CN112502789A - Combined heat and power generation unit with reheater cold and hot sections for steam extraction in cooperation - Google Patents
Combined heat and power generation unit with reheater cold and hot sections for steam extraction in cooperation Download PDFInfo
- Publication number
- CN112502789A CN112502789A CN202011069538.XA CN202011069538A CN112502789A CN 112502789 A CN112502789 A CN 112502789A CN 202011069538 A CN202011069538 A CN 202011069538A CN 112502789 A CN112502789 A CN 112502789A
- Authority
- CN
- China
- Prior art keywords
- steam
- header
- heat supply
- measuring device
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D15/00—Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
- F01D15/10—Adaptations for driving, or combinations with, electric generators
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D21/00—Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
- F01D21/003—Arrangements for testing or measuring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D25/00—Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
- F01D25/08—Cooling; Heating; Heat-insulation
- F01D25/12—Cooling
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K11/00—Plants characterised by the engines being structurally combined with boilers or condensers
- F01K11/02—Plants characterised by the engines being structurally combined with boilers or condensers the engines being turbines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/003—Arrangements for measuring or testing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/02—Controlling, e.g. stopping or starting
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K17/00—Using steam or condensate extracted or exhausted from steam engine plant
- F01K17/02—Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic
- F01K17/025—Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic in combination with at least one gas turbine, e.g. a combustion gas turbine
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B33/00—Steam-generation plants, e.g. comprising steam boilers of different types in mutual association
- F22B33/18—Combinations of steam boilers with other apparatus
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22G—SUPERHEATING OF STEAM
- F22G7/00—Steam superheaters characterised by location, arrangement, or disposition
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/14—Combined heat and power generation [CHP]
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Control Of Turbines (AREA)
Abstract
The embodiment of the invention discloses a combined heat and power generation unit with a reheater cold and hot section for cooperative steam extraction, which comprises a first heat supply steam header, a second heat supply steam header, a boiler reheater, a high pressure cylinder, a medium pressure cylinder, a data acquisition and control device, a thrust shoe lubricating oil system, a pipeline, a measuring device and a valve; the high-pressure cylinder is connected with a reheater cold section, and the reheater cold section is connected with a first heat supply steam header through a steam extraction pipeline; the intermediate pressure cylinder is connected with a reheater hot section, and the reheater hot section is connected with a second heat supply steam header through a steam extraction pipeline; the first heat supply steam header is connected with the second heat supply steam header; the data acquisition and control device is respectively connected with the measuring device and the valve through signal lines. The invention realizes the on-line monitoring and adjustment of the unit operation parameters, achieves the effects of temperature control and vibration reduction, prolongs the service life of equipment and improves the flexibility of steam extraction and heat supply of the unit, and realizes the full utilization of energy.
Description
Technical Field
The invention relates to the technical field of electric power, in particular to a combined heat and power generation unit with a reheater cold and hot section for cooperative steam extraction.
Background
At present, a working scheme about energy conservation and emission reduction is released, an optimized industry and an energy structure are provided, and the consumption of scattered coal and fuel oil is reduced; the method has the advantages of strengthening the emission reduction of main pollutants, accelerating the development of cogeneration and centralized heat supply, utilizing the existing cogeneration units, pure condensing generator sets and low-grade waste heat around cities and industrial parks to implement heat supply transformation, and eliminating a series of requirements such as coal-fired boilers in the heat supply and gas supply range.
At present, small industrial boilers on the market are gradually eliminated, peripheral condensing type generator sets are replaced by the small industrial boilers to supply heat and transform, and central heat supply to heat enterprises is realized by extracting steam from a steam system of the generator sets. In order to fully improve the energy utilization efficiency of the condensing type unit, for hot user enterprises with steam supply pressure grades of 0.6-2.0 MPa, a heat supply transformation mode of punching and steam extraction from a steam exhaust pipeline of a high-pressure cylinder and a steam inlet pipeline of a medium-pressure cylinder of a steam turbine or a heat supply power generation mode of respectively extracting steam from a cold section and a hot section of a boiler reheater to a steam mixer through high-temperature high-pressure steam pipelines is adopted for the generator set. However, when the steam extraction amount of the high-pressure cylinder steam exhaust pipeline and the steam inlet pipeline of the intermediate-pressure cylinder is not controlled properly in the transformation modes, the problems of overheat damage of the reheating wall of the boiler, overlarge axial thrust of the steam turbine, abnormal vibration of the steam turbine and the like can be caused.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a combined heat and power generation unit with a reheater cold and hot section cooperated steam extraction function and a control method thereof.
In order to achieve the purpose, the specific technical scheme of the invention is as follows:
a combined heat and power generation unit with a reheater cold and hot section for cooperative steam extraction comprises a first heat supply steam header, a second heat supply steam header, a boiler reheater, a high pressure cylinder, a medium pressure cylinder, a data acquisition and control device, a thrust shoe lubricating oil system, a pipeline, a measuring device and a valve;
the high-pressure cylinder is connected with a cold section of a boiler reheater; the cold section of the boiler reheater is connected with the first heat supply steam header through a cold section steam extraction pipeline, and a cold section steam extraction isolation valve, a cold section steam extraction check valve, a cold section steam extraction regulating valve, a cold section steam extraction flow measuring device and a cold section steam extraction pipeline are sequentially arranged in the middle of the boiler reheater; the intermediate pressure cylinder is connected with a hot section of a boiler reheater; the hot section of the boiler reheater is connected with a second heat supply steam header through a hot section steam extraction pipeline, and a hot section steam extraction isolation valve, a hot section steam extraction check valve, a hot section steam extraction flow measuring device and a hot section steam extraction regulating valve are sequentially arranged in the middle of the boiler reheater; the first heat supply steam header and the second heat supply steam header are connected through an inter-header pipeline, and an inter-header isolation valve, an inter-header adjusting valve and a water spraying temperature reduction device are arranged in the middle of the first heat supply steam header and the second heat supply steam header;
the data acquisition and control device is respectively connected with the measuring device and the valve through signal wires; the measuring device comprises a second axial vibration measuring device, a first axial vibration measuring device, a second bearing bush cover vibration measuring device, a first bearing bush cover vibration measuring device, an axial displacement measuring device, a thrust bush temperature measuring device, a reheater pipe wall metal temperature measuring device, a first heat supply steam header steam temperature measuring device, a second heat supply steam header steam temperature measuring device, a cold section steam extraction flow measuring device and a hot section steam extraction flow measuring device; the valves comprise a cold section steam extraction regulating valve, a first heat supply steam header steam supply regulating valve, a header interval isolating valve, a second heat supply steam header steam supply regulating valve, a hot section steam extraction regulating valve, a medium pressure cylinder steam inlet regulating valve, a high pressure cylinder steam inlet regulating valve, a cold section steam extraction isolating valve, a header interval isolating valve, a second heat supply steam header steam supply isolating valve and a hot section steam extraction isolating valve; the second shaft vibration measuring device is arranged at the position, close to the shaft neck of the middle pressure cylinder, of the second bearing; the first shaft vibration measuring device is arranged at a position, close to a shaft neck of the middle pressure cylinder, of the first bearing; the second bearing bush cover vibration measuring device is arranged on the second bearing bush cover; the axial displacement measuring device is fixedly arranged on a thrust pad cover of the thrust pad; the thrust pad temperature measuring device is arranged in the thrust pad; the reheater pipe wall metal temperature measuring device is arranged on the metal pipe wall of the boiler reheater pipe system; the steam inlet regulating valve of the intermediate pressure cylinder is arranged on a steam pipe of a hot section of a boiler reheater, which is connected with the intermediate pressure cylinder and the boiler reheater; and the high-pressure cylinder steam inlet regulating valve is arranged on a main steam pipe connected with the high-pressure cylinder and the boiler reheater.
Furthermore, an I heat supply steam header safety valve, an I heat supply steam header steam temperature measuring device and an I heat supply steam header steam pressure measuring device are arranged on the I heat supply steam header, and steam is supplied to the outside through an I heat supply steam header steam supply pipe; the steam supply pipe of the first heat supply steam header is provided with a steam supply isolation valve of the first heat supply steam header and a steam supply adjusting valve of the first heat supply steam header; a second heat supply steam header safety valve, a second heat supply steam header steam temperature measuring device and a second heat supply steam header steam pressure measuring device are arranged on the second heat supply steam header, and steam is supplied to the outside through a second heat supply steam header steam supply pipe; the second heat supply steam header steam supply pipe is provided with a second heat supply steam header steam supply isolating valve and a second heat supply steam header steam supply adjusting valve; the safety valve and the measuring device not only prevent the overpressure damage of the heat supply steam header, but also realize the function of measuring and monitoring the temperature and pressure of the steam in the heat supply steam header.
Furthermore, the thrust pad lubricating oil system comprises a thrust pad bearing box, a lubricating oil delivery pipe, a lubricating oil pump inlet oil pipe, a lubricating oil tank, a lubricating oil return pipe and an oil return cooler, and the thrust pad lubricating oil system is arranged between the second bearing and the third bearing; a thrust pad is arranged in the thrust pad bearing box; a thrust disc is arranged in the middle of the thrust pad, and lubricating oil is arranged between the thrust pad and the thrust disc; the thrust disc is arranged on the steam turbine rotor; the thrust bearing blocks are internally provided with Pt100 platinum resistance thermometers; the thrust pad lubricating system is mainly used for lubricating the thrust pad and taking away heat generated in the friction process of the thrust pad, plays roles in cooling and reducing friction, and plays a good role in protecting a thrust pad block, a thrust disc and a steam turbine rotor.
Furthermore, the temperature measuring device adopts an E-type thermocouple, and the pressure measuring device adopts an EJA or Rosemoun series pressure transmitter, so that the conversion of temperature and pressure signals to electric signals is realized respectively; the data acquisition and control device is used for accessing and converting electric signals such as temperature, pressure, axial displacement, axial vibration, a tile cover, axial displacement, valve opening degree and the like into digital quantities through signal lines, so that the calculation and control functions are realized; the hot section steam extraction flow measuring device and the cold section steam extraction flow measuring device are composed of flow throttling orifice plates and temperature and pressure measuring devices matched with the flow throttling orifice plates, the flow throttling orifice plates adopt angle connection pressure taking or flange pressure taking standard orifice plates, the flow differential pressure of the flow throttling orifice plates adopts EJA or Rosemoun series flow differential pressure transmitters, corresponding temperature measuring devices adopt E-type thermocouples, and the pressure measuring devices adopt EJA or Rosemoun series pressure transmitters, so that the conversion from volume steam flow to mass steam flow is realized; the isolation valve adopts a bellows stop valve; the data acquisition and control device (57) adopts an OVATION decentralized control system; the regulating valve is a pneumatic regulating valve or an electric regulating valve; the check valve is a stainless steel horizontal check valve; the axial displacement measuring device adopts a BENTELY 330709 axial displacement probe; the shaft vibration measuring device adopts a BENTELY vibration sensor; the tile cover vibration measuring device adopts a BENTELY tile vibration probe.
In conclusion, the invention provides a method for monitoring and controlling wall temperature of a boiler reheater, front and back vibration of a high and medium pressure cylinder, axial displacement of a rotor of a steam turbine, thrust bearing temperature of the steam turbine and heat supply steam flow aiming at an opening steam extraction mode of a steam inlet pipeline (reheater hot section) of a steam turbine (reheater cold section) and the medium pressure cylinder, so that overtemperature damage of a metal pipe wall of the boiler reheater can be prevented, damage risk of a steam turbine body caused by overhigh axial thrust of the steam turbine is prevented, and service life of equipment is greatly prolonged; meanwhile, the invention can improve the flexibility of steam extraction and heat supply from the steam turbine (a reheater cold section) and a steam inlet pipeline (a reheater hot section) of the intermediate pressure cylinder, reasonably arrange the steam extraction amount of the reheater cold section with low temperature and the steam extraction amount of the reheater hot section with high temperature, deeply excavate the steam supply potential, realize the full utilization of energy, reduce the enterprise cost and realize the effects of energy saving and efficiency improvement.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic structural diagram of a combined heat and power generation unit with co-extraction of steam from the hot and cold sections of a reheater in accordance with an embodiment of the present invention;
1-II shaft vibration measuring device, 2-II bearing, 3-II bearing bush cover vibration measuring device, 4-axial displacement measuring device, 5-thrust bush temperature measuring device, 6-thrust bush block, 7-thrust disc, 8-steam turbine rotor, 9-III bearing, 10-thrust bush bearing box, 11-lubricating oil conveying pipe, 12-lubricating oil pump, 13-lubricating oil pump inlet oil pipe, 14-lubricating oil box, 15-lubricating oil return pipe, 16-medium pressure cylinder, 17-high pressure cylinder, 18-high pressure cylinder steam exhaust check valve, 19-steam turbine front bearing box, 20-boiler reheater cold section steam pipe, 21-cold section steam extraction isolation valve, 22-cold section steam extraction check valve, 23-cold section steam extraction regulating valve, 24-cold section steam extraction pipeline, 25-I heat supply steam header, 26-I heat supply steam header steam supply isolation valve, 27-I heat supply steam header steam supply regulating valve, 28-I heat supply steam header steam supply pipe, 29-I heat supply steam header safety valve, 30-I heat supply steam header steam pressure measuring device, 31-I heat supply steam header steam temperature measuring device, 32-inter-header pipeline, 33-water spray temperature reducing device, 34-inter-header regulating valve, 35-inter-header isolation valve, 36-boiler reheater, 37-reheater pipe wall metal temperature measuring device, 38-boiler reheater pipeline system, 39-boiler reheater hot section steam pipe, 40-II heat supply steam header, 41-II heat supply steam header steam temperature measuring device, 42-II heat supply steam header steam pressure measuring device, 43-II heat supply steam header safety valve, 44-II heat supply steam header steam supply isolating valve, 45-II heat supply steam header steam supply regulating valve, 46-II heat supply steam header steam supply pipe, 47-hot section steam extraction pipeline, 48-hot section steam extraction regulating valve, 49-hot section steam extraction check valve, 50-hot section steam extraction isolating valve, 51-main steam pipe, 52-intermediate pressure cylinder steam inlet regulating valve, 53-high pressure cylinder steam inlet regulating valve, 54-I shaft vibration measuring device, 55-I bearing bush cover vibration measuring device, 56-I bearing, 57-data acquisition and control device, 58-oil return cooler, 59-hot section steam extraction flow measuring device and 60-cold section steam extraction flow measuring device.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Fig. 1 is a schematic structural diagram of a combined heat and power generation unit with reheater hot and cold sections cooperatively extracting steam according to an embodiment of the present invention, including a first heating steam header 25, a second heating steam header 40, a boiler reheater 36, a high pressure cylinder 17, an intermediate pressure cylinder 16, a data acquisition and control device 57, a thrust shoe lubricating oil system, pipes, a measurement device, and valves;
the high-pressure cylinder 17 is connected with a cold section of a boiler reheater; the cold section of the boiler reheater is connected with a first heat supply steam header 25 through a cold section steam extraction pipeline 24, and a cold section steam extraction isolation valve 21, a cold section steam extraction check valve 22, a cold section steam extraction regulating valve 23, a cold section steam extraction flow measuring device 60 and the cold section steam extraction pipeline 24 are sequentially arranged in the middle of the boiler reheater; the intermediate pressure cylinder 16 is connected with a hot section of a boiler reheater; the hot section of the boiler reheater is connected with the II-th heat supply steam header 40 through a hot section steam extraction pipeline 47, and a hot section steam extraction isolation valve 50, a hot section steam extraction check valve 49, a hot section steam extraction flow measuring device 59 and a hot section steam extraction regulating valve 48 are sequentially arranged in the middle of the boiler reheater; the first heat supply steam header 25 and the second heat supply steam header 40 are connected through an inter-header pipeline 32, and an inter-header isolation valve 35, an inter-header adjusting valve 34 and a water spraying temperature reduction device 33 are arranged in the middle;
the data acquisition and control device 57 is respectively connected with the measuring device and the valve through signal lines; the measuring device comprises a second axial vibration measuring device 1, a first axial vibration measuring device 54, a second bearing bush cover vibration measuring device 3, a first bearing bush cover vibration measuring device 55, an axial displacement measuring device 4, a thrust bush temperature measuring device 5, a reheater pipe wall metal temperature measuring device 37, a first heat supply steam header steam temperature measuring device 31, a second heat supply steam header steam temperature measuring device 41, a cold section steam extraction flow measuring device 60 and a hot section steam extraction flow measuring device 59; the valves comprise a cold section steam extraction regulating valve 23, a first heat supply steam header steam supply regulating valve 27, a header chamber regulating valve 34, a header chamber isolating valve 35, a second heat supply steam header steam supply regulating valve 45, a hot section steam extraction regulating valve 48, a medium pressure cylinder steam inlet regulating valve 52, a high pressure cylinder steam inlet regulating valve 53, a cold section steam extraction isolating valve 21, a header chamber isolating valve 35, a second heat supply steam header steam supply isolating valve 44 and a hot section steam extraction isolating valve 50; the II shaft vibration measuring device 1 is arranged at a shaft neck of the II bearing 2 close to the side of the intermediate pressure cylinder 16; the first shaft vibration measuring device 54 is arranged at the position of a journal of a first bearing 56 close to the side of the intermediate pressure cylinder 16; the II bearing bush cover vibration measuring device 3 is arranged on the II bearing 2 bush cover; the axial displacement measuring device 4 is fixedly arranged on a thrust pad cover of the thrust pad 6; the thrust pad temperature measuring device 5 is arranged in the thrust pad 6; the reheater pipe wall metal temperature measuring device 37 is installed on the metal pipe wall of a boiler reheater pipe system 38; the steam inlet regulating valve 52 of the intermediate pressure cylinder is arranged on a steam pipe 39 of a hot section of a boiler reheater, which is connected with the boiler reheater by the intermediate pressure cylinder; the high-pressure cylinder steam admission control valve 53 is provided on the main steam pipe 51 connecting the high-pressure cylinder to the boiler reheater.
A first heat supply steam header 25 in the heat and cold section coordinated steam extraction heat and power cogeneration unit of the reheater is provided with a first heat supply steam header safety valve 29, a first heat supply steam header steam temperature measuring device 31 and a first heat supply steam header steam pressure measuring device 30, and steam is supplied to the outside through a first heat supply steam header steam supply pipe 28; the first heat supply steam header steam supply pipe 28 is provided with a first heat supply steam header steam supply isolation valve 26 and a first heat supply steam header steam supply regulating valve 27. The safety valve and the measuring device not only prevent the overpressure damage of the heat supply steam header, but also realize the function of measuring and monitoring the temperature and pressure of the steam in the heat supply steam header.
A second heat supply steam header safety valve 43, a second heat supply steam header steam temperature measuring device 41 and a second heat supply steam header steam pressure measuring device 42 are arranged on a second heat supply steam header 40 in the heat and cold section coordinated steam extraction heat and power cogeneration unit, and steam is supplied to the outside through a second heat supply steam header steam supply pipe 46; the second heat supply steam header steam supply pipe 46 is provided with a second heat supply steam header steam supply isolation valve 44 and a second heat supply steam header steam supply regulating valve 45.
The thrust pad lubricating oil system in the combined heat and power generation unit with the reheater cold and hot section cooperated with steam extraction comprises a thrust pad bearing box 10, a lubricating oil delivery pipe 11, a lubricating oil pump 12, a lubricating oil pump inlet oil pipe 13, a lubricating oil tank 14, a lubricating oil return pipe 15 and a return oil cooler 58, which are arranged between a second bearing 2 and a third bearing 9; a thrust pad 6 is arranged in the thrust pad bearing box 10; a thrust disc 7 is arranged in the middle of the thrust pad 6, and lubricating oil is arranged between the thrust pad 6 and the thrust disc 7; the thrust disc 7 is arranged on a steam turbine rotor 8; and Pt100 platinum resistance thermometers are arranged in the thrust pads 6. The thrust pad lubricating system is mainly used for lubricating the thrust pad and taking away heat generated in the friction process of the thrust pad, plays roles in cooling and reducing friction, and plays a good role in protecting a thrust pad block, a thrust disc and a steam turbine rotor.
The control method of the combined heat and power generation unit based on the cooperation of the cold and hot sections of the reheater and steam extraction comprises the following steps:
1) checking before starting the unit:
when the unit is in a shutdown state, checking whether middle valves on a steam extraction pipeline of a high-pressure cylinder and a first heat supply steam header, a steam extraction pipeline of a middle-pressure cylinder and a second heat supply steam header, and a pipeline between the first heat supply steam header and the second heat supply steam header are in a normal state and ensuring the normal state;
2) the unit starts:
after the unit is started, the observation data acquisition and control device of the cold-section steam extraction regulating valve and the hot-section steam extraction regulating valve is adjusted to enable the steam extraction flow of the cold section of the boiler reheater to be basically similar to the steam extraction flow of the hot section of the boiler reheater, and meanwhile, whether parameters such as axial displacement, first shaft vibration, second shaft vibration, first bearing bush cover vibration, second bearing bush cover vibration, thrust bush temperature and reheater pipe wall metal temperature are in safe range values or not is observed;
3) when the monitored axial displacement of the parameter is close to a negative alarm value, the opening degree of the cold-section steam extraction regulating valve (23) is required to be reduced, and when the monitored axial displacement of the parameter is close to a positive alarm value, the opening degree of the hot-section steam extraction regulating valve (48) is required to be increased, so that the axial displacement is recovered to a safe range value;
4) when the metal temperature of the pipe wall of the reheater is monitored to be close to an alarm value, the opening degree of the cold section steam extraction regulating valve (23) is adjusted to be small, the opening degree of the hot section steam extraction regulating valve (48) is adjusted to be large, and the pipe wall temperature of the reheater is recovered to a safe range value.
The embodiment is a 300MW heat supply unit, and the steam turbine is a subcritical, once intermediate reheating, two-cylinder two-steam-exhaust and condensing steam turbine, and the model is as follows: n300-16.7/538/538-9; the main design parameters of the unit are shown in table 1 below, and all references to pressure (or vacuum) are absolute pressures. The steam supply pressure required by the heat utilization enterprises is 1.3MPa of the steam pressure of the first heat supply steam header and 0.8MPa of the steam pressure of the second heat supply steam header.
TABLE 1 Main design parameters of the unit
The unit operation mode, the heat supply process and the monitoring control method comprise the following steps:
a monitoring system and a method thereof are described according to the running state of a certain working condition with the total heat supply steam flow of a unit as 100 t/h.
Example 1:
when the steam extraction flow rate from the cold section of the boiler reheater is basically similar to that of the hot section of the boiler reheater (about 50 t/h), as shown by working condition 1 in table 2, the monitored parameters are all within the normal operation parameter range, and the unit can safely operate.
Example 2:
when the flow of 100t/h heat supply steam is only extracted from the hot section of the boiler reheater, as shown in a working condition 2 in table 2, the axial displacement in the monitored parameters is changed from-0.16 mm to-0.56 mm, the axial displacement is close to an alarm value of-0.63 mm, and the unit has potential safety operation hazards;
example 3:
when the flow rate of 100t/h heat supply steam is only extracted from the cold section of the boiler reheater, as shown in working condition 3 in table 2, the metal temperature of the reheater pipe wall in the monitored parameters is changed from 535 ℃ to 561 ℃, the temperature is not far away from the alarm value of 575 ℃, and the pipe wall of the reheater has the potential risk of overtemperature damage;
the detailed unit operation condition monitoring data is shown in table 2. The related protection fixed values of the invention are shown in table 3, and the related operations of alarming and shutdown protection are carried out according to the protection fixed values in table 3.
TABLE 2 monitoring data Table
TABLE 3 protection constant value table
Name (R) | Unit of | Normal value | Alarm value | Shutdown value |
Axial displacement | -0.63~+1.05 | -0.63 or +1.05 | -0.83 or +1.25 | |
Shaft vibration | μm | ≤76μm | ≥125μm | 200μm |
Bearing bush cover vibration | μm | <50μm | ≥50μm | Is free of |
Thrust bearing temperature | ℃ | <85 | 100 | 110 |
Reheater tube wall metal temperature | ℃ | 540 | 575 deg.C alarm |
Through the analysis and comparison of the embodiment 1, the embodiment 2 and the embodiment 3, when the steam extraction mode is simultaneously opened for the cold section and the hot section of the reheater, and the extraction amounts of the cold section and the hot section of the reheater are close to each other, the temperature of the pipe wall of the reheater of the unit, the vibration of the bearings at the two ends of the high and medium pressure cylinder and the axial displacement of the turbine rotor are all within the safe range.
The foregoing detailed description of the embodiments of the present invention has been presented for the purposes of illustrating the principles and implementations of the present invention and is provided only for the purpose of facilitating an understanding of the principles and core concepts of the present invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, there may be variations in the specific embodiments and the application scope, and in summary, the content of the present specification should not be construed as a limitation to the present invention.
Claims (4)
1. A combined heat and power generation unit with a reheater cold and hot section for cooperative steam extraction is characterized by comprising a first heat supply steam header (25), a second heat supply steam header (40), a boiler reheater (36), a high-pressure cylinder (17), an intermediate-pressure cylinder (16), a data acquisition and control device (57), a thrust shoe lubricating oil system, a pipeline, a measuring device and a valve;
the high-pressure cylinder (17) is connected with a cold section of a boiler reheater; the cold section of the boiler reheater is connected with a first heat supply steam header (25) through a cold section steam extraction pipeline (24), and a cold section steam extraction isolation valve (21), a cold section steam extraction check valve (22), a cold section steam extraction regulating valve (23), a cold section steam extraction flow measuring device (60) and a cold section steam extraction pipeline (24) are sequentially arranged in the middle of the boiler reheater; the intermediate pressure cylinder (16) is connected with a hot section of a boiler reheater; the hot section of the boiler reheater is connected with a second heat supply steam header (40) through a hot section steam extraction pipeline (47), and a hot section steam extraction isolation valve (50), a hot section steam extraction check valve (49), a hot section steam extraction flow measuring device (59) and a hot section steam extraction regulating valve (48) are sequentially arranged in the middle of the boiler reheater; the first heat supply steam header (25) and the second heat supply steam header (40) are connected through an inter-header pipeline (32), and an inter-header isolating valve (35), an inter-header adjusting valve (34) and a water spraying temperature reducing device (33) are arranged in the middle of the first heat supply steam header and the second heat supply steam header;
the data acquisition and control device (57) is respectively connected with the measuring device and the valve through signal wires; the measuring device comprises a second axial vibration measuring device (1), a first axial vibration measuring device (54), a second bearing bush cover vibration measuring device (3), a first bearing bush cover vibration measuring device (55), an axial displacement measuring device (4), a thrust bush temperature measuring device (5), a reheater pipe wall metal temperature measuring device (37), a first heat supply steam header steam temperature measuring device (31), a second heat supply steam header steam temperature measuring device (41), a cold section steam extraction flow measuring device (60) and a hot section steam extraction flow measuring device (59); the valves comprise a cold section steam extraction regulating valve (23), a first heat supply steam header steam supply regulating valve (27), a header chamber regulating valve (34), a header chamber isolating valve (35), a second heat supply steam header steam supply regulating valve (45) and a hot section steam extraction regulating valve (48);
a middle pressure cylinder steam inlet regulating valve (52), a high pressure cylinder steam inlet regulating valve (53), a cold section steam extraction isolating valve (21), a header isolating valve (35), a II-th heat supply steam header steam supply isolating valve (44) and a hot section steam extraction isolating valve (50); the second shaft vibration measuring device (1) is arranged at a shaft neck of the second bearing (2) close to the side of the intermediate pressure cylinder (16); the first shaft vibration measuring device (54) is arranged at a shaft neck of the first bearing (56) close to the side of the intermediate pressure cylinder (16); the II bearing bush cover vibration measuring device (3) is arranged on the II bearing (2) bush cover; the axial displacement measuring device (4) is fixedly arranged on a thrust pad cover of the thrust pad (6); the thrust pad temperature measuring device (5) is arranged in the thrust pad (6); the reheater pipe wall metal temperature measuring device (37) is arranged on the metal pipe wall of the boiler reheater pipe system (38); the steam inlet regulating valve (52) of the intermediate pressure cylinder is arranged on a steam pipe (39) of a hot section of a boiler reheater, which is connected with the boiler reheater; the high-pressure cylinder steam inlet regulating valve (53) is arranged on a main steam pipe (51) connected with the boiler reheater.
2. The reheater combined heat and power generation unit with co-extraction of steam in the cold and hot sections according to claim 1, wherein the first heating steam header (25) is provided with a first heating steam header safety valve (29), a first heating steam header steam temperature measuring device (31), and a first heating steam header steam pressure measuring device (30), and steam is supplied to the outside through a first heating steam header steam supply pipe (28); be equipped with I heat supply steam header on I heat supply steam header steam supply pipe (28) and supply vapour isolating valve (26), I heat supply steam header and supply vapour governing valve (27).
3. The combined heat and power generation unit with co-extraction of steam in the cold and hot sections of the reheater according to claim 1, wherein a second heat supply steam header safety valve (43), a second heat supply steam header steam temperature measuring device (41) and a second heat supply steam header steam pressure measuring device (42) are mounted on the second heat supply steam header (40), and steam is supplied to the outside through a second heat supply steam header steam supply pipe (46); and a second heat supply steam header steam supply isolating valve (44) and a second heat supply steam header steam supply adjusting valve (45) are arranged on the second heat supply steam header steam supply pipe (46).
4. The reheater cold and hot section co-extraction cogeneration unit of claim 1, the thrust pad lubricating oil system comprising a thrust pad bearing housing (10), a lubricating oil delivery pipe (11), a lubricating oil pump (12), a lubricating oil pump inlet oil pipe (13), a lubricating oil tank (14), a lubricating oil return pipe (15), a return oil cooler (58) installed between the second bearing (2) and the third bearing (9); a thrust pad block (6) is arranged in the thrust pad bearing box (10); a thrust disc (7) is arranged in the middle of the thrust pad (6), and lubricating oil is arranged between the thrust pad (6) and the thrust disc (7); the thrust disc (7) is arranged on a turbine rotor (8); and Pt100 platinum resistance thermometers are respectively installed in the thrust pads (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011069538.XA CN112502789B (en) | 2020-09-30 | 2020-09-30 | Combined heat and power generation unit with reheater cold and hot sections for steam extraction in cooperation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011069538.XA CN112502789B (en) | 2020-09-30 | 2020-09-30 | Combined heat and power generation unit with reheater cold and hot sections for steam extraction in cooperation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112502789A true CN112502789A (en) | 2021-03-16 |
CN112502789B CN112502789B (en) | 2022-11-22 |
Family
ID=74953601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011069538.XA Active CN112502789B (en) | 2020-09-30 | 2020-09-30 | Combined heat and power generation unit with reheater cold and hot sections for steam extraction in cooperation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112502789B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10331608A (en) * | 1997-05-29 | 1998-12-15 | Hitachi Ltd | Closed steam cooling gas turbine combined plant |
US8820078B1 (en) * | 2013-08-06 | 2014-09-02 | Thomas Edward Duffy | Heat recovery steam generator and method for fast starting combined cycles |
CN106194297A (en) * | 2016-09-27 | 2016-12-07 | 上海电气电站设备有限公司 | The double branch road heating system of a kind of cogeneration turbine |
CN206035552U (en) * | 2016-09-06 | 2017-03-22 | 上海电气电站设备有限公司 | Cogeneration vapour turbine system |
CN108868921A (en) * | 2018-07-12 | 2018-11-23 | 广西电网有限责任公司电力科学研究院 | A kind of large size pure condensed steam formula Turbo-generator Set heating system and heat supply method |
CN208518719U (en) * | 2018-07-12 | 2019-02-19 | 广西电网有限责任公司电力科学研究院 | A kind of large size pure condensed steam formula Turbo-generator Set heating system |
CN110701663A (en) * | 2019-11-05 | 2020-01-17 | 清华大学 | Injection type heat pump exhaust steam recovery heat supply mode and system based on complete thermoelectric decoupling |
CN210738628U (en) * | 2019-08-23 | 2020-06-12 | 广西电网有限责任公司电力科学研究院 | System for distributed combined cycle generator set collaborates power peak regulation and heat supply |
-
2020
- 2020-09-30 CN CN202011069538.XA patent/CN112502789B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10331608A (en) * | 1997-05-29 | 1998-12-15 | Hitachi Ltd | Closed steam cooling gas turbine combined plant |
US8820078B1 (en) * | 2013-08-06 | 2014-09-02 | Thomas Edward Duffy | Heat recovery steam generator and method for fast starting combined cycles |
CN206035552U (en) * | 2016-09-06 | 2017-03-22 | 上海电气电站设备有限公司 | Cogeneration vapour turbine system |
CN106194297A (en) * | 2016-09-27 | 2016-12-07 | 上海电气电站设备有限公司 | The double branch road heating system of a kind of cogeneration turbine |
CN108868921A (en) * | 2018-07-12 | 2018-11-23 | 广西电网有限责任公司电力科学研究院 | A kind of large size pure condensed steam formula Turbo-generator Set heating system and heat supply method |
CN208518719U (en) * | 2018-07-12 | 2019-02-19 | 广西电网有限责任公司电力科学研究院 | A kind of large size pure condensed steam formula Turbo-generator Set heating system |
CN210738628U (en) * | 2019-08-23 | 2020-06-12 | 广西电网有限责任公司电力科学研究院 | System for distributed combined cycle generator set collaborates power peak regulation and heat supply |
CN110701663A (en) * | 2019-11-05 | 2020-01-17 | 清华大学 | Injection type heat pump exhaust steam recovery heat supply mode and system based on complete thermoelectric decoupling |
Non-Patent Citations (3)
Title |
---|
周仁米等: "亚临界机组提升供热能力的研究", 《发电设备》 * |
尹中诚: "600MW超临界机组供热改造实例探索", 《通信电源技术》 * |
文立斌: "大型纯凝汽式汽轮发电机组供热改造方法研究", 《广西电力》 * |
Also Published As
Publication number | Publication date |
---|---|
CN112502789B (en) | 2022-11-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110500148B (en) | High-back-pressure heat supply and monitoring method and system for large steam turbine generator unit | |
CN111237018A (en) | Industrial steam residual pressure cascade utilization system applied to coal-fired steam supply unit in shutdown non-shutdown mode | |
CN112344413B (en) | Low-pressure steam source boosting and heat supplying method for cogeneration unit | |
CN210891604U (en) | Energy-saving auxiliary steam system | |
CN212154886U (en) | Industrial steam residual pressure cascade utilization system applied to coal-fired steam supply unit in shutdown non-shutdown mode | |
CN201671660U (en) | Steam turbine with steam extraction being changed into back pressure type | |
CN215170217U (en) | Unit air seal air supply system for cold start of steam turbine | |
CN112502789B (en) | Combined heat and power generation unit with reheater cold and hot sections for steam extraction in cooperation | |
CN112361423B (en) | Low-pressure steam source boosting and heating device of cogeneration unit | |
CN112503607B (en) | Electric-drive steam boosting and heating device suitable for electric cogeneration unit | |
CN112502788B (en) | Control method of combined heat and power generation unit based on reheater cold and hot section cooperative steam extraction | |
CN108915808A (en) | Double pressure back pressure turbine heating systems | |
CN111237735A (en) | Emergency industrial steam supply system for realizing shutdown and non-shutdown of large coal-fired generator set | |
CN208793049U (en) | Double pressure back pressure turbine heating systems | |
CN210768938U (en) | High back pressure heat supply and monitoring system of large-scale turbo generator set | |
CN111911252A (en) | Supercritical heat supply unit and cold-state starting method thereof | |
CN201714437U (en) | Steam turbine with steam extraction back pressure type changed from double-steam-extraction condensing type | |
CN204806365U (en) | Add energy -saving boiler that is equipped with water -cooled boiler feed water reducing temperature equipment | |
CN209687558U (en) | A kind of steam turbine of thermal power plant low-vacuum-operating phase gland packing leakage processing mechanism | |
CN210088827U (en) | Energy-saving thermal deoxidization system | |
CN208860155U (en) | A kind of device reducing power plant Heating Season condensed water dissolved oxygen content | |
CN112343669A (en) | Cogeneration unit monitoring device suitable for butterfly valve to control steam extraction pressure | |
CN110925730A (en) | Emergency industrial heating system based on shutdown and non-shutdown of coal-fired generating set | |
CN201424966Y (en) | Backpressure steam turbine | |
CN112361424B (en) | Steam boosting heat supply method suitable for electricity cogeneration unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |