is connected to the front side and the rear side of the spray head 33, the button 35 is symmetrically arranged on the upper portion of the inner side of the second support frame 31 in a bilateral mode, and the button 35 is matched.
People place the high temperature metal that the welding was accomplished on placing board 22, both sides baffle 23 prevents effectively that high temperature metal from derailing and causing the damage, place the completion back, people's manual first connecting rod 34 that moves left, under the guide effect of first slide rail 32, first connecting rod 34 contacts right side button 35 for the first time, open shower nozzle 33, begin to cool down high temperature metal, when pressing from both sides the button 35 contact with the left side, this time is the contact for the second time, so shower nozzle 33 is closed, it is short to reach processing cycle, the effect of easy accuse.
Example 2
On the basis of embodiment 1, as shown in fig. 5 to 9, the positioning device 4 further includes a positioning assembly 4, the positioning assembly 4 includes a stop lever 41, a handle 42, a pull rope 43, a second connecting rod 44, a first spring 45 and a third connecting rod 46, the stop lever 41 is slidably disposed between the front sides of the top portions of the baffles 23, the handle 42 is disposed on the top portion of the stop lever 41, the third connecting rod 46 is slidably disposed on the handle 42, the second connecting rods 44 are slidably disposed on the left and right sides of the stop lever 41, the second connecting rod 44 is slidably engaged with the baffles 23, the pull rope 43 is connected between the second connecting rod 44 and the third connecting rod 46, and the first spring 45 is connected between the second connecting rod 44 and the stop lever 41.
When people need cool down the work to high temperature metal, upwards extrude third connecting rod 46 of hand (hold) 42 downside, it contracts to drive both sides second connecting rod 44 inboard through stay cord 43, first spring 45 is compressed, portable pin 41 this moment, place high temperature metal on placing board 22, align back with pin 41 alignment high temperature metal edge, loosen third connecting rod 46 on hand (hold) 42, effect through first spring 45 resets, make second connecting rod 44 reset to the outside, under the effect of slotted hole on baffle 23, press from both sides tight location to it, reach and press from both sides the fixed effect that makes things convenient for counter point cooling work of clamp.
The mop dryer further comprises a mop assembly 5, the mop assembly 5 comprises a first guide rod 51, a support plate 52, a sponge block 53, a second spring 54, a second guide rod 55, a wedge block 56, a third spring 57, a fourth connecting rod 58 and a fifth connecting rod 59, the first guide rod 51 is symmetrically arranged on the upper portion of the second support frame 31 in the front-back direction, the support plate 52 is arranged between the first guide rods 51 in a sliding mode, the sponge block 53 is arranged at the bottom of the support plate 52, the second spring 54 is connected between the support plate 52 and the first guide rod 51, the second spring 54 is sleeved on the first guide rod 51, the second guide rod 55 is symmetrically arranged on the top of the support plate 52 in the front-back direction, the wedge block 56 is arranged on the second guide rod 55 in a sliding mode, the third spring 57 is connected between the wedge block 56 and the support plate 52, the third spring 57 is sleeved on the second guide rod 55, the fourth connecting rod 58 is symmetrically arranged on the first connecting rod, fifth connecting rods 59 are symmetrically arranged at the front and the rear of the upper part of the second supporting frame 31, the fourth connecting rods 58 are matched with the fifth connecting rods 59, and the wedge blocks 56 are matched with the fifth connecting rods 59 in a sliding manner.
When people pull the first connecting rod 34 to move leftwards to cool the high-temperature metal, the wedge block 56 is pressed to move upwards, the third spring 57 is stretched, the fourth connecting rod 58 on the first connecting rod 34 is clamped through the reset action of the third spring 57, when the first connecting rod 34 is contacted with the left button 35, the contact is performed for the second time, the spray head 33 is closed, then the first connecting rod 34 moves rightwards, the wedge block 56 and the sponge block 53 under the supporting plate 52 are driven to move rightwards, the second spring 54 is pressed, when the first connecting rod 34 is contacted with the left button 35 again, the switch of the spray head 33 is opened again, the high-temperature metal is cooled for the second time, the sponge block 53 wipes the water and impurities on the metal, when the wedge block 56 is contacted with the fifth connecting rod 59, the wedge block 56 is pressed upwards by the fifth connecting rod 59, the third spring 57 is stretched, the wedge block 56 is separated from the fourth connecting rod 58, under the action of the reset of the second spring 54, the support plate 52 and the sponge block 53 are reset leftwards, the sponge block 53 cleans the metal again, and the effect of improving the welding strength by point cooling is achieved.
Still including wind cooling assembly 6, wind cooling assembly 6 is equipped with bracing piece 61 including bracing piece 61, safety cover 62 and flabellum 63, first slide rail 32 top symmetry, and even interval is equipped with three safety cover 62 on the bracing piece 61, and the internal rotation formula of safety cover 62 is equipped with flabellum 63.
Can produce steam when the high temperature metal is cooling down, rotate through opening flabellum 63 and dispel the heat to steam, its safety cover 62 carries out the guard action to flabellum 63, reaches the effect that promotes the cooling quality.
Still including drive assembly 7, drive assembly 7 is including motor 71, first belt pulley 72, second belt pulley 73, driving belt 74, sixth connecting rod 75, second slide rail 76, second support frame 31 top right side is equipped with motor 71, be connected with first belt pulley 72 on the motor 71 output shaft, second support frame 31 top left side rotary type is equipped with second belt pulley 73, be connected with driving belt 74 between first belt pulley 72 and the second belt pulley 73, the last right side of driving belt 74 is equipped with sixth connecting rod 75, first connecting rod 34 top is equipped with second slide rail 76, slidingtype is connected between second slide rail 76 and the sixth connecting rod 75.
By starting the motor 71, the output shaft of the motor 71 drives the sixth connecting rod 75 on the transmission belt 74 to rotate clockwise, and under the guiding action of the second slide rail 76, the spray head 33 is driven to move left and right in a reciprocating manner, so that the high-temperature metal is continuously cooled and cleaned, and the effects of improving the welding strength and reducing the consumption are achieved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (8)

1. The utility model provides a high-end equipment is made with welding back rapid cooling equipment, characterized by, including:
the device comprises a base (1) and a placing component (2), wherein the placing component (2) is arranged on the base (1);
the base (1) is provided with a sprinkling assembly (3).
2. The equipment for rapidly cooling after welding for manufacturing high-end equipment according to claim 1, wherein the placing component (2) comprises:
the base (1) is provided with a first support frame (21);
the first support frame (21) is provided with a placing plate (22);
the baffle (23) is symmetrically arranged on the placing plate (22).
3. The equipment for rapidly cooling the welded high-end equipment after being manufactured according to claim 2, wherein the sprinkling assembly (3) comprises:
the base (1) is provided with a second support frame (31);
the first sliding rail (32) is arranged on the second supporting frame (31);
the spray head (33) is arranged on one side of the first slide rail (32) in a sliding manner;
the first connecting rod (34) is connected to the spray head (33);
the button (35) is symmetrically arranged on the second support frame (31), and the button (35) is matched with the first connecting rod (34).
4. The post-welding rapid cooling device for manufacturing high-end equipment as claimed in claim 3, wherein the device further comprises a positioning component (4), the positioning component (4) comprises:
the stop lever (41) is arranged between one sides of the baffles (23) in a sliding manner;
the handle (42) is arranged on the stop lever (41);
the stop lever (41) is symmetrically and slidably provided with a second connecting rod (44), and the second connecting rod (44) is in sliding fit with the baffle (23);
a third connecting rod (46), wherein the handle (42) is provided with the third connecting rod (46) in a sliding way;
the pull ropes (43) are connected between the second connecting rod (44) and the third connecting rod (46);
the first spring (45) is connected between the first spring (45), the second connecting rod (44) and the stop lever (41).
5. The equipment for rapidly cooling the high-end equipment after welding for manufacturing according to claim 4, further comprising a drying component (5), wherein the drying component (5) comprises:
the first guide rods (51) are symmetrically arranged on the second support frame (31);
the supporting plate (52) is arranged between the first guide rods (51) in a sliding mode;
the supporting plate (52) is provided with a sponge block (53);
the second springs (54) are connected between the supporting plate (52) and the first guide rod (51), and the second springs (54) are sleeved on the first guide rod (51);
the second guide rods (55) are symmetrically arranged on the support plate (52);
the wedge-shaped blocks (56) are arranged on the second guide rods (55) in a sliding manner;
third springs (57) are connected between the wedge-shaped blocks (56) and the supporting plate (52), and the third springs (57) are sleeved on the second guide rods (55);
the fourth connecting rod (58) is symmetrically arranged on the first connecting rod (34);
the fifth connecting rod (59) is symmetrically arranged on the second supporting frame (31), the fourth connecting rod (58) is matched with the fifth connecting rod (59), and the wedge block (56) is matched with the fifth connecting rod (59) in a sliding mode.
6. The post-welding rapid cooling device for manufacturing high-end equipment as claimed in claim 5, further comprising an air cooling assembly (6), wherein the air cooling assembly (6) comprises:
the supporting rods (61) are symmetrically arranged on the first sliding rail (32);
the protective covers (62) are arranged on the supporting rod (61) at uniform intervals;
the fan blades (63) are arranged in the protective cover (62) in a rotating mode.
7. The equipment for rapidly cooling after welding for manufacturing the high-end equipment according to claim 6, further comprising a driving assembly (7), wherein the driving assembly (7) comprises:
the motor (71) is arranged on one side of the second support frame (31);
the output shaft of the motor (71) is connected with the first belt pulley (72);
a second belt pulley (73), wherein the second belt pulley (73) is rotatably arranged on one side of the second support frame (31);
the transmission belt (74) is connected between the first belt pulley (72) and the second belt pulley (73);
a sixth connecting rod (75), wherein the sixth connecting rod (75) is arranged on one side of the transmission belt (74);
the second sliding rail (76) is arranged on the first connecting rod (34), and the second sliding rail (76) is connected with the sixth connecting rod (75) in a sliding mode.
8. The equipment for rapidly cooling after welding for manufacturing high-end equipment as claimed in claim 7, wherein the motor (71) is connected by bolts.
CN202110293249.6A 2021-03-19 2021-03-19 High-end equipment is made with welding back rapid cooling equipment Active CN113070611B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110293249.6A CN113070611B (en) 2021-03-19 2021-03-19 High-end equipment is made with welding back rapid cooling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110293249.6A CN113070611B (en) 2021-03-19 2021-03-19 High-end equipment is made with welding back rapid cooling equipment

Publications (2)

Publication Number Publication Date
CN113070611A true CN113070611A (en) 2021-07-06
CN113070611B CN113070611B (en) 2023-04-14

Family

ID=76613177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110293249.6A Active CN113070611B (en) 2021-03-19 2021-03-19 High-end equipment is made with welding back rapid cooling equipment

Country Status (1)

Country Link
CN (1) CN113070611B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114425619A (en) * 2021-12-08 2022-05-03 肖英梅 Cooling treatment equipment used after powder metallurgy sintering

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100829495B1 (en) * 2007-04-25 2008-05-16 노창식 A c00ling system of cooling water for an induction-heating apparatus
CN109016104A (en) * 2018-09-30 2018-12-18 西安中铁工程装备有限公司 A kind of section of jurisdiction stockyard automatic sprinkler fire-extinguishing system and its spraying method
CN211889549U (en) * 2020-03-10 2020-11-10 黄旭钟 Welding cooling device for manufacturing high-end equipment
CN111955136A (en) * 2020-08-21 2020-11-20 诸暨市物昇农业科技有限公司 Pit digging auxiliary device for white radishes
CN112043418A (en) * 2020-09-11 2020-12-08 胡强 Wiping arrangement of medical treatment operation pincers washing usefulness
CN112476115A (en) * 2020-11-23 2021-03-12 廖子宁 Iron plate welding mark rotation type equipment of polishing for five metals

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100829495B1 (en) * 2007-04-25 2008-05-16 노창식 A c00ling system of cooling water for an induction-heating apparatus
CN109016104A (en) * 2018-09-30 2018-12-18 西安中铁工程装备有限公司 A kind of section of jurisdiction stockyard automatic sprinkler fire-extinguishing system and its spraying method
CN211889549U (en) * 2020-03-10 2020-11-10 黄旭钟 Welding cooling device for manufacturing high-end equipment
CN111955136A (en) * 2020-08-21 2020-11-20 诸暨市物昇农业科技有限公司 Pit digging auxiliary device for white radishes
CN112043418A (en) * 2020-09-11 2020-12-08 胡强 Wiping arrangement of medical treatment operation pincers washing usefulness
CN112476115A (en) * 2020-11-23 2021-03-12 廖子宁 Iron plate welding mark rotation type equipment of polishing for five metals

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114425619A (en) * 2021-12-08 2022-05-03 肖英梅 Cooling treatment equipment used after powder metallurgy sintering
CN114425619B (en) * 2021-12-08 2023-09-08 株洲晴川硬质合金有限公司 Cooling treatment equipment for sintered powder metallurgy

Also Published As

Publication number Publication date
CN113070611B (en) 2023-04-14

Similar Documents

Publication Publication Date Title
CN113070611B (en) High-end equipment is made with welding back rapid cooling equipment
CN208649388U (en) Miniature workpiece quenching cooler with filter mechanism
CN210475385U (en) Bearing processing forging equipment
CN114425619B (en) Cooling treatment equipment for sintered powder metallurgy
CN102232642A (en) Full-automatic fusion splicing device of mask fusion splicing machine
CN214694292U (en) Small-size work piece heat treatment device
CN212634681U (en) Sheet metal working laser rapid welding device
CN220397961U (en) Temperature-controlled cooling equipment after forging
CN216097990U (en) Deburring equipment for metal casting treatment
CN216569666U (en) Stainless steel cooking basin with high strength and difficult damage
CN114934168B (en) Quenching equipment for tooth surface of powder metallurgy gear
CN210648743U (en) Efficient cutting machine for machining electric vehicle accessories
CN213142102U (en) Cooler for machining of parts of pliers
CN217236298U (en) Drying device for crucible
CN214270968U (en) Peanut pickup machine row grass fan impeller blade high frequency quenching equipment
CN211759398U (en) Convenient-to-detach protective cover for automatic welding machine
CN212071353U (en) Porous product deburring frock
CN216563956U (en) Terminal welding design collection device
CN217475090U (en) Power battery module welding equipment
CN214024033U (en) Spot welding machine fin
CN212247218U (en) Aluminum profile surface corrosion spot removing device
CN111745224B (en) Baking rack trimming equipment
CN213764195U (en) Hydraulic plate shearing machine with limiting structure
CN216065977U (en) Spot welding machine for motor manufacturing
CN214458151U (en) All-round cooling device is used in metal surface treatment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230403

Address after: 276000 East side of the middle section of Dayang Road, Linyi Industrial Park, Lanshan District, Linyi City, Shandong Province Business site: Building 5, No. 1066, Qiandongmen Village, Lanshan Economic Development Zone, Linyi City, Shandong Province

Applicant after: SHANDONG BEIYI VEHICLE Co.,Ltd.

Address before: Room 104, block a, 1228 Chengao Avenue East Road, Conghua District, Guangzhou, Guangdong 510900

Applicant before: Zhu Shangfu

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A rapid cooling device after welding for high-end equipment manufacturing

Effective date of registration: 20231212

Granted publication date: 20230414

Pledgee: Linyi Lanshan District Branch of China Postal Savings Bank Co.,Ltd.

Pledgor: SHANDONG BEIYI VEHICLE Co.,Ltd.

Registration number: Y2023980070929