CN113062738A - Coal seam excavation method in plane similarity simulation experiment - Google Patents

Coal seam excavation method in plane similarity simulation experiment Download PDF

Info

Publication number
CN113062738A
CN113062738A CN202110385109.1A CN202110385109A CN113062738A CN 113062738 A CN113062738 A CN 113062738A CN 202110385109 A CN202110385109 A CN 202110385109A CN 113062738 A CN113062738 A CN 113062738A
Authority
CN
China
Prior art keywords
coal seam
foam
excavating
simulation experiment
similar materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110385109.1A
Other languages
Chinese (zh)
Inventor
徐良骥
张坤
付俊
徐阳
刘昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN202110385109.1A priority Critical patent/CN113062738A/en
Publication of CN113062738A publication Critical patent/CN113062738A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Remote Sensing (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses an excavation method of a coal bed in a plane similarity simulation experiment, wherein the coal bed is formed by laying foam boards and similar materials at intervals, and the excavation of the coal bed is simulated by dissolving the foam boards by glue and cutting the similar materials by a cutter and a saw; the foam board is made of EPS foam material; the similar material is prepared by mixing river sand, lime, gypsum, ink and water according to a mixing ratio determined by a proportioning test. According to the excavation method, the foam plate is partially used for replacing similar materials to serve as the simulated coal bed, the foam plate is dissolved by PVC glue to simulate the coal bed excavation, the operation is convenient, the working strength is low, and the working efficiency is improved; the excavation method lays the foam board and similar materials at intervals, solves the problem of 'not mining and sinking firstly' caused by the fact that the foam board is flattened independently, increases the stability of the model, and ensures the experimental effect.

Description

Coal seam excavation method in plane similarity simulation experiment
Technical Field
The invention relates to the technical field of similar material simulation experiments, in particular to a coal seam excavation method in a plane similar simulation experiment.
Background
As an important research means, the simulation experiment is proposed by Suiyi expert Kunjinzenzov in the 30 s of the 20 th century and is widely applied to departments of mining industry, geology, water conservancy, geotechnical engineering and the like. The method is mainly used for researching the moving deformation and breaking rule of overlying strata, the earth pressure display rule and the like caused by coal seam excavation in a mining system. Most of the previous similar simulation experiments are plane simulation experiments, and experimental models are scaled according to a certain geometric similarity ratio by geological prototypes.
Coal seam excavation mode in traditional plane analog simulation experiment, not only waste time but also hard, in the gradual excavation in-process, often not excavated the design stride yet, the roof just collapses and gets off and lead to unable continuation excavation, perhaps not excavated inside the model yet, outside roof just collapses, leads to roof collapse, the stratum sinks inside and outside inhomogeneous, asynchronous, and then influences the experiment effect.
Disclosure of Invention
The invention aims to provide a coal bed material and an excavation method in a plane similarity simulation experiment, wherein foam boards and similar materials are paved at intervals to simulate the distribution of a coal bed, the foam boards are used as the coal bed material, the foam boards are dissolved by PVC glue to simulate the excavation of the coal bed, the simulation excavation operation is convenient, the working strength is low, and the working efficiency is improved; the foam board and similar materials are paved at intervals, the problem that the middle rock stratum sinks and is uneven and asynchronous inside and outside is solved, the problem that the foam board is flattened due to the fact that the foam board is used only is solved, and the stability and the reliability of a simulation experiment structure are improved.
The purpose of the invention can be realized by the following technical scheme:
the coal bed is formed by laying foam boards and similar materials at intervals, and the excavation of the coal bed is simulated by dissolving the foam boards with glue and cutting the similar materials with a cutter and a saw.
Further, the foam board is an EPS foam material.
Furthermore, the similar material is prepared by mixing river sand, lime, gypsum, ink and water according to a mixing ratio determined by a proportioning test.
Furthermore, according to mechanical performance parameters such as the compressive strength and the tensile strength of the actual coal seam and the like, the compressive strength and the tensile strength of the simulated coal seam are calculated by combining the experimental similarity ratio (stress similarity ratio), and then the material mixing ratio meeting the stress similarity ratio is determined through a proportioning experiment.
Further, the excavation method comprises the following operation steps:
s1, determining the thickness of the simulated coal seam according to the experimental similarity ratio (geometric similarity ratio), preparing a foam board with the same thickness, and cutting the foam board into strips for later use;
s2, mixing river sand, lime and gypsum according to the mixing proportion determined by the proportioning experiment, and adding water and ink with the mixing weight of 1/10 to prepare a coal bed similar material;
s3, laying the foam boards and the coal seam similar materials on a model frame at intervals;
s4, excavating the coal seam according to the design schedule, dipping glue from the two sides of the model by using brushes to dissolve foams in the foam part;
and S5, excavating the coal seam according to the design schedule, wherein similar material parts are excavated by simultaneously cutting the two sides of the model by using a strip-shaped cutter or a saw.
Further, the width of the foam board is 10-20 cm, and the length of the foam board is the width of the model frame.
Furthermore, the foam boards are placed in the area to be mined of the simulated coal bed in parallel at intervals of 5-10 cm, and the length direction of the foam boards is consistent with the width direction of the model frame.
Further, the glue is PVC-U quick-drying type drainage glue.
Further, the simulated coal seams between the foam boards and outside the foam boards are paved by similar materials.
The invention has the beneficial effects that:
1. the foam board is adopted as the coal bed material, the PVC glue is used for dissolving the foam board to simulate coal bed excavation, the simulated excavation operation is convenient, the working strength is low, and the working efficiency is improved;
2. the excavation method of the invention lays the foam boards and similar materials at intervals, solves the problems of uneven and asynchronous sinking of the middle rock stratum, avoids the problem of 'not mining and sinking before' caused by singly using the foam boards, increases the stability and reliability of the simulation experiment structure and ensures the experiment effect.
Drawings
The invention will be further described with reference to the accompanying drawings.
FIG. 1 is a schematic representation of a structural simulation of a coal seam in accordance with the present invention;
FIG. 2 is a schematic representation of a coal seam structure simulation of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
A method for excavating a coal seam in a plane similarity simulation experiment is disclosed, as shown in figures 1 and 2, the coal seam is formed by laying foam boards and similar materials at intervals, the foam boards are dissolved by glue, and the similar materials are cut by a cutter and a saw to simulate the excavation of the coal seam, the foam boards are made of EPS foam materials, and the similar materials are prepared by mixing river sand, lime, gypsum, ink and water according to a mixing ratio determined by a proportioning test.
According to the mechanical performance parameters such as the compressive strength and the tensile strength of the actual coal seam and the experimental similarity ratio (stress similarity ratio), the compressive strength and the tensile strength of the simulated coal seam are calculated, and then the material mixing ratio meeting the stress similarity ratio is determined through a proportioning experiment.
The excavation method comprises the following operation steps:
s1, determining the thickness of the simulated coal seam according to the experimental similarity ratio (geometric similarity ratio), preparing a foam board with the same thickness, and cutting the foam board into strips for later use;
s2, mixing river sand, lime and gypsum according to the mixing proportion determined by the proportioning experiment, and adding water and ink with the mixing weight of 1/10 to prepare a coal bed similar material;
s3, paving foam boards and coal seam similar materials on a model frame at intervals, paving similar materials between the foam boards and a simulated coal seam on the outer side of the foam boards, wherein the foam boards are 10-20 cm in width and 10-10 cm in length, the foam boards are placed in a to-be-mined area of the simulated coal seam in parallel at intervals of 5-10 cm, and the length direction of the foam boards is consistent with the width direction of the model frame;
s4, excavating the coal seam according to the design schedule, dipping glue from two sides of the model by using brushes to dissolve foam in the foam part, wherein the glue is PVC-U quick-drying drainage glue;
and S5, excavating the coal seam according to the design schedule, wherein similar material parts are excavated by simultaneously cutting the two sides of the model by using a strip-shaped cutter or a saw.
The excavation method adopts similar materials to lay and bear the upper pressure at intervals, solves the problems that the foam board cannot bear the pressure of the upper rock stratum and the rock stratum sinks unevenly and asynchronously in the excavation process only by using the foam board as the coal seam in the prior art, utilizes the PVC drainage glue to dissolve the foam board to simulate the coal seam excavation, and improves the excavation working efficiency of the simulation experiment because the foam board is quickly dissolved when meeting the drainage glue.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed.

Claims (9)

1. The method for excavating the coal bed in the plane similarity simulation experiment is characterized in that the coal bed is formed by paving foam boards and similar materials at intervals, and the excavation of the coal bed is simulated by dissolving the foam boards with glue and cutting the similar materials with a cutter and a saw.
2. The method for excavating a coal seam in a plane simulation experiment according to claim 1, wherein the foam board is made of EPS foam material.
3. The method as claimed in claim 1, wherein the similar material is prepared by mixing river sand, lime, gypsum, ink and water according to a mixing ratio determined by a proportioning test.
4. The method for excavating the coal seam in the plane similarity simulation experiment according to claim 3, characterized in that the compressive strength and the tensile strength of the simulated coal seam are calculated according to mechanical performance parameters such as the compressive strength and the tensile strength of the actual coal seam and by combining the experiment similarity ratio (stress similarity ratio), and then the material mixture ratio meeting the stress similarity ratio is determined through a proportioning experiment.
5. The method for excavating a coal seam in a plane-like simulation experiment according to claim 4, wherein the method comprises the following steps:
s1, determining the thickness of the simulated coal seam according to the experimental similarity ratio (geometric similarity ratio), preparing a foam board with the same thickness, and cutting the foam board into strips for later use;
s2, mixing river sand, lime and gypsum according to the mixing proportion determined by the proportioning experiment, and adding water and ink with the mixing weight of 1/10 to prepare a coal bed similar material;
s3, laying the foam boards and the coal seam similar materials on a model frame at intervals;
s4, excavating the coal seam according to the design schedule, dipping glue from the two sides of the model by using brushes to dissolve foams in the foam part;
and S5, excavating the coal seam according to the design schedule, wherein similar material parts are excavated by simultaneously cutting the two sides of the model by using a strip-shaped cutter or a saw.
6. The method for excavating a coal seam in a plane similarity simulation experiment according to claim 5, wherein the width of the foam board is 10-20 cm, and the length is the width of a model frame.
7. The method for excavating the coal seam in the plane similarity simulation experiment according to claim 5, wherein the foam boards are placed in a region to be mined of the simulated coal seam in parallel at intervals of 5-10 cm, and the length direction of the foam boards is consistent with the width direction of the model frame.
8. The method for excavating a coal seam in a plane similarity simulation experiment according to claim 1, wherein the glue is a PVC-U quick-drying drainage glue.
9. The method of claim 7, wherein the simulated coal seams between the foam boards and outside the foam boards are laid with similar materials.
CN202110385109.1A 2021-04-09 2021-04-09 Coal seam excavation method in plane similarity simulation experiment Pending CN113062738A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110385109.1A CN113062738A (en) 2021-04-09 2021-04-09 Coal seam excavation method in plane similarity simulation experiment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110385109.1A CN113062738A (en) 2021-04-09 2021-04-09 Coal seam excavation method in plane similarity simulation experiment

Publications (1)

Publication Number Publication Date
CN113062738A true CN113062738A (en) 2021-07-02

Family

ID=76566177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110385109.1A Pending CN113062738A (en) 2021-04-09 2021-04-09 Coal seam excavation method in plane similarity simulation experiment

Country Status (1)

Country Link
CN (1) CN113062738A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527231A (en) * 2013-11-06 2014-01-22 中国矿业大学 Preparation method of analog simulation model used for roadway supporting test
CN205210083U (en) * 2015-12-17 2016-05-04 西安科技大学 A model for digging up mine similar material simulation experiment excavation
CN105716955A (en) * 2016-01-20 2016-06-29 中国石油大学(北京) Simulation method and model system of rock pressure-sensitive fracture and application of simulation method
CN106626620A (en) * 2010-07-16 2017-05-10 阿克塞尔集团有限公司 Composite material and use thereof
CN106872668A (en) * 2017-03-03 2017-06-20 中国矿业大学(北京) Temperature seepage stress THM coupling similar test method
CN110018291A (en) * 2019-04-18 2019-07-16 中国矿业大学 A kind of filling mining fluid structurecoupling physical simulation experiment test system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106626620A (en) * 2010-07-16 2017-05-10 阿克塞尔集团有限公司 Composite material and use thereof
CN103527231A (en) * 2013-11-06 2014-01-22 中国矿业大学 Preparation method of analog simulation model used for roadway supporting test
CN205210083U (en) * 2015-12-17 2016-05-04 西安科技大学 A model for digging up mine similar material simulation experiment excavation
CN105716955A (en) * 2016-01-20 2016-06-29 中国石油大学(北京) Simulation method and model system of rock pressure-sensitive fracture and application of simulation method
CN106872668A (en) * 2017-03-03 2017-06-20 中国矿业大学(北京) Temperature seepage stress THM coupling similar test method
CN110018291A (en) * 2019-04-18 2019-07-16 中国矿业大学 A kind of filling mining fluid structurecoupling physical simulation experiment test system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
庞绪峰等: "急倾斜煤层充填开采相似模拟", 《煤矿安全》 *
涂敏等: "水采采场上覆岩层运动规律的三维相似模拟试验研究", 《淮南工业学院学报(自然科学版)》 *

Similar Documents

Publication Publication Date Title
CN113914862B (en) Roof-cutting pressure-relief coal-pillar-free self-entry mining design and evaluation method
CN109595029B (en) Goaf partial stowage supporting structure and its construction method under the conditions of tight roof
CN110735663A (en) collapse zone inner ground grouting filling slurry form similarity simulation method
CN109507393B (en) Indoor overlying strata separation layer quantity measurement and grouting control simulation system and method thereof
CN104100271A (en) Side-supporting roadway forming method by pre-digging guide cavern and filling with artificial side wall for secondary use
Liu et al. Characteristics analysis of roof overburden fracture in thick coal seam in deep mining and engineering application of super high water material in backfill mining
Brill et al. A ten-year perspective of jet grouting: advancements in applications and technology
CN109779663A (en) Gob side entry retaining multi-zone cascade-control method
Shi et al. Mechanics parameter optimization and evaluation of curtain grouting material in deep, water-rich karst tunnels
CN202132053U (en) VI-level surrounding-rock double track tunnel lining support structure
CN104179511A (en) Novel hole arrangement grouting method for enabling ground pre-grouting reinforcing roadway to penetrate through surrounding rocks at fault fracture zone
CN104018847A (en) Method for preventing extrusion flowing floor heave of rectangular roadway based on elastic foundation beam
CN113062738A (en) Coal seam excavation method in plane similarity simulation experiment
KR101278127B1 (en) Surface solidification deep cement mixing method for recycling floating soil
CN205502063U (en) Combined type retaining structure
CN104500076B (en) Large section, Long span collapse and cave-in granular media tunnel driving method
US20230030467A1 (en) Method for slope geological disaster treatment and mineral resource recovery
CN211081969U (en) Goaf longitude and latitude-shaped filling system
Li Failure of an under-dip shale slope and its response under excavation conditions
CN111119978B (en) Method for extracting coal seam gas by drilling holes in bedding and hydraulically cutting seams
CN211038641U (en) Tunnel segment earth surface reinforcing structure at junction of upper soft and lower hard stratum shield method and mine method
CN103334769A (en) Crossed building block wall body supporting method for reinforcing forefield abandoned roadway
Chen et al. Numerical Simulation of the Stability of a Cutting Slope and Study on Its Reinforcement Scheme
CN103205977B (en) The preparation method of the compound antiskid structure of composition board type
Salem et al. Stabilizing piles of soft cohesive slopes: a case history

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210702

RJ01 Rejection of invention patent application after publication