CN112613620A - Power distribution network emergency repair command system, power distribution network emergency repair method, device and processor - Google Patents

Power distribution network emergency repair command system, power distribution network emergency repair method, device and processor Download PDF

Info

Publication number
CN112613620A
CN112613620A CN202011376850.3A CN202011376850A CN112613620A CN 112613620 A CN112613620 A CN 112613620A CN 202011376850 A CN202011376850 A CN 202011376850A CN 112613620 A CN112613620 A CN 112613620A
Authority
CN
China
Prior art keywords
terminal
emergency repair
repair
distribution network
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011376850.3A
Other languages
Chinese (zh)
Inventor
刘若溪
车瑶
刘宏亮
侯宇程
王智晖
王帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202011376850.3A priority Critical patent/CN112613620A/en
Publication of CN112613620A publication Critical patent/CN112613620A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The application provides a command system, distribution network salvage method, device and treater are salvageed to distribution network, and this system includes: the emergency repair command center is in communication connection with the power distribution network information management systems and used for receiving fault information reported by the power distribution network information management systems and generating emergency repair tasks according to the fault information, and each power distribution network information management system comprises a power distribution scheduling system, a power utilization information acquisition system, a production management system, a geographic information system and a customer service system; the first terminal is in communication connection with the emergency repair command center and used for receiving emergency repair tasks, and the first terminal is a vehicle-mounted communication terminal of the emergency repair vehicle; the second terminal is in communication connection with the emergency repair command center and used for receiving emergency repair tasks, and the second terminal is a mobile communication terminal of emergency repair personnel; and the third terminal is in communication connection with the emergency repair command center and used for receiving emergency repair tasks, and the third terminal is a mobile phone of an appointed person. The method greatly improves the efficiency of emergency repair of the power distribution network.

Description

Power distribution network emergency repair command system, power distribution network emergency repair method, device and processor
Technical Field
The application relates to the technical field of power distribution network emergency repair, in particular to a power distribution network emergency repair command system, a power distribution network emergency repair method, a power distribution network emergency repair device, a computer readable storage medium and a processor.
Background
The existing urban power distribution network information management system is various in name and massive in information in various forms, wherein related information of distribution network fault emergency repair services is scattered in the existing systems, so that the emergency repair services are lack of uniform and reliable information support, efficient information transmission means are lacked between headquarter commanders and field emergency repair teams, headquarters cannot master fault field conditions at the first time, and the informatization level of the whole emergency repair process is low.
At present, the emergency repair service of the urban distribution network is not supported by a special information system, and the systems such as a PMS, a GIS, a marketing system, 95598, a DMS and the like which are already applied in a national network system do not independently design corresponding modules for the service. Aiming at the problem, the invention provides a design scheme of an urban power distribution network emergency repair command system, the scheme provides a framework of the whole command system, and further designs a power distribution network emergency repair business process and a communication mode which are suitable for the framework mode, so that the design scheme has certain practicability.
The existing urban power distribution network information management system is various in name and massive in information in various forms, wherein related information of distribution network fault emergency repair services is scattered in the existing systems, so that the emergency repair services are lack of uniform and reliable information support, efficient information transmission means are lacked between headquarter commanders and field emergency repair teams, headquarters cannot master fault field conditions at the first time, and the informatization level of the whole emergency repair process is low.
The above information disclosed in this background section is only for enhancement of understanding of the background of the technology described herein and, therefore, certain information may be included in the background that does not form the prior art that is already known in this country to a person of ordinary skill in the art.
Disclosure of Invention
The application mainly aims to provide a power distribution network emergency repair command system, a power distribution network emergency repair method, a power distribution network emergency repair device, a computer readable storage medium and a processor, so as to solve the problem that in the prior art, the efficiency of power distribution network emergency repair is low.
According to an aspect of the embodiments of the present invention, there is provided a power distribution network emergency repair command system, including: the emergency repair command center is in communication connection with the power distribution network information management systems and is used for receiving fault information reported by the power distribution network information management systems and generating emergency repair tasks according to the fault information, and each power distribution network information management system comprises a power distribution scheduling system, a power utilization information acquisition system, a production management system, a geographic information system and a customer service system; the first terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the first terminal is a vehicle-mounted communication terminal of an emergency repair vehicle; the second terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the second terminal is a mobile communication terminal of emergency repair personnel; and the third terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the third terminal is a mobile phone of a designated person.
Optionally, the emergency repair command center includes: the fault reason determining module is in communication connection with the power distribution network information management system and used for analyzing fault reasons according to the fault information; the emergency repair task management module is in communication connection with the fault reason determination module and is used for generating an emergency repair task according to the fault reason and receiving emergency repair information fed back in the process of executing the emergency repair task; the emergency repair effect evaluation module is in communication connection with the emergency repair task management module and is used for evaluating the emergency repair effect of the emergency repair task according to the emergency repair information; the management module is in communication connection with the fault reason determination module, the emergency maintenance task management module and the emergency maintenance effect evaluation module and is used for managing the work of the fault reason determination module, the emergency maintenance task management module and the emergency maintenance effect evaluation module.
Optionally, the system further comprises: the first terminal and the second terminal comprise a GPS satellite receiving module, a GPRS wireless communication module and a GIS geographic information module, and the emergency repair command center comprises a server.
Optionally, the emergency repair command center, the first terminal, the second terminal and the third terminal communicate with the Internet through a GPRS wireless network, and the emergency repair command center communicates with the power distribution network information management system through an intranet.
According to another aspect of the embodiments of the present invention, a method for emergency repair of a power distribution network is further provided, where a power distribution network emergency repair command system includes an emergency repair command center, a first terminal, a second terminal, and a third terminal, where the emergency repair command center is in communication connection with a plurality of power distribution network information management systems, and is configured to receive fault information reported by the power distribution network information management systems, and generate an emergency repair task according to the fault information, the power distribution network information management system includes a power distribution scheduling system, a power consumption information acquisition system, a production management system, a geographic information system, and a customer service system, the first terminal is in communication connection with the emergency repair command center, and is configured to receive the emergency repair task, the first terminal is a vehicle-mounted communication terminal of two emergency repair vehicles, the second terminal is in communication connection with the emergency repair command center, and is configured to receive the emergency repair task, the second terminal is a mobile communication terminal of a repair worker, the third terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, the third terminal is a mobile phone of a designated person, and the method comprises the following steps: receiving the fault information which is uploaded by the power distribution network information management system; analyzing the fault reason according to the fault information; generating the emergency repair task according to the fault reason; and sending the emergency repair task to the first terminal, the second terminal and the third terminal.
Optionally, after the emergency repair task is sent to the first terminal, the second terminal, and the third terminal, the method further includes: receiving first-aid repair information fed back by the first terminal, the second terminal and the third terminal; and evaluating the emergency repair effect of the emergency repair task according to the emergency repair information.
Optionally, after analyzing the failure cause according to the failure information, the method further includes: and sending the fault reason to the customer service system.
According to another aspect of the embodiments of the present invention, there is provided a device for emergency repair of a power distribution network, wherein a power distribution network emergency repair command system includes an emergency repair command center, a first terminal, a second terminal and a third terminal, the emergency repair command center is in communication connection with a plurality of power distribution network information management systems, and is configured to receive fault information reported by the power distribution network information management systems, and generate an emergency repair task according to the fault information, the power distribution network information management systems include a power distribution scheduling system, a power consumption information acquisition system, a production management system, a geographic information system and a customer service system, the first terminal is in communication connection with the emergency repair command center, and is configured to receive the emergency repair task, the first terminal is a vehicle-mounted communication terminal of two emergency repair vehicles, the second terminal is in communication connection with the emergency repair command center, and is configured to receive the emergency repair task, the second terminal is a mobile communication terminal of a maintenance worker, the third terminal, with salvage command center communication connection for receive salvage the task, the third terminal is appointed personnel's mobile phone, the device includes: the receiving unit is used for receiving the fault information, and the fault information is uploaded by the power distribution network information management system; the analysis unit is used for analyzing a fault reason according to the fault information; the generating unit is used for generating an emergency repair task according to the fault reason; and the first sending unit is used for sending the emergency repair task to the first terminal, the second terminal and the third terminal.
According to still another aspect of embodiments of the present invention, there is also provided a computer-readable storage medium including a stored program, wherein the program executes any one of the methods.
According to still another aspect of the embodiments of the present invention, there is further provided a processor, configured to execute a program, where the program executes any one of the methods.
In the embodiment of the present invention, in the method for emergency repair of a power distribution network, first, the fault information is received, where the fault information is uploaded by the power distribution network information management system, then, a fault cause is analyzed according to the fault information, then, the emergency repair task is generated according to the fault cause, and finally, the emergency repair task is sent to the first terminal, the second terminal, and the third terminal. According to the method, the emergency repair command center integrates the plurality of power distribution network information management systems, so that the fault information of the power distribution network is comprehensively and quickly mastered, the emergency repair command center directly sends emergency repair tasks to corresponding emergency repair vehicles, emergency repair personnel and terminal equipment of designated personnel, the communication efficiency between headquarter commanders and on-site emergency repair teams is improved, the emergency repair efficiency of the power distribution network is greatly improved, and the problem of low emergency repair efficiency of the power distribution network in the prior art is solved.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate embodiments of the application and, together with the description, serve to explain the application and are not intended to limit the application. In the drawings:
fig. 1 shows a schematic diagram of a power distribution network emergency repair command system according to an embodiment of the present application;
figure 2 illustrates a functional framework diagram of a first aid repair command center according to one embodiment of the present application;
figure 3 illustrates a flow diagram of a method of power distribution network emergency repair according to an embodiment of the present application;
fig. 4 shows a schematic view of a device for emergency repair of an electrical distribution network according to an embodiment of the present application.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
It will be understood that when an element such as a layer, film, region, or substrate is referred to as being "on" another element, it can be directly on the other element or intervening elements may also be present. Also, in the specification and claims, when an element is described as being "connected" to another element, the element may be "directly connected" to the other element or "connected" to the other element through a third element.
As mentioned in the background art, in order to solve the above problems, in the prior art, the power distribution network emergency repair efficiency is low, and in an exemplary embodiment of the present application, a power distribution network emergency repair command system, a power distribution network emergency repair method, an apparatus, a computer-readable storage medium, and a processor are provided.
According to the embodiment of this application, a command system is salvageed to distribution network is provided, as shown in fig. 1, above-mentioned command system is salvageed to distribution network includes:
the emergency repair command center is in communication connection with a plurality of power distribution network information management systems and is used for receiving fault information reported by the power distribution network information management systems and generating emergency repair tasks according to the fault information, and each power distribution network information management system comprises a power distribution scheduling system, a power utilization information acquisition system, a production management system, a geographic information system and a customer service system;
the first terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the first terminal is a vehicle-mounted communication terminal of an emergency repair vehicle;
the second terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the second terminal is a mobile communication terminal of emergency repair personnel;
and the third terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the third terminal is a mobile phone of a designated person.
In the power distribution network emergency repair command system, the emergency repair command center is in communication connection with a plurality of power distribution network information management systems, namely the emergency repair command center is in communication connection with the power distribution scheduling system, the power consumption information acquisition system, the production management system, the geographic information system and the customer service system, so as to acquire fault information reported by the power distribution network information management system, thereby generating an emergency repair task according to the fault information, and then sending the emergency repair task to the corresponding first terminal, the second terminal and the third terminal, namely sending the emergency repair task to the vehicle-mounted communication terminals of the corresponding emergency repair vehicles, the mobile communication terminals of the emergency repair personnel and the mobile phones of designated personnel, so as to command the vehicles, and the emergency repair personnel and the designated personnel complete the emergency repair task. The distribution network emergency repair command system integrates the distribution network information management systems through the emergency repair command center, so that fault information of the distribution network is comprehensively and quickly mastered, the emergency repair command center is in communication connection with two emergency repair vehicles, emergency repair personnel and terminal equipment of designated personnel, communication efficiency between headquarters command personnel and a field emergency repair team is improved, emergency repair efficiency of the distribution network is greatly improved, and the problem of low emergency repair efficiency of the distribution network in the prior art is solved.
In an embodiment of the application, the emergency repair command center includes a fault cause determination module, an emergency repair task management module, an emergency repair effect evaluation module and a management module, wherein the fault cause determination module is in communication connection with the power distribution network information management system and is used for analyzing a fault cause according to the fault information; the emergency repair task management module is in communication connection with the fault reason determination module and is used for generating the emergency repair task according to the fault reason and receiving emergency repair information fed back in the process of executing the emergency repair task; the emergency repair effect evaluation module is in communication connection with the emergency repair task management module and is used for evaluating the emergency repair effect of the emergency repair task according to the emergency repair information; the management module is in communication connection with the fault reason determining module, the emergency repair task management module and the emergency repair effect evaluation module, and is used for managing the work of the fault reason determining module, the emergency repair task management module and the emergency repair effect evaluation module. Specifically, the emergency repair command center generates an emergency repair task corresponding to fault information through the coordination work of the fault reason determining module, the emergency repair task management module, the emergency repair effect evaluation module and the management module, so that the unified command on the on-site emergency repair is realized, and the efficiency of the emergency repair of the power distribution network is further improved.
More specifically, as shown in fig. 2, the emergency repair command center communicates with the power distribution dispatching system, the electricity consumption information collection system, the production management system, the geographic information system, the customer service system and other systems by using an information interaction bus to obtain fault information and feed back emergency repair effects, the fault reason determination module comprises a plurality of sub-modules which are respectively used for fault information combination, fault point positioning and inspection route planning to perform fault positioning according to the fault information, thereby planning a proper inspection route and improving emergency repair efficiency, the emergency repair task management module comprises a plurality of sub-modules which are respectively used for emergency repair plan management, emergency repair resource allocation, emergency repair site communication management and emergency repair information reporting management to generate corresponding emergency repair tasks to realize unified allocation of site emergency repair work, and the emergency repair effect evaluation module comprises a plurality of sub-modules, a plurality of submodule pieces are used for carrying out the evaluation of rush-repair personnel according to the rush-repair information fed back respectively, the evaluation of rush-repair technology, the evaluation of rush-repair materials and the evaluation of rush-repair funds, a rush-repair task management module also comprises a plurality of submodule pieces, a plurality of submodule pieces are used for authority management respectively, system management, log management, report management and integrated service management with other systems, the fault reason determining module is managed, the work of the rush-repair task management module and the rush-repair effect evaluation module is managed, and meanwhile the normal operation of the distribution network rush-repair command system is maintained.
In an embodiment of the present application, the system further includes: the first terminal and the second terminal comprise a GPS satellite receiving module, a GPRS wireless communication module and a GIS geographic information module, and the emergency repair command center comprises a server. Specifically, the first terminal and the second terminal carry out images with the server of the emergency repair command center through the GPS satellite receiving module and the GPRS wireless communication module, the position information of emergency repair personnel and emergency repair vehicles is uploaded through the GIS geographic information module, the emergency repair command center can master the positions of the emergency repair personnel and the emergency repair vehicles, emergency repair task arrangement is carried out according to the nearby principle, and the efficiency of emergency repair of the power distribution network is further improved.
In an embodiment of the application, as shown in fig. 1, the emergency repair command center, the first terminal, the second terminal, and the third terminal communicate with the Internet through a GPRS wireless network, and the emergency repair command center communicates with the distribution network information management system through an intranet. Specifically, the first terminal, the second terminal and the third terminal are connected to a GPRS wireless network, the emergency repair command center is connected with the GPRS wireless network through the Internet, the emergency repair command center is achieved, the first terminal is achieved, communication connection is achieved between the second terminal and the third terminal, the emergency repair command center is communicated with the power distribution network information management system through an intranet, information leakage of a power distribution network is avoided, information safety can be improved, in addition, communication can be achieved through a communication satellite between the first terminal and the second terminal, the problem that real-time communication cannot be achieved between emergency repair personnel and emergency repair vehicles due to the fact that the GPRS wireless network is unstable is avoided, communication stability is improved, and efficiency of emergency repair of the power distribution network is further improved.
According to the embodiment of the application, a method for rush-repair of a power distribution network is provided, wherein a power distribution network rush-repair command system comprises a rush-repair command center, a first terminal, a second terminal and a third terminal, the rush-repair command center is in communication connection with a plurality of power distribution network information management systems and is used for receiving fault information reported by the power distribution network information management systems and generating rush-repair tasks according to the fault information, the power distribution network information management systems comprise a power distribution dispatching system, a power utilization information acquisition system, a production management system, a geographic information system and a customer service system, the first terminal is in communication connection with the rush-repair command center and is used for receiving the rush-repair tasks, the first terminal is a vehicle-mounted communication terminal of two rush-repair vehicles, the second terminal is in communication connection with the rush-repair command center and is used for receiving the rush-repair tasks, and the second terminal is a mobile communication terminal of rush-repair personnel, the third terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the third terminal is a mobile phone of a designated person.
Fig. 3 is a flowchart of a method for emergency repair of a power distribution network according to an embodiment of the present application. As shown in fig. 3, the method comprises the steps of:
step S101, receiving the fault information, wherein the fault information is uploaded by the power distribution network information management system;
step S102, analyzing the fault reason according to the fault information;
step S103, generating the first-aid repair task according to the fault reason;
and step S104, sending the emergency repair task to the first terminal, the second terminal and the third terminal.
In the method for rush-repair of the power distribution network, firstly, the fault information is received and uploaded by the power distribution network information management system, then, the fault reason is analyzed according to the fault information, then, the rush-repair task is generated according to the fault reason, and finally, the rush-repair task is sent to the first terminal, the second terminal and the third terminal. According to the method, the emergency repair command center integrates the plurality of power distribution network information management systems, so that the fault information of the power distribution network is comprehensively and quickly mastered, the emergency repair command center directly sends emergency repair tasks to corresponding emergency repair vehicles, emergency repair personnel and terminal equipment of designated personnel, the communication efficiency between headquarter commanders and on-site emergency repair teams is improved, the emergency repair efficiency of the power distribution network is greatly improved, and the problem of low emergency repair efficiency of the power distribution network in the prior art is solved.
It should be noted that there are two ways for generating the fault information, one is power failure repair information received by the customer service system, and the other is fault information uploaded by the distribution automation or power equipment real-time monitoring system, and the judgment of the fault reason is based on the result of the inspection personnel after the field inspection, and the inspection personnel communicates with the repair command center through the portable mobile communication terminal to report the specific condition and arrival time of the fault. And for the fault which can be automatically processed by the inspection personnel, the inspection personnel reports to an emergency repair command center to apply for the development of emergency repair work, and for the fault which can not be automatically processed by the inspection personnel, the emergency repair command center uniformly allocates emergency repair work resources and communicates with the field work vehicle through the vehicle-mounted communication terminal of the emergency repair vehicle. And for the fault which can be automatically processed by the inspection personnel, the inspection personnel reports to an emergency repair command center to apply for the development of emergency repair work, and for the fault which can not be automatically processed by the inspection personnel, the emergency repair command center uniformly allocates emergency repair work resources and communicates with the field work vehicle through the vehicle-mounted communication terminal of the emergency repair vehicle. After the site emergency repair personnel arranged by the emergency repair command center confirm the fault section, the site condition is reported to the emergency repair command center and the isolation work of the fault section is applied. And after confirming the field condition, the emergency repair command center submits an emergency repair work application to distribution network scheduling. After the fault section is isolated, the emergency repair command center informs the customer service system of the specific power failure area and the predicted power failure time. The on-site emergency repair personnel contact the emergency repair command center through the handheld mobile communication terminal to report the emergency repair progress in time.
It should also be noted that the steps illustrated in the flowcharts of the figures may be performed in a computer system such as a set of computer-executable instructions and that, although a logical order is illustrated in the flowcharts, in some cases, the steps illustrated or described may be performed in an order different than presented herein.
In an embodiment of the application, after sending the emergency repair task to the first terminal, the second terminal, and the third terminal, the method further includes: receiving first-aid repair information fed back by the first terminal, the second terminal and the third terminal; and evaluating the emergency repair effect of the emergency repair task according to the emergency repair information. Specifically, after the emergency repair work is finished, the emergency repair command center needs to analyze the effect of the whole emergency repair process, especially needs to summarize the problems encountered in the emergency repair, and gives a specific response plan.
In an embodiment of the application, after analyzing the cause of the fault according to the fault information, the method further includes: and sending the fault reason to the customer service system. Specifically, after the confirmation, the headquarter rush-repair command center pushes the information reported by the patrol personnel to the customer service system so as to inform the customer.
The embodiment of the application further provides a device for rush repair of the power distribution network, and it needs to be explained that the device for rush repair of the power distribution network provided by the embodiment of the application can be used for executing the method for rush repair of the power distribution network provided by the embodiment of the application. The power distribution network emergency repair device provided by the embodiment of the application is introduced below, the power distribution network emergency repair command system comprises an emergency repair command center, a first terminal, a second terminal and a third terminal, the emergency repair command center is in communication connection with a plurality of power distribution network information management systems and is used for receiving fault information reported by the power distribution network information management systems and generating emergency repair tasks according to the fault information, the power distribution network information management systems comprise a power distribution dispatching system, a power consumption information acquisition system, a production management system, a geographic information system and a customer service system, the first terminal is in communication connection with the emergency repair command center and is used for receiving the emergency repair tasks, the first terminal is a vehicle-mounted communication terminal of two emergency repair vehicles, the second terminal is in communication connection with the emergency repair command center and is used for receiving the emergency repair tasks, and the second terminal is a mobile communication terminal of emergency repair personnel, the third terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the third terminal is a mobile phone of a designated person.
Fig. 4 is a schematic diagram of a device for emergency repair of a power distribution network according to an embodiment of the application. As shown in fig. 4, the apparatus includes:
a receiving unit 10, configured to receive the fault information, where the fault information is uploaded by the power distribution network information management system;
an analysis unit 20, configured to analyze a failure cause according to the failure information;
a generating unit 30, configured to generate an emergency repair task according to the failure cause;
a first sending unit 40, configured to send the emergency repair task to the first terminal, the second terminal, and the third terminal.
In the device for emergency repair of the power distribution network, a receiving unit receives the fault information uploaded by the power distribution network information management system, an analyzing unit analyzes a fault reason according to the fault information, a generating unit generates the emergency repair task according to the fault reason, and a sending unit sends the emergency repair task to the first terminal, the second terminal and the third terminal. The device integrates a plurality of power distribution network information management systems through the emergency repair command center, so that the fault information of the power distribution network is comprehensively and quickly mastered, the emergency repair command center directly sends emergency repair tasks to corresponding emergency repair vehicles, emergency repair personnel and terminal equipment of designated personnel, the communication efficiency between headquarter command personnel and on-site emergency repair teams is improved, the emergency repair efficiency of the power distribution network is greatly improved, and the problem of low emergency repair efficiency of the power distribution network in the prior art is solved.
It should be noted that there are two ways for generating the fault information, one is power failure repair information received by the customer service system, and the other is fault information uploaded by the distribution automation or power equipment real-time monitoring system, and the judgment of the fault reason is based on the result of the inspection personnel after the field inspection, and the inspection personnel communicates with the repair command center through the portable mobile communication terminal to report the specific condition and arrival time of the fault. And for the fault which can be automatically processed by the inspection personnel, the inspection personnel reports to an emergency repair command center to apply for the development of emergency repair work, and for the fault which can not be automatically processed by the inspection personnel, the emergency repair command center uniformly allocates emergency repair work resources and communicates with the field work vehicle through the vehicle-mounted communication terminal of the emergency repair vehicle. And for the fault which can be automatically processed by the inspection personnel, the inspection personnel reports to an emergency repair command center to apply for the development of emergency repair work, and for the fault which can not be automatically processed by the inspection personnel, the emergency repair command center uniformly allocates emergency repair work resources and communicates with the field work vehicle through the vehicle-mounted communication terminal of the emergency repair vehicle. After the site emergency repair personnel arranged by the emergency repair command center confirm the fault section, the site condition is reported to the emergency repair command center and the isolation work of the fault section is applied. And after confirming the field condition, the emergency repair command center submits an emergency repair work application to distribution network scheduling. After the fault section is isolated, the emergency repair command center informs the customer service system of the specific power failure area and the predicted power failure time. The on-site emergency repair personnel contact the emergency repair command center through the handheld mobile communication terminal to report the emergency repair progress in time.
In an embodiment of the application, after the emergency repair task is sent to the first terminal, the second terminal, and the third terminal, the apparatus further includes an evaluation unit, where the evaluation unit includes a receiving module and an evaluation module, where the receiving module is configured to receive emergency repair information fed back by the first terminal, the second terminal, and the third terminal; the evaluation module is used for evaluating the emergency repair effect of the emergency repair task according to the emergency repair information. Specifically, after the emergency repair work is finished, the emergency repair command center needs to analyze the effect of the whole emergency repair process, especially needs to summarize the problems encountered in the emergency repair, and gives a specific response plan.
In an embodiment of the application, the apparatus further includes a first sending unit, where the first sending unit is configured to send the fault reason to the customer service system after analyzing the fault reason according to the fault information. Specifically, after the confirmation, the headquarter rush-repair command center pushes the information reported by the patrol personnel to the customer service system so as to inform the customer.
The device for rush repair of the power distribution network comprises a processor and a memory, wherein the receiving unit, the analyzing unit, the generating unit, the first sending unit and the like are stored in the memory as program units, and the processor executes the program units stored in the memory to realize corresponding functions.
The processor comprises a kernel, and the kernel calls the corresponding program unit from the memory. The kernel can be set to be one or more than one, and the problem of low emergency repair efficiency of the power distribution network in the prior art is solved by adjusting the kernel parameters.
The memory may include volatile memory in a computer readable medium, Random Access Memory (RAM) and/or nonvolatile memory such as Read Only Memory (ROM) or flash memory (flash RAM), and the memory includes at least one memory chip.
An embodiment of the present invention provides a computer-readable storage medium, on which a program is stored, where the program, when executed by a processor, implements the method for emergency repair of a power distribution network.
The embodiment of the invention provides a processor, which is used for running a program, wherein the method for rush repair of a power distribution network is executed when the program runs.
The embodiment of the invention provides equipment, which comprises a processor, a memory and a program which is stored on the memory and can run on the processor, wherein when the processor executes the program, at least the following steps are realized:
step S101, receiving the fault information, wherein the fault information is uploaded by the power distribution network information management system;
step S102, analyzing the fault reason according to the fault information;
step S103, generating the first-aid repair task according to the fault reason;
and step S104, sending the emergency repair task to the first terminal, the second terminal and the third terminal.
The device herein may be a server, a PC, a PAD, a mobile phone, etc.
The present application further provides a computer program product adapted to perform a program of initializing at least the following method steps when executed on a data processing device:
step S101, receiving the fault information, wherein the fault information is uploaded by the power distribution network information management system;
step S102, analyzing the fault reason according to the fault information;
step S103, generating the first-aid repair task according to the fault reason;
and step S104, sending the emergency repair task to the first terminal, the second terminal and the third terminal.
In the above embodiments of the present invention, the descriptions of the respective embodiments have respective emphasis, and for parts that are not described in detail in a certain embodiment, reference may be made to related descriptions of other embodiments.
In the embodiments provided in the present application, it should be understood that the disclosed technology can be implemented in other ways. The above-described embodiments of the apparatus are merely illustrative, and for example, the above-described division of the units may be a logical division, and in actual implementation, there may be another division, for example, multiple units or components may be combined or may be integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, units or modules, and may be in an electrical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The integrated unit may be stored in a computer-readable storage medium if it is implemented in the form of a software functional unit and sold or used as a separate product. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a computer-readable storage medium and includes several instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned computer-readable storage media comprise: a U-disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a removable hard disk, a magnetic or optical disk, and other various media capable of storing program codes.
From the above description, it can be seen that the above-described embodiments of the present application achieve the following technical effects:
1) in the command system is salvageed to distribution network of this application, salvage command center and a plurality of distribution network information management system communication connection, promptly salvage command center and distribution scheduling system, power consumption information acquisition system, the production management system, geographic information system and customer service system communication connection, in order to obtain the fault information that distribution network information management system reported, thereby generate the task of salvageing according to the fault information, then send the task of salvageing to corresponding first terminal, second terminal and third terminal, be about to salvage the task and send the on-vehicle communication terminal of two corresponding breakdown lorries, salvage personnel's mobile communication terminal and appointed personnel's mobile phone, with the command vehicle two, salvage personnel and appointed personnel accomplish the task of salvageing. The distribution network emergency repair command system integrates the distribution network information management systems through the emergency repair command center, so that fault information of the distribution network is comprehensively and quickly mastered, the emergency repair command center is in communication connection with two emergency repair vehicles, emergency repair personnel and terminal equipment of designated personnel, communication efficiency between headquarters command personnel and a field emergency repair team is improved, emergency repair efficiency of the distribution network is greatly improved, and the problem of low emergency repair efficiency of the distribution network in the prior art is solved.
2) According to the method for the emergency maintenance of the power distribution network, firstly, the fault information is received and uploaded by the power distribution network information management system, then, the fault reason is analyzed according to the fault information, then, the emergency maintenance task is generated according to the fault reason, and finally, the emergency maintenance task is sent to the first terminal, the second terminal and the third terminal. According to the method, the emergency repair command center integrates the plurality of power distribution network information management systems, so that the fault information of the power distribution network is comprehensively and quickly mastered, the emergency repair command center directly sends emergency repair tasks to corresponding emergency repair vehicles, emergency repair personnel and terminal equipment of designated personnel, the communication efficiency between headquarter commanders and on-site emergency repair teams is improved, the emergency repair efficiency of the power distribution network is greatly improved, and the problem of low emergency repair efficiency of the power distribution network in the prior art is solved.
3) In the device for rush repair of the power distribution network, the receiving unit receives the fault information uploaded by the power distribution network information management system, the analyzing unit analyzes a fault reason according to the fault information, the generating unit generates the rush repair task according to the fault reason, and the sending unit sends the rush repair task to the first terminal, the second terminal and the third terminal. The device integrates a plurality of power distribution network information management systems through the emergency repair command center, so that the fault information of the power distribution network is comprehensively and quickly mastered, the emergency repair command center directly sends emergency repair tasks to corresponding emergency repair vehicles, emergency repair personnel and terminal equipment of designated personnel, the communication efficiency between headquarter command personnel and on-site emergency repair teams is improved, the emergency repair efficiency of the power distribution network is greatly improved, and the problem of low emergency repair efficiency of the power distribution network in the prior art is solved.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (10)

1. The utility model provides a command system is salvageed to distribution network which characterized in that includes:
the emergency repair command center is in communication connection with the power distribution network information management systems and is used for receiving fault information reported by the power distribution network information management systems and generating emergency repair tasks according to the fault information, and each power distribution network information management system comprises a power distribution scheduling system, a power utilization information acquisition system, a production management system, a geographic information system and a customer service system;
the first terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the first terminal is a vehicle-mounted communication terminal of an emergency repair vehicle;
the second terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the second terminal is a mobile communication terminal of emergency repair personnel;
and the third terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, and the third terminal is a mobile phone of a designated person.
2. The system of claim 1, wherein the first aid repair command center comprises:
the fault reason determining module is in communication connection with the power distribution network information management system and used for analyzing fault reasons according to the fault information;
the emergency repair task management module is in communication connection with the fault reason determination module and is used for generating an emergency repair task according to the fault reason and receiving emergency repair information fed back in the process of executing the emergency repair task;
the emergency repair effect evaluation module is in communication connection with the emergency repair task management module and is used for evaluating the emergency repair effect of the emergency repair task according to the emergency repair information;
the management module is in communication connection with the fault reason determination module, the emergency maintenance task management module and the emergency maintenance effect evaluation module and is used for managing the work of the fault reason determination module, the emergency maintenance task management module and the emergency maintenance effect evaluation module.
3. The system of claim 1, further comprising:
the first terminal and the second terminal comprise a GPS satellite receiving module, a GPRS wireless communication module and a GIS geographic information module, and the emergency repair command center comprises a server.
4. The system of claim 1, wherein the emergency repair command center, the first terminal, the second terminal and the third terminal communicate with the Internet through a GPRS wireless network, and the emergency repair command center communicates with the distribution network information management system through an intranet.
5. A method for rush-repair of a power distribution network is characterized in that a power distribution network rush-repair command system comprises a rush-repair command center, a first terminal, a second terminal and a third terminal, wherein the rush-repair command center is in communication connection with a plurality of power distribution network information management systems and is used for receiving fault information reported by the power distribution network information management systems and generating rush-repair tasks according to the fault information, the power distribution network information management systems comprise a power distribution dispatching system, a power utilization information acquisition system, a production management system, a geographic information system and a customer service system, the first terminal is in communication connection with the rush-repair command center and is used for receiving the rush-repair tasks, the first terminal is a vehicle-mounted communication terminal of two rush-repair vehicles, the second terminal is in communication connection with the rush-repair command center and is used for receiving the rush-repair tasks, and the second terminal is a mobile communication terminal of rush-repair personnel, the third terminal is in communication connection with the emergency repair command center and used for receiving the emergency repair task, the third terminal is a mobile phone of a designated person, and the method comprises the following steps:
receiving the fault information which is uploaded by the power distribution network information management system;
analyzing the fault reason according to the fault information;
generating the emergency repair task according to the fault reason;
and sending the emergency repair task to the first terminal, the second terminal and the third terminal.
6. The method of claim 5, wherein after sending the repair task to the first terminal, the second terminal, and the third terminal, the method further comprises:
receiving first-aid repair information fed back by the first terminal, the second terminal and the third terminal;
and evaluating the emergency repair effect of the emergency repair task according to the emergency repair information.
7. The method of claim 5, wherein after analyzing a cause of the fault based on the fault information, the method further comprises:
and sending the fault reason to the customer service system.
8. The device for rush-repair of the power distribution network is characterized in that a power distribution network rush-repair command system comprises a rush-repair command center, a first terminal, a second terminal and a third terminal, wherein the rush-repair command center is in communication connection with a plurality of power distribution network information management systems and is used for receiving fault information reported by the power distribution network information management systems and generating rush-repair tasks according to the fault information, the power distribution network information management systems comprise a power distribution dispatching system, a power utilization information acquisition system, a production management system, a geographic information system and a customer service system, the first terminal is in communication connection with the rush-repair command center and is used for receiving the rush-repair tasks, the first terminal is a vehicle-mounted communication terminal of two rush-repair vehicles, the second terminal is in communication connection with the rush-repair command center and is used for receiving the rush-repair tasks, and the second terminal is a mobile communication terminal of rush-repair personnel, the third terminal, with salvage command center communication connection for receive salvage the task, the third terminal is appointed personnel's mobile phone, the device includes:
the receiving unit is used for receiving the fault information, and the fault information is uploaded by the power distribution network information management system;
the analysis unit is used for analyzing a fault reason according to the fault information;
the generating unit is used for generating an emergency repair task according to the fault reason;
and the first sending unit is used for sending the emergency repair task to the first terminal, the second terminal and the third terminal.
9. A computer-readable storage medium, characterized in that the computer-readable storage medium comprises a stored program, wherein the program performs the method of any one of claims 5 to 7.
10. A processor, characterized in that the processor is configured to run a program, wherein the program when running performs the method of any of claims 5 to 7.
CN202011376850.3A 2020-11-30 2020-11-30 Power distribution network emergency repair command system, power distribution network emergency repair method, device and processor Pending CN112613620A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011376850.3A CN112613620A (en) 2020-11-30 2020-11-30 Power distribution network emergency repair command system, power distribution network emergency repair method, device and processor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011376850.3A CN112613620A (en) 2020-11-30 2020-11-30 Power distribution network emergency repair command system, power distribution network emergency repair method, device and processor

Publications (1)

Publication Number Publication Date
CN112613620A true CN112613620A (en) 2021-04-06

Family

ID=75228229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011376850.3A Pending CN112613620A (en) 2020-11-30 2020-11-30 Power distribution network emergency repair command system, power distribution network emergency repair method, device and processor

Country Status (1)

Country Link
CN (1) CN112613620A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113346618A (en) * 2021-06-04 2021-09-03 国网江苏省电力有限公司滨海县供电分公司 Monitoring method and device for power distribution system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104751305A (en) * 2015-04-28 2015-07-01 国网上海市电力公司 Trouble analysis and repair-based intelligent interaction system and control method thereof
CN105868940A (en) * 2016-06-01 2016-08-17 黄绍华 Grid fault information issuing and processing system
CN106682826A (en) * 2016-12-22 2017-05-17 海南电网有限责任公司 Emergency repair command platform for distribution network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104751305A (en) * 2015-04-28 2015-07-01 国网上海市电力公司 Trouble analysis and repair-based intelligent interaction system and control method thereof
CN105868940A (en) * 2016-06-01 2016-08-17 黄绍华 Grid fault information issuing and processing system
CN106682826A (en) * 2016-12-22 2017-05-17 海南电网有限责任公司 Emergency repair command platform for distribution network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
熊军等: "基于生产管理系统的配网生产抢修指挥平台研究", 供用电, 15 July 2013 (2013-07-15), pages 31 - 35 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113346618A (en) * 2021-06-04 2021-09-03 国网江苏省电力有限公司滨海县供电分公司 Monitoring method and device for power distribution system
CN113346618B (en) * 2021-06-04 2023-12-19 国网江苏省电力有限公司滨海县供电分公司 Monitoring method and device for power distribution system

Similar Documents

Publication Publication Date Title
CN111045656A (en) Method and system for constructing platform system infrastructure in government affair service
EP2634889A1 (en) Battery charge/swap monitoring system and method based on internet of things
CN105427040A (en) Convenient electric power repair service method and system
CN104954180A (en) Broadcast television network comprehensive operation and maintenance supporting system and operation and maintenance method
CN107705042A (en) The method for inspecting and device of power equipment
CN102802174B (en) Drive test data acquiring method, drive test data acquiring system and drive test data acquiring device
CN104331766A (en) Automatic health management based integrated service system
CN108777637A (en) A kind of data center's total management system and method for supporting server isomery
CN105139118A (en) Distribution network fault first-aid repair power failure information reporting system and method
CN103065228A (en) Power-cut monitoring evaluating and warning method and equipment
CN111639889A (en) Logistics information management system based on cloud computing
CN104601723A (en) Power marketing management system SOA framework based on internal service bus
CN112419129A (en) Method and system for constructing platform system infrastructure in government affair service
Zografos et al. An integrated framework for managing emergency-response logistics: The case of the electric utility companies
CN112150027A (en) Power supply service command platform system
CN111461399A (en) Method for configuring stagnation point coordinates based on fault nonlinear discrete distribution
CN109168173B (en) Base station operation and maintenance management method and device and electronic equipment
CN112613620A (en) Power distribution network emergency repair command system, power distribution network emergency repair method, device and processor
CN112104688A (en) Integrated service type mobile operation terminal application management system
CN101951700A (en) Intelligent base station outage decision and scheduling system
CN111915196A (en) Information scheduling management system for maintenance
CN103152786B (en) A kind of method of internet of things service gateway uplink and downstream message route
CN108921733B (en) Property information processing system based on cloud storage
CN110852635A (en) Platform system in electricity merchant operation
CN113993161B (en) Service test method, server, terminal device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination