CN109083024A - A kind of construction technology of the modification coating for highway bridge floor - Google Patents

A kind of construction technology of the modification coating for highway bridge floor Download PDF

Info

Publication number
CN109083024A
CN109083024A CN201810993753.5A CN201810993753A CN109083024A CN 109083024 A CN109083024 A CN 109083024A CN 201810993753 A CN201810993753 A CN 201810993753A CN 109083024 A CN109083024 A CN 109083024A
Authority
CN
China
Prior art keywords
milling
crack
bridge floor
highway bridge
construction technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810993753.5A
Other languages
Chinese (zh)
Inventor
乔朝增
周铭玉
刘雷雷
乔翠晓
徐娟
熊海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zeng Da Highway Maintenance Management Co Ltd Of Henan Province
Original Assignee
Zeng Da Highway Maintenance Management Co Ltd Of Henan Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zeng Da Highway Maintenance Management Co Ltd Of Henan Province filed Critical Zeng Da Highway Maintenance Management Co Ltd Of Henan Province
Priority to CN201810993753.5A priority Critical patent/CN109083024A/en
Publication of CN109083024A publication Critical patent/CN109083024A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The present invention relates to a kind of construction technologies of modification coating for highway bridge floor, it is the following steps are included: the pavement disease processing of (1) original;(2) sticking layer oil spread is constructed;(3) there is first layer the micro-surface area cover of water-proof binding function to construct;(4) there is the second layer micro-surface area cover of antiskid function to construct;The technique is mainly used for the preventive maintenance of high-grade pitch or cement pavement and the corrective maintenance of slight disease, and has excellent durability, long service life, high-temperature stable, anti-low-temperature cracking.

Description

A kind of construction technology of the modification coating for highway bridge floor
Technical field
The invention belongs to bituminous highway conservation technology fields, and in particular to a kind of modification coating for highway bridge floor Construction technology.
Background technique
The effect of deck paving is that protection floorings prevent wheel or the direct wearing course of crawler belt, and girder is protected to invade from rainwater Erosion, and the load so as to dispersing wheel.Common deck paving has cement concrete, two kinds of shapes of mating formation of bituminous concrete Formula.On the bridge floor of water layer in the air, also has and to be mated formation using water-proof concrete.
Summary of the invention
A kind of modification for highway bridge floor is provided the purpose of the present invention is overcome the deficiencies in the prior art to cover The construction technology of layer, the road surface of the construction technology can repair the disease on former road surface using cold mixing cold-application thin overlay, restore road surface Original function makes road surface take on an entirely new look, and is a kind of environmental protection and energy saving construction technology.
In order to achieve the above object, the present invention adopts the following technical scheme:
The present invention provides a kind of construction technology of modification coating for highway bridge floor, it the following steps are included:
(1) former pavement disease processing;
(2) sticking layer oil spread is constructed;
(3) there is first layer the micro-surface area cover of water-proof binding function to construct;
(4) there is the second layer micro-surface area cover of antiskid function to construct.
According to the construction technology of the above-mentioned modification coating for highway bridge floor, the original pavement disease processing includes Following steps:
A. finish-milling digs, cleans: using finish-milling plane mill off out-of-flatness part to improve surface evenness, is typically employed in highway In repair and large range of old pavement destroys loose portions, using sweeper or manually leave the cleaning of milling material;Inspection Each milling scored surface is looked into, when adjacent two milling faces generation occurs greater than 5mm faulting of slab ends, to carry out milling plucking repairing again, and right The defect of milling scored surface is handled in time;
B. it the repairing of disease: is repaired in strict accordance with the standard requirements of " highway cement concrete pavement maintenance technology specification " It mends;
C. it cleans crack: using air compressor machine by the disintegrating slag and crack two sides at least 10cm range in slot in the crack on road surface Interior dust thorough cleaning is clean;The direct filling of notch and fill slot or right >=crack 10mm either to the crack 3~10mm Seam keeps the cleaning and drying in crack in the gap of crack and the dust of slotted wall is blown off with hair dryer, thoroughly removes clean.
According to the construction technology of the above-mentioned modification coating for highway bridge floor, the sticking layer oil spread construction party Method: the thin bitumen layer of bonding between pitch and former road surface and spread should thoroughly clean milling scored surface in work progress, use Surface is floated ash and blown off by air compressor machine, blower, removes wash cement laitance, it is ensured that milling exposed surface is clean, dry;It is dripped using profession Green distribution vehicle carries out sprinkling sticking layer oil to milling scored surface, and spread quantity is in 0.5kg/ ㎡~0.7kg/ ㎡.
According to the construction technology of the above-mentioned modification coating for highway bridge floor, step (3) first layer micro-surface area cover Face through traffic bound for 24 hours after, then carry out step (4) second layer micro-surface area cover construction.
It is accurate to measure in step a according to the construction technology of the above-mentioned modification coating for highway bridge floor, it determines Milling range and milling depth;Do not implement milling meeting design requirement absolute altitude section in principle, needs milling for belonging to design Milling section delimited according to actual measurement elevation in section, determine the average milling depth in each milling section.
According to the construction technology of the above-mentioned modification coating for highway bridge floor, when including several in a milling section Continuous milling section, implements continuous milling plucking, and milling depth is adjusted in milling, guarantees that road surface is longitudinally smooth.
According to the construction technology of the above-mentioned modification coating for highway bridge floor, in step c, for cement concrete The crack road surface < 3mm, edge of crack are scattered without deformation, nothing, stitch without branch, do not have influential light crack to vehicle driving, and split The crack slit width degree >=10mm, after being cleaned out in seam, using the method for the direct cementation of fissures;For the crack of 3~10mm, elder generation is needed Fluting is carried out with groover and expands seam, is then infused dedicated subzero 20 DEG C of the gap-grouting material of northeast weather that is suitable for by pouring machine Enter in gap, fills dead-end fracture;Base joint grouting glue adhesion strength used by Filling Technology is high.
Above-mentioned micro-surface area considers climatic factor when constructing, and does the following:
A. temperature reaches 13 DEG C and must not construct when continuing to decline, but temperature reaches 10 DEG C and continues to apply when rising Work;
B. the rainy day is forbidden to construct, surface gathered water is not dry or before not removing after rain, must not construct;
C. possible rainfall in construction and maintenance shaping period, must not construct;
D. it conserves temperature in shaping period and is greater than 10 DEG C.
In order to guarantee the quality on road surface after micro-surface area is constructed, former road surface must satisfy the following conditions:
A. former road surface must have enough structural strengths.The structural strength on former road surface is insufficient, should not use micro-surface area The maintenance plan of construction;Former road surface partial structurtes intensity is insufficient, it is necessary to select suitable method reinforcement as the case may be.
B. former road surface can construct after having local damage to answer thorough digging.
Compared with prior art, the present invention obtain the utility model has the advantages that
1, thickness is thin, light-weight, and coating thickness is generally 5-10mm, does not increase bridge floor load and pavement thickness, does not influence The passage clear height such as tunnel, is designed more flexible.
2, effectively anti-skidding, wear-resisting, draining, shortens braking distance, for former pavement structural depth reduction pavement noise bigger than normal And rainy day driving water mist, improve travel safety and comfort.
3, waterproof, corrosion-resistant function are had both, bridge floor rain penetration can be effectively prevent.
4, economical easy to maintain, 5-10 can be extended to maintenance period by the 3-5 on plain asphalt road surface, either initial stage throws Money or long term maintenance expense are below bituminous pavement, and long-term economic benefit becomes apparent.
5, speed of application is fast, and the road closure time is short, does not change pavement structure, is suitable for old pavement renewing.
6, excellent durability, long service life, high-temperature stable, anti-low-temperature cracking.
7, environmentally protective, volatile solvent is free of, heating construction is not required to.
Detailed description of the invention
Fig. 1 is specific production process figure of the invention.
Specific embodiment
Lower embodiment is to carry out detailed specific description to the content of present invention, but the contents of the present invention do not limit so.
Embodiment 1:
The present invention provides a kind of construction technology of modification coating for highway bridge floor, one kind being used for highway The construction technology of the modification coating of bridge floor, it the following steps are included:
(1) former pavement disease processing;
(2) sticking layer oil spread is constructed;
(3) there is first layer the micro-surface area cover of water-proof binding function to construct;
(4) there is the second layer micro-surface area cover of antiskid function to construct.
It is described original pavement disease processing the following steps are included:
A. finish-milling digs, cleans: using finish-milling plane mill off out-of-flatness part to improve surface evenness, is typically employed in highway In repair and large range of old pavement destroys loose portions, using sweeper or manually leave the cleaning of milling material;Inspection Each milling scored surface is looked into, when adjacent two milling faces generation occurs greater than 5mm faulting of slab ends, to carry out milling plucking repairing again, and right The defect of milling scored surface is handled in time;Accurate measurement, determines milling range and milling depth;Meeting design in principle It is required that milling is not implemented in absolute altitude section, needs milling section to delimit milling section according to actual measurement elevation for belonging to design, determine each The average milling depth in milling section;According to the construction technology of the above-mentioned modification coating for highway bridge floor, when one Include several continuous milling sections in milling section, implement continuous milling plucking, milling depth is adjusted in milling, guarantees that road surface is vertical To smooth;
B. it the repairing of disease: is repaired in strict accordance with the standard requirements of " highway cement concrete pavement maintenance technology specification " It mends;
C. it cleans crack: using air compressor machine by the disintegrating slag and crack two sides at least 10cm range in slot in the crack on road surface Interior dust thorough cleaning is clean;The direct filling of notch and fill slot or right >=crack 10mm either to the crack 3~10mm Seam keeps the cleaning and drying in crack in the gap of crack and the dust of slotted wall is blown off with hair dryer, thoroughly removes clean.
The sticking layer oil spread construction method: the thin bitumen layer of bonding between pitch and former road surface and spread was constructed Cheng Zhongying thoroughly cleans milling scored surface, and ash is floated on surface and is blown off using air compressor machine, blower, removes wash cement laitance, it is ensured that Milling exposed surface is clean, dry;Sprinkling sticking layer oil is carried out to milling scored surface using professional pitch sprinkling car, spread quantity exists 0.5kg/ ㎡~0.7kg/ ㎡.
Step (3) first layer micro-surface area cover through traffic bound for 24 hours after, then carry out step (4) second layer micro-surface area cover Construction.
In step c, for the crack cement concrete pavement < 3mm, edge of crack is scattered without deformation, nothing, stitches without branch, right Vehicle driving does not have influential light crack and the crack fracture width >=10mm, after cleaning out in seam, using the direct cementation of fissures Method;For the crack of 3~10mm, needs first to carry out fluting expansion seam with groover, then will dedicated be suitable for by pouring machine In in northeast weather subzero 20 DEG C of gap-grouting material injection gap, dead-end fracture is filled;Cementation of fissures gluing used by Filling Technology Knotting strength is high.
Compound micro-surface area cover
1, material requirements
(1) modified emulsifying asphalt
The emulsified asphalt that micro-surface area must select cation type polymer modified, modified dosage should not be less than 3%;Items refer to Mark should meet the technical requirements of table one:
Table one, BCR type modified emulsifying asphalt technical requirements
(2) mineral aggregate
Mineral aggregate should select it is hard, coarse, wear-resisting, clean gather materials, mainly use 0-3mm, 3-5mm specification, various rule Strict classification is stacked after lattice building stones are marched into the arena, and super particles is screened out by material screening machine, in strict accordance with mix-design ingredient.Technology It is required that being shown in Table two:
Table two, coarse aggregate technical indicator
Its specific production process is shown in Fig. 1.
(3) additive
Additive in micro-surface area will be depending on actual conditions.It is divided into coagulant and retarder, and emulsified asphalt is adjusted De-emulsification speed, additive types and metering should be determined by experiment, and the admixture of additive must not be to mixture overall performance Have an adverse effect.
Not experiment proves that additive must not be used in construction.
(4) filler
Mineral aggregate gradation gradation can be improved using filler in micro-surface area, adjust slurry mixture can the mixing time, at Pulpous state state and performance after molding improve the intensity of stability and sealing.
More common miberal powder, cement and lime etc. are used as filler in micro-surfacing mixture, and the addition content of filler must be by mixed Material contrived experiment is closed to determine.
(5) water
Micro-surface area water should use drinkable water, the object for being free of harmful solubility salt in water, capable of causing chemical reaction Matter and other pollutants.
2, mix proportion design
(1) gradation
The selection of micro-surface area gradation fully take into account situation, the volume of traffic, weather conditions, the requirement on former road surface etc. because Element selects suitable gradation types.Micro-surface area mineral aggregate gradation range (being shown in Table three)
Three micro-surface area mineral aggregate gradation range table of table
(2) slurry mixture technical indicator:
The laboratory test technical indicator of slurry mixture should meet the requirement of table four:
Four micro-surfacing mixture technical indicator of table
(3) mix-design
A. according to the gradation types of selection, grading limit, the various mixing ratios gathered materials is calculated, formate gradation composition is being required Grading limit in.
B, it according to the dosage of previous each material of experience primary election, carries out mixing and stirring test and Cohesion torque test.It can the mixing time Test temperature is considered as highest construction temperature, and the test temperature of Cohesion torque test is considered as the lowest temperature being likely encountered in construction Degree.
C, according to the apparent condition of test result and slurry mixture, 3 is selected and thinks reasonable prescription of mixed materials, by table The performance of four regulation test slurry mixtures, is not inconsistent requirement such as, and the mixing ratio of appropriate adjustment a variety of materials is tested again, until symbol It closes until requiring.
D. when designer's experience deficiency, 3 prescription of mixed materials of primary election can be changed different asphalt contents respectively, It repeats to test according to the requirement of table four, and the wet wheel wearing valve of the lh of different pitches dosage and sand adhesive capacity is depicted as relationship respectively Curve.Using the asphalt content that wearing valve is required close in table five as minimum asphalt content Pbmin., sand adhesive capacity is close to table five The asphalt content of middle requirement is maximum asphalt content Pbmax, obtains selectable range Pbmin~Pbmax of asphalt content.
E. suitable asphalt content rule of thumb is selected in the optional range of asphalt content.To micro-surfacing mixture, with Selected asphalt content examines the wet wheel of the immersion 6d of mixture to wear away index, and load wheel is examined in the increase for track filling The change width rate index of test adjusts asphalt content and tests again, until meeting the requirements when not being inconsistent requirement.
F. according to previous experiences and Mixture ratio design result.It is comprehensive on the basis of fully considering weather and traffic feature It closes and determines prescription of mixed materials.
G. by asphalt mixture design, asphalt mixture design report is provided.Report content should include:
(a) modified emulsifying asphalt proportion and technical indicator;
(b) gathers materials technical indicator, aggregate mix proportion and mineral aggregate gradation range;
(c) micro-surfacing mixture cooperates when technical indicator.
Above-mentioned modified coating application following situations:
1, in bridge strengthening improvement project, the occasion of pave-load layer load, thinned pave-load layer thickness need to be mitigated;
2, bridge floor color change (such as cement concrete bridge deck white change black);
3, road surface, the construction of bridge deck surfaces wearing course;
4, the renewal and reform of old bridge floor, old pavement;
5, the deck pavings such as overhead road of city;
6, need to do the road surface of anti-skidding processing;
7, road surface functional rehabilitation or thin layer repairing, such as cement concrete road surface pitted skin play powder, peeling, freeze thawing Destroy etc..
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, although referring to aforementioned reality Applying example, invention is explained in detail, for those skilled in the art, still can be to aforementioned each implementation Technical solution documented by example is modified or equivalent replacement of some of the technical features.It is all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (7)

1. a kind of construction technology of the modification coating for highway bridge floor, it is characterised in that it the following steps are included:
(1) former pavement disease processing;
(2) sticking layer oil spread is constructed;
(3) there is first layer the micro-surface area cover of water-proof binding function to construct;
(4) there is the second layer micro-surface area cover of antiskid function to construct.
2. the construction technology of the modification coating according to claim 1 for highway bridge floor, it is characterised in that described The processing of former pavement disease the following steps are included:
A. finish-milling digs, cleans: using finish-milling plane mill off out-of-flatness part to improve surface evenness, is typically employed in highway In repair and large range of old pavement destroys loose portions, using sweeper or manually leave the cleaning of milling material;It checks Each milling scored surface will carry out milling plucking repairing, and to milling when adjacent two milling faces generation occurs greater than 5mm faulting of slab ends again The defect of plane scored surface is handled in time;
B. it the repairing of disease: is repaired in strict accordance with the standard requirements of " highway cement concrete pavement maintenance technology specification ";
C. crack is cleaned: will be within the scope of the disintegrating slag and crack two sides at least 10cm in slot using air compressor machine by the crack on road surface Dust thorough cleaning it is clean;The direct cementation of fissures of notch and fill slot or right >=crack 10mm either to the crack 3~10mm, By in the gap of crack and the dust of slotted wall is blown off with hair dryer, thoroughly removes clean, the cleaning and drying in crack are kept.
3. the construction technology of the modification coating according to claim 1 for highway bridge floor, it is characterised in that: described Sticking layer oil spread construction method: the thin bitumen layer of bonding between pitch and former road surface and spread, it should be thoroughly clear in work progress Milling scored surface is swept, ash is floated on surface and is blown off using air compressor machine, blower, removes wash cement laitance, it is ensured that milling exposed surface is clean Only, dry;Sprinkling sticking layer oil is carried out to milling scored surface using professional pitch sprinkling car, spread quantity is in 0.5kg/ ㎡~0.7kg/ ㎡。
4. the construction technology of the modification coating according to claim 1 for highway bridge floor, it is characterised in that: step (3) first layer micro-surface area cover through traffic bound for 24 hours after, then carry out step (4) second layer micro-surface area cover construction.
5. the construction technology of the modification coating according to claim 2 for highway bridge floor, it is characterised in that step a In, it is accurate to measure, determine milling range and milling depth;Do not implement milling meeting design requirement absolute altitude section in principle, it is right It needs milling section to delimit milling section according to actual measurement elevation in belonging to design, determines the average milling depth in each milling section.
6. the construction technology of the modification coating according to claim 5 for highway bridge floor, it is characterised in that: when one Include several continuous milling sections in a milling section, implement continuous milling plucking, milling depth is adjusted in milling, guarantees road surface It is longitudinal smooth.
7. the construction technology of the modification coating according to claim 1 for highway bridge floor, it is characterised in that step c In, for the crack cement concrete pavement < 3mm, edge of crack is scattered without deformation, nothing, stitches without branch, does not have shadow to vehicle driving Loud light crack and the crack fracture width >=10mm, after being cleaned out in seam, using the method for the direct cementation of fissures;For 3~ The crack of 10mm, needs first to carry out fluting with groover to expand seam, and then by pouring machine, to be suitable for northeast weather subzero by dedicated In 20 DEG C of gap-grouting material injection gap, dead-end fracture is filled;Base joint grouting glue adhesion strength used by Filling Technology is high.
CN201810993753.5A 2018-08-29 2018-08-29 A kind of construction technology of the modification coating for highway bridge floor Pending CN109083024A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810993753.5A CN109083024A (en) 2018-08-29 2018-08-29 A kind of construction technology of the modification coating for highway bridge floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810993753.5A CN109083024A (en) 2018-08-29 2018-08-29 A kind of construction technology of the modification coating for highway bridge floor

Publications (1)

Publication Number Publication Date
CN109083024A true CN109083024A (en) 2018-12-25

Family

ID=64795171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810993753.5A Pending CN109083024A (en) 2018-08-29 2018-08-29 A kind of construction technology of the modification coating for highway bridge floor

Country Status (1)

Country Link
CN (1) CN109083024A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112064477A (en) * 2020-08-08 2020-12-11 上海静安市政工程有限公司 Lane gridding milling construction method and gridding node marking device thereof
CN113005844A (en) * 2021-03-19 2021-06-22 贾伟忠 Pavement disease repairing method
CN113564992A (en) * 2021-08-13 2021-10-29 李维维 Micro-surfacing paver and construction method
CN113638321A (en) * 2021-09-06 2021-11-12 上海市政工程设计研究总院(集团)有限公司 Repairing method of concrete bridge deck

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846715A (en) * 2015-05-08 2015-08-19 河南省增达公路养护管理有限公司 Method for cape seal of preventative-maintenance experimental road
CN105133455A (en) * 2015-07-22 2015-12-09 济南市市政工程设计研究院(集团)有限责任公司 Asphalt overlay treatment method of extreme-cold region cement concrete pavement
CN106012746A (en) * 2016-07-08 2016-10-12 山东大山路桥工程有限公司 Surface treatment method for achieving low noise and skid resistance of road
CN106087640A (en) * 2015-12-24 2016-11-09 武汉市汉阳市政建设集团公司 A kind of construction method of colored micro-surface area
KR101719615B1 (en) * 2016-12-23 2017-03-24 주식회사 에이스로드텍 Asphalt fiber reinforcing Grid with hot melt film for increasing adhesion and Pavement reinforcing methods by using Asphalt fiber reinforcing Grid

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846715A (en) * 2015-05-08 2015-08-19 河南省增达公路养护管理有限公司 Method for cape seal of preventative-maintenance experimental road
CN105133455A (en) * 2015-07-22 2015-12-09 济南市市政工程设计研究院(集团)有限责任公司 Asphalt overlay treatment method of extreme-cold region cement concrete pavement
CN106087640A (en) * 2015-12-24 2016-11-09 武汉市汉阳市政建设集团公司 A kind of construction method of colored micro-surface area
CN106012746A (en) * 2016-07-08 2016-10-12 山东大山路桥工程有限公司 Surface treatment method for achieving low noise and skid resistance of road
KR101719615B1 (en) * 2016-12-23 2017-03-24 주식회사 에이스로드텍 Asphalt fiber reinforcing Grid with hot melt film for increasing adhesion and Pavement reinforcing methods by using Asphalt fiber reinforcing Grid

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋成志等: "微表处技术在白改黑工程中的应用", 《公路交通科技》 *
赵树青等: "《公路养护与管理》", 31 January 2016, 华中科技大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112064477A (en) * 2020-08-08 2020-12-11 上海静安市政工程有限公司 Lane gridding milling construction method and gridding node marking device thereof
CN113005844A (en) * 2021-03-19 2021-06-22 贾伟忠 Pavement disease repairing method
CN113005844B (en) * 2021-03-19 2022-04-26 贾伟忠 Pavement disease repairing method
CN113564992A (en) * 2021-08-13 2021-10-29 李维维 Micro-surfacing paver and construction method
CN113638321A (en) * 2021-09-06 2021-11-12 上海市政工程设计研究总院(集团)有限公司 Repairing method of concrete bridge deck

Similar Documents

Publication Publication Date Title
CN109083024A (en) A kind of construction technology of the modification coating for highway bridge floor
CN109914178B (en) Construction method for integrally paving road by using bio-enzyme curing material
US7714058B2 (en) Pavement life extension product and method
CN103806356B (en) A kind of preparation method of decorative concrete earth construction
Autelitano et al. Criteria for the selection and design of joints for street pavements in natural stone
CN109930462A (en) A kind of quick method for repairing and constructing in old road of polyurethane-modified cement
CN101476273A (en) Japanese epoxy asphalt pavement construction method for large-stride steel bridge deck
CN114351529A (en) Pavement structure adopting warm-mix ultrathin layer overlay and construction method thereof
CN109082969A (en) A kind of construction technology of the anticoagulant ice thin overlay of snow melt
CN105176116A (en) Cold mixing self-emulsifying retinasphal material, preparation method and purpose of cold mixing self-emulsifying retinasphal material
CN101319091B (en) Colorful asphalt emulsion, preparation, and application in colorful slurry sealing layer
CN107419635A (en) A kind of composite pavement sealing method
CN103924495A (en) Small and medium-sized steel bridge deck pavement system and implementation method
US8603570B2 (en) Fiber modified layer and methods of making and using same
CN211472012U (en) Signal lamp crossing filling type composite pavement
CN204898456U (en) Asphalt pavement containing rubber asphalt stress absorbing layer
RU2341479C1 (en) Cast road concrete mix for bridge drive way covering
Estakhri et al. Guidelines on construction and maintenance of porous friction courses in Texas
CN105803937B (en) A kind of AC and epoxy construction layer clad steel bridge floor pavement construction method
Orr Pavement Maintenance
CN110438896A (en) Concrete bridge deck polyurethane rubber drainage pavement structure and its construction method
CN107386040A (en) A kind of cationic high molecular polymer pitch airfield pavement sealing maintenance process
CN104372735A (en) Bridge seamless expansion joint filling prefabricated part
CN207619839U (en) A kind of anti-freezing ice double deck maintenance structure
KR101115544B1 (en) A multi functional elastic ascone and its manufacturing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225

RJ01 Rejection of invention patent application after publication