CN112510579B - A cross-line pay-off device - Google Patents
A cross-line pay-off device Download PDFInfo
- Publication number
- CN112510579B CN112510579B CN202011414444.1A CN202011414444A CN112510579B CN 112510579 B CN112510579 B CN 112510579B CN 202011414444 A CN202011414444 A CN 202011414444A CN 112510579 B CN112510579 B CN 112510579B
- Authority
- CN
- China
- Prior art keywords
- hole
- base
- pay
- shaft
- driving device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
本发明公开了一种跨线放线装置,属于电力设备技术领域,跨线放线装置包括放线机构和升降机构,放线机构包括底座、导引单元和连接单元,导引单元设于底座上,上层导线被配置为从导引单元中穿过;连接单元设于底座上,并位于导引单元的一侧,连接单元包括第一驱动装置和连接件,第一驱动装置的输出端与连接件连接,第一驱动装置能够驱动连接件与导引单元配合,以限位上层导线;升降机构与底座连接,升降机构能使放线机构沿竖直方向移动。本发明上层导线穿设在导引单元中,通过连接件与导引单元配合,上层导线被稳定限位,不会从放线机构上脱落;升降机构带动底座沿竖直方向移动,使上层导线被抬离下层导线,避免下层导线被磨损。
The invention discloses a cross-line pay-off device, which belongs to the technical field of electric equipment. The cross-line pay-off device includes a pay-off mechanism and a lifting mechanism. The pay-off mechanism includes a base, a guide unit and a connection unit, and the guide unit is arranged on the base. On the upper layer, the wires on the upper layer are configured to pass through the guide unit; the connection unit is arranged on the base and is located on one side of the guide unit, the connection unit includes a first driving device and a connecting piece, and the output end of the first driving device is connected to the The connecting piece is connected, and the first driving device can drive the connecting piece to cooperate with the guide unit to limit the upper layer of wires; the lifting mechanism is connected to the base, and the lifting mechanism can make the pay-off mechanism move vertically. The upper wire of the present invention is installed in the guide unit, and through the cooperation of the connecting piece and the guide unit, the upper wire is stably limited and will not fall off from the wire-releasing mechanism; the lifting mechanism drives the base to move in the vertical direction, so that the upper wire Lifted away from the underlying conductors to avoid abrasion of the underlying conductors.
Description
技术领域technical field
本发明涉及电力设备技术领域,尤其涉及一种跨线放线装置。The invention relates to the technical field of electric equipment, in particular to an over-the-line pay-off device.
背景技术Background technique
在0.4kV低压电线上空交叉跨越架设10kV导线时或在架空通信线上方跨越架设其他导线时,上层导线放线过程中,会拖损下层导线。而且现在有些施工人员不对下层导线做任何保护措施,直接将上层导线压在下层导线表面,进行拖拽;或者用PVC套管套设于下层导线,进行拖拽,均不能有效保护下层导线。而且,现有的跨越放线方式,在施工过程中还会出现由于上方操作人员没有握紧上层导线,而导致上层导线下滑压在下层电线上,导线发生绝缘皮破损,从而对下方操作人员造成安全隐患,甚至引起触电事故。When crossing over 0.4kV low-voltage wires and erecting 10kV conductors or when erecting other conductors over overhead communication lines, the lower conductors will be dragged during the process of unwinding the upper conductors. And now some construction workers do not do any protective measures to the lower conductor, directly press the upper conductor on the surface of the lower conductor, and drag it; Moreover, in the existing way of striding over the wires, during the construction process, the upper conductors do not hold the upper conductors tightly, causing the upper conductors to slide down and press on the lower conductors, and the insulation of the conductors is damaged, thereby causing damage to the operators below. Potential safety hazard, even cause electric shock accident.
为此,亟需提供一种跨线放线装置以解决上述问题。For this reason, there is an urgent need to provide an over-the-line pay-off device to solve the above-mentioned problems.
发明内容Contents of the invention
本发明的目的在于提供一种跨线放线装置,在上层导线跨越下层导线进行铺设时,上层导线被跨线放线装置稳定限位且上层导线与下层导线相分离,保证上层导线不易脱落,又能保证下层导线不被磨损,保护人员安全,使用便捷。The purpose of the present invention is to provide an over-the-line pay-off device. When the upper-layer wire is laid across the lower-layer wire, the upper-layer wire is stably limited by the over-the-line pay-off device and the upper-layer wire is separated from the lower-layer wire to ensure that the upper-layer wire is not easy to fall off. It can also ensure that the lower layer wires are not worn, protect the safety of personnel, and be convenient to use.
为实现上述目的,提供以下技术方案:In order to achieve the above purpose, the following technical solutions are provided:
一种跨线放线装置,用于上层导线跨越下层导线进行架设,包括:A cross-line pay-off device is used for erecting upper-layer wires across lower-layer wires, including:
放线机构,包括底座、导引单元和连接单元,所述导引单元设于所述底座上,所述上层导线被配置为从所述导引单元中穿过;所述连接单元设于所述底座上,并位于所述导引单元的一侧,所述连接单元包括第一驱动装置和连接件,所述第一驱动装置的输出端与所述连接件连接,所述第一驱动装置能够驱动所述连接件与所述导引单元配合,以限位所述上层导线;The pay-off mechanism includes a base, a guide unit and a connection unit, the guide unit is arranged on the base, and the upper layer wire is configured to pass through the guide unit; the connection unit is arranged on the On the base, and located on one side of the guide unit, the connecting unit includes a first driving device and a connecting piece, the output end of the first driving device is connected to the connecting piece, and the first driving device The connecting piece can be driven to cooperate with the guiding unit to limit the upper layer wire;
升降机构,与所述底座连接,所述升降机构能使所述放线机构沿竖直方向移动。A lifting mechanism is connected with the base, and the lifting mechanism can make the wire-paying mechanism move vertically.
作为跨线放线装置的可选方案,所述导引单元包括第一竖辊、第二竖辊和横辊,所述第一竖辊转动安装于沿竖直方向延伸的第一轴上,所述第二竖辊转动安装于沿竖直方向延伸的第二轴上,所述第一轴和所述第二轴间隔设于所述底座上;所述第一轴和所述第二轴的下部沿径向分别设有第一安装孔和第二安装孔,所述第一安装孔和所述第二安装孔内安装有沿水平方向延伸的第三轴,所述横辊转动安装于所述第三轴上;所述横辊与所述第一竖辊和所述第二竖辊之间形成U型空间,所述上层导线滑动穿设于所述U型空间。As an optional solution for the over-the-line pay-off device, the guide unit includes a first vertical roller, a second vertical roller and a horizontal roller, and the first vertical roller is rotatably mounted on a first shaft extending vertically, The second vertical roller is rotatably mounted on a second shaft extending vertically, and the first shaft and the second shaft are spaced apart on the base; the first shaft and the second shaft The lower part of the radial direction is respectively provided with a first installation hole and a second installation hole, and a third shaft extending in the horizontal direction is installed in the first installation hole and the second installation hole, and the horizontal roller is rotatably installed on the On the third axis: a U-shaped space is formed between the horizontal roller, the first vertical roller and the second vertical roller, and the upper-layer wire slides through the U-shaped space.
作为跨线放线装置的可选方案,所述第一轴和所述第二轴的上部沿径向分别设有第一通孔和第二通孔,所述连接件为活动杆,所述活动杆依次穿接于所述第二通孔和所述第一通孔内,使所述U型空间上端闭合。As an optional solution for the over-the-line pay-off device, the upper parts of the first shaft and the second shaft are respectively provided with a first through hole and a second through hole in the radial direction, the connecting part is a movable rod, and the The movable rod is sequentially connected in the second through hole and the first through hole to close the upper end of the U-shaped space.
作为跨线放线装置的可选方案,所述连接单元还包括固定台,所述第一驱动装置安装于所述固定台上,所述固定台靠近所述导引单元的一端设有导向孔,所述导向孔的中心位于所述第一通孔和所述第二通孔的中心连线上,所述连接件依次穿设于所述导向孔、所述第二通孔和所述第一通孔。As an optional solution for the over-the-line pay-off device, the connecting unit further includes a fixed platform, the first driving device is installed on the fixed platform, and a guide hole is provided at one end of the fixed platform close to the guiding unit , the center of the guide hole is located on the line connecting the centers of the first through hole and the second through hole, and the connecting piece is sequentially passed through the guide hole, the second through hole and the first through hole A through hole.
作为跨线放线装置的可选方案,所述升降机构包括折叠三脚架和升降管,所述折叠三脚架包括三脚杆和设于所述三脚杆之间的中轴套管,所述中轴套管的下端设有第二驱动装置,所述第二驱动装置包括驱动电机和与所述驱动电机传动连接的齿轮;所述升降管的外壁面设有齿条,所述齿条沿竖直方向延伸,所述升降管的一端与所述底座连接,另一端套设于所述中轴套管内,且所述齿条与所述齿轮相啮合。As an optional solution for the over-the-line pay-off device, the lifting mechanism includes a folding tripod and a lifting tube, and the folding tripod includes a tripod and a central axis sleeve arranged between the tripods, and the central axis sleeve The lower end of the lower end is provided with a second driving device, and the second driving device includes a driving motor and a gear connected with the driving motor; the outer wall of the lifting tube is provided with a rack, and the rack extends vertically , one end of the lifting tube is connected to the base, the other end is sheathed in the center shaft sleeve, and the rack is meshed with the gear.
作为跨线放线装置的可选方案,所述第二驱动装置还包括防逆转机构,所述防逆转机构包括壳体、棘轮、锁紧件和拨动开关,所述棘轮与所述齿轮同轴连接,所述锁紧件与所述拨动开关连接,通过所述拨动开关带动所述锁紧件相对所述壳体转动,能使所述锁紧件的一端卡入所述棘轮的齿槽中。As an optional solution for the over-the-line pay-off device, the second drive device also includes an anti-reverse mechanism, and the anti-reverse mechanism includes a housing, a ratchet, a locking member and a toggle switch, and the ratchet is the same as the gear. The locking member is connected to the toggle switch, and the locking member is driven to rotate relative to the housing through the toggle switch, so that one end of the locking member can be snapped into the ratchet in the alveolar.
作为跨线放线装置的可选方案,所述壳体包括第一盖体和第二盖体,所述第一盖体和所述第二盖体可拆卸连接。As an optional solution of the over-the-line pay-off device, the housing includes a first cover and a second cover, and the first cover and the second cover are detachably connected.
作为跨线放线装置的可选方案,所述升降管的数量为至少两个,至少两个所述升降管沿竖直方向依次拼接。As an optional solution of the over-the-line pay-off device, the number of the lifting pipes is at least two, and at least two of the lifting pipes are spliced sequentially along the vertical direction.
作为跨线放线装置的可选方案,所述升降管的一端设有中间连接件,另一端设有卡接孔,所述中间连接件上设有弹簧销,一所述升降管设有所述弹簧销的一端能够弹性卡入另一所述升降管开设有所述卡接孔的一端。As an alternative to the cross-line pay-off device, one end of the lifting tube is provided with an intermediate connector, and the other end is provided with a clamping hole, the intermediate connector is provided with a spring pin, and one of the lifting tubes is provided with the One end of the spring pin can be elastically snapped into the other end of the lifting tube provided with the snapping hole.
作为跨线放线装置的可选方案,所述升降管的外壁面上设有拉线环。As an optional solution for the over-the-line pay-off device, a pull-wire ring is provided on the outer wall of the lifting tube.
与现有技术相比,本发明的有益效果:Compared with prior art, the beneficial effect of the present invention:
本发明所提供的跨线放线装置设置有放线机构和升降机构,在底座上设置导引单元和连接单元,使上层导线穿设在导引单元中,通过采用连接件与导引单元配合,实现上层导线被稳定限位,不会从放线机构上脱落,保护人员安全;采用升降机构与底座连接,升降机构带动底座沿竖直方向移动,以调节上层导线的高度,使上层导线可以被抬离下层导线,实现上层导线与下层导线相分离,避免下层导线被磨损,使用方便快捷。The over-the-line pay-off device provided by the present invention is provided with a pay-off mechanism and a lifting mechanism, and a guide unit and a connecting unit are arranged on the base, so that the upper-layer wires are passed through the guide unit, and the connecting piece is used to cooperate with the guide unit. , so that the upper wire is stably limited and will not fall off from the pay-off mechanism to protect the safety of personnel; the lifting mechanism is connected to the base, and the lifting mechanism drives the base to move vertically to adjust the height of the upper wire so that the upper wire can be It is lifted away from the lower layer wires to separate the upper layer wires from the lower layer wires, avoiding the wear of the lower layer wires, and is convenient and quick to use.
附图说明Description of drawings
图1为本发明实施例中跨线放线装置的结构示意图;Fig. 1 is the structural representation of cross-line pay-off device in the embodiment of the present invention;
图2为本发明实施例中图1中图A的局部放大图;Fig. 2 is a partially enlarged view of Fig. A in Fig. 1 in an embodiment of the present invention;
图3为本发明实施例中升降机构的结构示意图;Fig. 3 is the structural representation of lifting mechanism in the embodiment of the present invention;
图4为本发明实施例中图3中图B的局部放大图;Fig. 4 is a partially enlarged view of Fig. B in Fig. 3 in an embodiment of the present invention;
图5为本发明实施例中防逆转机构的结构示意图;Fig. 5 is a schematic structural view of the anti-reversal mechanism in the embodiment of the present invention;
图6为本发明实施例中壳体的结构示意图;Fig. 6 is a schematic structural diagram of a housing in an embodiment of the present invention;
图7为本发明实施例中升降管的结构示意图。Fig. 7 is a schematic structural diagram of the riser in the embodiment of the present invention.
附图标记:Reference signs:
100、放线机构;200、升降机构;100. Pay-off mechanism; 200. Lifting mechanism;
1、底座;1. Base;
2、导引单元;21、第一竖辊;211、第一通孔;22、第二竖辊;221、第二通孔;23、横辊;24、U型空间;2. Guide unit; 21. First vertical roller; 211. First through hole; 22. Second vertical roller; 221. Second through hole; 23. Horizontal roller; 24. U-shaped space;
3、连接单元;31、第一驱动装置;32、连接件;33、固定台;331、导向孔;3. Connection unit; 31. First driving device; 32. Connector; 33. Fixed platform; 331. Guide hole;
4、折叠三脚架;41、中轴套管;42、第二驱动装置;421、齿轮;43、防逆转机构;431、壳体;4311、第一盖体;4312、第二盖体;432、棘轮;433、锁紧件;434、拨动开关;44、三脚杆;4. Folding tripod; 41. Central shaft sleeve; 42. Second driving device; 421. Gear; 43. Anti-reverse mechanism; 431. Shell; 4311. First cover; 4312. Second cover; 432. Ratchet; 433, locking piece; 434, toggle switch; 44, tripod;
5、升降管;51、齿条;52、中间连接件;521、弹簧销;53、卡接孔;54、拉线环。5. Lifting tube; 51. Rack; 52. Intermediate connector; 521. Spring pin; 53. Clamping hole; 54. Pull ring.
具体实施方式Detailed ways
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本发明实施例的组件可以以各种不同的配置来布置和设计。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.
因此,以下对在附图中提供的本发明的实施例的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。Accordingly, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.
在本发明的描述中,需要说明的是,术语“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该发明产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上。In the description of the present invention, it should be noted that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" etc. The positional relationship is based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship that is usually placed when the product of the invention is used, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying the referred device Or elements must have a certain orientation, be constructed and operate in a certain orientation, and thus should not be construed as limiting the invention. In addition, the terms "first", "second", "third", etc. are only used for distinguishing descriptions, and should not be construed as indicating or implying relative importance. In the description of the present invention, unless otherwise specified, "plurality" means two or more.
在本发明的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should also be noted that, unless otherwise clearly specified and limited, the terms "setting" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection, or Connected integrally; either mechanically or electrically. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.
在本发明中,除非另有明确的规定和限定,第一特征在第二特征之“上”或之“下”可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征“之上”、“上方”和“上面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”包括第一特征在第二特征正下方和斜下方,或仅仅表示第一特征水平高度小于第二特征。In the present invention, unless otherwise clearly specified and limited, a first feature being "on" or "under" a second feature may include direct contact between the first and second features, and may also include the first and second features Not in direct contact but through another characteristic contact between them. Moreover, "above", "above" and "above" the first feature on the second feature include that the first feature is directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature. "Below", "beneath" and "under" the first feature to the second feature include that the first feature is directly below and obliquely below the second feature, or simply means that the first feature has a lower level than the second feature.
下面详细描述本发明的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本发明,而不能理解为对本发明的限制。Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary only for explaining the present invention and should not be construed as limiting the present invention.
实施例一Embodiment one
如图1-7所示,对本实施例的具体内容进行了详细描述。如图1-2所示,本实施例提供了一种跨线放线装置,用于上层导线跨越下层线进行架设,该跨线放线装置包括放线机构100和升降机构200,放线机构100包括底座1、导引单元2和连接单元3,底座1为长板状,导引单元2设置在底座1的上方,上层导线被配置为从导引单元2中穿过,连接单元3也设置在底座1上方,并位于导引单元2的一侧,连接单元3包括第一驱动装置31和连接件32,第一驱动装置31的输出端与连接件32连接,第一驱动装置31能够驱动连接件32与导引单元2配合,以限位上层导线。升降机构200与放线机构100的底座1连接并位于底座1的下方,升降机构200能够使放线机构100沿竖直方向进行移动,当上层导线架设的高度需要提高或降低时,可以通过升降机构200实现放线机构100的抬高或降低。As shown in Figures 1-7, the specific content of this embodiment is described in detail. As shown in Fig. 1-2, this embodiment provides a cross-line pay-off device, which is used for erecting the upper-layer conductor across the lower-layer wire. 100 includes a base 1, a
简而言之,本实施例提供的跨线放线装置的放线机构100和升降机构200,在底座1上设置导引单元2和连接单元3,使上层导线穿设在导引单元2中,通过采用连接件32与导引单元2配合,实现上层导线被稳定限位,不会从放线机构100上脱落,保护人员安全;采用升降机构200与底座1连接,升降机构200带动底座1沿竖直方向移动,以调节上层导线的高度,使上层导线可以被抬离下层导线,实现上层导线与下层导线相分离,避免下层导线被磨损的功能,使用方便快捷。In short, the pay-
进一步地,如图2所示,导引单元2包括第一竖辊21、第二竖辊22和横辊23,第一竖辊21转动安装于沿竖直方向延伸的第一轴上,第二竖辊22转动安装于沿竖直方向延伸的第二轴上,第一轴和第二轴间隔设在底座1上;第一轴和第二轴的下部沿径向分别设有第一安装孔和第二安装孔,第一安装孔和第二安装孔内安装有沿水平方向延伸的第三轴,横辊23转动安装于第三轴上;横辊23与第一竖辊21和第二竖辊22之间形成U型空间24,上层导线滑动穿于U型空间24内。上层导线被可滑动地穿设于U型空间24,由于辊轮与导线接触属于滚动摩擦,能减小拖拽上层导线时的摩擦力,有效的保护上层导线的外层表皮。当上层导线的数量增多时,只需延长第一轴的和第二轴的长度就可以实现多根导线的放置,扩大使用范围。Further, as shown in FIG. 2 , the
进一步地,第一轴和第二轴的上部沿径向分别设有第一通孔211和第二通孔221,连接件32为活动杆,在第一驱动装置31的驱动下,活动杆依次穿接于第二通孔221和第一通孔211内,使U型空间24上端闭合。通过活动杆穿接在第二通孔221和第一通孔211内,实现U型空间24的闭合,使上层导线在被拖拽架设的过程中,不会从放线机构100中脱落,安全可靠,同时保护人员安全,提高跨线放线装置的安全性。Further, the upper parts of the first shaft and the second shaft are respectively provided with a first through
进一步地,连接单元3还包括呈L型的固定台33,第一驱动装置31安装于固定台33上,固定台33靠近导引单元2的一端设有导向孔331,导向孔331的中心位于第一通孔211和第二通孔221的中心连线上,连接件32依次穿设于导向孔331、第二通孔221和第一通孔211。增设导向孔331位于上述的中心连线上,对连接件32沿设定方向移动时,起导向作用,实现连接件32准确的移动并穿设在第一通孔211和第二通孔221中;当连接件32长度较大时,也可以对连接件32起到支撑的作用,避免连接件32由于重力的影响而向下弯曲,导致穿孔失败。优选地,连接件32的外表面设置有弹性保护层,例如橡胶层,在上层导线穿过放线机构100时,上层导线与连接件32之间接触时,降低碰撞影响,进一步保护上层导线。Further, the
在本实施例中的第一驱动装置31的动力源可以为由无线遥控器控制的直线电机、同步电机或伺服电机等动力源。本实施例中,第一驱动装置31还包括丝杠和设有螺纹孔的活动块,电机设置在固定台33远离放线单元2的一端,丝杠的一端与电机的输出端连接,另一端与固定台33靠近放线单元2的一端可转动连接,活动块的螺纹孔和丝杠螺接,活动块的上端与连接件32的一端连接,通过电机驱动丝杠转动,带动活动块滑动,进而实现连接件32沿设定方向进行移动,并穿接于第一通孔211和第二通孔221内。进一步可选地,固定台33与底座1采用支撑杆连接,利用支撑杆可以抬高连接单元3的高度,使连接件32与相应的通孔相对应,位于同一高度。通过无线遥控器遥控电机旋转,电机旋转带动丝杠运动,丝杠运动使得连接件32做直线运动,驱动连接件32做直线运动到通孔处,从而使得U型空间24处于封闭状态,防止导线滑出,提高跨线放线装置的安全性。The power source of the
参考图3-图4,进一步可选地,升降机构200包括折叠三脚架4和升降管5。折叠三脚架4包括三脚杆44和设于三脚杆44之间的中轴套管41,中轴套管41下端设有第二驱动装置42,第二驱动装置42包括驱动电机和与驱动电机传动连接的齿轮421。升降管5的外壁面设有齿条51,齿条51沿竖直方向延伸,升降管5的一端与底座1连接,另一端套设于中轴套管41内,且部分齿条51与第二驱动装置42的齿轮421相啮合。第二驱动装置42通过齿轮421驱动设有齿条51的升降管5进行移动,实现放线机构100的高度调节,由于齿牙间距小,提高调节精度,使放线机构100可以位于合适的高度。本实施例中的驱动装置均可以采用无线遥控控制,人员无需靠近施工现场,保证人员安全;折叠三脚架4的三脚杆44也可以采用套管螺接,实现折叠三脚架4高度的调节,三脚杆44的下端可转动的设置有地脚,地脚可以根据施工现场的地面进行相应的转动,实现放线机构100始终处于水平状态。Referring to FIGS. 3-4 , further optionally, the
在本实施例中,如图4和如5所示,进一步可选地,第二驱动装置42设有防逆转机构43,防逆转机构43包括壳体431、棘轮432、呈Y型的锁紧件433和拨动开关434,棘轮432与齿轮421同轴连接,锁紧件433与拨动开关434连接,通过拨动开关434带动锁紧件433相对壳体431转动,锁紧件433的一端能够卡入棘轮432的齿槽中。当放线机构100被升降机构200移动至相应的高度,拨动开关434带动锁紧件433相对壳体431转动,使锁紧件433的一端卡入棘轮432的齿槽中,使齿轮421无法向相反的方向移动,提高跨线放线装置的安全性。In this embodiment, as shown in FIG. 4 and FIG. 5 , further optionally, the
如图6所示,进一步可选地,壳体431分为第一盖体4311和第二盖体4312,第一盖体4311和第二盖体4312可拆卸连接。方便壳体431内部零件的安装和更换,也有利于维修人员对防逆转机构43的维修检查,进一步提高跨线放线装置的安全性。As shown in FIG. 6 , further optionally, the
进一步可选地,升降管5的数量为至少两个,至少两个升降管5沿竖直方向依次拼接,每个升降管5能够与另一升降管5上下连接,升降管5可以根据下层导线的高度进行拼接,同时也便于操作人员的携带放置,提高跨线放线装置的可操作性。Further optionally, the number of
如图7所示,可选地,升降管5的一端设有中间连接件52,另一端设有卡接孔53,中间连接件52上设有弹簧销521,当两个升降管5拼接时,一升降管5设有弹簧销521的一端能够弹性卡入另一升降管5开设有卡接孔53的一端。一升降管5上的弹簧销521可插接卡入到另一个升降管5的卡接孔53内,实现延长升降管5的长度;通过按压弹簧销521,能使相插接的升降管5之间松开。As shown in Figure 7, optionally, one end of the lifting
当上层导线需要架设的高度过高时,导致升降管5长度过长,容易受到外界风力的影响,存在安全隐患。进一步地,如图2和图7所示,在升降管5的外壁面上周向间隔设置拉线环54,将钢丝绳的一端与拉线环54连接,另一端与地面的固定物连接,升降管5沿周向被拉紧,使升降管5始终保持竖直状态,不发生晃动,提高了跨线放线装置的稳定性。本实施例中,升降管5为铝管。When the height of the upper conductor needs to be erected is too high, the length of the
实施例二Embodiment two
本实施例提供了一种跨线放线装置,与实施例一相比,本实施例提供的跨线放线装置的基本结构与实施例一相同,仅升降管5的拼接设置存在差异,本实施例不再对与实施例一相同的结构进行赘述。This embodiment provides an over-the-line pay-off device. Compared with Embodiment 1, the basic structure of the over-the-line pay-off device provided by this embodiment is the same as that of Embodiment 1, and only the splicing of the lifting
本实施例中,升降管5设有中间连接件52的一端设有外螺纹,升降管5的另一端管内设有内螺纹,相邻升降管5之间可以相互螺接,实现升降管5长度的延长。In this embodiment, one end of the
本领域技术人员会理解,本发明不限于这里所述的特定实施例,对本领域技术人员来说能够进行各种明显的变化、重新调整和替代而不会脱离本发明的保护范围。因此,虽然通过以上实施例对本发明进行了较为详细的说明,但是本发明不仅仅限于以上实施例,在不脱离本发明构思的情况下,还可以包括更多其他等效实施例,而本发明的范围由所附的权利要求范围决定。Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the protection scope of the present invention. Therefore, although the present invention has been described in detail through the above embodiments, the present invention is not limited to the above embodiments, and can also include more other equivalent embodiments without departing from the concept of the present invention, and the present invention The scope is determined by the scope of the appended claims.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202011414444.1A CN112510579B (en) | 2020-12-04 | 2020-12-04 | A cross-line pay-off device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202011414444.1A CN112510579B (en) | 2020-12-04 | 2020-12-04 | A cross-line pay-off device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN112510579A CN112510579A (en) | 2021-03-16 |
| CN112510579B true CN112510579B (en) | 2023-02-10 |
Family
ID=74971884
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202011414444.1A Active CN112510579B (en) | 2020-12-04 | 2020-12-04 | A cross-line pay-off device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN112510579B (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113184720B (en) * | 2021-04-29 | 2023-08-15 | 广东电网有限责任公司清远供电局 | A display device that crosses obstacles |
| CN113277421A (en) * | 2021-06-09 | 2021-08-20 | 安徽送变电工程有限公司 | Line turning crossing device based on crane |
| CN113852007A (en) * | 2021-09-26 | 2021-12-28 | 广东电网有限责任公司 | A pay-off spanning rack |
| CN117526165B (en) * | 2023-11-21 | 2024-07-09 | 国网黑龙江省送变电工程有限公司 | Power transmission line crossing construction device and construction process thereof |
| CN119297839B (en) * | 2024-10-28 | 2025-08-05 | 长沙理工大学 | A three-phase four-wire conductor pull-over device and a control method thereof |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201821046U (en) * | 2009-12-30 | 2011-05-04 | 顺德职业技术学院 | Tension-driven wire automatic cable arrangement |
| CN203434532U (en) * | 2013-07-26 | 2014-02-12 | 中国一冶集团有限公司 | Safety auxiliary device for vertical cable laying |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS54126998A (en) * | 1978-03-25 | 1979-10-02 | Sumitomo Electric Ind Ltd | Apparatus for laying cable on vehicle |
| CN102946075B (en) * | 2012-11-19 | 2016-04-06 | 柳州职业技术学院 | Cable accessory production support |
| CN204068039U (en) * | 2014-08-12 | 2014-12-31 | 国家电网公司 | A kind of take-up for low-voltage circuit transformation, actinobacillus device |
| CN207910366U (en) * | 2017-12-29 | 2018-09-25 | 国网山东省电力公司蒙阴县供电公司 | A kind of conducting wire actinobacillus device and conducting wire paying off system |
| CN208142716U (en) * | 2018-05-22 | 2018-11-23 | 赵文渊 | A kind of power transmission line erection crossover device |
| CN209881260U (en) * | 2019-04-26 | 2019-12-31 | 宝鸡华源电力设备有限公司 | Be applied to and join in marriage quick fixed pin device of network operation of not cutting off power supply |
| CN110416918A (en) * | 2019-08-21 | 2019-11-05 | 广东电网有限责任公司 | It is a kind of to cross over bracket |
| CN211046304U (en) * | 2019-09-27 | 2020-07-17 | 长沙亚明电子科技发展有限公司 | Bridge capable of quickly installing cable |
| CN110778886B (en) * | 2019-10-28 | 2020-10-23 | 中国矿业大学 | An integrated drilling peeping device |
| CN111525452B (en) * | 2020-04-28 | 2022-05-17 | 广东电网有限责任公司东莞供电局 | Combined turning guide device for cable |
-
2020
- 2020-12-04 CN CN202011414444.1A patent/CN112510579B/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201821046U (en) * | 2009-12-30 | 2011-05-04 | 顺德职业技术学院 | Tension-driven wire automatic cable arrangement |
| CN203434532U (en) * | 2013-07-26 | 2014-02-12 | 中国一冶集团有限公司 | Safety auxiliary device for vertical cable laying |
Also Published As
| Publication number | Publication date |
|---|---|
| CN112510579A (en) | 2021-03-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112510579A (en) | Cross-line pay-off device | |
| US4051525A (en) | Raisable and lowerable surveillance camera assembly | |
| CN103825227B (en) | Improved automatic threading apparatus | |
| CN108666779B (en) | A grounding wire device for electric power engineering maintenance transmission line | |
| CN110792893A (en) | Orbital inspection robot PTZ lifting device and its working method | |
| CN110615111A (en) | A guide rope cutting device for unmanned aerial vehicle | |
| CN213326019U (en) | Cable pay-off device | |
| CN212849744U (en) | A cable erection support device for electromechanical installation | |
| CN104659504B (en) | Grounding method | |
| CN210156819U (en) | Trolley set for replacing ground wire | |
| CN204008704U (en) | The universal lead wire insulating bar in a kind of high-altitude | |
| CN112382981A (en) | Connecting device for in-out operation of strain insulator string of ultra-high voltage transmission line | |
| CN215771932U (en) | High tension switchgear fiber sensor wiring structure | |
| CN102969671A (en) | Equipotential outlet trolley for double bundle conductor | |
| CN218809510U (en) | Cable pay-off device | |
| CN108071256A (en) | Charging garage and the take-up and pay-off device for the garage that charges | |
| CN205209797U (en) | A filthy degree sampling device for indoor transformer overhauls | |
| CN115931907A (en) | A cable inspection device for bridge inspection | |
| CN201639251U (en) | Cable transmission and laying structure of electric slab tongs | |
| CN115465716A (en) | Wire and cable pay-off device | |
| CN209082963U (en) | Lifting basket equipment | |
| CN213011357U (en) | Cable laying mechanism and automatic winding and unwinding device of photoelectric mooring cable | |
| CN216918055U (en) | Cable mobile device for electric power construction | |
| CN215817415U (en) | Fire-resistant bus duct of copper conductor with extending structure | |
| CN222814162U (en) | Cable hoists and cable wells |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| OL01 | Intention to license declared | ||
| OL01 | Intention to license declared |
