Integrated construction equipment for superstructure of high-pile wharf and construction method thereof Download PDFInfo
- Publication number
- CN112695696A CN112695696A CN202110008294.2A CN202110008294A CN112695696A CN 112695696 A CN112695696 A CN 112695696A CN 202110008294 A CN202110008294 A CN 202110008294A CN 112695696 A CN112695696 A CN 112695696A
- Authority
- CN
- China
- Prior art keywords
- wharf
- pile
- hoisting
- superstructure
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 112
- 230000007246 mechanism Effects 0.000 claims abstract description 102
- 239000004567 concrete Substances 0.000 claims abstract description 36
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 19
- 239000010959 steel Substances 0.000 claims description 19
- 238000009434 installation Methods 0.000 claims description 11
- 238000000034 method Methods 0.000 claims description 9
- 238000012544 monitoring process Methods 0.000 claims description 3
- 239000002344 surface layer Substances 0.000 abstract description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- FGRBYDKOBBBPOI-UHFFFAOYSA-N 10,10-dioxo-2-[4-(N-phenylanilino)phenyl]thioxanthen-9-one Chemical compound O=C1c2ccccc2S(=O)(=O)c2ccc(cc12)-c1ccc(cc1)N(c1ccccc1)c1ccccc1 FGRBYDKOBBBPOI-UHFFFAOYSA-N 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/068—Landing stages for vessels
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
Abstract
The invention discloses integrated construction equipment and a construction method for an upper structure of a high-pile wharf, which are used for hoisting the upper structure of the wharf at a position close to water, wherein the high-pile wharf comprises a plurality of pile foundations vertically arranged at intervals, pile caps arranged at the tops of the pile foundations, concrete prefabricated members arranged at the tops of the pile caps and a cast-in-place surface layer used for slope placement of the wharf; the upper structure refers to a concrete prefabricated part placed at the top of the pile cap, and comprises a prefabricated cross beam, a prefabricated longitudinal beam and a prefabricated panel; the integrated construction equipment for the upper structure of the high-pile wharf comprises a truss mechanism, a pile cap and a walking device, wherein the truss mechanism is supported and arranged right above the pile cap; the hoisting mechanism is used for hoisting the plurality of concrete prefabricated parts to the pile caps to form a supporting plane; and the track mechanism is supported at the bottom of the integrated construction equipment and used for walking the integrated construction equipment. Can be widely applied to the technical field of wharf construction.
Description
Technical Field
The invention relates to the technical field of wharf construction. More particularly, the invention relates to integrated construction equipment for an upper structure of a high-pile wharf and a construction method thereof.
Background
With the gradual shortage of engineering construction period requirements and the worse construction environment, the assembled structure is gradually favored by people. In the field of wharf engineering, an assembled structure is still in a starting stage, and most wharfs still use the traditional design and construction method of a cast-in-place crossbeam. The reason restricting the development of the fabricated wharf is that the steel bars are interfered when the prefabricated longitudinal and transverse beam is erected, and the error in the erecting and placing process is not easy to control. In an assembly type wharf structure, in order to ensure the continuity of stress, a certain extending length is reserved at a node of a prefabricated longitudinal beam of the wharf, so that binding or welding is performed; and a certain extending length also needs to be reserved for the prefabricated beam. The reinforcing steel bars extending out of the longitudinal and transverse beams have interference at nodes, so that the erection difficulty is high. On the other hand, the prefabricated part is usually large in size, land transportation is often limited by local policies and natural conditions, water transportation can only be performed, the wharf is of a near-water structure, the influence of sea waves and tide often exists in the construction process, the water hoisting operation on a swaying crane ship is low in accuracy, low in efficiency and expensive in manufacturing cost. In summary, suitable integrated construction equipment and construction method for the superstructure of the high-pile wharf need to be developed, so that the rapid installation of the fabricated wharf structure is realized.
Disclosure of Invention
The invention aims to provide integrated construction equipment for an upper structure of a high-pile wharf and a construction method thereof.
To achieve these objects and other advantages in accordance with the purpose of the invention, a high pile wharf superstructure integrated construction equipment for performing a hoisting construction on a wharf superstructure in a waterside position,
the wharf upper structure comprises a plurality of pile foundations which are vertically arranged at intervals, and pile caps arranged at the tops of the pile foundations;
the integrated construction equipment for the upper structure of the high-pile wharf comprises,
the truss mechanism is supported and arranged right above the pile foundation, and a walking device is further arranged at the bottom of the truss mechanism;
hoisting machine constructs, relies on truss mechanism sets up for hoist and mount a plurality of concrete prefabricated parts extremely on the pile cap, form a supporting plane, the concrete prefabricated part includes: cross beams, longitudinal beams and panels;
the track mechanism is used for supporting the truss mechanism to walk; the pile cap comprises a concrete cast-in-place block which is arranged at the top of the pile foundation in a pouring mode, and a plurality of vertical reinforcing steel bars arranged on the cushion block.
Preferably, the truss mechanism includes:
the pair of door type vertical frames are oppositely arranged at intervals, the upper parts of the pair of door type vertical frames are not interfered with each other, and the lower parts of the pair of door type vertical frames are connected together through a pair of bases respectively;
the hoisting mechanism is arranged on the pair of door type vertical frames and positioned between the pair of door type vertical frames and can move along the length direction between the pair of door type vertical frames.
Preferably, the pile cap further comprises a rail, the rail is arranged at the top of the pile cap and is positioned at the bottom of the walking device, and the rail is matched with the walking device to enable the walking device to displace along the extending direction of the rail;
and the bottom of the track is also provided with a track mechanism fulcrum which is supported on the pile cap.
Preferably, the bottom of the base is provided with a plurality of vertical supporting legs, and the bottom of each supporting leg is further provided with a telescopic device for increasing or decreasing the length of the supporting leg.
Preferably, a sensing device is arranged at the hoisting position of the hoisting mechanism on the pile cap and used for monitoring the hoisting position of the hoisting mechanism.
Preferably, the pile cap further comprises a temporary anchor ear, specifically, a plurality of anchor cables, one end of each anchor cable is fixedly embedded into the concrete cast-in-place block of the pile cap, and the other end of each anchor cable is provided with a locking structure and can be temporarily locked on the steel bars on the pile cap.
A construction method of integrated construction equipment for a high-pile wharf superstructure comprises the steps of dividing the wharf superstructure at a waterside position into a plurality of sections for sequential construction, and sequentially transporting prefabricated parts to a preset installation position from the waterside side, wherein the construction of each section of the wharf superstructure comprises the following steps:
step S1, mounting the cross beam and the longitudinal beam, including transporting the cross beam or the longitudinal beam to the hoisting position of the truss mechanism, hoisting the cross beam or the longitudinal beam in sequence and erecting all the cross beams or the longitudinal beams on the pile cap;
if the cross beams are installed firstly, installing all the cross beams in each segment firstly and then installing the longitudinal beams of the corresponding segment, and if the longitudinal beams are installed firstly, installing all the longitudinal beams in each segment firstly and then installing the cross beams of the corresponding segment;
step S2, installing the panels, including transporting the panels to the hoisting positions of the truss mechanism, hoisting the panels in sequence and laying all the panels above the cross beams and the longitudinal beams to form the supporting plane;
step S3, pouring concrete on the supporting plane of the step S2, curing and completing the construction of the wharf superstructure of one section of the wharf;
and repeating the steps to finish the construction of the wharf superstructure of all the sections of the wharf in sequence.
Preferably, the wharf superstructure is divided into a plurality of sections for sequential construction, and further comprises the following steps when the truss mechanism is constructed from one construction section and then enters the next construction:
a1, moving the truss mechanism to the track at the beginning of the next construction section;
a2, utilizing the hydraulic telescopic device to lift the height of the truss mechanism until the walking device is vertically suspended over the track of the track mechanism;
a3, horizontally moving the track mechanism track to make the end of the track mechanism track far away from the truss mechanism in the step A2 be positioned right below the truss mechanism;
and A4, lowering the truss mechanism to enable the truss mechanism to be supported on the track of the track mechanism, and performing construction of the next construction section.
Preferably, a pair of extensions is formed at both ends of a pair of the portal stands of the truss device, and the length of the extensions protrudes from the horizontal area of the wharf superstructure;
the length of the concrete prefabricated part exceeds the distance between the pair of door type vertical frames, meanwhile, the width of the concrete prefabricated part is smaller than the distance between the pair of door type vertical frames, and during hoisting, the concrete prefabricated part is rotated to enable the length direction of the concrete prefabricated part to be consistent with the longitudinal bridge direction between the door type vertical frames;
wherein, the length of extension is greater than half of the length of precast concrete spare to guarantee the precast concrete spare can rotate smoothly.
Preferably, the method comprises the step of bundling the steel bars on the plurality of cushion blocks after the installation construction of the longitudinal beams and the transverse beams is completed.
The invention at least comprises the following beneficial effects:
1. by the aid of the integrated construction equipment erected at the pile cap of the wharf, onshore construction of the wharf under severe sea conditions is achieved, and accuracy of prefabricated part erection is guaranteed.
2. The integrated construction equipment has the advantages of low manufacturing cost, convenient transportation and reutilization; the water floating type operation ships such as a renting crane ship and the like are avoided, and the high cost of the ship and the aircraft is saved.
3. By adopting the construction method of the integrated construction equipment, the assembled wharf is free of wind waves, and the assembled wharf is beneficial to popularization and enhancement of the engineering construction efficiency.
4. The prefabricated longitudinal and transverse beam plates are erected to form a prefabricated surface layer of the wharf, so that the process of building a temporary channel for binding a cast-in-place beam is avoided, and the safety of construction of personnel on the wharf is guaranteed.
5. The design method of the assembled wharf is provided, the problem of interference of reinforcing steel bars at the joints of the longitudinal beams and the transverse beams is effectively solved, meanwhile, complicated welding of the reinforcing steel bars of the longitudinal beams and the transverse beams is avoided, and specifically, pile caps are enlarged to increase the installation positions of the intersection points of the longitudinal beams and the transverse beams.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
Fig. 1 is a schematic overall structure view of the integrated construction equipment for the superstructure of the high-piled wharf according to the present invention;
FIG. 2 is a top view of the integrated construction equipment for the superstructure of the high-piled wharf according to the present invention;
FIG. 3 is a schematic structural view of the pile cap of the present invention;
the specification reference numbers indicate: 1. hoisting mechanism, 2, truss mechanism, 201, portal frame 3, rotary lifting lug, 4, truss mechanism supporting leg, 5, track mechanism fulcrum, 6, track mechanism track, 7, pile cap, 8, running gear, 9, pile foundation, 701, concrete cast-in-place block, 702, reinforcing steel bar, 10 and telescoping device.
Detailed Description
The present invention is further described in detail below with reference to the attached drawings so that those skilled in the art can implement the invention by referring to the description text.
In the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
As shown in fig. 1-3, the integrated construction equipment for the superstructure of the high-pile wharf is used for hoisting the superstructure at a waterside position,
the wharf superstructure comprises a plurality of pile foundations 9 arranged vertically at intervals and pile caps 7 arranged at the tops of the pile foundations 9;
the integrated construction equipment for the upper structure of the high-pile wharf comprises,
the truss mechanism 2 is supported and arranged right above the pile foundation 9, and the bottom of the truss mechanism 2 is also provided with a walking device 8;
hoisting machine constructs 1, relies on truss mechanism 2 sets up for hoist and mount a plurality of concrete prefabricated parts extremely on the pile cap 7, form a supporting plane, the concrete prefabricated part includes: cross beams, longitudinal beams and panels;
the pile cap 7 comprises a concrete cast-in-place block 701 which is cast at the top of the pile foundation 9, and a plurality of steel bars 702 vertically arranged on the cushion block.
In the technical scheme, in the construction of the superstructure of the high-pile wharf, after the pouring construction of the pile caps 7 at the tops of the pile foundations 9 is completed, the truss mechanism 2 is erected on the pile caps 7, and then the concrete prefabricated components are hoisted to the top positions of all the pile foundations 9 one by one through the hoisting device and are arranged in the longitudinal direction and the transverse direction, so that all the construction procedures are completed;
after the construction of the prefabricated parts as a whole is completed, one of the prefabricated parts is transported to the hoisting position of the hoisting mechanism 1 by transportation equipment, including ships, vehicles and the like, and then the subsequent hoisting construction process is carried out; the clear distance between the berthed ship and the front line of the wharf in the construction period is not less than 1m, so that the ship is prevented from impacting a wharf structure under the swaying motion, and the specific safe distance is determined by combining natural conditions such as stormy waves, tides and the like; under the condition that the geology is clay, sandy soil and the like and the operation wave height is less than 1m, the berthing ship prefers a mooring system such as a positioning pile, and the like, so that the swaying motion of tidal ranges and waves to the ship is reduced, and the stability of the berthing ship and an upper component is improved. The ship can be turned over when berthing, and the prefabricated part is guaranteed to be in the hoisting range of the integrated construction equipment.
Further, the supporting position of the truss mechanism 2 is arranged on the opposite outer side of the pile cap 7 located on the upper structure of the high-pile wharf, the two ends of the truss mechanism 2 extend out of the coverage range of the upper structure of the high-pile wharf, and the truss mechanism is arranged in a suspending mode so as to conveniently hoist the prefabricated part.
Furthermore, in the design of the wharf, the longitudinal beam, the cross beam and the panel are all of prefabricated structures, the wharf surface which only needs to be put on a slope is of a cast-in-place structure, the prefabricated longitudinal beam and the prefabricated cross beam are both placed on the pile cap, and the panel is placed on the longitudinal cross beam. The longitudinal beam adopts the form of enlarging pile caps at the nodes, thereby ensuring that each connecting steel bar at the nodes of the longitudinal beam is not interfered and being convenient for erecting the longitudinal beam. The overhanging steel bars 702 of the outermost pile cap are staggered and reserved with a distance of about 25cm, so that the support points 5 of the track mechanism of the bridge crane can be conveniently erected.
In another aspect, the truss mechanism 2 includes:
a pair of door-type stands 201 which are arranged at intervals, wherein the upper parts of the door-type stands 201 are not interfered with each other, and the lower parts of the door-type stands 201 are connected together through a pair of bases 202;
the hoisting mechanism 1 is arranged on the pair of door type vertical frames 201 and positioned between the pair of door type vertical frames 201, and can move along the length direction between the pair of door type vertical frames 201.
In the above technical solution, a pair of portal vertical frames 201 can move along the length direction of the superstructure of the high-pile wharf, and after a section of the wharf is constructed, the portal vertical frames enter the next construction section, the bottom of the hoisting mechanism forms a hoisting point 3, and the position of the hoisting point 3 adopts a rotary hoisting tool.
In another technical scheme, the pile cap further comprises a rail mechanism rail 6 which is arranged at the top of the pile cap 7 and is positioned at the bottom of the traveling device 8, and the rail mechanism rail 6 is matched with the traveling device 8 to enable the traveling device 8 to displace along the extending direction of the rail mechanism rail 6;
and a track mechanism fulcrum 5 is further arranged at the bottom of the track mechanism track 6 and supported on the pile cap 7.
In the technical scheme, the track structure consists of a track structure support, a track, a steel box girder or a steel truss.
In another technical scheme, a plurality of vertical truss mechanism support legs 4 are arranged at the bottom of the base 202, and a telescopic device 10 is further arranged at the bottom of each truss mechanism support leg 4 and used for increasing or decreasing the length of each truss mechanism support leg 4.
In the above technical solution, the telescopic device 10 can be set as the hydraulic telescopic device 10, when the door type vertical frame 201 needs to move along the track mechanism track 6, the height of the telescopic device 10 is reduced, and when the door type vertical frame 201 moves to the preset position, the door type vertical frame 201 is lifted off the track mechanism track 6 through the telescopic device 10, so as to fix the position.
In another technical scheme, a sensing device is arranged at the hoisting position of the hoisting mechanism 1 on the pile cap 7 and used for monitoring the hoisting position of the hoisting device.
In the technical scheme, the sensing device is a GPS sensor and is used for positioning the real-time hoisting position of the hoisting mechanism 1, so that the hoisting reliability is ensured.
In another technical scheme, the pile cap 7 further includes a temporary anchor ear, specifically, a plurality of anchor cables, one end of each anchor cable is fixedly embedded in the concrete cast-in-place block 701 of the pile cap 7, and the other end of each anchor cable has a locking structure capable of being temporarily locked on the steel bar 702 on the pile cap 7.
A construction method of integrated construction equipment for a high-pile wharf superstructure comprises the steps of dividing the wharf superstructure at a waterside position into a plurality of sections for sequential construction, and sequentially transporting prefabricated parts to a preset installation position from the waterside side, wherein the construction of each section of the wharf superstructure comprises the following steps:
step S1, mounting the cross beam and the longitudinal beam, including transporting the cross beam or the longitudinal beam to the hoisting position of the truss mechanism 2, hoisting the cross beam or the longitudinal beam in sequence and erecting all the cross beams or the longitudinal beams on the pile cap 7;
if the cross beams are installed firstly, installing all the cross beams in each segment firstly and then installing the longitudinal beams of the corresponding segment, and if the longitudinal beams are installed firstly, installing all the longitudinal beams in each segment firstly and then installing the cross beams of the corresponding segment;
step S2, installing the panels, including transporting the panels to the hoisting positions of the truss mechanism 2, hoisting the panels in sequence and laying all the panels above the cross beams and the longitudinal beams to form the supporting plane;
step S3, pouring concrete on the supporting plane of the step S2, curing and completing the construction of the wharf superstructure of one section of the wharf;
and repeating the steps to finish the construction of the wharf superstructure of all the sections of the wharf in sequence.
Further, the division of the wharf superstructure into a plurality of sections for sequential construction further comprises the following steps when the truss mechanism 2 enters the next construction after the construction of one construction section is completed:
a1, moving the truss mechanism 2 to the track mechanism track at the beginning of the next construction section;
a2, utilizing the hydraulic telescopic device 10 to lift the height of the truss mechanism 2 until the walking device 8 is vertically suspended right above the track mechanism track 6;
a3, horizontally moving the track mechanism track 6, so that the end of the track mechanism track 6 far away from the truss mechanism 2 in the step a2 is positioned right below the truss mechanism 2;
and A4, lowering the truss mechanism 2, supporting the truss mechanism 2 on the track mechanism track 6, and constructing the next construction section.
In another technical solution, a pair of extensions is formed at two ends of a pair of portal frames 201 of the truss device, and the length of the extensions protrudes out of the horizontal area of the wharf superstructure;
the length of the concrete prefabricated member exceeds the distance between the pair of door type vertical frames 201, meanwhile, the width of the concrete prefabricated member is smaller than the distance between the pair of door type vertical frames 201, and during hoisting, the concrete prefabricated member is rotated to enable the length direction of the concrete prefabricated member to be consistent with the longitudinal bridge direction between the door type vertical frames 201, so that the concrete prefabricated member passes through the door type vertical frames with a smaller side;
wherein the length of the extension is greater than half of the length of the concrete pre-form.
In another technical scheme, after the installation construction of the longitudinal beams and the transverse beams is completed, a binding procedure is performed on the steel bars 702 on the cushion blocks.
The first embodiment is as follows:
the integrated construction equipment is supported on pile caps of two rows of piles at the outermost side of the wharf through anchoring support structures such as solid steel bars, so that the structure of the integrated construction equipment is supported, and the length of the structure extension part is reduced; by reasonably arranging the steel bars 702, the interference of the externally extending steel bars 702 of the wharf pile cap on the solid steel bars is avoided; meanwhile, the track mechanism fulcrum 5 is located close to the outer side of the pile cap, so that the track mechanism track 6 and the portal structure are staggered from the position of the shaft longitudinal beam, and the shaft longitudinal beam is convenient to mount. And a track mechanism track 6 spanning 3 bent frames is arranged on a track mechanism fulcrum 5, so that the integrated construction equipment moves along the longitudinal direction of the wharf, and the integrated construction equipment is combined with the transverse movement of a crown block, so that the lifting of all longitudinal beams of the wharf surface layer can be ensured. Considering the characteristics of the wharf structure, the integrated construction equipment is provided with the overhanging end with a certain length, so that the beam can be taken off on the sea or on the land.
In a second embodiment, the step of mounting the cross beam includes:
1: completing conventional overwater pile sinking and pile cap pouring operation, and prefabricating a beam plate in a prefabrication plant;
2: assembling integrated construction equipment on 2 bent frames with pile caps formed on the wharf;
3: transporting the prefabricated beam and the transverse boundary beam to the front edge of the wharf through the ship;
4: the integrated construction equipment comprises a crown block, a cross beam, a through hole and a lifting device, wherein the crown block transversely moves to the position above a berthing ship at the front edge of a wharf, lifts the cross beam and rotates by 90 degrees to pass through the hole, and the crown block transports the cross beam to the position above a designed position for erection; sequentially erecting all the cross beams on the bent frame;
5: the integrated construction equipment crown block moves transversely above a berthing ship at the front edge of a wharf, and after the side beam is lifted, the side beam is lifted by a cantilever beam;
6: the integrated construction equipment is shifted to the next row of racks, and the steps 3 to 5 of the second embodiment are repeated to complete the installation of all the cross beams of the wharf section;
in a third embodiment, the stringer mounting step includes:
transporting the prefabricated longitudinal beam and the prefabricated longitudinal edge beam to the front edge of the wharf through the ship;
1: longitudinally moving an integrated construction equipment crown block to a position above a designed longitudinal beam to ensure that the center of the integrated construction equipment is consistent with the center of the longitudinal beam in the longitudinal direction of the wharf;
2: the integrated construction equipment comprises a crown block, a longitudinal beam, a through hole, a crown block and a lifting device, wherein the crown block transversely moves to the position above a berthed ship at the front edge of a wharf, lifts the longitudinal beam and rotates by 90 degrees, the longitudinal beam rotates by 90 degrees after passing through the through hole, and the crown block transports the longitudinal beam to the position above a designed position for erection; sequentially putting all the longitudinal beams on the bent frame;
3: the integrated construction equipment crown block moves transversely above a berthed ship at the front edge of a wharf, and after a longitudinal beam is lifted, the side longitudinal beam is lifted in a cantilever manner;
4: the integrated construction equipment is shifted to the next row of racks, and the steps 1 to 3 of the third embodiment are repeated to complete the installation of all the longitudinal beams and the side longitudinal beams of the wharf section;
in a fourth embodiment, the panel mounting step includes:
transporting the prefabricated panels and the side plates to the front edge of the wharf through the ship;
1: the integrated construction equipment is transversely moved above a berthing ship at the front edge of the wharf, the wharf panel is lifted and rotated by 90 degrees through a hole, the wharf panel is rotated by 90 degrees after the hole is passed, and the wharf is transported to the position above the designed position by a crane for erection; sequentially putting all panels on the bent;
2: the integrated construction equipment crown block moves transversely above a berthing ship at the front edge of a wharf, and after the side plate is lifted, the side longitudinal beam is lifted in a cantilever manner; and (5) completing the installation of the wharf section part and all prefabricated parts. After the prefabricated panel frame is placed, the steel bar binding work of longitudinal and transverse beam nodes and the wharf cast-in-place surface layer can be synchronously carried out, and after the steel bar binding is finished, the upper concrete of the wharf segment is poured at one time.
While embodiments of the invention have been described above, it is not limited to the applications set forth in the description and the embodiments, which are fully applicable in various fields of endeavor to which the invention pertains, and further modifications may readily be made by those skilled in the art, it being understood that the invention is not limited to the details shown and described herein without departing from the general concept defined by the appended claims and their equivalents.
Claims (10)
1. The integrated construction equipment for the upper structure of the high-pile wharf is used for hoisting the upper structure of the wharf at the position close to water and is characterized in that,
the wharf upper structure comprises a plurality of pile foundations which are vertically arranged at intervals, and pile caps arranged at the tops of the pile foundations;
the integrated construction equipment for the upper structure of the high-pile wharf comprises,
the truss mechanism is supported and arranged right above the pile cap, and a walking device is further arranged at the bottom of the truss mechanism;
hoisting machine constructs, relies on truss mechanism sets up for hoist and mount a plurality of concrete prefabricated parts extremely on the pile cap, form a supporting plane, the concrete prefabricated part includes: cross beams, longitudinal beams and panels;
the track mechanism is used for supporting the truss mechanism to walk;
the pile cap comprises a concrete cast-in-place block which is arranged at the top of the pile foundation in a pouring mode, and a plurality of steel bars which are vertically arranged on the concrete cast-in-place block.
2. The elevated pile wharf superstructure integrated construction equipment of claim 1, wherein the truss mechanism comprises:
the pair of door type vertical frames are oppositely arranged at intervals, the upper parts of the pair of door type vertical frames are not interfered with each other, and the lower parts of the pair of door type vertical frames are connected together through a pair of bases respectively;
the hoisting mechanism is arranged on the pair of door type vertical frames and positioned between the pair of door type vertical frames and can move along the length direction between the pair of door type vertical frames.
3. The integrated construction equipment for the superstructure of the high-pile wharf according to claim 1, wherein the rail mechanism comprises a rail mechanism rail disposed at the top of the pile cap at the bottom of the traveling device, the rail mechanism rail cooperating with the traveling device to displace the traveling device along the extending direction of the rail mechanism rail;
and the bottom of the track mechanism track is also provided with a track mechanism fulcrum which is supported on the pile cap.
4. The integrated construction equipment of the superstructure of the high-piled wharf according to claim 1, wherein the bottom of the base is provided with a plurality of vertical legs, and the bottom of the legs is further provided with a telescopic device for raising or lowering the length of the legs.
5. The integrated construction equipment for the superstructure of the high-pile wharf according to claim 1, wherein a sensing device is arranged on the pile cap at a hoisting position of the hoisting mechanism for monitoring the hoisting position of the hoisting device.
6. The integrated construction equipment for the superstructure of the high-pile wharf as claimed in claim 1, wherein the pile cap further comprises a temporary anchor ear, specifically, a plurality of anchor cables, one end of each anchor cable is fixedly embedded in the concrete cast-in-place block of the pile cap, and the other end of each anchor cable is provided with a locking structure capable of being temporarily locked on the steel bars on the pile cap.
7. The construction method of the high pile wharf superstructure integrated construction equipment according to claims 1-6, wherein the wharf superstructure at a waterside position is divided into a plurality of sections for sequential construction, and the prefabricated parts are sequentially transported from the waterside to a preset installation position, and the construction of each section of the wharf superstructure comprises the following steps:
step S1, mounting the cross beam and the longitudinal beam, including transporting the cross beam or the longitudinal beam to the hoisting position of the truss mechanism, hoisting the cross beam or the longitudinal beam in sequence and erecting all the cross beams or the longitudinal beams on the pile cap;
if the cross beams are installed firstly, installing all the cross beams in each segment firstly and then installing the longitudinal beams of the corresponding segment, and if the longitudinal beams are installed firstly, installing all the longitudinal beams in each segment firstly and then installing the cross beams of the corresponding segment;
step S2, installing the panels, including transporting the panels to the hoisting positions of the truss mechanism, hoisting the panels in sequence and laying all the panels above the cross beams and the longitudinal beams to form the supporting plane;
step S3, pouring concrete on the supporting plane of the step S2, curing and completing the construction of the wharf superstructure of one section of the wharf;
and repeating the steps to finish the construction of the wharf superstructure of all the sections of the wharf in sequence.
8. The method of claim 7, wherein the construction of the integrated construction equipment of the wharf superstructure is divided into a plurality of sections, and the construction of the wharf superstructure comprises the following steps when the truss mechanism is constructed from one construction section and then enters the next construction:
a1, moving the truss mechanism to the track mechanism track at the beginning of the next construction section;
a2, utilizing the hydraulic telescopic device to lift the height of the truss mechanism until the walking device is vertically suspended over the track of the track mechanism;
a3, horizontally moving the track mechanism track to make the end of the track mechanism track far away from the truss mechanism in the step A2 be positioned right below the truss mechanism;
and A4, lowering the truss mechanism to enable the truss mechanism to be supported on the track of the track mechanism, and performing construction of the next construction section.
9. The construction method of the high pile wharf superstructure integrated construction equipment according to claim 7,
a pair of extending parts are formed at two ends of the pair of door type vertical frames of the truss device, and the length of the extending parts protrudes out of the horizontal area of the wharf superstructure;
the length of the concrete prefabricated part exceeds the distance between the pair of door type vertical frames, and the concrete prefabricated part is rotated during hoisting so that the length direction of the concrete prefabricated part is consistent with the longitudinal bridge direction between the door type vertical frames;
wherein the length of the extension is greater than half of the length of the concrete pre-form.
10. The construction method of the integrated construction equipment for the superstructure of the high-pile wharf according to claim 7, wherein the construction method comprises a step of binding the steel bars on the plurality of the cushion blocks after the installation construction of the longitudinal beams and the cross beams is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110008294.2A CN112695696A (en) | 2021-01-05 | 2021-01-05 | Integrated construction equipment for superstructure of high-pile wharf and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110008294.2A CN112695696A (en) | 2021-01-05 | 2021-01-05 | Integrated construction equipment for superstructure of high-pile wharf and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112695696A true CN112695696A (en) | 2021-04-23 |
Family
ID=75514745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110008294.2A Pending CN112695696A (en) | 2021-01-05 | 2021-01-05 | Integrated construction equipment for superstructure of high-pile wharf and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112695696A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114922132A (en) * | 2022-05-19 | 2022-08-19 | 中交第二航务工程局有限公司 | High-pile wharf upper structure part materialized construction method based on combined inclined piles |
CN114991072A (en) * | 2022-05-20 | 2022-09-02 | 中交第二航务工程局有限公司 | Inter-pile mud dredging and stone throwing operation platform for high-pile wharf and operation method |
CN115362292A (en) * | 2022-07-06 | 2022-11-18 | 中交第二航务工程局有限公司 | Novel superstructure of high-pile wharf and construction equipment and construction method thereof |
CN116556397A (en) * | 2023-05-12 | 2023-08-08 | 中交第二航务工程局有限公司 | Photovoltaic multifunctional construction equipment and construction method for offshore beach fixed tubular pile |
-
2021
- 2021-01-05 CN CN202110008294.2A patent/CN112695696A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114922132A (en) * | 2022-05-19 | 2022-08-19 | 中交第二航务工程局有限公司 | High-pile wharf upper structure part materialized construction method based on combined inclined piles |
CN114991072A (en) * | 2022-05-20 | 2022-09-02 | 中交第二航务工程局有限公司 | Inter-pile mud dredging and stone throwing operation platform for high-pile wharf and operation method |
CN115362292A (en) * | 2022-07-06 | 2022-11-18 | 中交第二航务工程局有限公司 | Novel superstructure of high-pile wharf and construction equipment and construction method thereof |
CN115362292B (en) * | 2022-07-06 | 2023-08-18 | 中交第二航务工程局有限公司 | High pile wharf superstructure and construction equipment and construction method thereof |
WO2024007203A1 (en) * | 2022-07-06 | 2024-01-11 | 中交第二航务工程局有限公司 | New superstructure for high-piled wharf, and construction apparatus and construction method therefor |
CN116556397A (en) * | 2023-05-12 | 2023-08-08 | 中交第二航务工程局有限公司 | Photovoltaic multifunctional construction equipment and construction method for offshore beach fixed tubular pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112695696A (en) | Integrated construction equipment for superstructure of high-pile wharf and construction method thereof | |
CN111794119B (en) | Temporary supporting system and hoisting method for basket type steel box tie bar arch | |
CN102720140A (en) | Large-span prestress concrete continuous beam deepwater pier construction process | |
CN105603881A (en) | Integral erecting system for large sea-crossing arch bridge and construction method thereof | |
US8555599B2 (en) | Method for the construction of a civil engineering structure and associated system | |
CN106088120B (en) | A kind of cofferdam decentralization construction method | |
CN215329670U (en) | Integrated construction equipment for superstructure of high-pile wharf | |
CN110820519A (en) | Tunnel arch bridge convenient for rapid construction and construction method thereof | |
CN113026563B (en) | Suspension bridge high-low displacement girder trestle girder hoisting facility and construction method thereof | |
CN109653101A (en) | A kind of erection method of the trestle for bridge construction | |
US5216773A (en) | Method of formation and installation of a floating bridge | |
CN113863736B (en) | Construction process of continuous-span common-column C-shaped stock yard | |
CN114933247B (en) | Intelligent construction equipment and construction process thereof | |
CN115961549A (en) | Rear-feeding beam type erection construction method for large-tonnage whole-section steel beam of cable-stayed bridge | |
CN115652859A (en) | Integral installation method for offshore pile foundation marine building superstructure | |
CN114701949A (en) | Method for installing main girder of bridge crane of main power house of pump station | |
CN211735477U (en) | A tower crane foundation structure for bridge tower construction | |
CN211171563U (en) | Tunnel arch bridge convenient to quick construction | |
CN113482047A (en) | Pipe gallery installation method | |
CN112523097A (en) | Large-span bridge gantry crane and construction method thereof | |
CN115362292B (en) | High pile wharf superstructure and construction equipment and construction method thereof | |
CN113897968B (en) | Mounting system for assembling, sinking and positioning water surface under water-moving condition of block-type hydraulic building | |
CN118792965A (en) | Construction method for erecting prefabricated box girder of bent steel structure system bridge | |
CN117266220A (en) | Construction method for pile tops of fabricated wharf | |
JPH081057B2 (en) | How to build artificial ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220216 Address after: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province Applicant after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd. Applicant after: CCCC Wuhan harbor engineering design and Research Institute Co., Ltd Address before: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province Applicant before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd. |