Prior art keywords
strip
oil
gasket
road planing
guide sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110109024.0A
Other languages
Chinese (zh)
Other versions
CN112792535A (en
Inventor
刘高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ganzhou Baoside Machinery Technology Co ltd
Original Assignee
Ganzhou Baoside Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ganzhou Baoside Machinery Technology Co ltd filed Critical Ganzhou Baoside Machinery Technology Co ltd
Priority to CN202110109024.0A priority Critical patent/CN112792535B/en
Publication of CN112792535A publication Critical patent/CN112792535A/en
Application granted granted Critical
Publication of CN112792535B publication Critical patent/CN112792535B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0278Arrangement or mounting of spray heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/02Devices for feeding articles or materials to conveyors
    • B65G47/04Devices for feeding articles or materials to conveyors for feeding articles
    • B65G47/12Devices for feeding articles or materials to conveyors for feeding articles from disorderly-arranged article piles or from loose assemblages of articles
    • B65G47/14Devices for feeding articles or materials to conveyors for feeding articles from disorderly-arranged article piles or from loose assemblages of articles arranging or orientating the articles by mechanical or pneumatic means during feeding
    • B65G47/1407Devices for feeding articles or materials to conveyors for feeding articles from disorderly-arranged article piles or from loose assemblages of articles arranging or orientating the articles by mechanical or pneumatic means during feeding the articles being fed from a container, e.g. a bowl
    • B65G47/1414Devices for feeding articles or materials to conveyors for feeding articles from disorderly-arranged article piles or from loose assemblages of articles arranging or orientating the articles by mechanical or pneumatic means during feeding the articles being fed from a container, e.g. a bowl by means of movement of at least the whole wall of the container
    • B65G47/1421Vibratory movement

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses automatic pipe clamp gasket feeding equipment for road planing teeth, which comprises a workbench, wherein a conveying mechanism and a central control platform are arranged at the top of the workbench, a road planing tooth feeding device is arranged at the initial end of the conveying mechanism, a pipe clamp mounting device and a gasket mounting device are arranged on one side of the conveying mechanism along the moving direction of the conveying mechanism, and a counter and an oil spraying device are arranged at the tail end of the conveying mechanism. According to the invention, the road planing teeth are conveyed to the conveying mechanism through the road planing tooth feeding device, the pipe clamp and the gasket are respectively installed on the road planing teeth through the pipe clamp installing device and the gasket installing device in the process of conveying the road planing teeth, and finally oil is sprayed onto the road planing teeth through the oil spraying device to realize rust prevention, so that the automatic production of the road planing teeth is realized, and the production efficiency is improved.

Description

Dig automatic top tube card gasket equipment of way tooth
Technical Field
The invention belongs to the field of mechanical equipment, and particularly relates to automatic pipe clamping gasket equipment for road planing teeth.
Background
The milling teeth, also called milling machine tool bits or road planing teeth, can be usually matched with a plurality of cutting teeth to cut the road surface, and the working efficiency is high through a mechanized operation mode, so that the milling teeth are widely applied to road and bridge maintenance and cutting of road materials. In the process of machining the road planing teeth, the clamp spring and the gasket are required to be installed on the tooth handles of the road planing teeth, the existing installation mode is usually installed manually by workers, the efficiency is low, the installation precision is poor, and the quality of the road planing teeth is affected.
Disclosure of Invention
The invention aims to provide equipment for automatically feeding pipe clamp gaskets to road planing teeth so as to solve the technical problem of low production efficiency of the road planing teeth.
In order to solve the technical problem, the specific technical scheme of the automatic pipe clamping gasket installing device for the road planing teeth is as follows:
the utility model provides a dig automatic top tube strap gasket equipment of way tooth, includes the workstation, conveying mechanism and well accuse platform are installed to the workstation top, conveying mechanism's initial end department installs and digs way tooth loading attachment, conveying mechanism's one side is followed conveying mechanism moving direction is provided with pipe strap installation device and gasket installation device, counter and fueling injection equipment are installed to conveying mechanism's end department.
Preferably, conveying mechanism includes two guide ways and two fixed strips that are parallel to each other, the guide way with the fixed strip interval sets up, swing joint has in the guide way with the parallel activity strip of fixed strip, the activity strip provides power through power device and realizes going up and down and following the fixed strip extending direction translation, the activity strip with all follow on the fixed strip distribution direction evenly distributed has a plurality of draw-in grooves, the activity strip with on the fixed strip draw-in groove quantity equals, adjacent two on the activity strip distance between the draw-in groove with adjacent two on the fixed strip distance between the draw-in groove equals.
Preferably, one side of the fixed strip, which is far away from the workbench, is provided with a fixed stop block which can be close to or far away from the fixed strip, the fixed stop block provides power through a second air cylinder, and the second air cylinder is installed on the workbench through a support.
Preferably, dig way tooth loading attachment includes first vibration dish and third guide pin bushing, follow in the third guide pin bushing the fixed strip direction sliding connection that distributes has the propelling movement piece, the neighbouring of propelling movement piece one of fixed strip is served and is equipped with the holding tank, the propelling movement piece provides power through first cylinder, the discharge end of first vibration dish with the holding tank is connected.
Preferably, the pipe clamp installation device comprises a first guide sleeve with an axis perpendicular to the fixing strip, the top of the first guide sleeve is communicated with a feeding track along the vertical direction, a first push block is connected in the first guide sleeve in a sliding mode along the axial direction of the first guide sleeve, and the first push block provides power through a third air cylinder.
Preferably, the gasket mounting device comprises a second vibration disc and a second guide sleeve, the axis of the second guide sleeve is perpendicular to the fixed strip, the discharge end of the second vibration disc is communicated with the top of the second guide sleeve, a second push block is connected in the second guide sleeve in a sliding mode along the axial direction of the second guide sleeve, a blind hole is formed in one end, close to the fixed strip, of the second push block, and the second push block provides power through a fourth cylinder.
Preferably, one end of the second push block, which is adjacent to the fixing strip, is provided with a U-shaped positioning strip with an upward opening, and the inner side of the U-shaped positioning strip is provided with a plurality of bead screws.
Preferably, oil spout device is including spouting the oil groove, highly from closing on the bottom surface of spouting the oil groove one side of fixed strip is to keeping away from one side of fixed strip reduces in proper order, spout deviating from of oil groove one side of fixed strip is equipped with the opening, be provided with the baffle of liftable in the opening, the baffle provides power through fifth cylinder, spout being equipped with the nozzle in the oil groove.
Preferably, spout the opening part of oil groove and install the oil groove, the bottom of oil groove through defeated oil pipe with the nozzle is connected, defeated oil pipe is last to install the oil pump, oil groove internal fixation support ring, be equipped with step portion on the inner peripheral surface of support ring, the top of support ring is equipped with the oil drain net, the step portion department of support ring is equipped with the filter screen.
Preferably, the support ring is connected with the oil draining net through a spring.
The automatic pipe clamp gasket loading equipment for the road planing teeth has the following advantages: the road planing teeth are conveyed to the conveying mechanism through the road planing teeth feeding device, the pipe clamp and the gasket are installed on the road planing teeth through the pipe clamp installing device and the gasket installing device respectively in the process of conveying the road planing teeth, oil is finally sprayed onto the road planing teeth through the oil spraying device to achieve rust prevention, automatic production of the road planing teeth is achieved, and production efficiency is improved.
Drawings
FIG. 1 is a front view of the automatic pipe fitting gasket apparatus of the road planing teeth of the present invention;
FIG. 2 is a top view of the present invention apparatus for automated loading of shaving teeth with tube clamps and shims;
FIG. 3 is a schematic structural diagram of an apparatus for automatically loading pipe clamp gaskets onto a road planing tooth according to the present invention;
FIG. 4 is a schematic diagram of the internal structure of the device for automatically feeding pipe clamp gasket onto the road planing teeth of the present invention;
FIG. 5 is a schematic structural diagram of a pipe clamp installation device of the automatic pipe clamp gasket loading device for road planing teeth according to the present invention;
FIG. 6 is a schematic structural diagram of a gasket mounting device of the road planing teeth automatic pipe clamping gasket loading device of the present invention;
FIG. 7 is a schematic structural view of a road planing tooth feeding device of the automatic road planing tooth feeding pipe clamp gasket device of the present invention;
fig. 8 is a cross-sectional view of the oil sump of the road planing teeth automatic pipe clamp gasket loading apparatus of the present invention.
The symbols in the figure illustrate: 1. a first vibrating disk; 2. a first cylinder; 3. a center console; 4. a pushing block; 5. a movable bar; 6. a fixing strip; 7. fixing a stop block; 8. a second cylinder; 9. a support; 10. a second vibratory pan; 11. a counter; 12. a nozzle; 13. an oil sump; 14. a work table; 15. a third cylinder; 16. a baffle plate; 17. an oil spraying groove; 18. a guide groove; 19. a fourth cylinder; 20. a spring; 21. a support ring; 22. a fifth cylinder; 23. an oil delivery pipe; 24. an oil pump; 25. a feeding track; 26. a first guide sleeve; 27. a first push block; 28. a second guide sleeve; 29. a positioning bar; 30. a second push block; 31. a ball screw; 32. a third guide sleeve; 33. accommodating grooves; 34. an oil draining net; 35. and (5) filtering by using a filter screen.
Detailed Description
In order to better understand the purpose, structure and function of the present invention, the automatic pipe clamping gasket installing device for road planing teeth of the present invention is further described in detail below with reference to the accompanying drawings.
As shown in fig. 1-3, an automatic pipe clamp gasket feeding device for road planing teeth comprises a workbench 14, a conveying mechanism and a central control console 3 are mounted at the top of the workbench 14, a road planing tooth feeding device is mounted at the starting end of the conveying mechanism, road planing teeth are conveyed to the conveying mechanism through the road planing tooth feeding device, a pipe clamp mounting device and a gasket mounting device are arranged on one side of the conveying mechanism along the moving direction of the conveying mechanism, pipe clamps and gaskets are mounted on the road planing teeth by the pipe clamp mounting device and the gasket mounting device respectively in the process of conveying the road planing teeth by the conveying mechanism, a counter 11 and an oil spraying device are mounted at the tail end of the conveying mechanism, the mounted road planing teeth realize rust prevention through oil spraying of the oil spraying device, the automatic formation spirit of the road planing teeth is realized, and the production efficiency is improved.
As shown in fig. 4, conveying mechanism includes two guide ways 18 and two fixed strips 6 that are parallel to each other, guide way 18 and fixed strip 6 interval set up, swing joint has the activity strip 5 parallel with fixed strip 6 in the guide way 18, activity strip 5 provides power through power device and realizes going up and down and along the translation of fixed strip 6 extending direction, all there are a plurality of draw-in grooves along fixed strip 6 distribution direction evenly distributed on activity strip 5 and the fixed strip 6, draw-in groove quantity on activity strip 5 and the fixed strip 6 equals, distance between two adjacent draw-in grooves on the activity strip 5 equals with the distance between two adjacent draw-in grooves on the fixed strip 6. One side of the fixed strip 6 departing from the workbench 14 is provided with a fixed stop 7 which can be close to or far away from the fixed strip 6 to move, the fixed stop 7 provides power through a second air cylinder 8, and the second air cylinder 8 is installed on the workbench 14 through a support 9. Power device provides power, make 5 lifting translation of activity strip, when activity strip 5 rises, the tooth of digging the way in the draw-in groove on the fixed strip 6 is held up to activity strip 5, later activity strip 5 will dig the way tooth and carry forward, later activity strip 5 descends, dig the way tooth respectively and send to the adjacent next draw-in groove on the fixed strip 6 in, realize digging the transport of way tooth, can effectively control the distance of digging the way tooth and carrying at every turn through this kind of mode, the position of tooth is dug in effective control, it docks with pipe strap and gasket to be convenient for dig the way tooth, after digging the way tooth and carrying in place, 8 drive fixed dog 7 descends of second cylinder, realize digging the reinforcement of way tooth through fixed dog 7, prevent to dig the way tooth and make the emergence dislocation at installation pipe strap and gasket.
As shown in fig. 7, the road planing tooth feeding device includes a first vibrating disk 1 and a third guide sleeve 32, a pushing block 4 is connected to the third guide sleeve 32 in a sliding manner along the distribution direction of the fixing strip 6, an accommodating groove 33 is formed in one end, adjacent to the fixing strip 6, of the pushing block 4, the pushing block 4 provides power through a first cylinder 2, and the discharge end of the first vibrating disk 1 is connected with the accommodating groove 33. First vibration dish 1 will dig in the holding tank 33 of propelling movement piece 4 is sent to behind the tooth adjusting position, and first cylinder 2 provides power, and control propelling movement piece 4 moves along third pipe box 32, and then will dig the tooth and send the moving range to activity strip 5, makes activity strip 5 can connect and dig the tooth.
As shown in fig. 5, the pipe clamp mounting device includes a first guide sleeve 26 whose axis is perpendicular to the fixing strip 6, the top of the first guide sleeve 26 is communicated with a feeding track 25 along the vertical direction, an operator manually stacks the pipe clamp adjusting position in the feeding track 25 to enable the pipe clamp to sequentially enter the first guide sleeve 26, a first push block 27 is connected in the first guide sleeve 26 in a sliding manner along the axial direction of the first guide sleeve 26, the first push block 27 provides power through a third cylinder 15, after the road planing tooth moves to the position aligned with the pipe clamp, the third cylinder 15 pushes the first push block 27, the pipe clamp is pushed out through the first push block 27, and the pipe clamp is mounted on the road planing tooth.
As shown in fig. 6, the gasket mounting device includes a second vibration disk 10 and a second guide sleeve 28 whose axis is perpendicular to the fixing strip 6, a discharge end of the second vibration disk 10 is communicated with a top of the second guide sleeve 28, a second push block 30 is connected in the second guide sleeve 28 in a sliding manner along an axial direction of the second guide sleeve 28, a blind hole is formed in one end of the second push block 30 adjacent to the fixing strip 6, and the second push block 30 provides power through a fourth cylinder 19. The second vibration disc 10 can sequentially send the gasket into the second guide sleeve 28, the fourth air cylinder 19 provides power, the gasket is pushed out through the second pushing block 30, the gasket is installed on the road planing teeth, the blind holes in the second pushing block 30 can accommodate tooth handles of the road planing teeth, and meanwhile, the installation position of the gasket can be calibrated. In practical use, the end of the second pushing block 30 adjacent to the fixing strip 6 is provided with a U-shaped positioning strip 29 with an upward opening, the inner side of the U-shaped positioning strip 29 is provided with a plurality of bead screws 31, the gasket is supported by the positioning strip 29 and the bead screws 31 because the gasket is thin and is not favorable for standing, and after the gasket is installed, the gasket can be separated from the positioning strip 29 by the contraction of the bead screws 31.
Of course, for the rust-resistant of realizing digging the way tooth, fueling injection equipment reduces in proper order from the one side that closes on fixed strip 6 to the one side that is kept away from fixed strip 6 including spouting oil groove 17, the height of the bottom surface of fueling injection groove 17, spouts one side that deviates from fixed strip 6 of oil groove 17 and is equipped with the opening, is provided with the baffle 16 of liftable in the opening, and baffle 16 provides power through fifth cylinder 22, spouts being equipped with nozzle 12 in the oil groove 17. After the pipe clamp and the gasket are installed on the road planing teeth, the road planing teeth enter the oil spraying groove 17, move towards the outlet of the oil spraying groove 17 along the bottom surface of the oil spraying groove 17 under the action of gravity, evenly spray oil to the road planing teeth through the nozzle 12 while moving, and then the fifth cylinder 22 controls the baffle 16 to lift, so that the oil spraying groove 17 is opened and closed, and the road planing teeth can be sent out from the oil spraying groove 17.
As shown in fig. 8, an oil groove 13 is installed at an opening of the oil injection groove 17, the bottom of the oil groove 13 is connected with the nozzle 12 through an oil delivery pipe 23, an oil pump 24 is installed on the oil delivery pipe 23, a support ring 21 is fixed in the oil groove 13, a step portion is arranged on the inner circumferential surface of the support ring 21, an oil draining net 34 is arranged at the top of the support ring 21, the support ring 21 is connected with the oil draining net 34 through a spring 20, and a filter screen 35 is arranged at the step portion of the support ring 21. Dig the way tooth and send out the back from the oil spout 17 and drop on oil drain net 34, under spring 20's cushioning effect, can effectively protect digging the way tooth, dig the way tooth and stop on oil drain net 34, drip unnecessary oil and dry, simultaneously through filter screen 34 with oil filter after retrieve in the oil groove 13, reduce the loss of oil, provide power through oil pump 24, can send the oil in the oil groove 13 to nozzle 12 department through defeated oil pipe 23 and spray, in fact, oil drain net 34 and filter screen 34 layering set up, can prevent that the impurity in the oil from gluing on digging the way tooth.
It is to be understood that the present invention has been described with reference to certain embodiments, and that various changes in the features and embodiments, or equivalent substitutions may be made therein by those skilled in the art without departing from the spirit and scope of the invention. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the invention without departing from the essential scope thereof. Therefore, it is intended that the invention not be limited to the particular embodiment disclosed, but that the invention will include all embodiments falling within the scope of the appended claims.

Claims (9)

1. The utility model provides a dig automatic pipe strap gasket equipment of way tooth, a serial communication port, including workstation (14), conveying mechanism and central control platform (3) are installed at workstation (14) top, conveying mechanism's initial end department installs and digs way tooth loading attachment, conveying mechanism's one side is followed conveying mechanism moving direction is provided with pipe strap installation device and gasket installation device, conveying mechanism's end department installs counter (10) and fueling injection equipment, conveying mechanism includes two guide ways (18) and two fixed strip (6) that are parallel to each other, guide way (18) with fixed strip (6) interval sets up, swing joint has in guide way (18) with movable strip (5) that fixed strip (6) are parallel, movable strip (5) provide power through power device and realize going up and down and follow fixed strip (6) extending direction translation, movable strip (5) with all follow on fixed strip (6) distribution direction evenly distributed has a plurality of draw-in grooves, movable strip (5) with on the fixed strip (6) the quantity, movable strip (5) are equal between two adjacent distances between the fixed strip (6) are equal.
2. The automatic pipe clamping gasket device for road planing teeth according to claim 1, characterized in that one side of the fixing strip (6) facing away from the worktable (14) is provided with a fixing stopper (7) which can move close to or away from the fixing strip (6), the fixing stopper (7) is powered by a second cylinder (8), and the second cylinder (8) is mounted on the worktable (14) through a bracket (9).
3. The automatic pipe clamping gasket device for the road planing teeth according to claim 1, wherein the road planing teeth feeding device comprises a first vibrating disc (1) and a third guide sleeve (32), a pushing block (4) is connected to the third guide sleeve (32) in a sliding mode along the distribution direction of the fixing strip (6), an accommodating groove (33) is formed in one end, adjacent to the fixing strip (6), of the pushing block (4), the pushing block (4) provides power through a first air cylinder (2), and the discharging end of the first vibrating disc (1) is connected with the accommodating groove (33).
4. The automatic pipe clamp gasket device for the road planing teeth as recited in claim 1, wherein the pipe clamp installing device comprises a first guide sleeve (26) with an axis perpendicular to the fixing strip (6), the top of the first guide sleeve (26) is communicated with a feeding track (25) along a vertical direction, a first push block (27) is connected inside the first guide sleeve (26) in a sliding manner along an axial direction of the first guide sleeve (26), and the first push block (27) provides power through a third cylinder (15).
5. The automatic pipe clamping gasket device for road planing teeth as claimed in claim 1, wherein the gasket mounting device comprises a second vibrating disk (10) and a second guide sleeve (28) with an axis perpendicular to the fixing strip (6), a discharge end of the second vibrating disk (10) is communicated with the top of the second guide sleeve (28), a second push block (30) is connected to the inside of the second guide sleeve (28) in a sliding manner along the axial direction of the second guide sleeve (28), a blind hole is formed in one end, adjacent to the fixing strip (6), of the second push block (30), and power is provided by the second push block (30) through a fourth cylinder (19).
6. The automatic pipe clamping gasket device for road planing teeth as claimed in claim 5, wherein a U-shaped positioning strip (29) with an upward opening is arranged at one end of the second pushing block (30) adjacent to the fixing strip (6), and a plurality of wave bead screws (31) are arranged on the inner side of the U-shaped positioning strip (29).
7. The automatic pipe clamp gasket device of claim 1, wherein the oil spraying device comprises an oil spraying groove (17), the height of the bottom surface of the oil spraying groove (17) is sequentially reduced from one side close to the fixing strip (6) to one side away from the fixing strip (6), an opening is formed in one side, away from the fixing strip (6), of the oil spraying groove (17), a liftable baffle (16) is arranged in the opening, the baffle (16) provides power through a fifth cylinder (22), and a nozzle (12) is arranged in the oil spraying groove (17).
8. The automatic pipe clamp gasket device for road planing teeth according to claim 7, wherein an oil groove (13) is installed at an opening of the oil spraying groove (17), the bottom of the oil groove (13) is connected with the nozzle (12) through an oil conveying pipe (23), an oil pump (24) is installed on the oil conveying pipe (23), the supporting ring (21) is fixed in the oil groove (13), a step portion is arranged on the inner circumferential surface of the supporting ring (21), an oil draining net (34) is arranged at the top of the supporting ring (21), and a filtering net (35) is arranged at the step portion of the supporting ring (21).
9. The planing tooth automatic pipe clamping gasket device according to claim 8, characterized in that the support ring (21) and the oil draining screen (34) are connected by a spring (20).
CN202110109024.0A 2021-01-27 2021-01-27 Dig automatic top tube card gasket equipment of way tooth Active CN112792535B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110109024.0A CN112792535B (en) 2021-01-27 2021-01-27 Dig automatic top tube card gasket equipment of way tooth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110109024.0A CN112792535B (en) 2021-01-27 2021-01-27 Dig automatic top tube card gasket equipment of way tooth

Publications (2)

Publication Number Publication Date
CN112792535A CN112792535A (en) 2021-05-14
CN112792535B true CN112792535B (en) 2022-12-13

Family

ID=75812028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110109024.0A Active CN112792535B (en) 2021-01-27 2021-01-27 Dig automatic top tube card gasket equipment of way tooth

Country Status (1)

Country Link
CN (1) CN112792535B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114346642B (en) * 2021-12-22 2024-06-04 宁波艾尔通风设备有限公司 Rubber coating machine
CN117890616B (en) * 2024-03-14 2024-06-04 佳木斯大学 Sample batch pretreatment equipment for capsule medicine quality inspection

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106081623B (en) * 2016-07-28 2018-09-28 意力(广州)电子科技有限公司 Shift the device of rack automatically for product
CN108515122B (en) * 2018-05-23 2024-03-22 温州市奥信科技有限公司 Stacking and conveying device of punching machine
CN109048268B (en) * 2018-10-09 2023-10-17 深圳市鹏盈贸易有限公司 Full-automatic assembling production method for gear needle roller
CN110919361A (en) * 2019-12-25 2020-03-27 无锡阿尔法精密机械制造有限公司 Multi-station rotating disc type automatic assembly production line of combined rollers
CN111604662A (en) * 2020-06-09 2020-09-01 中山市尚研自动化设备有限公司 Gasket structure on handle

Also Published As

Publication number Publication date
CN112792535A (en) 2021-05-14

Similar Documents

Publication Publication Date Title
CN112792535B (en) Dig automatic top tube card gasket equipment of way tooth
CN109277817B (en) A kind of universal inlet valve seat production line
CN211991184U (en) Cutting equipment for machining automobile parts
CN202367409U (en) Engine cylinder body bowl plug servo gluing press fitting equipment
CN202292043U (en) Engine cylinder bowl plug servo gluing and press mounting machine tool
CN214393413U (en) Cut-off chamfering machine
CN109396383A (en) Motor rotor die-casting machine people's transfer matic
CN109772646B (en) Angle modulation ware sheath gap oiling device
CN218810271U (en) Quantitative canning equipment for producing synthetic cutting fluid
CN115420081B (en) Fork truck portal channel-section steel drainage device
CN110340415B (en) Shaft groove cutting machine
CN114832993B (en) Automatic conveying type paint spraying device for furniture processing
CN115999849A (en) Automatic grease injection machine
CN215046701U (en) Automatic feeding structure for pipe fittings
CN110640823B (en) Silica gel mud feeding machine
CN209792617U (en) Discharging device for lathe
CN111976025A (en) Arc cutting machine
CN112917219A (en) Automatic feeding device of numerical control cutting machine
CN220610982U (en) Oiling device
CN217200296U (en) Vibration dish feeding mechanism
CN220679546U (en) Steel pipe cutting sawing machine
CN214996056U (en) Dual-purpose building template construction maintenance equipment
CN216609330U (en) Automatic five-axis water jet cutting machine tool
CN212041093U (en) Milling cutter surface spouts material frock
CN221134847U (en) Full-automatic group attack group drill equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220329

Address after: 341100 No. 10 Taiyangping Road, Ganzhou high tech Industrial Development Zone, Ganxian District, Ganzhou City, Jiangxi Province

Applicant after: Ganzhou baoside Machinery Technology Co.,Ltd.

Address before: 214000 No.8 Yanggong Road, Yangming high tech Industrial Park, Liangxi District, Wuxi City, Jiangsu Province

Applicant before: Wuxi Simon Machinery Manufacturing Co.,Ltd.

GR01 Patent grant
GR01 Patent grant