CN113034052A - Production workshop intelligent scheduling system based on MES - Google Patents

Production workshop intelligent scheduling system based on MES Download PDF

Info

Publication number
CN113034052A
CN113034052A CN202110457792.5A CN202110457792A CN113034052A CN 113034052 A CN113034052 A CN 113034052A CN 202110457792 A CN202110457792 A CN 202110457792A CN 113034052 A CN113034052 A CN 113034052A
Authority
CN
China
Prior art keywords
order
department
production
module
mes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110457792.5A
Other languages
Chinese (zh)
Inventor
陈翔
陈晓彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Yunjizhizao System Technology Co ltd
Original Assignee
Shenzhen Yunjizhizao System Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Yunjizhizao System Technology Co ltd filed Critical Shenzhen Yunjizhizao System Technology Co ltd
Priority to CN202110457792.5A priority Critical patent/CN113034052A/en
Publication of CN113034052A publication Critical patent/CN113034052A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Computational Linguistics (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses an MES-based intelligent production workshop scheduling system, which relates to the technical field of computer management and comprises a production management system, wherein the production management system consists of a timetable, a meeting module, a department login module, a plan making module, a mail reminding module and an event query module, and the department login module comprises the following departments: sales department, equipment branch of academic or vocational study, material portion, production department, personnel portion and other service departments, production department is provided with the product data table, and sales department is provided with the order table, and equipment branch of academic or vocational study is provided with the equipment access table, and material portion is provided with the material data table, and personnel portion is provided with the personnel table. The system can identify whether the intention order can be completed on time according to the related data, if not, the reason causing the order abnormity is displayed, and the mail reminding module and the conference mode are started, so that the related departments can coordinate and process in time conveniently, and the loss of companies caused by the fact that the order cannot be completed in time due to lack of communication among all departments in the traditional production process is avoided.

Description

Production workshop intelligent scheduling system based on MES
Technical Field
The invention relates to the technical field of computer management, in particular to an MES-based intelligent production workshop scheduling system.
Background
The entity investment refers to the investment of enterprises which invest in other enterprises by cash, real objects, intangible assets and the like. The investment directly forms the capacity of the production and operation activities and creates necessary conditions for carrying out certain production and operation activities. It has the characteristics of close connection with production and operation, etc., and the real investment includes joint operation investment, concurrent investment, etc. In the physical industry, a production process of a product needs to involve cooperation of a plurality of departments, and a plurality of mechanisms such as a common department of personnel, a production department, an equipment department, a material storage department, a transportation department and the like coordinate and cooperate. The human department is mainly responsible for recruitment and mobilization of personnel, the production department is mainly responsible for processing and quality supervision of products, the equipment department is mainly responsible for maintaining and maintaining production machines, the material storage is mainly responsible for purchasing and managing various materials for production, and the transportation department is mainly responsible for transporting the products to a designated place after the products are produced.
In a sales order, need each department coordinate the cooperation and carry out the production transportation, and in real life, do not have suitable platform of exchanging between each department, lead to the unable rapid transfer of information between each department, consequently appear easily plan between each department and appear conflicting in time, lead to the order in time to accomplish from this, finally lead to customer satisfaction to descend, serious will lead to the customer to run off, consequently, need a workshop intelligence scheduling system based on MES to carry out the overall planning to the incident and the time between each department.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides an MES-based intelligent production workshop scheduling system.
The invention provides an MES-based production workshop intelligent scheduling system, which comprises a production management system, wherein the production management system consists of a timetable, a meeting module, a department login module, a plan making module, a mail reminding module and an event query module, and the department login module comprises the following departments: sales department, equipment branch of academic or vocational study, material portion, production department, personnel portion and other service departments, production department is provided with the product data table, and sales department is provided with the order table, and equipment branch of academic or vocational study is provided with the equipment access table, and material portion is provided with the material data table, and personnel portion is provided with the personnel table.
As a still further scheme of the invention: the product data sheet contains the following information for the product: name, internal number, using equipment, type and number of required articles, processing time and required number of people.
As a still further scheme of the invention: the order table contains the following information: product name, product number, product quantity and product demand date.
As a still further scheme of the invention: the conference module is used for communicating with departments within a company range, and comprises a voice and video screen function and a document recording function, and the document recording function is associated with the mails.
As a still further scheme of the invention: the plan making module is used for making and uploading the work plan by each department, the work plan format which is not completely consistent exists in each department, the key information in the work plan is specially convenient to retrieve by the system, and the intelligence is improved.
As a still further scheme of the invention: the timetable is used for recording and displaying the time corresponding to the work plan of the company department.
As a still further scheme of the invention: the mail reminding module has a mail sending function.
As a still further scheme of the invention: the event query module is matched with the schedule and used for querying whether the working plan conflicts in time or not, and the currently uploaded working plan and the currently uploaded production plan are recorded in the event query module.
As a still further scheme of the invention: the intelligent scheduling method for the production process further comprises the following working steps:
s1: a department or a department responsible person logs in the production management system and uploads a production or work plan, wherein the equipment department writes the current situation of the current enterprise equipment and an equipment maintenance plan in a maintenance table; the material part displays the stock condition of each material in a material data table, wherein the stock condition of each material comprises the stock quantity of the existing material, the quantity of the material waiting for arriving at the warehouse and the predicted time, and the set predicted time is used for the system to automatically calculate whether the order can be completed on time according to the predicted time of the arrival of the material; the personnel department displays the current talent market condition and the number of people predicted to be temporarily recruited in the staff table;
s2: the sales department logs in the production management system and submits an intention sales order, and the production management system marks the order as a pre-order;
s3: the production management system inquires whether the order conflicts with the existing production work plan according to the existing production work plan on the sales order comparison schedule, and the method comprises the following inquiry contents: a 1: the system searches raw materials and equipment required by the production of the product according to the product number in the pre-order, calculates the total quantity and total working hours of the required raw materials according to the quantity of the pre-order, compares the total quantity and the total working hours according to data in a material table and checks whether the existing materials are enough; a 2: whether the required equipment can normally run or not within the order preparation time and whether the production of other products is influenced or not during the order preparation; a 3: when the pre-order is produced, whether the related staff is on duty normally or not;
s4: if the demands of the order are not conflicted in time, the production management system adds the order into a production plan and adds the order into a time table, and the order becomes a formal order;
s5: if the system inquires that the order is produced and has insufficient materials or time conflict with other formal orders at S3, the production management system starts a mail reminding module and enters a conference mode, namely the system automatically sends a mail reminding to a department generating the conflict, starts the conference mode and waits for the discussion among the departments;
s6: after the conference discussion is finished, if the order is produced, the relevant department adjusts the production work plan and uploads the new production work plan to the production management system again, the system marks the order as a formal order and adds the formal order into a time schedule, and the system generates an adjustment log and sends each department in the form of an email; if the order is not produced, the system sends a mail to a sales department to wait for the sales department to adjust the order, meanwhile, each department uploads the reason why the order cannot be produced according to the conference result, and the system records the information of the current intention sales order and combines and counts the reason of the flow order, so that data analysis or achievement analysis can be conveniently carried out in the later period.
The beneficial effects of the invention are as follows:
1. the intelligent scheduling method and system for the production process are composed of a time schedule, a meeting module, a department login module, a plan making module, a mail reminding module and an event query module, sales staff input an intention order, the system can identify whether the order can be completed on time according to related data, if the order can not be completed on time, the reason causing order abnormity is displayed, the mail reminding module and the meeting mode are started, the related departments can conveniently coordinate and timely, the arrangement and management of the work flow can be conveniently realized, and the problem that the order can not be completed in time and the loss of companies is caused due to lack of communication among all the departments in the traditional production process is avoided.
2. The conference module is used for communicating with departments within a company range, the conference module comprises a voice and video screen function and a document recording function, the document recording function is associated with mails, a user can record key point information in a conference process and upload the information to be ordered to conference statistics, and a later system can automatically generate a conference result according to the key point information uploaded by each department.
3. After the meeting mode is finished, if the order is produced, the relevant departments adjust the production work plan and upload the new production work plan to the production management system again, the system marks the order as a formal order and adds the formal order into a time table, and the system generates an adjustment log and sends the adjustment log to each department in the form of a mail; if the order is not produced, the system sends a mail to a sales department to wait for the sales department to adjust the order, meanwhile, each department uploads the reason why the order cannot be produced according to the conference result, and the system records the information of the current intention sales order and combines and counts the reason of the flow order, so that the reason can be conveniently analyzed and improved in the later period.
Drawings
FIG. 1 is a schematic diagram of a department framework structure of an MES-based intelligent scheduling system for a manufacturing plant according to the present invention;
FIG. 2 is a schematic view of a flow structure of an MES-based intelligent scheduling system for a manufacturing shop according to the present invention;
FIG. 3 is a frame diagram of a statistical table of the MES-based intelligent scheduling system for a manufacturing shop according to the present invention;
FIG. 4 is a schematic diagram of an overall framework structure of an MES-based intelligent scheduling system for a manufacturing plant according to the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Referring to fig. 1-4, an intelligent scheduling system for manufacturing shop based on MES comprises a production management system, the production management system is composed of a schedule, a meeting module, a department login module, a plan making module, an email reminding module and an event query module, the department login module comprises the following departments: sales department, equipment branch of academic or vocational study, material portion, production department, personnel portion and other service departments, production department is provided with the product data table, and sales department is provided with the order table, and equipment branch of academic or vocational study is provided with the equipment access table, and material portion is provided with the material data table, and personnel portion is provided with the personnel table.
In the present invention, the product data sheet contains the following information for the product: name, internal number, equipment used, type and number of required articles, processing time and required number, the internal number is used as a key word for searching, if the articles are in a production state, the produced time and the expected using time are displayed, and the data is provided by the production part.
In the present invention, the order form contains the following information: product name, product number, product quantity and product demand date.
In the invention, the conference module is used for communicating with departments within a company range, the conference module comprises a voice and video screen function and a document recording function, the document recording function is associated with a mail, a user can record key point information in a conference process and upload the key point information to conference statistics, and a later system can automatically generate a conference result according to the key point information uploaded by each department.
In the invention, the plan making module is used for making and uploading the work plan by each department, and each department has an incompletely consistent work plan format, thereby being particularly convenient for the system to retrieve the key information in the work plan and improving the intellectualization.
In the invention, the timetable is used for recording and displaying the time corresponding to the work plan of the company department, and the set timetable is convenient for quickly knowing the crossed region of the work arrangement on the time.
In the invention, the mail reminding module has a mail sending function.
In the invention, the event query module is matched with the time schedule and used for querying whether the working plan conflicts in time, and the currently uploaded working plan and production plan are recorded in the event query module.
The intelligent scheduling method for the production process comprises the following working steps:
s1: a department or a department responsible person logs in the production management system and uploads a production or work plan, wherein the equipment department writes the current situation of the current enterprise equipment and an equipment maintenance plan in a maintenance table; the material part displays the stock condition of each material in a material data table, wherein the stock condition of each material comprises the stock quantity of the existing material, the quantity of the material waiting for arriving at the warehouse and the predicted time, and the set predicted time is used for the system to automatically calculate whether the order can be completed on time according to the predicted time of the arrival of the material; the personnel department displays the current talent market condition and the number of people predicted to be temporarily recruited in the staff table;
s2: the sales department logs in the production management system and submits an intention sales order, and the production management system marks the order as a pre-order;
s3: the production management system inquires whether the order conflicts with the existing production work plan according to the existing production work plan on the sales order comparison schedule, and the method comprises the following inquiry contents: a 1: the system searches raw materials and equipment required by the production of the product according to the product number in the pre-order, calculates the total quantity and total working hours of the required raw materials according to the quantity of the pre-order, compares the total quantity and the total working hours according to data in a material table and checks whether the existing materials are enough; a 2: whether the required equipment can normally run or not within the order preparation time and whether the production of other products is influenced or not during the order preparation; a 3: when the pre-order is produced, whether the related staff is on duty normally or not;
s4: if the demands of the order are not conflicted in time, the production management system adds the order into a production plan and adds the order into a time table, and the order becomes a formal order;
s5: if the system inquires that the order is produced and has insufficient materials or time conflict with other formal orders at S3, the production management system starts a mail reminding module and enters a conference mode, namely the system automatically sends a mail reminding to a department generating the conflict, starts the conference mode and waits for the discussion among the departments;
s6: after the conference discussion is finished, if the order is produced, the relevant department adjusts the production work plan and uploads the new production work plan to the production management system again, the system marks the order as a formal order and adds the formal order into a time schedule, and the system generates an adjustment log and sends each department in the form of an email; if the order is not produced, the system sends a mail to a sales department to wait for the sales department to adjust the order, meanwhile, each department uploads the reason why the order cannot be produced according to the conference result, and the system records the information of the current intention sales order and combines and counts the reason of the flow order, so that data analysis or performance analysis can be conveniently carried out in the later period, and targeted improvement can be carried out.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (9)

1. The utility model provides a workshop intelligence scheduling system based on MES, includes production management system, its characterized in that, production management system comprises timetable, meeting module, department login module, plan making module, mail warning module and incident query module, contain following department in the department login module: sales department, equipment branch of academic or vocational study, material portion, production department, personnel portion and other service departments, production department is provided with the product data table, and sales department is provided with the order table, and equipment branch of academic or vocational study is provided with the equipment access table, and material portion is provided with the material data table, and personnel portion is provided with the personnel table.
2. The MES-based intelligent scheduling system for manufacturing plants as claimed in claim 1, wherein the product data sheet comprises the following information for the product: name, internal number, using equipment, type and number of required articles, processing time and required number of people.
3. An MES-based intelligent scheduling system for manufacturing plants as claimed in claim 1 wherein said order form contains the following information: product name, product number, product quantity and product demand date.
4. An MES-based intelligent scheduling system for manufacturing plants as claimed in claim 1, wherein said meeting module is used for connecting departments in the company area, and comprises a voice and video screen function and a document recording function, and the document recording function is associated with mails.
5. The system as claimed in claim 1, wherein the planning module is used for the departments to make and upload the work plan, and the departments have a non-uniform work plan format, so that the system can search key information in the work plan, thereby improving intelligence.
6. The MES-based intelligent scheduling system for manufacturing plants as claimed in claim 1, wherein said schedule is used to record and display the time corresponding to the work schedule of the company department.
7. The MES-based intelligent scheduling system for production plants of claim 1, wherein said mail reminding module has a mail sending function.
8. An MES-based intelligent scheduling system for manufacturing plants as claimed in any one of claims 1-7, wherein said event query module is associated with a schedule for querying whether the work plan conflicts with each other in time, and the event query module records the currently uploaded work plan and the currently uploaded production plan.
9. An MES-based intelligent scheduling system for manufacturing plants as claimed in claim 1, comprising the following steps:
s1: a department or a department responsible person logs in the production management system and uploads a production or work plan, wherein the equipment department writes the current situation of the current enterprise equipment and an equipment maintenance plan in a maintenance table; the material part displays the stock condition of each material in a material data table, wherein the stock condition comprises the stock quantity of the existing material, the quantity of the material waiting for arriving at the warehouse and the predicted time; the personnel department displays the current talent market condition and the number of people predicted to be temporarily recruited in the staff table;
s2: the sales department logs in the production management system and submits an intention sales order, and the production management system marks the order as a pre-order;
s3: the production management system inquires whether the order conflicts with the existing production work plan according to the existing production work plan on the sales order comparison schedule, and the method comprises the following inquiry contents: a 1: raw materials and equipment required by the production of the products in the pre-order form are calculated according to the information of the pre-order form, the total quantity and the total working hours of the required raw materials are calculated, and whether the existing materials are enough or not is checked; a 2: whether the required equipment can normally run or not within the order preparation time and whether the production of other products is influenced or not during the order preparation; a 3: when the pre-order is produced, whether the related staff is on duty normally or not;
s4: if the demands of the order are not conflicted in time, the production management system adds the order into a production plan and adds the order into a time table, and the order becomes a formal order;
s5: if the system inquires that the order is produced and has insufficient materials or time conflict with other formal orders at S3, the production management system starts a mail reminding module and enters a conference mode, namely the system automatically sends a mail reminding to a department generating the conflict, starts the conference mode, waits for inter-department discussion, and pops up a time table when the system conducts the discussion among multiple departments;
s6: after the discussion is finished, if the order is produced, the relevant department adjusts the production work plan and uploads the new production work plan to the production management system again, the system marks the order as a formal order and adds the formal order into a time schedule, and the system generates an adjustment log and sends the adjustment log to each department in the form of an email; if the order is not produced, the system sends a mail to a sales department to wait for the sales department to adjust the order, meanwhile, each department uploads the reason why the order cannot be produced according to the meeting result, and the system records the information of the current intention sales order and combines and counts the reason of the flow order.
CN202110457792.5A 2021-04-27 2021-04-27 Production workshop intelligent scheduling system based on MES Pending CN113034052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110457792.5A CN113034052A (en) 2021-04-27 2021-04-27 Production workshop intelligent scheduling system based on MES

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110457792.5A CN113034052A (en) 2021-04-27 2021-04-27 Production workshop intelligent scheduling system based on MES

Publications (1)

Publication Number Publication Date
CN113034052A true CN113034052A (en) 2021-06-25

Family

ID=76454697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110457792.5A Pending CN113034052A (en) 2021-04-27 2021-04-27 Production workshop intelligent scheduling system based on MES

Country Status (1)

Country Link
CN (1) CN113034052A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115421840A (en) * 2022-09-22 2022-12-02 佛山市南海区微高软件有限公司 Order information pushing method and device, electronic equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005196484A (en) * 2004-01-07 2005-07-21 Mitsui Eng & Shipbuild Co Ltd Production management system
CN104331770A (en) * 2014-11-03 2015-02-04 叶校然 Intelligent management system of flexible production enterprise
CN111047257A (en) * 2019-12-09 2020-04-21 中铝国际工程股份有限公司 Production order management system based on 5G network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005196484A (en) * 2004-01-07 2005-07-21 Mitsui Eng & Shipbuild Co Ltd Production management system
CN104331770A (en) * 2014-11-03 2015-02-04 叶校然 Intelligent management system of flexible production enterprise
CN111047257A (en) * 2019-12-09 2020-04-21 中铝国际工程股份有限公司 Production order management system based on 5G network

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115421840A (en) * 2022-09-22 2022-12-02 佛山市南海区微高软件有限公司 Order information pushing method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
McAfee The impact of enterprise information technology adoption on operational performance: An empirical investigation
US7443282B2 (en) System and a method, including software and hardware, for providing real-time and synchronization views of supply chain information
CN103679322B (en) Production data processing method, apparatus and system
CN108320069A (en) A kind of manufacturing execution system
CN110580026A (en) intelligent manufacturing MES system
CN111081361A (en) Intelligent logistics platform management system
CN111047257A (en) Production order management system based on 5G network
Elmoselhy Hybrid lean-agile manufacturing system strategic facet in automotive sector
CN113537812A (en) Customized production management method and system for non-standard articles
CN113034052A (en) Production workshop intelligent scheduling system based on MES
CN114548614A (en) Intelligent manufacturing MES system
CN111915167A (en) Intelligent manufacturing virtual shipyard information model construction method
CN108319638A (en) A kind of application holds the dangerous material manufacturing execution system of inspection device
CN109002982A (en) A kind of veterinary drug GMP information system and veterinary drug quality of production control method
CN111080262A (en) Intelligent logistics platform management method
CN111798125A (en) Food ERP production management system
CN117670197A (en) Warehouse logistics control management system
CN112613825A (en) Logistics supply chain multi-user-based collaborative management platform
CN112150235A (en) Production workshop intelligent scheduling system based on MES
TWI298853B (en) A system and method for scheduling delayed orders
US20030204454A1 (en) System and method for managing received orders
CN114548865A (en) Design method of production scheduling early warning and alarm mechanism system based on ERP
CN112749912A (en) Marketing management system
CN112150099A (en) Interface for connecting ERP and MES in enterprise production scheduling
Ashayeri et al. Demand driven distribution: The logistical challenges and opportunities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination