CN113005844B - Pavement disease repairing method - Google Patents

Pavement disease repairing method Download PDF

Info

Publication number
CN113005844B
CN113005844B CN202110293716.5A CN202110293716A CN113005844B CN 113005844 B CN113005844 B CN 113005844B CN 202110293716 A CN202110293716 A CN 202110293716A CN 113005844 B CN113005844 B CN 113005844B
Authority
CN
China
Prior art keywords
milling
pavement
frame body
layer
disease
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110293716.5A
Other languages
Chinese (zh)
Other versions
CN113005844A (en
Inventor
贾伟忠
王峰
王毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110293716.5A priority Critical patent/CN113005844B/en
Publication of CN113005844A publication Critical patent/CN113005844A/en
Application granted granted Critical
Publication of CN113005844B publication Critical patent/CN113005844B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/005Methods or materials for repairing pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/08Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for roughening or patterning; for removing the surface down to a predetermined depth high spots or material bonded to the surface, e.g. markings; for maintaining earth roads, clay courts or like surfaces by means of surface working tools, e.g. scarifiers, levelling blades
    • E01C23/085Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for roughening or patterning; for removing the surface down to a predetermined depth high spots or material bonded to the surface, e.g. markings; for maintaining earth roads, clay courts or like surfaces by means of surface working tools, e.g. scarifiers, levelling blades using power-driven tools, e.g. vibratory tools
    • E01C23/088Rotary tools, e.g. milling drums

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a pavement disease repairing method, which comprises the following steps: A. carrying out pavement inspection tour to determine the positions and the ranges of pavement diseases; B. milling the surface layer in the disease range by using a milling machine, and spraying water for dust reduction while milling; C. after milling the surface layer, timely cleaning the bulk materials, checking whether an interlayer exists or not, timely cleaning the existing interlayer, then checking the diseases of the lower bearing layer, if no disease exists, spreading a permeable layer and a sealing layer after cleaning; the lower bearing layer is repaired by using a filler when the lower bearing layer is damaged. The invention can improve the defects of the prior art and improve the strength and the stability of the pavement repairing area.

Description

Pavement disease repairing method
Technical Field
The invention relates to the technical field of road administration construction, in particular to a pavement damage repairing method.
Background
The road surface diseases refer to the defects of collapse, deformation and the like after the road is used for a period of time. Although the existing pavement damage repairing method can temporarily repair the pavement, the strength and stability of the repaired area are not the same as those of the initially laid pavement, and how to improve the strength and stability of the pavement repaired area becomes one of the problems to be solved in the field.
Disclosure of Invention
The technical problem to be solved by the invention is to provide a pavement damage repairing method, which can overcome the defects of the prior art and improve the strength and stability of a pavement repairing area.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows.
A pavement disease repairing method comprises the following steps:
A. carrying out pavement inspection tour to determine the positions and the ranges of pavement diseases;
B. milling the surface layer in the disease range by using a milling machine, and spraying water for dust reduction while milling;
C. after milling the surface layer, timely cleaning the bulk materials, checking whether an interlayer exists or not, timely cleaning the existing interlayer, then checking the diseases of the lower bearing layer, if no disease exists, spreading a permeable layer and a sealing layer after cleaning; and (4) milling the lower bearing layer for the second time when the lower bearing layer has diseases, filling, and spreading a permeable layer and a sealing layer.
Preferably, in step B, the bottom of the milling work surface is flat and the edge is straight.
Preferably, the following components: and step B, spraying water and reducing dust by using a spraying mechanism, wherein the spraying mechanism comprises a water tank, the water tank is connected with a spray head through a hose, a pressure pump is installed on the hose, and the spray head sprays towards the milling machine tool bit.
Preferably, in step C, the bulking agent is a cold feed.
Preferably, in the step C, when the disease of the lower bearing layer is treated, the original crack filling material and garbage in the crack are removed, the crack is trimmed to be flat, the crack is kept dry, emulsified asphalt is brushed on the inner periphery of the crack, the crack is filled with cold patch asphalt mixture, the crack is opened into an isosceles triangle interface, a plurality of support frames are placed in the milling operation surface at intervals after milling is completed, and then cold patch is injected into the milling operation surface.
Preferably, the support frame comprises an upper frame body and a lower frame body, the upper frame body is tightly attached to the milling operation surface, and the lower frame body is in clearance fit with the milling operation surface; the reinforcing ribs are transversely installed in the upper frame body, the side walls of the lower frame body are provided with a plurality of baffles, and gaps are reserved between the adjacent baffles.
Preferably, two ends of the baffle are connected with the lower frame body through flexible elastic sheets.
Adopt the beneficial effect that above-mentioned technical scheme brought to lie in: the invention realizes the accurate classification of pavement diseases by milling the pavement twice, and carries out targeted treatment on different types of diseases. When the lower bearing layer diseases are treated, the support strength and the impact strength of solidified fillers in the milling area can be effectively improved by optimizing the repairing process and using the support frame in a matched manner, so that the strength and the stability of the pavement repairing area are fundamentally improved.
Drawings
Fig. 1 is a structural view of a spray mechanism according to an embodiment of the present invention.
Fig. 2 is a structural view of a support stand according to an embodiment of the present invention.
In the figure: 1. an upper frame body; 2. a lower frame body; 3. reinforcing ribs; 4. a baffle plate; 5. a flexible spring sheet; 6. a water tank; 7. a hose; 8. a spray head; 9. a pressure pump.
Detailed Description
The standard parts used in the invention can be purchased from the market, the special-shaped parts can be customized according to the description and the description of the attached drawings, and the specific connection mode of each part adopts the conventional means of mature bolts, rivets, welding, sticking and the like in the prior art, and the detailed description is not repeated.
Referring to fig. 1-2, one embodiment of the present invention includes the steps of:
A. carrying out pavement inspection tour to determine the positions and the ranges of pavement diseases;
B. milling the surface layer in the disease range by using a milling machine, and spraying water for dust reduction while milling;
C. after milling the surface layer, timely cleaning the bulk materials, checking whether an interlayer exists or not, timely cleaning the existing interlayer, then checking the diseases of the lower bearing layer, if no disease exists, spreading a permeable layer and a sealing layer after cleaning; and (4) milling the lower bearing layer for the second time when the lower bearing layer has diseases, filling, and spreading a permeable layer and a sealing layer.
And in the step B, the bottom of the milling operation surface is flat, and the edge part is straight.
And in the step B, a spraying mechanism is used for spraying water and reducing dust, the spraying mechanism comprises a water tank 6, the water tank 6 is connected with a spray head 8 through a hose 7, a pressure pump 9 is installed on the hose 7, and the spray head 8 sprays towards the milling machine tool bit.
In the step C, the filler is cold-patch material.
And C, when the disease of the lower bearing layer is treated, removing the original crack pouring materials and garbage in the cracks, trimming and straightening the cracks, keeping the inside of the cracks dry, brushing emulsified asphalt around the inner peripheries of the cracks, filling the cracks with cold-patch asphalt mixture, forming the cracks into isosceles triangle interfaces, placing a plurality of support frames at intervals in the milling operation surface after milling is finished, and then injecting cold-patch materials into the milling operation surface.
The support frame comprises an upper frame body 1 and a lower frame body 2, wherein the upper frame body 1 is tightly attached to a milling operation surface, and the lower frame body 2 is in clearance fit with the milling operation surface; go up transversely to install strengthening rib 3 in the support body, a plurality of baffle 4 is installed to the lateral wall of lower support body 2, leaves the space between the adjacent baffle 4. Two ends of the baffle 4 are connected with the lower frame body 2 through flexible elastic sheets 5.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (4)

1. A pavement disease repairing method is characterized by comprising the following steps:
A. carrying out pavement inspection tour to determine the positions and the ranges of pavement diseases;
B. milling the surface layer in the disease range by using a milling machine, and spraying water for dust reduction while milling;
C. after milling the surface layer, timely cleaning the bulk materials, checking whether an interlayer exists or not, timely cleaning the existing interlayer, then checking the diseases of the lower bearing layer, if no disease exists, spreading a permeable layer and a sealing layer after cleaning; repairing the lower bearing layer by using a filling agent when the lower bearing layer has a disease;
when the disease of the lower bearing layer is treated, firstly removing original crack pouring materials and garbage in a seam, trimming and straightening a crack, keeping the inside of the seam dry, brushing emulsified asphalt on the periphery of the inner periphery of the seam, filling the seam with cold-patch asphalt mixture, forming the crack into an isosceles triangle interface, firstly placing a plurality of support frames at intervals in a milling operation surface after milling is finished, and then injecting cold patch materials into the milling operation surface; the support frame comprises an upper frame body (1) and a lower frame body (2), the upper frame body (1) is tightly attached to the milling operation surface, and the lower frame body (2) is in clearance fit with the milling operation surface; reinforcing ribs (3) are transversely arranged in the upper frame body, a plurality of baffles (4) are arranged on the side wall of the lower frame body (2), and gaps are reserved between the adjacent baffles (4); two ends of the baffle (4) are connected with the lower frame body (2) through flexible elastic sheets (5).
2. The pavement damage repair method according to claim 1, characterized in that: and in the step B, the bottom of the milling operation surface is flat, and the edge part is straight.
3. The pavement damage repair method according to claim 2, characterized in that: and in the step B, a spraying mechanism is used for spraying water and reducing dust, the spraying mechanism comprises a water tank (6), the water tank (6) is connected with a spray head (8) through a hose (7), a pressure pump (9) is installed on the hose (7), and the spray head (8) sprays towards the milling machine tool bit.
4. The pavement damage repair method according to claim 1, characterized in that: in the step C, the filler is cold-patch material.
CN202110293716.5A 2021-03-19 2021-03-19 Pavement disease repairing method Active CN113005844B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110293716.5A CN113005844B (en) 2021-03-19 2021-03-19 Pavement disease repairing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110293716.5A CN113005844B (en) 2021-03-19 2021-03-19 Pavement disease repairing method

Publications (2)

Publication Number Publication Date
CN113005844A CN113005844A (en) 2021-06-22
CN113005844B true CN113005844B (en) 2022-04-26

Family

ID=76402799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110293716.5A Active CN113005844B (en) 2021-03-19 2021-03-19 Pavement disease repairing method

Country Status (1)

Country Link
CN (1) CN113005844B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758008A (en) * 2013-12-24 2014-04-30 英达公路再生科技(集团)有限公司 Method for repairing bituminous pavement cracks with molding asphalt rubber
CN207646562U (en) * 2017-12-10 2018-07-24 李燕 A kind of crack on road fixing device
CN109083024A (en) * 2018-08-29 2018-12-25 河南省增达公路养护管理有限公司 A kind of construction technology of the modification coating for highway bridge floor
US20190010667A1 (en) * 2017-07-10 2019-01-10 Cimline, Inc. Methods and Apparatus for Repairing Road Surfaces
CN210368560U (en) * 2019-06-26 2020-04-21 湖南省醴陵市通达建设工程有限公司 Asphalt pavement crack repairing and leveling filling structure
CN211522803U (en) * 2019-11-25 2020-09-18 南通辉腾道路工程有限公司 Clean type road surface milling machine
CN211897673U (en) * 2020-03-05 2020-11-10 中建七局安装工程有限公司 Road and bridge crack reinforced structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210458891U (en) * 2019-07-01 2020-05-05 长春市城建维护集团股份有限公司 Road and bridge crack reinforcing apparatus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758008A (en) * 2013-12-24 2014-04-30 英达公路再生科技(集团)有限公司 Method for repairing bituminous pavement cracks with molding asphalt rubber
US20190010667A1 (en) * 2017-07-10 2019-01-10 Cimline, Inc. Methods and Apparatus for Repairing Road Surfaces
CN207646562U (en) * 2017-12-10 2018-07-24 李燕 A kind of crack on road fixing device
CN109083024A (en) * 2018-08-29 2018-12-25 河南省增达公路养护管理有限公司 A kind of construction technology of the modification coating for highway bridge floor
CN210368560U (en) * 2019-06-26 2020-04-21 湖南省醴陵市通达建设工程有限公司 Asphalt pavement crack repairing and leveling filling structure
CN211522803U (en) * 2019-11-25 2020-09-18 南通辉腾道路工程有限公司 Clean type road surface milling machine
CN211897673U (en) * 2020-03-05 2020-11-10 中建七局安装工程有限公司 Road and bridge crack reinforced structure

Also Published As

Publication number Publication date
CN113005844A (en) 2021-06-22

Similar Documents

Publication Publication Date Title
CN205347950U (en) Novel bituminous paving pouring machine
CN205700735U (en) A kind of ore crusher
CN108867291B (en) Municipal road surface repairing equipment and repairing method
CN105442424A (en) Full-automatic jet type pavement pit repairing vehicle
CN207062724U (en) A kind of special urban road repair apparatus of municipal administration
CN211522800U (en) A crack cleaning device for highway bridge maintenance
CN113005844B (en) Pavement disease repairing method
CN212956079U (en) Highway maintenance road surface crack pouring device
CN216156326U (en) Road surface fracture cementation of fissures device for town road
CN208328629U (en) A kind of highway subgrade maintenance pavement seam filling device
CN207987689U (en) Road and bridge pavement asphalt laying device
CN212826030U (en) Concrete PC component mould platform surface cleaning machine
CN206718132U (en) Concrete prefabricated element assisting demolding device
CN213772856U (en) Superstrong viscous coat construction equipment convenient to cold recycling surface course material is under construction fast
CN218203788U (en) Road repair is with pouring machine
CN218203808U (en) Road asphalt crack pouring machine
CN109267463B (en) Portable asphalt crack pouring device
CN214882846U (en) Crack filling equipment for highway maintenance
CN217579692U (en) Highway crack processing apparatus that highway engineering was used
CN107724259A (en) Silicone adhesive enclosed bridge cracks of abutment capping technique
CN113882213A (en) Highway damage repairing method
CN211522781U (en) Movable asphalt pavement joint filling machine
CN201579183U (en) Automatic glue removing device for robot glue spreader
CN212077573U (en) Small-size road repair construction device
CN209099125U (en) A kind of highway, which is repaired the roads, uses road roller

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant