CN113011013B - 一种高压架空输电线路子导线分组融冰时间计算方法 - Google Patents
一种高压架空输电线路子导线分组融冰时间计算方法 Download PDFInfo
- Publication number
- CN113011013B CN113011013B CN202110233648.3A CN202110233648A CN113011013B CN 113011013 B CN113011013 B CN 113011013B CN 202110233648 A CN202110233648 A CN 202110233648A CN 113011013 B CN113011013 B CN 113011013B
- Authority
- CN
- China
- Prior art keywords
- sub
- ice melting
- calculating
- grouping
- transmission line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/04—Power grid distribution networks
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Measurement Of Current Or Voltage (AREA)
- Locating Faults (AREA)
Abstract
本发明公开了一种高压架空输电线路子导线分组融冰时间计算方法,它包括:统计输电线路末端总有功功率P,确定输电线路首端电压值和末端电压;将具有分裂导线的高压输电线路的子导线进行分组,每组n根子导线,并计算融冰分组子导线对应电阻和电抗参数R,X;计算得到线路首末端电压之间相位差;计算分组子导线融冰电流;确定单根子导线电流能否达到融冰电流需求,否则返回重新分组,减少每组子导线数;在确定子导线电流能够满足融冰电流基础上,计算对应分组子导线融冰时间;计算剩余分组子导线融冰时间;解决了传统将原线路电流直接视为分裂导线电流带来的融冰不准确;为线路采用分组融冰电流计算提供了理论计算依据。
Description
技术领域
本发明属于输电线路融冰技术,尤其涉及一种高压架空输电线路子导线分组融冰时间计算方法。
背景技术
输电线路覆冰是电网在冬季低温凝冻天气下极易发生的自然灾害,采用交、直流短路融冰方法虽然是现阶段电力系统中采用的主要方法,但其也存在需要调整线路运行方式并对目标线路进行停电再进行融冰的效率低下等问题。
随着电网规模的不断扩大以及在线融冰理论、技术的不断发展,学者们提出了针对多分裂导线利用负荷电流开展子导线分组融冰的方法。然而采用子导线分组融冰,将改变线路参数并对融冰用负荷电流产生明显影响,进而难以有效、准确指导高压架空电线路采用子导线分组融冰计算时间,将原线路电流直接等效为分组负荷电流会带来融冰电流不足造成的融冰效率差、和准确性差等技术问题。
发明内容
本发明要解决的技术问题:提供一种高压架空输电线路子导线分组融冰时间计算方法,实现计算在线融冰技术手段过程中采用分组子导线融冰负荷电流准确计算,避免传统将原线路电流直接等效为分组负荷电流带来的融冰电流不足造成的融冰效率、和准确性差等技术问题。
本发明技术方案:
一种高压架空输电线路子导线分组融冰时间计算方法,它包括:
步骤1、统计输电线路末端总有功功率P,确定输电线路首端电压值U1和末端电压U2;
步骤2、将具有分裂导线的高压输电线路的子导线进行分组,每组n根子导线,并计算融冰分组子导线对应电阻和电抗参数R,X;
步骤3、利用步骤1和步骤2参数计算得到线路首末端电压之间相位差;
步骤4、计算分组子导线融冰电流;
步骤5、确定单根子导线电流能否达到融冰电流需求,否则返回步骤2重新分组,减少每组子导线数;
步骤6、在确定子导线电流能够满足融冰电流基础上,计算对应分组子导线融冰时间t1;
步骤7、计算剩余分组子导线融冰时间t2,t3...tn。
它还包括:步骤8、确定融冰总时间,t=t1+t2+...+tn。
计算融冰分组子导线对应电阻和电抗参数R,X的公式为:
R=n×Ro,X=n×Xo;式中Ro、Xo为原分裂导线电阻与电抗。
则U1,U2之间电压差值为
那么U1与dU之间相位差为
本发明的有益效果:
本发明充分考虑了高压架空电线路子导线分组融冰过程中线路阻抗参数变化对线路电流影响,采集输电线路末端总有功功率P,确定输电线路首端电压值U1和末端电压U2;将具有分裂导线的高压输电线路的子导线进行分组,每组n根子导线,并计算融冰分组子导线对应电阻和电抗参数R,X;实现计算在线融冰技术手段过程中采用分组子导线融冰负荷电流准确计算;解决了传统将原线路电流直接视为分裂导线电流带来的融冰不准确;为线路采用分组融冰电流计算提供了理论计算依据。
附图说明
图1为本发明流程示意图;
图2为本发明dU计算示意图。
具体实施方式
本发明的技术方案具体如下:
2)将具有分裂导线的高压输电线路的子导线进行分组,每组n根子导线,并计算融冰分组子导线对应电阻和电抗参数R=n×Ro,X=n×Xo,式中Ro、Xo为原分裂导线电阻与电抗;
6)在确定子导线电流能够满足融冰电流基础上,计算对应分组子导线融冰时间t1;
7)计算剩余分组子导线融冰时间t2,t3...tn;
8)基于步骤6)、7)确定融冰总时间,t=t1+t2+...+tn。
Claims (5)
1.一种高压架空输电线路子导线分组融冰时间计算方法,它包括:
步骤1、统计输电线路末端总有功功率P,确定输电线路首端电压值U1和末端电压U2;
步骤2、将具有分裂导线的高压输电线路的子导线进行分组,每组n根子导线,并计算融冰分组子导线对应电阻和电抗参数R,X;
步骤4、计算分组子导线融冰电流;
则U1,U2之间电压差值为
那么U1与dU之间相位差为
步骤5、确定单根子导线电流能否达到融冰电流需求,否则返回步骤2重新分组,减少每组子导线数;
步骤6、在确定子导线电流能够满足融冰电流基础上,计算对应分组子导线融冰时间t1;
步骤7、计算剩余分组子导线融冰时间t2,t3...tn。
2.根据权利要求1所述的一种高压架空输电线路子导线分组融冰时间计算方法,其特征在于:它还包括:步骤8、确定融冰总时间,t=t1+t2+...+tn。
4.根据权利要求1所述的一种高压架空输电线路子导线分组融冰时间计算方法,其特征在于:计算融冰分组子导线对应电阻和电抗参数R,X的公式为:
R=n×Ro,X=n×Xo;式中Ro、Xo为原分裂导线电阻与电抗。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110233648.3A CN113011013B (zh) | 2021-03-03 | 2021-03-03 | 一种高压架空输电线路子导线分组融冰时间计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110233648.3A CN113011013B (zh) | 2021-03-03 | 2021-03-03 | 一种高压架空输电线路子导线分组融冰时间计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113011013A CN113011013A (zh) | 2021-06-22 |
CN113011013B true CN113011013B (zh) | 2023-04-28 |
Family
ID=76403328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110233648.3A Active CN113011013B (zh) | 2021-03-03 | 2021-03-03 | 一种高压架空输电线路子导线分组融冰时间计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113011013B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113363871B (zh) * | 2021-07-07 | 2022-12-09 | 贵州电网有限责任公司 | 一种基于横向扭矩摆的抑制架空地线脱冰跳跃的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101710683A (zh) * | 2009-12-25 | 2010-05-19 | 重庆大学 | 利用分裂导线传输电流智能循环的防冰方法 |
CN103915809A (zh) * | 2014-03-26 | 2014-07-09 | 贺长宏 | 一种用于多分裂导线的交流线路不停电融冰方法及其装置 |
CN106207863A (zh) * | 2016-09-26 | 2016-12-07 | 南京工程学院 | 一种基于电网间同期并列装置的统一潮流控制器融冰方法 |
CN109494615A (zh) * | 2018-12-10 | 2019-03-19 | 贵州电网有限责任公司 | 利用柔性多状态开关制造有功环流实现配电网融冰方法 |
-
2021
- 2021-03-03 CN CN202110233648.3A patent/CN113011013B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101710683A (zh) * | 2009-12-25 | 2010-05-19 | 重庆大学 | 利用分裂导线传输电流智能循环的防冰方法 |
CN103915809A (zh) * | 2014-03-26 | 2014-07-09 | 贺长宏 | 一种用于多分裂导线的交流线路不停电融冰方法及其装置 |
CN106207863A (zh) * | 2016-09-26 | 2016-12-07 | 南京工程学院 | 一种基于电网间同期并列装置的统一潮流控制器融冰方法 |
CN109494615A (zh) * | 2018-12-10 | 2019-03-19 | 贵州电网有限责任公司 | 利用柔性多状态开关制造有功环流实现配电网融冰方法 |
Non-Patent Citations (3)
Title |
---|
分裂导线循环电流防冰融冰方法的控制方案研究;罗保松;《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑》;20130315(第3期);第C042-596页 * |
基于高频激励法的输电线路融冰激励源研究;荆群伟等;《电力科学与工程》;20151028;第31卷(第10期);第11-15页 * |
考虑功率衰减的输电线路高频激励融冰法研究;王贤军等;《电力科学与工程》;20180228;第43卷(第02期);第14-19页 * |
Also Published As
Publication number | Publication date |
---|---|
CN113011013A (zh) | 2021-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111191181B (zh) | 一种轨道交通多列车节能速度优化的运行能耗计算方法 | |
WO2022142126A1 (zh) | 一种铝电解槽数字孪生控制系统 | |
CN111049149B (zh) | 电网末端低电压治理方法 | |
CN113011013B (zh) | 一种高压架空输电线路子导线分组融冰时间计算方法 | |
CN105117560B (zh) | 一种中压配电线路理论线损计算方法 | |
CN111585274A (zh) | 一种考虑负荷瞬时不平衡度的台区理论线损计算方法 | |
CN114202186A (zh) | 一种海上风电场并网输送系统经济评估性方法 | |
CN115795889A (zh) | 一种基于多参量修正的输电线路线损优化计算方法 | |
CN110307898B (zh) | 一种采用型线时高压直流线路下方噪声计算方法及装置 | |
CN110688619B (zh) | 一种配电网的理论线损计算系统及方法 | |
CN105279353A (zh) | 一种基于聚类特征及网络向量的低压台区线损计算方法 | |
CN107767060B (zh) | 配网线路理论线损计算系统及方法 | |
CN113917282B (zh) | 一种基于短路电流的配网故障快速定位系统 | |
CN112202248B (zh) | 低压配电网拓扑分支细化识别方法 | |
CN211183415U (zh) | 由同塔双回交流线路改造的直流线路 | |
CN111273085B (zh) | 基于本征电气相位差的配电网时钟同步校正方法 | |
Fu et al. | Application Prospects of Flexible Low-Frequency AC Transmission in Offshore Wind Power Integration | |
CN113889957A (zh) | 一种基于分布式潮流控制的非接触耦合式融冰拓扑及融冰方法 | |
CN114282718A (zh) | 一种考虑多类型资源的数据中心园区供电协调规划方法 | |
CN112578179B (zh) | 一种功率监测方法 | |
CN114744576B (zh) | 交流输电线路改直流运行优化设计方法及系统 | |
CN110829613A (zh) | 架空输电线路的地线取能方法 | |
CN118280479A (zh) | 一种超高海拔特高压直流输电线路的空气间隙计算方法 | |
CN110427631B (zh) | 理论线损计算所需主网线路与变压器参数双重校核方法 | |
CN112039053B (zh) | 一种基于短路电流约束确定枢纽变电站出线数目的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |