CN112488595A - Wisdom building site system - Google Patents

Wisdom building site system Download PDF

Info

Publication number
CN112488595A
CN112488595A CN202011574108.3A CN202011574108A CN112488595A CN 112488595 A CN112488595 A CN 112488595A CN 202011574108 A CN202011574108 A CN 202011574108A CN 112488595 A CN112488595 A CN 112488595A
Authority
CN
China
Prior art keywords
module
equipment
login
cloud end
operation instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011574108.3A
Other languages
Chinese (zh)
Inventor
汤千
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Aolesi Intelligent Technology Co ltd
Original Assignee
Suzhou Aolesi Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Aolesi Intelligent Technology Co ltd filed Critical Suzhou Aolesi Intelligent Technology Co ltd
Priority to CN202011574108.3A priority Critical patent/CN112488595A/en
Publication of CN112488595A publication Critical patent/CN112488595A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C9/00Individual registration on entry or exit
    • G07C9/30Individual registration on entry or exit not involving the use of a pass
    • G07C9/32Individual registration on entry or exit not involving the use of a pass in combination with an identity check
    • G07C9/37Individual registration on entry or exit not involving the use of a pass in combination with an identity check using biometric data, e.g. fingerprints, iris scans or voice recognition
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C9/00Individual registration on entry or exit
    • G07C9/30Individual registration on entry or exit not involving the use of a pass
    • G07C9/38Individual registration on entry or exit not involving the use of a pass with central registration

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Human Computer Interaction (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses an intelligent construction site system which comprises a login end, a cloud end, a site management module and a display module, wherein the login end is connected with the cloud end; the login end issues an operation instruction to the cloud end, and the cloud end decodes and analyzes the operation instruction and judges whether the operation instruction has the authority of logging in the field management module; if yes, the field management module is started, the field management module executes the operation instruction, and meanwhile the operation instruction and the operation result are fed back to the cloud end; the cloud end counts the received feedback information, generates a report and sends the report to a display module; according to the invention, each data stream forms a timely feedback, so that the solution is quick; when the equipment operator is not in the working period, the cloud analyzes the data, issues an operation instruction, changes passive management into active intelligent management, improves emergency response speed and the disposal speed of events, effectively improves the management efficiency of a construction site, and greatly improves the construction safety.

Description

Wisdom building site system
Technical Field
The invention relates to an intelligent construction site system, and belongs to the technical field of Internet of things.
Background
The building industry is one of important material production departments and strut industries of national economy in China, and is a high-risk industry with multiple safety accidents; with the rapid development of economy in China and the positive promotion of novel urbanization construction, the number and scale of construction sites are continuously enlarged, the problems of frequent safety accidents, construction quality, site dust emission and the like of the construction sites come with the increase of the number and scale of the construction sites, and safe construction, green construction and civilized construction become supervision 'pain spots' of government departments; how to strengthen the safety management of the construction site, reduce the accident occurrence frequency and improve the quality of the construction project is an important research subject in front of all levels of government departments, people in the industry and broad students.
In addition, the phenomena of potential safety hazards such as inadequate monitoring, various illegal operations, non-civilized construction and the like exist in the site management, and the safe production and engineering quality management are influenced, because the existing site generally has untimely feedback in the personnel management and the safety management and cannot analyze each data stream in real time to form the timely feedback.
Disclosure of Invention
In view of the above technical problems, the present invention aims to: the intelligent construction site system can strengthen safety management of a construction site, reduce accident frequency and improve the quality of construction engineering.
The technical solution of the invention is realized as follows: an intelligent construction site system comprises a login end, a cloud end, a site management module and a display module; the login end issues an operation instruction to the cloud end, and the cloud end decodes and analyzes the operation instruction and judges whether the operation instruction has the authority of logging in the field management module; if yes, the field management module is started, the field management module executes the operation instruction, and meanwhile the operation instruction and the operation result are fed back to the cloud end; and the cloud end counts the received feedback information, generates a report and sends the report to the display module.
Preferably, the field management module comprises an attendance module, a construction site software management module and a construction site hardware management module; the display module comprises an LED display screen.
Preferably, an entrance guard module and an equipment login module are arranged in the attendance checking module; the attendance checking module judges whether the login end has the login authority of the access control module and the equipment login module according to data stored in the cloud end; if the access control module has the login authority, the access control module is opened; and if the access control module has the login authority of the equipment login module, opening the access control module and the equipment login module.
Preferably, the construction site software management module is connected with an OA approval system and a wagon balance system; the construction site software management module judges whether the login end has the authority of the OA approval system and the wagon balance system according to the data stored in the cloud end; if the login authority of the OA approval system is possessed, the OA approval system is started; and if the login authority of the wagon balance system is possessed, starting the wagon balance system.
Preferably, the construction site hardware management module is connected with hardware equipment, and the hardware equipment is connected with the equipment login module; the hardware equipment comprises tower crane monitoring equipment, hook visual equipment, dust raising equipment, water and electricity meter equipment, monitoring equipment and limb early warning equipment.
Preferably, the entrance guard module is connected with a vehicle identification module, a face identification module and a fingerprint identification module; the access control module controls the opening and closing of the access control module according to the comparison result of the identity authentication information by comparing the identity authentication information stored in the login end at the cloud end; the equipment login module judges whether the login authority is started or not according to the comparison result of the identity authentication information by comparing the identity authentication information stored in the cloud.
Preferably, the OA approval system is used for financial approval and report analysis, the wagon balance system is used for field hardware material analysis of a construction site, and a weight sensor is arranged in the wagon balance system and connected with the entrance guard module.
Preferably, the equipment login module and the preferable tower crane monitoring equipment are used for monitoring the surrounding environment;
the hook visual equipment is used for recording the surrounding environment;
the dust monitoring equipment is connected to the cloud end and is linked with a spraying system to detect PM2.5, and if the density of the PM2.5 exceeds a set value, the spraying system is started to remove dust;
the water meter equipment monitors water consumption and power consumption in real time through an intelligent electric meter;
the monitoring equipment is connected to a cloud end and collects a field picture of a construction site in real time, and the cloud end receives the field picture, compares the field picture with a preset range and outputs a feedback signal;
the limb early warning equipment carries out early warning through intelligent nut real-time monitoring and light and sound.
Due to the application of the technical scheme, compared with the prior art, the invention has the following advantages:
according to the intelligent construction site system, an administrator can perform financial examination and approval, report analysis and on-site hardware material analysis of a construction site through the construction site software management module, and does not need to detect on site every time, so that the working efficiency is greatly improved; when the equipment operator is not in the working period, the cloud analyzes the data and issues an operation instruction, so that automatic supervision facilities are realized, passive management is changed into active intelligent management, the emergency response speed and the disposal speed of events are improved, the management efficiency of a construction site is effectively improved, and the construction safety is greatly improved.
Drawings
The technical scheme of the invention is further explained by combining the accompanying drawings as follows:
FIG. 1 is a schematic diagram of a system architecture of an intelligent worksite system according to the present invention.
Detailed Description
The invention is described below with reference to the accompanying drawings.
As shown in fig. 1, an intelligent worksite system includes an access terminal, a cloud terminal, a worksite management module and a display module; the login end issues an operation instruction to the cloud end, and the cloud end decodes and analyzes the operation instruction and judges whether the operation instruction has the authority of logging in the field management module; if yes, the field management module is started, the field management module executes the operation instruction, and meanwhile the operation instruction and the operation result are fed back to the cloud end; and the cloud end counts the received feedback information, generates a report and sends the report to the display module.
A user logs in the applet/website/APP access system through a login end including a PC end and a mobile end, and identity authentication information of all users is stored in the cloud end; after the identity and the authority are confirmed, the user enters an attendance checking module, a construction site software management module and a construction site hardware management module; an entrance guard module and an equipment login module are arranged in the attendance module, if the attendance module has the login authority of the entrance guard module, the entrance guard module is opened, the entrance guard module is erected at each entrance and exit of the construction site, and a user can carry out the operations of entering and exiting, card punching, leave asking and the like; if the access control module has the login authority of the equipment login module, the access control module can also log in or log out the hardware equipment and call out the basic information of the hardware equipment; the hardware equipment comprises tower crane monitoring equipment, hook visual equipment, dust raising equipment, water and electricity meter equipment, monitoring equipment and limb early warning equipment; the tower crane monitoring equipment is used for monitoring the surrounding environment of the used equipment, and the monitoring content comprises weight, amplitude, gyration, inclination angle, moment and wind speed; the hook visual equipment comprises a video host, a video hard disk and a high-definition camera, and is used for recording and monitoring the surrounding environment of the used equipment in multiple layers and paying attention to the condition of a construction site at any time; the dust monitoring equipment is connected to the cloud end and is linked with a spraying system to detect PM2.5, and if the density of the PM2.5 exceeds a set value, the spraying system is started to remove dust, so that the problem of dust emission in a construction site is solved; the water meter equipment monitors water consumption and power consumption in real time through an intelligent electric meter; when the electricity or water consumption is abnormal, an alarm is given out, so that hidden dangers can be conveniently and timely checked; the monitoring equipment is used for acquiring a field picture of a construction site in real time, sending the field picture to the LED display screen and the cloud end, receiving the field picture by the cloud end, comparing the field picture with a preset range, outputting a feedback signal, and supervising various illegal operations and non-civilized construction; face limit early warning equipment and erect in construction place edge, carry out the early warning through intelligent nut real-time supervision and through light and sound, avoid the personnel of not knowing cause the accidental injury.
If the user has the login authority of the OA examination and approval system, the OA examination and approval system is started, the financial examination and approval and report analysis can be performed, and complicated work flows are reduced; if the access authority of the wagon balance system is possessed, the wagon balance system is started, a weight sensor is arranged in the wagon balance system, the wagon balance system is arranged below the ground surface of each access of the construction site and is connected with the entrance guard module, the wagon balance system is used for analyzing hardware materials on the construction site, detection in the field is not needed every time, and the working efficiency is greatly improved.
According to the intelligent construction site system, the construction site is managed through the attendance module, the construction site software management module and the construction site hardware management module, so that the working efficiency is greatly improved; when the equipment operator is not in the working period, the cloud analyzes the data and issues an operation instruction, so that automatic supervision facilities are realized, passive management is changed into active intelligent management, the emergency response speed and the disposal speed of events are improved, the management efficiency of a construction site is effectively improved, and the construction safety is greatly improved.
The above-mentioned embodiments are merely illustrative of the technical idea and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and implement the present invention, and not to limit the scope of the present invention, and all equivalent changes or modifications made according to the spirit of the present invention should be covered in the scope of the present invention.

Claims (8)

1. An wisdom building site system which characterized in that: the system comprises a login end, a cloud end, a field management module and a display module; the login end issues an operation instruction to the cloud end, and the cloud end decodes and analyzes the operation instruction and judges whether the operation instruction has the authority of logging in the field management module; if yes, the field management module is started, the field management module executes the operation instruction, and meanwhile the operation instruction and the operation result are fed back to the cloud end; and the cloud end counts the received feedback information, generates a report and sends the report to the display module.
2. The intelligent worksite system of claim 1, wherein: the field management module comprises an attendance checking module, a construction site software management module and a construction site hardware management module; the display module comprises an LED display screen.
3. An intelligent worksite system according to claim 2, wherein: an entrance guard module and an equipment login module are arranged in the attendance checking module; the attendance checking module judges whether the login end has the login authority of the access control module and the equipment login module according to data stored in the cloud end; if the access control module has the login authority, the access control module is opened; and if the access control module has the login authority of the equipment login module, opening the access control module and the equipment login module.
4. An intelligent worksite system according to claim 3, wherein: the construction site software management module is connected with an OA examination and approval system and a wagon balance system; the construction site software management module judges whether the login end has the authority of the OA approval system and the wagon balance system according to the data stored in the cloud end; if the login authority of the OA approval system is possessed, the OA approval system is started; and if the login authority of the wagon balance system is possessed, starting the wagon balance system.
5. The intelligent worksite system of claim 4, wherein: the construction site hardware management module is connected with hardware equipment, and the hardware equipment is connected with the equipment login module; the hardware equipment comprises tower crane monitoring equipment, hook visual equipment, dust raising equipment, water and electricity meter equipment, monitoring equipment and limb early warning equipment.
6. An intelligent worksite system according to claim 3, wherein: the entrance guard module is connected with a vehicle identification module, a face identification module and a fingerprint identification module; the access control module controls the opening and closing of the access control module according to the comparison result of the identity authentication information by comparing the identity authentication information stored in the login end at the cloud end; the equipment login module judges whether the login authority is started or not according to the comparison result of the identity authentication information by comparing the identity authentication information stored in the cloud.
7. The intelligent worksite system of claim 4, wherein: the OA approval system is used for carrying out financial approval and report analysis, the wagon balance system is used for analyzing hardware materials on a construction site, and a weight sensor is arranged in the wagon balance system and connected with the entrance guard module.
8. An intelligent worksite system according to claim 5, wherein: the tower crane monitoring equipment is used for monitoring the surrounding environment;
the hook visual equipment is used for recording the surrounding environment;
the dust monitoring equipment is connected to the cloud end and is linked with a spraying system to detect PM2.5, and if the density of the PM2.5 exceeds a set value, the spraying system is started to remove dust;
the water meter equipment monitors water consumption and power consumption in real time through an intelligent electric meter;
the monitoring equipment is connected to a cloud end and collects a field picture of a construction site in real time, and the cloud end receives the field picture, compares the field picture with a preset range and outputs a feedback signal;
the limb early warning equipment carries out early warning through intelligent nut real-time monitoring and light and sound.
CN202011574108.3A 2020-12-28 2020-12-28 Wisdom building site system Pending CN112488595A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011574108.3A CN112488595A (en) 2020-12-28 2020-12-28 Wisdom building site system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011574108.3A CN112488595A (en) 2020-12-28 2020-12-28 Wisdom building site system

Publications (1)

Publication Number Publication Date
CN112488595A true CN112488595A (en) 2021-03-12

Family

ID=74915690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011574108.3A Pending CN112488595A (en) 2020-12-28 2020-12-28 Wisdom building site system

Country Status (1)

Country Link
CN (1) CN112488595A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117520979A (en) * 2023-11-03 2024-02-06 长沙云软信息技术有限公司 Wagon balance measuring equipment based on OCR (optical character recognition) and application method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117520979A (en) * 2023-11-03 2024-02-06 长沙云软信息技术有限公司 Wagon balance measuring equipment based on OCR (optical character recognition) and application method thereof
CN117520979B (en) * 2023-11-03 2024-05-31 长沙云软信息技术有限公司 Wagon balance measuring equipment based on OCR (optical character recognition) and application method thereof

Similar Documents

Publication Publication Date Title
WO2023103505A1 (en) Method for safety early warning for construction site personnel
CN111552216A (en) Construction site intelligent supervision system based on 5G
CN110620906A (en) Electric power construction safety management system based on thing networking
CN203148460U (en) Iron tower monitoring system
CN210691346U (en) Automatic identification system based on construction site hidden danger
CN110533231A (en) Disaster-ridden kind of monitoring and warning and emergency commading system
CN111815831A (en) Intelligent community security system based on Internet of things
CN211877114U (en) Construction site supervisory system based on 5G
CN113011833A (en) Safety management method and device for construction site, computer equipment and storage medium
CN107481478A (en) One kind faces side, hole automatic sensing phonetic warning system
CN212624219U (en) Electronic fence identification system based on artificial intelligence
CN112070941A (en) Wisdom building site is environment supervisory systems for construction
CN111678549A (en) Tower crane operator safety monitoring method, device and system
CN112488595A (en) Wisdom building site system
CN110127526B (en) Intelligent early warning system for tower crane
CN115526523A (en) Evaluation method for intelligent construction site
CN110631683A (en) Building rigid part strain safety monitoring method
CN205105339U (en) Construction project quality safety remote monitering system
CN205121278U (en) Gaseous remote monitoring control system of dangerous chemical
CN214042542U (en) Face limit and prevent tearing open alarm system
CN214475052U (en) Gantry crane safe operation management device
Rongrong et al. Application of intelligent safety supervision based on artificial intelligence technology
CN212832233U (en) Elevator guide rail frame safety early warning system based on cloud platform
CN211979798U (en) Information operation and maintenance personnel behavior compliance linkage early warning system
CN111612995A (en) Frontier defense equipment and system for construction site safety supervision

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210312