CN112508292A - 一种基于模糊topsis法的智慧充电站选址优化方法 - Google Patents
一种基于模糊topsis法的智慧充电站选址优化方法 Download PDFInfo
- Publication number
- CN112508292A CN112508292A CN202011476023.1A CN202011476023A CN112508292A CN 112508292 A CN112508292 A CN 112508292A CN 202011476023 A CN202011476023 A CN 202011476023A CN 112508292 A CN112508292 A CN 112508292A
- Authority
- CN
- China
- Prior art keywords
- evaluation
- charging station
- index
- scheme
- cost
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 50
- 238000005457 optimization Methods 0.000 title claims abstract description 15
- 238000011156 evaluation Methods 0.000 claims abstract description 114
- 238000004364 calculation method Methods 0.000 claims abstract description 5
- 239000011159 matrix material Substances 0.000 claims description 19
- 238000010276 construction Methods 0.000 claims description 15
- 230000008901 benefit Effects 0.000 claims description 13
- 238000012423 maintenance Methods 0.000 claims description 6
- 238000011084 recovery Methods 0.000 claims description 3
- 238000012854 evaluation process Methods 0.000 abstract description 6
- 238000004422 calculation algorithm Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 230000002068 genetic effect Effects 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 238000010206 sensitivity analysis Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N7/00—Computing arrangements based on specific mathematical models
- G06N7/02—Computing arrangements based on specific mathematical models using fuzzy logic
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Software Systems (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Algebra (AREA)
- Mathematical Physics (AREA)
- General Engineering & Computer Science (AREA)
- Computing Systems (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Optimization (AREA)
- Mathematical Analysis (AREA)
- Evolutionary Computation (AREA)
- Data Mining & Analysis (AREA)
- Computational Mathematics (AREA)
- Artificial Intelligence (AREA)
- Molecular Biology (AREA)
- Fuzzy Systems (AREA)
- Biomedical Technology (AREA)
- Automation & Control Theory (AREA)
- Life Sciences & Earth Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011476023.1A CN112508292A (zh) | 2020-12-14 | 2020-12-14 | 一种基于模糊topsis法的智慧充电站选址优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011476023.1A CN112508292A (zh) | 2020-12-14 | 2020-12-14 | 一种基于模糊topsis法的智慧充电站选址优化方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112508292A true CN112508292A (zh) | 2021-03-16 |
Family
ID=74973573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011476023.1A Pending CN112508292A (zh) | 2020-12-14 | 2020-12-14 | 一种基于模糊topsis法的智慧充电站选址优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112508292A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112884377A (zh) * | 2021-03-30 | 2021-06-01 | 中煤能源研究院有限责任公司 | 一种浆体充填系统优选模型及构建方法 |
CN113052384A (zh) * | 2021-03-29 | 2021-06-29 | 淮阴工学院 | 基于集对分析的高速公路服务区客运接驳站选址评价方法 |
CN113077076A (zh) * | 2021-03-18 | 2021-07-06 | 汕头大学 | 一种混凝土搅拌站选址的确定方法及系统 |
CN113379317A (zh) * | 2021-07-02 | 2021-09-10 | 中国海洋大学 | 波浪能电站选址决策方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109409730A (zh) * | 2018-10-22 | 2019-03-01 | 西南交通大学 | 一种基于复杂网络特性评估的能源微网选址方法 |
CN109523183A (zh) * | 2018-11-27 | 2019-03-26 | 中铁二院工程集团有限责任公司 | 基于混合多属性决策的铁路建设方案的评价方法 |
CN109902860A (zh) * | 2019-01-23 | 2019-06-18 | 西南交通大学 | 一种基于组合距离评估的电动汽车充电站选址方法 |
WO2020199558A1 (zh) * | 2019-03-29 | 2020-10-08 | 江苏大学 | 一种电动汽车充电站最优建设数量和选址方案规划方法 |
-
2020
- 2020-12-14 CN CN202011476023.1A patent/CN112508292A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109409730A (zh) * | 2018-10-22 | 2019-03-01 | 西南交通大学 | 一种基于复杂网络特性评估的能源微网选址方法 |
CN109523183A (zh) * | 2018-11-27 | 2019-03-26 | 中铁二院工程集团有限责任公司 | 基于混合多属性决策的铁路建设方案的评价方法 |
CN109902860A (zh) * | 2019-01-23 | 2019-06-18 | 西南交通大学 | 一种基于组合距离评估的电动汽车充电站选址方法 |
WO2020199558A1 (zh) * | 2019-03-29 | 2020-10-08 | 江苏大学 | 一种电动汽车充电站最优建设数量和选址方案规划方法 |
Non-Patent Citations (1)
Title |
---|
廖勇;: "基于三角模糊数的铁路客运站选址方案评价方法", 中国铁道科学, no. 06 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113077076A (zh) * | 2021-03-18 | 2021-07-06 | 汕头大学 | 一种混凝土搅拌站选址的确定方法及系统 |
CN113052384A (zh) * | 2021-03-29 | 2021-06-29 | 淮阴工学院 | 基于集对分析的高速公路服务区客运接驳站选址评价方法 |
CN112884377A (zh) * | 2021-03-30 | 2021-06-01 | 中煤能源研究院有限责任公司 | 一种浆体充填系统优选模型及构建方法 |
CN113379317A (zh) * | 2021-07-02 | 2021-09-10 | 中国海洋大学 | 波浪能电站选址决策方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112508292A (zh) | 一种基于模糊topsis法的智慧充电站选址优化方法 | |
CN111260211A (zh) | 一种基于ahp-改进的熵权法-topsis的智慧能源系统评价方法及装置 | |
CN112791997B (zh) | 一种退役电池梯次利用筛选的方法 | |
WO2021189745A1 (zh) | 电动汽车充电设施的推荐方法、装置、计算机设备及存储介质 | |
CN109754168A (zh) | 充电站选址方法和装置 | |
CN110189025B (zh) | 考虑不同负荷增长的电动汽车充电站规划方案获取方法 | |
CN109215344B (zh) | 用于城市道路短时交通流量预测的方法和系统 | |
CN107909208A (zh) | 一种台区配网降损方法 | |
CN103034691A (zh) | 一种基于支持向量机的专家系统知识获取方法 | |
CN110189182B (zh) | 一种基于车联网的里程焦虑管理方法 | |
CN113459871B (zh) | 换电站的电池充电方法、装置以及存储介质、电子设备 | |
CN109492874B (zh) | 一种三层级配电网投资决策体系的决策方法 | |
CN112766800A (zh) | 一种基于模糊层次分析法的城市绿色交通系统评价方法 | |
CN112487281A (zh) | 一种立体车库推荐方法 | |
CN113992677A (zh) | 一种延迟与能耗联合优化的mec计算卸载方法 | |
CN112418742B (zh) | 信息物理融合的电动汽车换电站网络双层控制方法 | |
CN111626492A (zh) | 一种电动汽车充电网络模糊多目标机会约束规划方法 | |
CN114880939A (zh) | 一种动力电池寿命的智能预测方法及装置 | |
CN115034501A (zh) | 一种电动汽车充电站选址定容方法 | |
CN111914900A (zh) | 一种用户用电模式分类方法 | |
CN115186882A (zh) | 一种基于聚类的可控负荷空间密度预测方法 | |
CN113361789A (zh) | 一种基于层次化博弈的充电站服务定价方法 | |
CN113222241B (zh) | 考虑充电服务引导与客户需求的出租车快充电站规划方法 | |
CN114722904A (zh) | 一种面向稀疏群智感知的参与者优化选择方法 | |
CN114862263A (zh) | 一种提高可再生能源消纳的多区域物流车队配送管理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20211111 Address after: 110168 Room 903, No. 19a-1, Hunnan East Road, Hunnan District, Shenyang City, Liaoning Province Applicant after: State Grid Liaoning Electric Power Co., Ltd. Marketing Service Center Applicant after: State Grid Corporation of China Address before: 110168 Room 903, No. 19a-1, Hunnan East Road, Hunnan District, Shenyang City, Liaoning Province Applicant before: State Grid Liaoning Electric Power Co., Ltd. Marketing Service Center Applicant before: LIAONING ELECTRIC POWER DEVELOPMENT Co.,Ltd. Applicant before: STATE GRID CORPORATION OF CHINA |