CN112832112A - 一种铁路机制砂混凝土箱梁浇筑及振捣工艺 - Google Patents
一种铁路机制砂混凝土箱梁浇筑及振捣工艺 Download PDFInfo
- Publication number
- CN112832112A CN112832112A CN202110050943.5A CN202110050943A CN112832112A CN 112832112 A CN112832112 A CN 112832112A CN 202110050943 A CN202110050943 A CN 202110050943A CN 112832112 A CN112832112 A CN 112832112A
- Authority
- CN
- China
- Prior art keywords
- pouring
- concrete
- vibrating
- web
- box girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开了一种铁路机制砂混凝土箱梁浇筑及振捣工艺,包括步骤如下:两侧翼缘板及顶板区域灌注:当灌平两侧腹板区域的顶部后停10~20min,使腹板混凝土充分沉落,然后再灌注两侧翼缘板及顶板区域的混凝土,以解决腹板与顶板交界处因腹板混凝土沉落而造成纵向裂纹的问题。
Description
技术领域
本发明涉及一种铁路机制砂混凝土箱梁浇筑及振捣工艺,属于箱梁施工技术领域。
背景技术
随着公路和铁路等基础设施的建设,箱梁被广泛的使用,目前对箱梁浇筑的的施工工艺,存在腹板与顶板交界处因腹板混凝土沉落而造成纵向裂纹,导致箱梁生产后的质量不合格。
发明内容
为解决上述技术问题,本发明提供了一种铁路机制砂混凝土箱梁浇筑及振捣工艺。
本发明通过以下技术方案得以实现。
本发明提供的一种铁路机制砂混凝土箱梁浇筑及振捣工艺,包括步骤如下:
两侧翼缘板及顶板区域灌注:当灌平两侧腹板区域的顶部后停10~20min,使腹板混凝土充分沉落,然后再灌注两侧翼缘板及顶板区域的混凝土。
在进行上述两侧翼缘板及顶板区域顶部的桥面板混凝土灌注时,混凝土从一端向另一端灌注。
在进行所述两侧翼缘板及顶板区域顶部浇筑时,一台混凝土泵车A从一端向另一端灌注混凝土,另一台混凝土输送泵B先将另一端2m左右浇筑完成并及时收光、抹面,然后混凝土输送泵B从混凝土泵车A浇筑接头开始负责浇筑顶板钢筋骨架以下混凝土,混凝土泵车A负责浇筑顶板钢筋骨架以上混凝土,提浆整平机及时整平。
在完成所述两侧翼缘板及顶板区域灌注的步骤前,先依次完成底腹板倒角区域灌注浇筑、底板区域浇筑、两侧腹板区域浇筑。
所述底腹板倒角区域灌注浇筑为:从两端向跨中持续对称进行的灌注工艺,合拢处浇筑接茬错开跨中4m范围。
在进行所述底板区域浇筑的步骤时,首盘和最后一盘混凝土不得浇筑在支座和跨中部位。
在进行两侧腹板区域浇筑时采用两侧腹板对称进行,保持两侧混凝土面高度基本一致,高度差不宜超过30cm,防止混凝土对内模的压力差过大造成其偏移。
上述步骤中,混凝土浇筑时纵向分段长度为4~5m,水平分层侧壁的厚度不得大于30cm,先后两层混凝土的间隔时间不得超过混凝土的初凝时间。
本发明的有益效果在于:当灌平两侧腹板区域的顶部后停10~20min,使腹板混凝土充分沉落,然后再灌注两侧翼缘板及顶板区域的混凝土,以解决腹板与顶板交界处因腹板混凝土沉落而造成纵向裂纹的问题。
附图说明
图1是本发明箱梁的横截断面剖视结构示意图;
具体实施方式
下面进一步描述本发明的技术方案,但要求保护的范围并不局限于所述。
参见图1所示。
本发明的一种铁路机制砂混凝土箱梁浇筑及振捣工艺,包括步骤如下:
两侧翼缘板及顶板区域4灌注:当灌平两侧腹板区域3的顶部后停10~20min,使腹板混凝土充分沉落,然后再灌注两侧翼缘板及顶板区域4的混凝土,以解决腹板与顶板交界处因腹板混凝土沉落而造成纵向裂纹的问题。
在进行上述两侧翼缘板及顶板区域4顶部的桥面板混凝土灌注时,混凝土从一端向另一端灌注,但必须保证腹板混凝土初凝前顶板混凝土灌注完毕,并及时整平、收浆。
在进行所述两侧翼缘板及顶板区域4顶部浇筑时,一台混凝土泵车A从一端向另一端灌注混凝土,另一台混凝土输送泵B先将另一端2m左右浇筑完成并及时收光、抹面,然后混凝土输送泵B从混凝土泵车A浇筑接头开始负责浇筑顶板钢筋骨架以下混凝土,混凝土泵车A负责浇筑顶板钢筋骨架以上混凝土,提浆整平机及时整平。
在完成所述两侧翼缘板及顶板区域4灌注的步骤前,先依次完成底腹板倒角区域1灌注浇筑、底板区域2浇筑、两侧腹板区域3浇筑。
所述底腹板倒角区域1灌注浇筑为:从两端向跨中持续对称进行的灌注工艺,合拢处浇筑接茬错开跨中4m范围。
在进行所述底板区域2浇筑的步骤时,首盘和最后一盘混凝土不得浇筑在支座和跨中部位。
在进行两侧腹板区域3浇筑时采用两侧腹板对称进行,保持两侧混凝土面高度基本一致,高度差不宜超过30cm,防止混凝土对内模的压力差过大造成其偏移。
所述两侧翼缘板及顶板区域4灌注和底板区域2浇筑采用插入式振捣器振捣成型;加强振捣质量,以保证脱模后梁体表面光滑平整,达到混凝土外观质量要求;
所述底腹板倒角区域1、两侧腹板区域3在进行浇筑时,使用插入式振捣器振捣,同时和附着式振捣器共同完成振捣。
在所述两侧翼缘板及顶板区域4顶部进行浇筑时,采用插入式振捣器振捣,提浆整平机振捣抹面,构造排水坡度,人工站在抹面平台上对梁面抹面收光。
上述步骤中,混凝土浇筑时纵向分段长度为4~5m,水平分层侧壁的厚度不得大于30cm,先后两层混凝土的间隔时间不得超过混凝土的初凝时间。
Claims (10)
1.一种铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于,包括步骤如下:
两侧翼缘板及顶板区域(4)灌注:当灌平两侧腹板区域(3)的顶部后停10~20min,使腹板混凝土充分沉落,然后再灌注两侧翼缘板及顶板区域(4)的混凝土。
2.如权利要求1所述的铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于,在进行上述两侧翼缘板及顶板区域(4)顶部的桥面板混凝土灌注时,混凝土从一端向另一端灌注,但必须保证腹板混凝土初凝前顶板混凝土灌注完毕,并及时整平、收浆。
3.如权利要求2所述的铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于,在进行所述两侧翼缘板及顶板区域(4)顶部浇筑时,一台混凝土泵车A从一端向另一端灌注混凝土,另一台混凝土输送泵B先将另一端2m左右浇筑完成并及时收光、抹面,然后混凝土输送泵B从混凝土泵车A浇筑接头开始负责浇筑顶板钢筋骨架以下混凝土,混凝土泵车A负责浇筑顶板钢筋骨架以上混凝土,提浆整平机及时整平。
4.如权利要求3所述的铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于:在完成所述两侧翼缘板及顶板区域(4)灌注的步骤前,先依次完成底腹板倒角区域(1)灌注浇筑、底板区域(2)浇筑、两侧腹板区域(3)浇筑。
5.如权利要求4所述的铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于:所述底腹板倒角区域(1)灌注浇筑为:从两端向跨中持续对称进行的灌注工艺,合拢处浇筑接茬错开跨中4m范围。
6.如权利要求4所述的铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于,在进行所述底板区域(2)浇筑的步骤时,首盘和最后一盘混凝土不得浇筑在支座和跨中部位。
7.如权利要求4所述的铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于,在进行两侧腹板区域(3)浇筑时采用两侧腹板对称进行,保持两侧混凝土面高度基本一致,高度差不宜超过30cm。
8.如权利要求4所述的铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于,所述两侧翼缘板及顶板区域(4)灌注和底板区域(2)浇筑采用插入式振捣器振捣成型;所述底腹板倒角区域(1)、两侧腹板区域(3)在进行浇筑时,使用插入式振捣器振捣,同时和附着式振捣器共同完成振捣。
9.如权利要求4所述的铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于,在所述两侧翼缘板及顶板区域(4)顶部进行浇筑时,采用插入式振捣器振捣,提浆整平机振捣抹面,构造排水坡度,梁面抹面收光。
10.如权利要求4所述的铁路机制砂混凝土箱梁浇筑及振捣工艺,其特征在于,上述步骤中,混凝土浇筑时纵向分段长度为4~5m,水平分层侧壁的厚度不得大于30cm,先后两层混凝土的间隔时间不得超过混凝土的初凝时间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110050943.5A CN112832112A (zh) | 2021-01-14 | 2021-01-14 | 一种铁路机制砂混凝土箱梁浇筑及振捣工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110050943.5A CN112832112A (zh) | 2021-01-14 | 2021-01-14 | 一种铁路机制砂混凝土箱梁浇筑及振捣工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112832112A true CN112832112A (zh) | 2021-05-25 |
Family
ID=75928198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110050943.5A Pending CN112832112A (zh) | 2021-01-14 | 2021-01-14 | 一种铁路机制砂混凝土箱梁浇筑及振捣工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112832112A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113430942A (zh) * | 2021-06-25 | 2021-09-24 | 中铁十九局集团第五工程有限公司 | 箱梁混凝土浇筑的施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101403212A (zh) * | 2008-11-13 | 2009-04-08 | 中铁二局股份有限公司 | 一种先张法预应力混凝土简支t梁的施工方法 |
CN106812065A (zh) * | 2015-12-01 | 2017-06-09 | 衡阳市新德力预应力有限公司 | 一种混凝土简支预应力箱梁施工工艺 |
-
2021
- 2021-01-14 CN CN202110050943.5A patent/CN112832112A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101403212A (zh) * | 2008-11-13 | 2009-04-08 | 中铁二局股份有限公司 | 一种先张法预应力混凝土简支t梁的施工方法 |
CN106812065A (zh) * | 2015-12-01 | 2017-06-09 | 衡阳市新德力预应力有限公司 | 一种混凝土简支预应力箱梁施工工艺 |
Non-Patent Citations (3)
Title |
---|
李进荣等: "武广客运专线双线整孔箱梁预制技术", 《施工技术》 * |
蒲凤平: "特大跨度预应力混凝土箱梁水中支架现浇施工技术", 《低碳世界》 * |
黄冠达: "大体积预应力混凝土简支箱梁浇筑工艺", 《中国标准化》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113430942A (zh) * | 2021-06-25 | 2021-09-24 | 中铁十九局集团第五工程有限公司 | 箱梁混凝土浇筑的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107268878A (zh) | 预制夹芯墙板的制作安装方法 | |
WO2017185905A1 (zh) | 一种中低速磁浮低置线路肋柱分散式道岔基础结构 | |
CN103774561A (zh) | 高速公路预制小箱梁工装法流水化作业施工 | |
CN111764522A (zh) | 一种防渗漏建筑楼板后浇带结构及浇筑方法 | |
CN112832112A (zh) | 一种铁路机制砂混凝土箱梁浇筑及振捣工艺 | |
CN104164951B (zh) | 楼梯休息平台及其施工方法 | |
CN102425110A (zh) | 市政立交箱梁全断面现浇砼施工方法 | |
CN211850891U (zh) | 一种混凝土墙连续浇筑装置 | |
CN109868751B (zh) | 一种装配式轨道梁砼后浇槽口、模板及施工方法 | |
CN106368362A (zh) | 一种gbf高注合金薄壁方箱的空心楼板及制作方法 | |
CN107012985A (zh) | 一种预制小梁及含所述预制小梁的叠合楼板施工工艺 | |
CN111155432A (zh) | 一种现浇箱梁的混凝土浇筑施工方法 | |
CN101666122B (zh) | 微距离架空大梁底模施工方法 | |
CN113756601B (zh) | 框架柱置换加固施工方法 | |
CN207277644U (zh) | 加气混凝土砌块箱式内模空心楼盖 | |
CN206873731U (zh) | 一种混凝土空心双层楼板 | |
CN112045840B (zh) | 用于预制高速铁路箱梁的装配式存梁台座的施工方法 | |
CN1865633A (zh) | 贮液结构中混凝土的连续浇注方法 | |
CN106639100B (zh) | 中空阵列式圆筒混凝土厚板施工方法 | |
CN210622368U (zh) | 一种新型无支撑置换剪力墙混凝土装置 | |
CN101457562A (zh) | 用于现浇空腹楼盖的轻质构件 | |
CN219968314U (zh) | 一种便于装拆桩板墙挡土板模板 | |
CN105856415B (zh) | 预制箱梁梁底楔块干砂调节施工方法 | |
CN110748221A (zh) | 一种预制装配式水池导流墙 | |
CN213352912U (zh) | 用于预制高速铁路箱梁的装配式存梁台座 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210525 |
|
RJ01 | Rejection of invention patent application after publication |