CN112854282A - Connecting structure and connecting method for pile cutting top and bearing platform of PHC precast pile - Google Patents

Connecting structure and connecting method for pile cutting top and bearing platform of PHC precast pile Download PDF

Info

Publication number
CN112854282A
CN112854282A CN202110070101.6A CN202110070101A CN112854282A CN 112854282 A CN112854282 A CN 112854282A CN 202110070101 A CN202110070101 A CN 202110070101A CN 112854282 A CN112854282 A CN 112854282A
Authority
CN
China
Prior art keywords
pile
phc
wall
phc precast
steel sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110070101.6A
Other languages
Chinese (zh)
Inventor
尹成章
戴建国
周兴林
李洞明
朱立锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN202110070101.6A priority Critical patent/CN112854282A/en
Publication of CN112854282A publication Critical patent/CN112854282A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a connecting structure for a pile cutting pile top and a bearing platform of a PHC precast pile, wherein a pile foundation hollow core is formed inside the PHC precast pile. The connecting structure of the invention transmits bending moment through the main reinforcement of the reinforcement cage, increases the bending resistance of the pile foundation joint, has reasonable and clear structural stress, simple structure, convenient and quick construction and good economical efficiency, and is a great improvement and popularization of the PHC precast pile cutting process.

Description

Connecting structure and connecting method for pile cutting top and bearing platform of PHC precast pile
Technical Field
The invention relates to the technical field of bridge structure design, in particular to a connecting structure and a connecting method for a pile cutting pile top and a bearing platform of a PHC precast pile.
Background
The PHC prefabricated pile foundation has low construction cost and quick construction, and is a pile foundation form with wide applicability. When the PHC precast pile bears larger horizontal force, the traditional connection between the pile cutting pile top and the bearing platform needs to continuously excavate a soil layer in a foundation pit, steel bars are bound, the construction is complex, the construction period is influenced, the construction risk is increased to a certain extent, and the development and the use of the PHC precast pile are limited. Therefore, the novel structure for connecting the pile top of the PHC precast pile with the bearing platform is designed and researched, has the advantages of simple structure, convenience in construction, safety, reliability, low manufacturing cost and wide applicability, is a great improvement and popularization on the PHC precast pile cutting process, and can create great social benefits.
Disclosure of Invention
The invention aims to provide a connecting structure for a pile cutting pile top and a bearing platform of a PHC precast pile, which has the advantages of simple structure, convenience in construction, safety and reliability.
In order to achieve the purpose, the technical scheme of the invention is as follows: the utility model provides a connection structure that is used for PHC precast pile to cut pile bolck and cushion cap, the inside pile foundation hollow that forms of PHC precast pile, its characterized in that the structure is established the steel sleeve outside the PHC precast pile including the cover, reserve the space between steel sleeve inner wall and the PHC precast pile outer wall, vacuole formation, the steel sleeve bottom carries out the cavity back cover with the back cover concrete, sets up the layer board in the pile foundation hollow, places the steel reinforcement cage in pile foundation hollow and the outside cavity of PHC precast pile, pouring concrete to pile bolck elevation.
Further, the wall thickness of the steel sleeve is 8-12 mm, and the total height of the sleeve is 1000-1500 mm; and a gap of 150-250 mm is reserved between the inner wall of the steel sleeve and the outer wall of the PHC precast pile.
Furthermore, according to the shape of the pile foundation, the outer wall and the inner wall of the steel sleeve are circular, square or polygonal, and the steel sleeve can select different section types and heights according to the shape of the pile foundation, and is not limited to a steel pipe structure.
Further, the concrete is C50 concrete.
The invention also aims to provide a method for connecting the pile cutting top and the bearing platform of the PHC precast pile, which has the advantages of simple structure, convenient construction, safety and reliability.
In order to achieve the purpose, the technical scheme of the invention is as follows: a method for connecting a pile cutting pile top of a PHC precast pile with a bearing platform is characterized in that after pile cutting of the pile top of the PHC precast pile is completed, a pile foundation hollow core is formed in the PHC precast pile, a steel sleeve is sleeved outside the PHC precast pile, and a gap is reserved between the inner wall of the steel sleeve and the outer wall of the PHC precast pile to form a cavity; emptying soil in the hollow core and the cavity of the pile foundation, and washing the steel sleeve and the side wall of the PHC tubular pile; and (3) carrying out cavity bottom sealing by using bottom sealing concrete, arranging a supporting plate in the hollow core of the pile foundation, respectively placing a reinforcement cage in the hollow core of the pile foundation and the cavity, closely vibrating after pouring concrete until the elevation of the pile top, and pouring a bearing platform outside the steel sleeve after the pile top is cut, namely finishing the connection of the pile top and the bearing platform of the PHC precast pile.
The invention has the beneficial effects that:
the invention relates to a structure for connecting a pile cutting pile top and a bearing platform of a PHC precast pile, which has the following advantages compared with the traditional structure for connecting the pile cutting pile top and the bearing platform: the construction cancels soil layer excavation and reinforcement binding outside the precast pile, the steel sleeve and the precast reinforcement cage are used for replacing the construction, and bending moment is transmitted through the main reinforcement of the reinforcement cage, so that the bending resistance of the connecting structure is improved. The pile cutting device has the advantages of simple structure, convenience in construction, safety, reliability, low manufacturing cost and wide applicability, and is a great improvement and popularization of the PHC precast pile cutting process.
Drawings
Fig. 1 is a schematic view of a connecting structure of a pile cutting top and a bearing platform of the PHC precast pile.
Fig. 2 is a sectional view a-a of fig. 1.
Detailed Description
The invention is further described below with reference to the figures and examples.
A new structure used for connecting the pile cutting pile top and the bearing platform of a PHC precast pile, a pile foundation hollow core is formed in the PHC precast pile 6; after pile cutting at the pile top of the precast pile is finished, inserting a steel sleeve 1, and reserving a gap of 200mm between the inner wall of the steel sleeve 1 and the side wall of the PHC precast pile to form a cavity; and (4) emptying the pile core of the precast pile and soil in the cavity, and washing the steel sleeve and the side wall of the PHC tubular pile clean. Carry out the cavity back cover with C50 back cover concrete 4, the pile core sets up layer board 8 simultaneously, transfers first steel reinforcement cage 2 and second steel reinforcement cage 5 respectively, and the cavity vibrates closely after cavity and pile foundation hollow core pouring C50 concrete 3, until pile bolck elevation.
The connection structure of the present invention is composed of three major parts. The first part is that after pile cutting of the pile top of the precast pile is completed, a steel sleeve 1 is inserted, the wall thickness of the steel sleeve 1 is 10mm, and the total height of the sleeve is 1200 mm; and a gap of 200mm is reserved between the inner wall of the steel sleeve 1 and the side wall of the PHC precast pile to form a cavity. The second part is that the layer board 8 is arranged in the hollow core of the pile foundation, the layer board is welded with the positioning steel bar and fixed on the pile top, and the distance from the pile top is not less than 3D (D is the diameter of the pile foundation) and not less than 1.5 m. The cavity is bottomed with C50 bottomed concrete 4. Second steel reinforcement cage 5 and first steel reinforcement cage 2 are transferred respectively to pile foundation hollow core and pile foundation outer cavity, and the steel reinforcement cage is transferred and is required to empty pile foundation hollow core and the interior earth of cavity before, erodees clean steel sleeve and PHC tubular pile lateral wall, and the length that the steel reinforcement cage gos deep into in the cushion cap is 40d (d is steel reinforcement cage owner muscle diameter). And the third part is that the pile core and the cavity are compacted by vibration after C50 concrete 3 is poured until the height of the pile top is high. And after the pile cutting top is finished, pouring a concrete cushion layer and a bearing platform outside the steel sleeve, namely finishing the connection of the pile cutting top and the bearing platform of the PHC precast pile.
The invention discloses a novel structure for connecting a pile cutting pile top and a bearing platform of a PHC precast pile, which is characterized in that a steel sleeve is inserted, and C50 concrete is poured to form a whole body by the steel sleeve and the PHC precast pile; bending moment is transmitted through the main reinforcement of the steel reinforcement cage, and bending resistance of the pile foundation joint is improved. The structure atress is reasonable clear and definite, and simple structure, construction convenience, quick, economic nature is good, is the very big improvement and the popularization of pile cutting technology to PHC precast pile.
The foregoing detailed description of the preferred embodiments of the invention has been presented. It should be understood that numerous modifications and variations could be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions available to those skilled in the art through logic analysis, reasoning and limited experiments based on the prior art according to the concept of the present invention should be within the scope of protection defined by the claims.

Claims (5)

1. The utility model provides a connection structure that is used for PHC precast pile to cut pile bolck and cushion cap, the inside pile foundation hollow that forms of PHC precast pile, its characterized in that the structure is established the steel sleeve outside the PHC precast pile including the cover, reserve the space between steel sleeve inner wall and the PHC precast pile outer wall, vacuole formation, the steel sleeve bottom carries out the cavity back cover with the back cover concrete, sets up the layer board in the pile foundation hollow, places the steel reinforcement cage in pile foundation hollow and the outside cavity of PHC precast pile, pouring concrete to pile bolck elevation.
2. A connecting structure for a pile cutting head and a pile cap of a PHC precast pile according to claim 1, wherein: the wall thickness of the steel sleeve is 8-12 mm, and the total height of the sleeve is 1000-1500 mm; and a gap of 150-250 mm is reserved between the inner wall of the steel sleeve and the outer wall of the PHC precast pile.
3. A connecting structure for a pile cutting head and a pile cap of a PHC precast pile according to claim 1, wherein: the concrete is C50 concrete.
4. A connecting structure for a pile cutting head and a pile cap of a PHC precast pile according to claim 1, wherein: according to the shape of the pile foundation, the outer wall and the inner wall of the steel sleeve are circular, square or polygonal matched with the shape of the pile foundation.
5. A method for connecting a pile cutting pile top of a PHC precast pile with a bearing platform is characterized in that after pile cutting of the pile top of the PHC precast pile is completed, a pile foundation hollow core is formed in the PHC precast pile, a steel sleeve is sleeved outside the PHC precast pile, and a gap is reserved between the inner wall of the steel sleeve and the outer wall of the PHC precast pile to form a cavity; emptying soil in the hollow core and the cavity of the pile foundation, and washing the steel sleeve and the side wall of the PHC tubular pile; and carrying out cavity bottom sealing by using bottom sealing concrete, arranging a supporting plate in the hollow core of the pile foundation, respectively placing a reinforcement cage in the hollow core of the pile foundation and the cavity, and closely vibrating after pouring the concrete until the elevation of the pile top.
CN202110070101.6A 2021-01-19 2021-01-19 Connecting structure and connecting method for pile cutting top and bearing platform of PHC precast pile Pending CN112854282A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110070101.6A CN112854282A (en) 2021-01-19 2021-01-19 Connecting structure and connecting method for pile cutting top and bearing platform of PHC precast pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110070101.6A CN112854282A (en) 2021-01-19 2021-01-19 Connecting structure and connecting method for pile cutting top and bearing platform of PHC precast pile

Publications (1)

Publication Number Publication Date
CN112854282A true CN112854282A (en) 2021-05-28

Family

ID=76007379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110070101.6A Pending CN112854282A (en) 2021-01-19 2021-01-19 Connecting structure and connecting method for pile cutting top and bearing platform of PHC precast pile

Country Status (1)

Country Link
CN (1) CN112854282A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411521A (en) * 2021-12-20 2022-04-29 安徽省公路桥梁工程有限公司 Concrete pavement and superposition structure for bridge deck of steel box girder and process thereof

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1928251A (en) * 2006-09-26 2007-03-14 徐东强 Pipe pile hole maker with concrete bottom sealing, pipe cover and wings and construction process thereof
CN102134854A (en) * 2011-02-16 2011-07-27 中交二航局第四工程有限公司 Slipway underwater pile foundation and construction method thereof
CN102425184A (en) * 2011-12-13 2012-04-25 中交第二公路工程局有限公司 Cap preserved hole construction method for deep-water soft soil foundation reverse low pile cap composite foundation
CN204112354U (en) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 The syndeton of concrete precast pile and pile foundation support table
KR20160009386A (en) * 2014-07-16 2016-01-26 (주)하경엔지니어링 Precast concrete pile with sheath and the construction method therewith
CN107119677A (en) * 2017-06-08 2017-09-01 太原理工大学 A kind of pile tube stake top fricting shearing type power consumption attachment means and its construction method
CN108265635A (en) * 2017-12-20 2018-07-10 中铁广州工程局集团有限公司 A kind of coastal dock is hindered bridge pier by damage and reinforcement method is not repaired under Unloading Condition
CN110158581A (en) * 2019-05-30 2019-08-23 武汉中力岩土工程有限公司 Pile base construction method
CN209585028U (en) * 2018-12-07 2019-11-05 江阴市城乡规划设计院 A kind of open caisson applies broken pile
CN110984138A (en) * 2019-11-29 2020-04-10 中建八局第四建设有限公司 Method for manufacturing PHS hollow square pile concrete pile core supporting plate component
CN111560972A (en) * 2020-05-20 2020-08-21 太原理工大学 PHC tubular pile and bearing platform mortise-tenon type semi-rigid joint
CN111576403A (en) * 2020-05-20 2020-08-25 太原理工大学 Sleeve end plate for realizing grouting connection and PHC tubular pile
CN211815986U (en) * 2020-08-25 2020-10-30 中交天津港湾工程设计院有限公司 High-pile beamless plate wharf structure
CN211898496U (en) * 2019-12-31 2020-11-10 上海建工七建集团有限公司 Pile splicing structure for precast pile and foundation bearing platform
CN212270920U (en) * 2020-03-31 2021-01-01 宁波中交水运设计研究有限公司 PHC tubular pile splicing structure
CN212294721U (en) * 2020-05-08 2021-01-05 中国能源建设集团辽宁电力勘测设计院有限公司 Prestressed pipe pile foundation and connection structure of prestressed pipe pile foundation and 35KV power transmission line iron tower

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1928251A (en) * 2006-09-26 2007-03-14 徐东强 Pipe pile hole maker with concrete bottom sealing, pipe cover and wings and construction process thereof
CN102134854A (en) * 2011-02-16 2011-07-27 中交二航局第四工程有限公司 Slipway underwater pile foundation and construction method thereof
CN102425184A (en) * 2011-12-13 2012-04-25 中交第二公路工程局有限公司 Cap preserved hole construction method for deep-water soft soil foundation reverse low pile cap composite foundation
CN204112354U (en) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 The syndeton of concrete precast pile and pile foundation support table
KR20160009386A (en) * 2014-07-16 2016-01-26 (주)하경엔지니어링 Precast concrete pile with sheath and the construction method therewith
CN107119677A (en) * 2017-06-08 2017-09-01 太原理工大学 A kind of pile tube stake top fricting shearing type power consumption attachment means and its construction method
CN108265635A (en) * 2017-12-20 2018-07-10 中铁广州工程局集团有限公司 A kind of coastal dock is hindered bridge pier by damage and reinforcement method is not repaired under Unloading Condition
CN209585028U (en) * 2018-12-07 2019-11-05 江阴市城乡规划设计院 A kind of open caisson applies broken pile
CN110158581A (en) * 2019-05-30 2019-08-23 武汉中力岩土工程有限公司 Pile base construction method
CN110984138A (en) * 2019-11-29 2020-04-10 中建八局第四建设有限公司 Method for manufacturing PHS hollow square pile concrete pile core supporting plate component
CN211898496U (en) * 2019-12-31 2020-11-10 上海建工七建集团有限公司 Pile splicing structure for precast pile and foundation bearing platform
CN212270920U (en) * 2020-03-31 2021-01-01 宁波中交水运设计研究有限公司 PHC tubular pile splicing structure
CN212294721U (en) * 2020-05-08 2021-01-05 中国能源建设集团辽宁电力勘测设计院有限公司 Prestressed pipe pile foundation and connection structure of prestressed pipe pile foundation and 35KV power transmission line iron tower
CN111560972A (en) * 2020-05-20 2020-08-21 太原理工大学 PHC tubular pile and bearing platform mortise-tenon type semi-rigid joint
CN111576403A (en) * 2020-05-20 2020-08-25 太原理工大学 Sleeve end plate for realizing grouting connection and PHC tubular pile
CN211815986U (en) * 2020-08-25 2020-10-30 中交天津港湾工程设计院有限公司 High-pile beamless plate wharf structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411521A (en) * 2021-12-20 2022-04-29 安徽省公路桥梁工程有限公司 Concrete pavement and superposition structure for bridge deck of steel box girder and process thereof

Similar Documents

Publication Publication Date Title
CN2934352Y (en) Root key type drilling perfusion stake construction device
CN101457548A (en) Node for connecting round steel tube concrete column with reinforced concrete floor and method for making same
CN101831970A (en) Integrally assembled wallboard wall and construction method thereof
CN101684650A (en) Cast-in-place concrete thin-walled tooth-shaped tubular pile with large diameter, pile forming device and method for forming pile
CN201762717U (en) Structure for connecting prestressed pipe pile and cushion cap
CN101220593A (en) Fastening method of post-treating pipe pile break with pre-stress pipe pile construction
CN104594372A (en) Fan pile pier foundation and construction method thereof
CN103669866A (en) Construction method of basement reinforced concrete column joint connecting structure
CN102359110A (en) Modular cast-in-place construction method for large-diameter root foundation
CN111364352A (en) Prefabricated pipe pier and cast-in-place pile connecting structure and construction method
CN203200771U (en) Connection structure for pile extension top and bearing platform
CN107059910B (en) Socket type concrete filled steel tube beam storage bench and construction method thereof
CN112854282A (en) Connecting structure and connecting method for pile cutting top and bearing platform of PHC precast pile
CN113006117A (en) Karst cave stratum pile foundation structure and pile forming process
CN202323938U (en) Core filling structure of prestressed concrete hollow pipe pile
CN201406767Y (en) Node for connecting circular concrete-filled tubular column and reinforced concrete floor
CN210066722U (en) Pretensioning prestressed spiral concrete multi-thorn precast tubular pile
CN203238642U (en) Supporting retaining wall of foundation pit
CN204491649U (en) A kind of blower fan pile pier basis
CN202139587U (en) Steel pile tube with closed conical end
CN209066594U (en) The connection structure of contrary sequence method foundation pit construction central sill and steel core concrete column
CN205614821U (en) Core concrete member is irritated in prefabrication of PHC tubular pile
CN207277358U (en) A kind of pile anchor rod basis available for soft clay area
CN211547797U (en) Tower crane foundation structure suitable for basement raft foundation
CN110080314B (en) Method for reducing side friction resistance of pile foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination