CN112982935B - Pull-up scaffold for wide-scene balcony and construction method thereof - Google Patents

Pull-up scaffold for wide-scene balcony and construction method thereof Download PDF

Info

Publication number
CN112982935B
CN112982935B CN202110235517.9A CN202110235517A CN112982935B CN 112982935 B CN112982935 B CN 112982935B CN 202110235517 A CN202110235517 A CN 202110235517A CN 112982935 B CN112982935 B CN 112982935B
Authority
CN
China
Prior art keywords
connecting piece
connecting pipe
tensioning
balcony
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110235517.9A
Other languages
Chinese (zh)
Other versions
CN112982935A (en
Inventor
陈�胜
胡其扬
陈育红
陈辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huai'an Boyan Civil Engineering Science Research Institute Co ltd
Original Assignee
Huai'an Boyan Civil Engineering Science Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huai'an Boyan Civil Engineering Science Research Institute Co ltd filed Critical Huai'an Boyan Civil Engineering Science Research Institute Co ltd
Priority to CN202110235517.9A priority Critical patent/CN112982935B/en
Publication of CN112982935A publication Critical patent/CN112982935A/en
Application granted granted Critical
Publication of CN112982935B publication Critical patent/CN112982935B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/045Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to an upward-pulling scaffold for a wide-scene balcony, which comprises a cantilever beam for erecting a scaffold, a tensioning part for connecting the cantilever beam and a structural beam on the upper layer and a load transfer part for transferring vertical load; the tensioning part comprises a tensioning rope, two ends of the tensioning rope are respectively connected with the upper layer structural beam and the current layer cantilever beam, and a tensioning adjusting piece for adjusting the tension of the tensioning rope is arranged on the tensioning rope; the load transfer part comprises an adjustable support rod arranged between the structural beam and the platform opening beam, the adjustable support rod comprises a second connecting pipe and a first connecting pipe which are coaxially arranged, the first connecting pipe is inserted into the second connecting pipe, and the second connecting pipe moves along the axial direction of the first connecting pipe; and provides a construction method of the scaffold. According to the technical scheme, the upward-pulling scaffold for the wide-scene balcony and the construction method thereof can effectively solve the problems that the existing scaffold is high in erecting danger, large in balcony bearing weight and easy to influence later-stage use of the balcony.

Description

Pull-up scaffold for wide-scene balcony and construction method thereof
Technical Field
The invention relates to the technical field of building construction, in particular to an upward-pulling scaffold for a wide-scene balcony and a construction method thereof.
Background
The overhanging balcony refers to a balcony with the whole or multiple parts extending out, and the outermost edge of the balcony has no bearing wall or pillar, and the bearing is achieved by a floor slab or by two sections of outriggers arranged on the balcony. Overhanging type scaffold frame of encorbelmenting to simple structure, convenient operation reduce the input of steel pipe, practice thrift advantages such as labour cost, have won the favor of construction enterprises widely, and the building is higher more economical. At present, when a building with a wide balcony is built, a scaffold is erected in a mode of matching cantilever beams and cable-stayed steel cables, wherein the end parts of the cantilever beams are directly fixed on the lower section of a platform opening beam, and only the upper section part of the platform opening beam is connected with a balcony slab, so that the lower section of the platform opening beam can form an inward downward force, the lower section of the platform opening beam generates a bending moment, the balcony slab also generates a negative bending moment, and the male balcony slab and the platform opening beam can be cracked or broken.
Therefore, it is necessary to design a new technical solution to comprehensively solve the problems in the prior art.
Disclosure of Invention
The invention aims to provide an upward-pulling scaffold for a wide-scene balcony and a construction method thereof, which can effectively solve the problem that the existing overhanging balcony externally-built overhanging scaffold is easy to crack or break an balcony board and a platform opening beam.
In order to solve the technical problems, the invention adopts the following technical scheme:
an upward-pulling scaffold for a wide-scene balcony comprises cantilever beams for building a scaffold, a tensioning part for connecting the cantilever beams and an upper layer of structural beams, a load transfer part for transferring vertical load, and a connecting part for supporting the corresponding layer of structural beams and a floor slab; the tensioning part comprises a tensioning rope, two ends of the tensioning rope are respectively connected with the upper layer structural beam and the current layer cantilever beam, and a tensioning adjusting piece for adjusting the tension degree of the tensioning rope is arranged on the tensioning rope;
the load transfer part comprises an adjustable support rod arranged between the structural beam and the platform opening beam, the adjustable support rod comprises a second connecting pipe and a first connecting pipe which are coaxially arranged, the first connecting pipe is inserted into the second connecting pipe, and the second connecting pipe moves along the axial direction of the first connecting pipe;
the connecting portion comprises an adjusting supporting rod, the adjusting supporting rod is fixed between the bottom surface of the floor slab and the side surface of the structural beam close to the floor slab, and the adjusting supporting rod, the floor slab and the structural beam form a right-angled triangle structure.
Preferably, the cantilever beam comprises I-shaped steel and a first connecting piece arranged at the end part of the I-shaped steel, the top surface of the I-shaped steel is provided with a connecting lug for connecting a stretching rope, and the first connecting piece is provided with a connecting hole and an anchoring hole for connecting the platform opening beam.
Preferably, the second connecting pipe is movably arranged in the first connecting pipe through threads; the end part of the second connecting pipe is provided with a second connecting piece, and the second connecting piece is provided with an anchoring hole for fixing on the structural beam; the first connecting pipe is fixed on the platform opening beam through a third connecting piece, through holes and anchoring holes are formed in the third connecting piece in positions corresponding to the first connecting piece connecting holes and the anchoring holes, and the anchor bolt is connected with the third connecting piece, the platform opening beam and the first connecting piece through the anchoring holes; wherein the anchoring holes are all arranged at the outer ring positions of the third connecting sheet and the first connecting sheet.
Preferably, a stiffening plate is further arranged between the second connecting sheet and the second connecting pipe; a fourth connecting piece is arranged on the structural beam opposite to the second connecting piece, an anchoring hole is formed in the fourth connecting piece at a position corresponding to the anchoring hole of the second connecting piece, and an anchor bolt is connected with the fourth connecting piece, the structural beam and the second connecting piece through the anchoring hole; wherein the anchoring holes are all arranged at the outer ring positions of the second connecting sheet and the fourth connecting sheet.
Preferably, the tensioning adjusting part is a turn buckle, the tensioning rope is provided with two sections, the adjacent ends of the two sections of tensioning ropes are connected through the turn buckle, and the separated ends are respectively fixed on the upper layer of structural beam and the current layer of cantilever beam.
Preferably, the pull-up scaffold for the wide-scene balcony further comprises a connecting part for connecting the corresponding layer of structural beam and the floor slab, the connecting part of the current layer of structural beam and the floor slab is an adjustable supporting rod, the adjustable supporting rod is fixed between the bottom surface of the floor slab and the side surface of the structural beam close to the floor slab side, and the adjustable supporting rod, the floor slab and the structural beam form a right-angled triangle structure; the connecting portion of last layer of structure roof beam is the tensile rope of regulation formula, and the tensile rope of regulation formula is fixed between floor bottom surface and the structure roof beam side near floor side, and the tensile rope of regulation formula forms right triangle structure with floor and structure roof beam.
Preferably, the adjustable support rod comprises a turn buckle, and two separated ends of a bolt rod of the turn buckle are respectively fixed on the current floor slab and the structural beam; the adjustable tensile rope comprises a turn buckle and pull ropes arranged at two ends of the turn buckle, two through holes of the turn buckle are respectively connected with adjacent ends of the two pull ropes, and the separated ends of the two pull ropes are respectively fixed on the upper floor and the structural beam.
The construction method of the upward-pulling scaffold for the wide-scene balcony comprises the following steps:
s1, punching holes in a current-layer platform opening beam, installing a cantilever beam, supporting the lower part of the cantilever beam by adopting an adjustable jacking, then erecting a scaffold on the cantilever beam, and continuing upward construction;
s2, after the strength of the previous layer of structural beam meets the construction requirement, removing a template and battens below the balcony slab, then installing an assembled adjustable stay bar between the current layer of structural beam and the platform opening beam, installing a first connecting pipe of the adjustable stay bar on the platform opening beam through a connecting piece and an anchor bolt penetrating through the outer ring of the connecting piece, so that the first connecting pipe, the platform opening beam and the cantilever beam are rigidly connected, then adjusting the overall length of the adjustable stay bar to enable the adjustable stay bar to be arranged in a manner of being tightly attached to the structural beam and the platform opening beam, and fixing the end part of a second connecting pipe of the adjustable stay bar on the structural beam after the adjustment is finished;
s3, installing a tensioning rope, fixing one end of the tensioning rope on a connecting lug above the cantilever beam, and fixing the other end of the tensioning rope on a structural beam of the upper floor;
and S4, adjusting the adjustable jacking to enable the adjustable jacking to be separated from the bottom surface of the cantilever beam.
According to the upward-pulling scaffold for the wide-scene balcony, the cantilever beam is arranged for erecting a scaffold, the tensioning portion is arranged for connecting the cantilever beam with the previous layer of structural beam, the load transfer portion is arranged for transferring the vertical load of the scaffold, and the connecting portion is arranged for supporting the space between the corresponding layer of structural beam and the floor slab, so that the structural beam is prevented from bearing the horizontal load which cannot be transferred, the structural reliability of the upward-pulling scaffold is further improved, and the problems that the existing scaffold is high in erecting danger, the balcony is heavy in bearing weight and the later use of the balcony is easily influenced are effectively solved.
According to the cantilever beam, the I-shaped steel and the first connecting piece are adopted, the anchoring hole is formed in the first connecting piece, the I-shaped steel is fixed on the platform opening beam through the anchoring hole of the first connecting piece, the mounting mode is simple and convenient, and the stability is high; the I-shaped steel top surface is equipped with the engaging lug, and the stretch-draw rope is fixed through the engaging lug, and hookup location is fixed, can effectively improve construction speed and connection stability.
The adjustable stay bar adopts the second connecting pipe and the first connecting pipe which are in threaded connection, and the threaded connection can enable the length of the adjustable stay bar to be adjusted more accurately and can be adjusted in a small range; in addition, the first connecting pipe is fixed on the platform opening beam through a third connecting piece, the third connecting piece and the first connecting piece are provided with matched anchoring holes, and the anchor bolt realizes the connection of the third connecting piece, the platform opening beam and the first connecting piece through the anchoring holes on the third connecting piece and the first connecting piece; similarly, the second connecting pipe is fixed on the structural beam through a second connecting piece, an anchoring hole is formed in the second connecting piece, a fourth connecting piece matched with the second connecting piece is arranged, and the anchor bolt realizes connection of the second connecting piece, the structural beam and the fourth connecting piece through the anchoring holes in the anchor bolt and the fourth connecting piece; and finally, in order to improve the stability of the second connecting sheet and the second connecting pipe, a stiffening plate is arranged between the second connecting sheet and the second connecting pipe.
In order to facilitate the adjustment of the tension degree of the tension rope, the turn buckle is used as a tension adjusting part, so that the tension between the upper-layer structural beam and the current-layer cantilever beam is conveniently tensioned, and the better connection strength is ensured; the same regulation formula bracing piece also adopts the mode of turn buckle, can support between effective floor and the structure roof beam like this, improves and prevents that the structure roof beam from causing the damage because of the horizontal load is too big.
Drawings
FIG. 1 is a schematic structural view of a first embodiment of an upward-pulling scaffold for a wide balcony in accordance with the present invention;
FIG. 2 is a schematic structural view of the first connecting piece according to the present invention;
FIG. 3 is a schematic structural view of a third connecting piece according to the present invention;
FIG. 4 is a schematic structural view of a second connecting piece according to the present invention;
FIG. 5 is a schematic structural view of a first embodiment of a fourth connecting sheet according to the present invention;
FIG. 6 is a schematic structural view of a second embodiment of the pull-up scaffold for a wide balcony in accordance with the present invention;
fig. 7 is a schematic structural diagram of a second embodiment of a fourth connecting piece according to the present invention.
In the figure: 1. a floor slab; 11. a structural beam; 2. a balcony board; 21. a table top beam; 3. i-shaped steel; 31. connecting lugs; 32. a first connecting piece; 4. erecting a scaffold; 41. the adjustable jacking is carried out; 5. a tension section; 51. stretching a rope; 52. tensioning the adjusting piece; 6. a first connecting pipe; 61. a third connecting sheet; 7. a second connecting pipe; 71. a second connecting sheet; 72. a stiffening plate; 8. an adjustable support rod; 81. a fourth connecting sheet; 82. a set square; 83. a support plate; 9. adjusting a tensile rope; 10. an anchor bolt; 101. an anchoring hole; 102. connecting holes; 103. and a through hole.
Detailed Description
In order that the objects and advantages of the invention will be more clearly understood, the following description is given in conjunction with the accompanying examples. It is to be understood that the following text is merely illustrative of one or more specific embodiments of the invention and does not strictly limit the scope of the invention as specifically claimed.
Example 1
The technical scheme adopted by the invention is as shown in figures 1-5, and the upward-pulling scaffold for the wide-scene balcony comprises a cantilever beam for erecting a scaffold upright rod 4, a tensioning part 5 for connecting the cantilever beam with an upper layer of structural beam 11 and a load transfer part for transferring vertical load; the cantilever beam comprises an I-shaped steel 3 and a first connecting piece 32 arranged at the end part of the I-shaped steel 3, the top surface of the I-shaped steel 3 is provided with a connecting lug 31 for connecting a stretching rope 51, and as shown in fig. 2, the first connecting piece 32 is provided with a connecting hole 102 and an anchoring hole 101 for connecting the platform opening beam 21; the tensioning part 5 comprises a tensioning rope 51, two ends of the tensioning rope 51 are respectively connected with the connecting lug 31 of the previous layer of structural beam 11 and the current layer of cantilever beam, a tensioning adjusting part 52 for adjusting the tensioning degree of the tensioning rope is arranged on the tensioning rope 51, the tensioning adjusting part 52 is a turn buckle, the tensioning rope 51 is provided with two sections in the embodiment, adjacent ends of the two sections of tensioning ropes 51 are connected through the turn buckle, and separated ends are respectively fixed on the connecting lugs of the previous layer of structural beam 11 and the current layer of cantilever beam.
The load transfer part comprises an adjustable support rod arranged between the structural beam 11 and the platform opening beam 21, the adjustable support rod comprises a second connecting pipe 7 and a first connecting pipe 6 which are coaxially arranged and connected through threads, the first connecting pipe 6 is inserted into the second connecting pipe 7, and the second connecting pipe 7 moves along the axial direction of the first connecting pipe 6; the second connecting pipe 7 is fixed on the structural beam 11 through a second connecting piece 71, as shown in fig. 4, an anchoring hole 101 is formed in the second connecting piece 71, and a stiffening plate 72 is further arranged between the second connecting piece 71 and the second connecting pipe 7; the structural beam 11 opposite to the second connecting piece 71 is provided with a fourth connecting piece 81, as shown in fig. 5, an anchoring hole 101 is provided on the fourth connecting piece 81 at a position corresponding to the anchoring hole 101 of the second connecting piece 71, the anchor bolt 10 is connected with the fourth connecting piece 81, the structural beam 11 and the second connecting piece 71 through the anchoring hole 101, and referring to fig. 4 and 5, the anchoring holes are provided at the outer ring position of the connecting pieces. The first connecting pipe 6 is fixed on the platform opening beam 21 through a third connecting piece 61, as shown in fig. 3, a through hole 103 and an anchoring hole are arranged on the third connecting piece 61 corresponding to a connecting hole 102 and an anchoring hole 101 on the first connecting piece 32, the anchor bolt 10 is connected with the third connecting piece 61, the platform opening beam 21 and the first connecting piece 32 through the anchoring hole 101, the anchor bolt is the same as the second connecting piece and the fourth connecting piece, the anchoring hole is arranged on the outer ring of the connecting piece, when the third connecting piece, the platform opening beam and the first connecting piece are connected through the anchoring hole, the rigid connection of the first connecting pipe, the platform opening beam and the cantilever beam is realized, so that the vertical load is transferred to the adjustable supporting rod, the horizontal load is changed, the bearing force of the male bedplate 2 and the lower-layer scaffold is reduced, and the safety factor and the balcony construction quality are improved.
Example 2
The technical scheme adopted by the invention is as shown in figures 2-4 and 6-7, and the upward-pulling scaffold for the wide-scene balcony comprises a cantilever beam for erecting a scaffold upright rod 4, a tensioning part 5 for connecting the cantilever beam with an upper layer of structural beam 11 and a load transfer part for transferring vertical load; the cantilever beam comprises an I-shaped steel 3 and a first connecting piece 32 arranged at the end part of the I-shaped steel 3, the top surface of the I-shaped steel 3 is provided with a connecting lug 31 for connecting a stretching rope 51, and as shown in fig. 2, the first connecting piece 32 is provided with a connecting hole 102 and an anchoring hole 101 for connecting the platform opening beam 21; tensioning portion 5 is including stretching out the stay cord 51, the both ends of stretching out the stay cord 51 link to each other with last layer of structure roof beam 11 and current layer cantilever beam respectively, be equipped with the stretch-draw regulating part 52 of adjusting the stay cord 51 rate of tension on the stretch-draw cord 51, stretch-draw regulating part 52 is the basket bolt in this embodiment, stretch-draw cord 51 is equipped with two sections, two sections adjacent ends of stretching out the stay cord 51 link to each other through the basket bolt, the end of separating mutually is fixed respectively on last layer of structure roof beam 11 and current layer cantilever beam, through the rate of tension of adjusting the basket bolt department and stretching out the stay cord, realize the regulation of whole stretch-draw cord rate of tension.
The load transfer part comprises an adjustable support rod arranged between the structural beam 11 and the platform opening beam 21, the adjustable support rod comprises a second connecting pipe 7 and a first connecting pipe 6 which are coaxially arranged and connected through threads, the first connecting pipe 6 is inserted into the second connecting pipe 7, and the second connecting pipe 7 moves along the axial direction of the first connecting pipe 6; the second connecting pipe 7 is fixed on the structural beam 11 through a second connecting sheet 71, and an anchoring hole 101 is formed in the second connecting sheet 71; a stiffening plate 72 is arranged between the second connecting sheet 71 and the second connecting pipe 7; a fourth connecting piece 81 is arranged on the structural beam 11 on the opposite side of the second connecting piece 71, an anchoring hole 101 is formed in the fourth connecting piece 81 at a position corresponding to the anchoring hole 101 of the second connecting piece 71, the anchor bolt 10 is connected with the fourth connecting piece 81, the structural beam 11 and the second connecting piece 71 through the anchoring hole 101, and referring to fig. 4 and 5, the anchoring hole is formed in the outer ring position of the connecting piece.
The first connecting pipe 6 is fixed on the platform opening beam 21 through a third connecting piece 61, as shown in fig. 3, a through hole 103 and an anchoring hole 101 are formed in the third connecting piece 61 corresponding to a connecting hole 102 and an anchoring hole 101 of the first connecting piece 32, the anchor bolt 10 is connected with the third connecting piece 61, the platform opening beam 21 and the first connecting piece 32 through the anchoring hole 101, the anchor bolt is the same as the second connecting piece and the fourth connecting piece, the anchoring hole is formed in the outer ring position of the connecting piece, when the third connecting piece, the platform opening beam and the first connecting piece are connected through the anchoring hole, rigid connection of the first connecting pipe, the platform opening beam and the cantilever beam is achieved, vertical load is transferred to the adjustable supporting rod, horizontal load is achieved, bearing force of the male bedplate 2 and a lower-layer scaffold is reduced, and safety factor and balcony construction quality are improved.
When the vertical load is transferred to the load transfer part and becomes a horizontal load, a larger bearing force is applied to the structural beam, in order to avoid damage to the structural beams, the present embodiment is further provided with connections for supporting the structural beams 11 and the floor slab 1 of the respective layer, and, in addition, because the direction of the force borne by the previous layer of structural beam is different from that of the current layer of structural beam, the current layer of connecting part adopts an adjustable supporting rod 8, the adjustable supporting rod 8 is fixed between the bottom surface of the current layer of floor slab 1 and the side surface of the structural beam 11 near the floor slab side, the adjustable supporting rod 8, the floor slab 1 and the structural beam 11 form a right-angled triangle structure, a turn buckle is specifically selected as the adjustable supporting rod, two separated ends of a bolt rod of the turn buckle are respectively fixed on the floor slab 1 and the structural beam 11, the adjustable supporting rod mainly plays a role of outward support, and an anchoring hole on the fourth connecting piece is connected with an anchoring hole on the second connecting piece in a matching manner; it is corresponding, last layer of structure roof beam adopts the tensile rope 9 of regulation formula with the connecting portion of floor, the tensile rope 9 of regulation formula is fixed between 1 bottom surface of last layer floor and the 11 sides of structure roof beam on nearly floor side, the tensile rope 9 of regulation formula forms the right angled triangle structure with floor 1 and structure roof beam 11, the connecting piece of the tensile rope of formula is regarded as to specifically select the turn buckle, the stay cord is connected to two through-holes of turn buckle, the stay cord leaves the end mutually and fixes respectively on floor 1 and structure roof beam 11, the tensile rope of formula mainly plays the effect of inside draft.
Therefore, the fourth connecting piece adopts the structure shown in fig. 7, the fourth connecting piece extends downwards, a triangular plate 82 is welded on the fourth connecting piece at equal intervals, and then a supporting plate 83 is welded on the triangular plate 82 and used for fixing the bolt rod of the turn buckle; and (4) as for the turn buckle of the structural beam at the upper layer, adopting a clasp for connection.
Example 3
The construction method of the pull-up scaffold for the wide balcony of embodiment 1 includes the steps of:
s1, punching holes in a current-layer platform opening beam, installing a cantilever beam, supporting the lower part of the cantilever beam by adopting an adjustable jacking, then erecting a scaffold on the cantilever beam, and continuing upward construction;
s2, after the strength of the previous layer of structural beam meets the construction requirement, removing a template and battens below the balcony slab, then installing an assembled adjustable stay bar between the current layer of structural beam and the platform opening beam, installing a first connecting pipe of the adjustable stay bar on the platform opening beam through a connecting piece and an anchor bolt penetrating through the outer ring of the connecting piece, so that the first connecting pipe, the platform opening beam and the cantilever beam are rigidly connected, then adjusting the overall length of the adjustable stay bar to enable the adjustable stay bar to be arranged in a manner of being tightly attached to the structural beam and the platform opening beam, and fixing the end part of a second connecting pipe of the adjustable stay bar on the structural beam after the adjustment is finished;
s3, installing a tensioning rope, fixing one end of the tensioning rope on a connecting lug above the cantilever beam, and fixing the other end of the tensioning rope on a structural beam of the upper floor;
and S4, adjusting the adjustable jacking to enable the adjustable jacking to be separated from the bottom surface of the cantilever beam.
Example 4
The construction method of the pull-up scaffold for the wide balcony of embodiment 2 includes the steps of:
s1, punching a hole on a current floor platform opening beam 21, installing a cantilever beam, supporting the lower part of the cantilever beam by adopting an adjustable jacking support 41, installing a tensioning rope 51 above the cantilever beam through a connecting lug 31, and fixing the other end of the tensioning rope 51 on a structural beam 11 of an upper floor 1;
s2, respectively installing adjustable supporting rods 8 on the bottom surfaces of the current floor and the previous floor 1 and the side surface of the structural beam 11;
s3, installing a second connecting pipe 7 and a first connecting pipe 6 which are assembled between the current-layer structural beam 11 and the platform opening beam 21, installing the first connecting pipe 6 on the platform opening beam 21, adjusting the length of the adjustable stay bar to enable the adjustable stay bar to be arranged in a mode of being tightly attached to the structural beam 11 and the platform opening beam 21, and fixing the end part of the second connecting pipe 7 on the structural beam 11 after the adjustment is finished;
s4, adjusting support rods are respectively arranged between the bottom surfaces of the current layer and the upper layer of floor slab and the side surfaces of the structural beams, one end of each adjusting support rod arranged on the upper layer is fixed on the bottom surface of the upper layer of floor slab, and the other end of each adjusting support rod is fixed on the upper layer of structural beam opposite to the connection point of the tensioning rope; the regulation formula bracing piece one end that sets up on present layer is fixed at present layer floor bottom surface, and the other end passes through the connection piece and fixes on the current layer structure roof beam opposite at the second connecting pipe with the crab-bolt that runs through the connection piece outer lane.
S5, continuously erecting a scaffold on the cantilever beam to finish the erection and use of the next layer of scaffold.
The scaffold is erected according to the construction methods of the embodiment 3 and the embodiment 4, so that the deformation of a wide-view balcony can be reduced, the load of the scaffold can be effectively reduced due to the fact that the vertical load is transferred to the adjustable support rods, and the stability of erecting the scaffold is effectively improved.
The present invention is not limited to the above embodiments, and those skilled in the art can make various equivalent changes and substitutions without departing from the principle of the present invention after learning the content of the present invention, and these equivalent changes and substitutions should be considered as belonging to the protection scope of the present invention.

Claims (7)

1. The utility model provides a wide-range balcony is with upward drawing scaffold which characterized in that:
the device comprises a cantilever beam for erecting a scaffold, a tensioning part for connecting the cantilever beam and a structural beam on the upper layer and a load transfer part for transferring vertical load;
the tensioning part comprises a tensioning rope, two ends of the tensioning rope are respectively connected with the upper layer structural beam and the current layer cantilever beam, and a tensioning adjusting piece for adjusting the tension degree of the tensioning rope is arranged on the tensioning rope;
the load transfer part comprises an adjustable support rod arranged between the structural beam and the platform opening beam, the adjustable support rod comprises a second connecting pipe and a first connecting pipe which are coaxially arranged, and the second connecting pipe moves along the axial direction of the first connecting pipe;
the cantilever beam comprises I-shaped steel and a first connecting piece arranged at the end part of the I-shaped steel, the top surface of the I-shaped steel is provided with a connecting lug for connecting a stretching rope, and the first connecting piece is provided with a connecting hole and an anchoring hole for connecting the platform opening beam;
the second connecting pipe is movably arranged in the first connecting pipe through threads;
the end part of the second connecting pipe is provided with a second connecting piece, and the second connecting piece is provided with an anchoring hole for fixing on the structural beam;
the first connecting pipe is fixed on the platform opening beam through a third connecting piece, through holes and anchoring holes are formed in the third connecting piece in positions corresponding to the first connecting piece connecting holes and the anchoring holes, and the anchor bolt is connected with the third connecting piece, the platform opening beam and the first connecting piece through the anchoring holes; wherein the anchoring holes are all arranged at the outer ring positions of the third connecting sheet and the first connecting sheet.
2. The wide balcony stand according to claim 1, wherein:
a stiffening plate is also arranged between the second connecting sheet and the second connecting pipe;
a fourth connecting piece is arranged on the structural beam opposite to the second connecting piece, an anchoring hole is formed in the fourth connecting piece at a position corresponding to the anchoring hole of the second connecting piece, and an anchor bolt is connected with the fourth connecting piece, the structural beam and the second connecting piece through the anchoring hole;
wherein the anchoring holes are all arranged at the outer ring positions of the second connecting sheet and the fourth connecting sheet.
3. The wide balcony stand according to claim 1, wherein:
the tensioning adjusting piece is a turn buckle, the tensioning rope is provided with two sections, the adjacent ends of the two sections of tensioning ropes are connected through the turn buckle, and the separated ends are respectively fixed on the upper layer structural beam and the current layer cantilever beam.
4. The wide balcony stand according to claim 1, wherein:
the pull-up scaffold for the wide-scene balcony further comprises a connecting part for connecting the corresponding layer of structural beam and the floor slab, the connecting part of the current layer of structural beam and the floor slab is an adjustable supporting rod, the adjustable supporting rod is fixed between the bottom surface of the floor slab and the side surface of the structural beam close to the floor slab side, and the adjustable supporting rod, the floor slab and the structural beam form a right-angled triangle structure;
the connecting portion of last layer of structure roof beam is the tensile rope of regulation formula, and the tensile rope of regulation formula is fixed between floor bottom surface and the structure roof beam side near floor side, and the tensile rope of regulation formula forms right triangle structure with floor and structure roof beam.
5. The wide balcony stand according to claim 4, wherein:
the adjustable support rod comprises a turn buckle, and two opposite ends of a bolt rod of the turn buckle are respectively fixed on the current floor slab and the structural beam;
the adjustable tensile rope comprises a turn buckle and pull ropes arranged at two ends of the turn buckle, two through holes of the turn buckle are respectively connected with adjacent ends of the two pull ropes, and the separated ends of the two pull ropes are respectively fixed on the upper floor and the structural beam.
6. A construction method of a pull-up scaffold for a wide balcony as claimed in claim 1, comprising the steps of:
s1, punching holes in a current-layer platform opening beam, installing a cantilever beam, supporting the lower part of the cantilever beam by adopting an adjustable jacking, then erecting a scaffold on the cantilever beam, and continuing upward construction;
s2, after the strength of the previous layer of structural beam meets the construction requirement, removing a template and battens below the balcony slab, then installing an assembled adjustable stay bar between the current layer of structural beam and the platform opening beam, installing a first connecting pipe of the adjustable stay bar on the platform opening beam through a connecting piece and an anchor bolt penetrating through the outer ring of the connecting piece, so that the first connecting pipe, the platform opening beam and the cantilever beam are rigidly connected, then adjusting the overall length of the adjustable stay bar to enable the adjustable stay bar to be arranged in a manner of being tightly attached to the structural beam and the platform opening beam, and fixing the end part of a second connecting pipe of the adjustable stay bar on the structural beam after the adjustment is finished;
s3, installing a tensioning rope, fixing one end of the tensioning rope on a connecting lug above the cantilever beam, and fixing the other end of the tensioning rope on a structural beam of the upper floor;
and S4, adjusting the adjustable jacking to enable the adjustable jacking to be separated from the bottom surface of the cantilever beam.
7. The construction method of the pull-up scaffold for the wide balcony according to claim 6, wherein,
the upward-pulling scaffold for the wide-scene balcony also comprises an adjustable supporting rod for supporting the corresponding layer of structural beam and the floor slab;
the construction method includes the following steps between the step S3 and the step S4:
adjusting support rods are respectively arranged between the bottom surfaces of the current layer and the previous layer of floor slab and the side surfaces of the structural beams, one end of each adjusting support rod arranged on the previous layer is fixed on the bottom surface of the previous layer of floor slab, and the other end of each adjusting support rod is fixed on the structural beam on the previous layer opposite to the connection point of the tensioning rope;
the regulation formula bracing piece one end that sets up on present layer is fixed at present layer floor bottom surface, and the other end passes through the connection piece and fixes on the current layer structure roof beam opposite at the second connecting pipe with the crab-bolt that runs through the connection piece outer lane.
CN202110235517.9A 2021-03-03 2021-03-03 Pull-up scaffold for wide-scene balcony and construction method thereof Active CN112982935B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110235517.9A CN112982935B (en) 2021-03-03 2021-03-03 Pull-up scaffold for wide-scene balcony and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110235517.9A CN112982935B (en) 2021-03-03 2021-03-03 Pull-up scaffold for wide-scene balcony and construction method thereof

Publications (2)

Publication Number Publication Date
CN112982935A CN112982935A (en) 2021-06-18
CN112982935B true CN112982935B (en) 2021-10-26

Family

ID=76352345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110235517.9A Active CN112982935B (en) 2021-03-03 2021-03-03 Pull-up scaffold for wide-scene balcony and construction method thereof

Country Status (1)

Country Link
CN (1) CN112982935B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700280B (en) * 2021-09-28 2022-12-27 中能建西北城市建设有限公司 Overhanging scaffold
CN117669082A (en) * 2023-12-01 2024-03-08 五丰建设咨询有限公司 Initial tension analysis method of temporary unloading pull rod of scaffold for width Jing Yangtai

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1006432B (en) * 1974-04-12 1976-09-30 Bassani Spa INSTALLATION MEANS AND PROTECTION PARTICULARLY FOR PROXIMITY SWITCHES OR SIMILAR
SU1761911A1 (en) * 1990-10-05 1992-09-15 Ю.Ф. Баннов и В.В. Климов Cantilever working platform for feeding loads via window aperture
DE19654311A1 (en) * 1996-12-24 1998-06-25 Karl Kemper Assembly cradle for building work
CN2315205Y (en) * 1997-03-18 1999-04-21 陈胜坤 Multiple drop-proof lifting scaffold
JP2889570B1 (en) * 1998-05-12 1999-05-10 ホリー株式会社 Hanging scaffold
US5992808A (en) * 1998-07-28 1999-11-30 Morrow; Christopher James Assembly for retaining electrical components
CN2660023Y (en) * 2003-11-03 2004-12-01 姚康华 Hanging tool scaffold
KR101370981B1 (en) * 2011-05-26 2014-03-10 권종규 Cage rail climbing system
CN203569872U (en) * 2013-10-16 2014-04-30 中建三局第二建设工程有限责任公司 Same layer lifting type cantilever frame device
CN105926916B (en) * 2016-05-24 2018-10-23 杭州江润科技有限公司 Overhang combined type support system and construction method based on intelligent monitoring oblique pull
CN210316454U (en) * 2019-06-28 2020-04-14 广东建星建造集团有限公司 Large-span roof overhanging support system
CN211817846U (en) * 2020-03-05 2020-10-30 方远建设集团股份有限公司 Overhanging scaffold
CN111236606B (en) * 2020-03-30 2022-08-02 淮安市博彦土木工程科学研究院有限公司 Isolation system of overhanging scaffold
CN111335609B (en) * 2020-04-21 2022-07-12 淮安市博彦土木工程科学研究院有限公司 Clamping type conversion unloading device for hanging scaffold

Also Published As

Publication number Publication date
CN112982935A (en) 2021-06-18

Similar Documents

Publication Publication Date Title
CN112982935B (en) Pull-up scaffold for wide-scene balcony and construction method thereof
CN100590277C (en) Overhead bridge type suspension scaffold
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN214062435U (en) Support system for high-altitude ultra-long cantilever structure
CN104695752A (en) Rapid repairing tower system and erection method thereof
CN215803108U (en) Attached beam type hanging basket
KR20170040837A (en) Heavy lifting device
CN205100531U (en) Lift scaffold support body assembly
CN215817990U (en) Supporting structure of flexible photovoltaic support
CN209957286U (en) Liftable simple and easy installation device of jib
CN215564318U (en) Rigid pull rod large-cantilever scaffold platform structure
CN113958131B (en) Suspended ceiling structure of steel structure truss string system roof and construction method thereof
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN108729644B (en) Suspension beam bracket and installation and use method thereof
CN208604911U (en) A kind of novel suspention beam bracket
CN209872171U (en) Gantry crane with novel structure
CN204643648U (en) Pylon and hanging basket thereof
CN217027983U (en) I-steel cable-stayed steel wire rope stop device and scaffold that encorbelments
CN220767698U (en) Supporting structure
CN217629469U (en) High pier stud owner muscle hoist device
CN216512463U (en) Erecting device for full-binding heavy-weight reinforcement cage
CN220704330U (en) Cable body lifting device for steel strand inhaul cable construction
CN220365282U (en) Electric translation type hanging basket
CN213597452U (en) Novel building scaffold
CN220319075U (en) Guy rope hanging basket assembling platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A pull-up scaffold for a wide view balcony and its construction method

Effective date of registration: 20230904

Granted publication date: 20211026

Pledgee: Huaian Qingjiang puyintai financing Company limited by guarantee

Pledgor: HUAI'AN BOYAN CIVIL ENGINEERING SCIENCE RESEARCH INSTITUTE Co.,Ltd.

Registration number: Y2023980055194

PE01 Entry into force of the registration of the contract for pledge of patent right