CN112854795A - 一种在砖混结构承重墙预制板加固节点的施工方案 - Google Patents
一种在砖混结构承重墙预制板加固节点的施工方案 Download PDFInfo
- Publication number
- CN112854795A CN112854795A CN201911264362.0A CN201911264362A CN112854795A CN 112854795 A CN112854795 A CN 112854795A CN 201911264362 A CN201911264362 A CN 201911264362A CN 112854795 A CN112854795 A CN 112854795A
- Authority
- CN
- China
- Prior art keywords
- angle steel
- brick
- concrete structure
- construction scheme
- holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/027—Preventive constructional measures against earthquake damage in existing buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
一种在砖混结构承重墙预制板加固节点的施工方案。该加固方案仅涉及砖混结构房屋,有承重墙、预制板时使用。上述所示节点及施工方法为:将承重墙上部搁置的左右两块预制板端部1000mm范围注胶填满预制板的孔洞,在墙板交接的上下四处阴角反向安装四根通长角钢,再用对穿螺栓将四根角钢两两对拉锚固。本发明具有加强砖混结构房屋整体性,具备更强的抗震能力,在地震时更有效的抑制因横向水平作用而引起预制板的脱落和承重墙的倾倒,延长人员逃生时间的特点。
Description
技术领域
本发明公开了一种在砖混结构承重墙预制板加固节点的施工方案,属于建筑施工技术领域。
背景技术
老砖混结构建筑的抗震加固在我国已经十分普遍,本方案遇到的情况是一种在砖混结构房屋中承重墙、预制板上下层位置的加固节点。按常规方法,仅在预制板下方墙体安装一根与通长角钢,作用为增加预制板搁置长度。但是在地震发生时预制板仍然会出现水平位移导致脱落,墙体坍塌等,仅比原状房屋多一点逃生时间,加固作用十分有限。
发明内容
本发明的目的在于提供一种在砖混结构承重墙预制板加固节点的施工方案,该发明对于加强砖混结构房屋整体性,具备更强的抗震能力,在地震时更有效的抑制因横向水平作用而引起预制板的脱落和承重墙的倾倒,延长人员逃生时间的提升。
本发明是通过以下技术方案实现:
一种在砖混结构承重墙预制板加固节点的施工方案。该节点仅涉及砖混预制板结构建筑抗震加固时使用。上述所示吊柱及施工方法为:将承重墙上部搁置的左右两块预制板端部1000mm范围注胶填满预制板的孔洞,在墙板交接的上下四处阴角反向安装四根通长角钢,再用对穿螺栓将四根角钢两两对拉锚固。
一种在砖混结构承重墙预制板加固节点的施工方案,其特征在于:
第一步:基层处理:放线定位,将角钢安装的位置的板和墙体基层打磨平整,清理干净并开设相应位置的对穿螺栓孔;
第二步:角钢下料加工:按承重墙长度切割对应长度的角钢并开设相应位置的螺栓孔;
第三步:预制板孔洞填充:预制板端部1000mm范围内,孔洞使用灌注胶等填满;
第四步:角钢安装:将加工完成的角钢安装于板墙交接处上下左右四个阴角,对穿螺栓拧紧;
第五步:角钢注胶:在角钢与板、墙的间隙使用灌注胶等填满;
第六步:表面防护:对角钢表面作防腐、防火处理。
优选的对穿螺栓孔径大于对穿螺杆植筋5mm。
优选的角钢需抛丸除锈后开设相应位置的螺栓孔间距按设计要求设置。
优选的预制板距端部1000mm处先打孔注射发泡剂堵塞预制板孔洞。
优选的预制板距端部1000mm处打孔注射发泡剂堵塞预制板孔洞完成后使用泡沫混凝土、灌注胶等轻型结构材料打孔灌注密实。
优选的角钢与板、墙的间隙以及对穿孔与对穿螺杆间的空隙,封边完成后使用灌注胶,压力灌注密实。
优选的对角钢表面作防腐、防火涂料处理后面层涂刷界面剂便于下道工序粉刷等施工。
与现有的技术相比,本发明的有益效果是:
(1)本发明在预制板端部填塞了轻型结构材料,增强了端部节点预制板的强度。
(2)本发明替代了效果有限的抗震加固方案,加强砖混结构房屋整体性,具备更强的抗震能力,在地震时更有效的抑制因横向水平作用而引起预制板的脱落和承重墙的倾倒,延长人员逃生时间的提升。
附图说明
图1为本发明实施例的结构示意图
图中:1、承重墙;2、预制板;3、对穿螺栓;4、角钢。
具体实施方式
一种在砖混结构承重墙预制板加固节点的施工方案,其特征在于:
第一步:基层处理:放线定位,将角钢安装的位置的板和墙体基层打磨平整,清理干净并开设相应位置的对穿螺栓孔;
第二步:角钢下料加工:按承重墙长度切割对应长度的角钢并开设相应位置的螺栓孔;
第三步:预制板孔洞填充:预制板端部1000mm范围内,孔洞使用灌注胶等填满;
第四步:角钢安装:将加工完成的角钢安装于板墙交接处上下左右四个阴角,对穿螺栓拧紧;
第五步:角钢注胶:在角钢与板、墙的间隙使用灌注胶等填满;
第六步:表面防护:对角钢表面作防腐、防火处理。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (7)
1.一种在砖混结构承重墙预制板加固节点的施工方案,其特征在于:
第一步:基层处理:放线定位,将角钢安装的位置的板和墙体基层打磨平整,清理干净并开设相应位置的对穿螺栓孔;
第二步:角钢下料加工:按承重墙长度切割对应长度的角钢并开设相应位置的螺栓孔;
第三步:预制板孔洞填充:预制板端部1000mm范围内,孔洞使用灌注胶等填满;
第四步:角钢安装:将加工完成的角钢安装于板墙交接处上下左右四个阴角,对穿螺栓拧紧;
第五步:角钢注胶:在角钢与板、墙的间隙使用灌注胶等填满;
第六步:表面防护:对角钢表面作防腐、防火处理。
2.根据权利要求1所述的一种在砖混结构承重墙预制板加固节点的施工方案,其特征在于:所述所属对穿螺栓孔径大于对穿螺杆植筋5mm。
3.根据权利要求1所述的一种在砖混结构承重墙预制板加固节点的施工方案,其特征在于:所述角钢需抛丸除锈后开设相应位置的螺栓孔间距按设计要求设置。
4.根据权利要求1所述的一种在砖混结构房屋中承重墙、预制板上下层位置加固节点的一种施工方案,其特征在于:所述预制板距端部1000mm处先打孔注射发泡剂堵塞预制板孔洞。
5.一种在砖混结构承重墙预制板加固节点的施工方案,其特征在于:所述预制板距端部1000mm处打孔注射发泡剂堵塞预制板孔洞完成后使用泡沫混凝土、灌注胶等轻型结构材料打孔灌注密实。
6.根据权利要求1所述的一种在砖混结构承重墙预制板加固节点的施工方案,其特征在于:所述角钢与板、墙的间隙以及对穿孔与对穿螺杆间的空隙,封边完成后使用灌注胶,压力灌注密实。
7.根据权利要求1所述的一种在砖混结构承重墙预制板加固节点的施工方案,其特征在于:对角钢表面作防腐、防火涂料处理后面层涂刷界面剂便于下道工序粉刷等施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911264362.0A CN112854795A (zh) | 2019-11-28 | 2019-11-28 | 一种在砖混结构承重墙预制板加固节点的施工方案 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911264362.0A CN112854795A (zh) | 2019-11-28 | 2019-11-28 | 一种在砖混结构承重墙预制板加固节点的施工方案 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112854795A true CN112854795A (zh) | 2021-05-28 |
Family
ID=75996060
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911264362.0A Pending CN112854795A (zh) | 2019-11-28 | 2019-11-28 | 一种在砖混结构承重墙预制板加固节点的施工方案 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112854795A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114775875A (zh) * | 2022-04-20 | 2022-07-22 | 中建三局第三建设工程有限责任公司 | 空心预制楼板吊装钢架 |
CN115874812A (zh) * | 2021-09-29 | 2023-03-31 | 中国石油天然气集团有限公司 | 一种湿陷性黄土地区既有建筑新增穿墙管沟的构造方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101608503A (zh) * | 2009-03-26 | 2009-12-23 | 云南奥斯通芬兰新型建材有限公司 | 建筑用空心墙板防治裂缝的方法 |
CN102477799A (zh) * | 2010-11-30 | 2012-05-30 | 上海维固工程实业有限公司 | 砌体结构整体性加固方法 |
CN202248958U (zh) * | 2011-10-21 | 2012-05-30 | 苏州二建建筑集团有限公司 | 砖混结构建筑物的抗震加固结构 |
CN103758358A (zh) * | 2014-01-06 | 2014-04-30 | 北京筑福国际工程技术有限责任公司 | 钢板角钢组合构造柱和粘锚钢板砌体加固结构及施工方法 |
CN203808542U (zh) * | 2014-03-17 | 2014-09-03 | 江苏省城市规划设计研究院 | 一种预制空心楼板的角钢加固装置 |
CN104514305A (zh) * | 2014-12-23 | 2015-04-15 | 中国建筑第八工程局有限公司 | 3d打印桁架空心楼板及其施工方法 |
CN207177329U (zh) * | 2017-09-15 | 2018-04-03 | 江苏省城市规划设计研究院 | 一种预制空心楼板加固装置 |
-
2019
- 2019-11-28 CN CN201911264362.0A patent/CN112854795A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101608503A (zh) * | 2009-03-26 | 2009-12-23 | 云南奥斯通芬兰新型建材有限公司 | 建筑用空心墙板防治裂缝的方法 |
CN102477799A (zh) * | 2010-11-30 | 2012-05-30 | 上海维固工程实业有限公司 | 砌体结构整体性加固方法 |
CN202248958U (zh) * | 2011-10-21 | 2012-05-30 | 苏州二建建筑集团有限公司 | 砖混结构建筑物的抗震加固结构 |
CN103758358A (zh) * | 2014-01-06 | 2014-04-30 | 北京筑福国际工程技术有限责任公司 | 钢板角钢组合构造柱和粘锚钢板砌体加固结构及施工方法 |
CN203808542U (zh) * | 2014-03-17 | 2014-09-03 | 江苏省城市规划设计研究院 | 一种预制空心楼板的角钢加固装置 |
CN104514305A (zh) * | 2014-12-23 | 2015-04-15 | 中国建筑第八工程局有限公司 | 3d打印桁架空心楼板及其施工方法 |
CN207177329U (zh) * | 2017-09-15 | 2018-04-03 | 江苏省城市规划设计研究院 | 一种预制空心楼板加固装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115874812A (zh) * | 2021-09-29 | 2023-03-31 | 中国石油天然气集团有限公司 | 一种湿陷性黄土地区既有建筑新增穿墙管沟的构造方法 |
CN114775875A (zh) * | 2022-04-20 | 2022-07-22 | 中建三局第三建设工程有限责任公司 | 空心预制楼板吊装钢架 |
CN114775875B (zh) * | 2022-04-20 | 2023-07-25 | 中建三局第三建设工程有限责任公司 | 空心预制楼板吊装钢架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112854795A (zh) | 一种在砖混结构承重墙预制板加固节点的施工方案 | |
CN104295109B (zh) | 老旧小区不入户阳台快速加固结构及其施工方法 | |
CN107780559A (zh) | 一种隔热保温石膏隔墙的施工方法 | |
CN103352583A (zh) | 装配式多层砖混结构加固方法 | |
CN215802445U (zh) | 一种适用于钢板剪力墙的外包防火构造 | |
CN108166772B (zh) | 一种柱包钢加固变截面节点的加固方法 | |
CN111321732A (zh) | 一种在高压旋喷桩中置入预制桩的复合地基承载结构 | |
CN111576658B (zh) | 一种装配式地下室外墙后浇带保护墙施工工法 | |
Paul et al. | Use of glass fibre reinforced gypsum panels with reinforced concrete infills for construction of walls and slabs | |
CN211899792U (zh) | 一种采用钢拉杆穿纵向墙体和穿楼板组合加固砌体结构 | |
CN204098519U (zh) | 老旧小区不入户阳台快速加固结构 | |
CN112521181A (zh) | 用于高层建筑快速环保施工的构件及环保施工方法 | |
US10689869B1 (en) | System method and device for structural repair | |
CN112983039A (zh) | 一种用于历史建筑保留立面整体卸解保护的施工方法 | |
CN108518079B (zh) | 大高度砖混房屋加固方法 | |
CN216865685U (zh) | 一种既有建筑楼梯通道抗震加强结构 | |
JP2004150134A (ja) | 補修方法および構築方法 | |
CN101285326A (zh) | 现浇整体施工外墙根部节点处理方法 | |
CN217151362U (zh) | 双跨及多跨横墙钢拉杆、圈梁构造柱加固砌体结构 | |
KR100736884B1 (ko) | 하이브리드 보수 모르타르를 이용한 철근 콘크리트의 보수방법 | |
CN205062855U (zh) | 止水片 | |
CN219547860U (zh) | 一种用于陡峭边坡防护的板式锚杆挡墙 | |
CN214364320U (zh) | 一种自密实高性能混凝土梁板 | |
CN212773607U (zh) | 砌块加强层 | |
CN212641745U (zh) | 一种用于矿区的装配式铝合金框架结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20210528 |
|
WD01 | Invention patent application deemed withdrawn after publication |