CN112467620B - Shielding device and shielding method for live construction - Google Patents

Shielding device and shielding method for live construction Download PDF

Info

Publication number
CN112467620B
CN112467620B CN202011486011.7A CN202011486011A CN112467620B CN 112467620 B CN112467620 B CN 112467620B CN 202011486011 A CN202011486011 A CN 202011486011A CN 112467620 B CN112467620 B CN 112467620B
Authority
CN
China
Prior art keywords
clamping block
shielding
plate
shaft pin
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011486011.7A
Other languages
Chinese (zh)
Other versions
CN112467620A (en
Inventor
刘守志
吴世隆
黄立强
黄佳丽
朱玉祁
陈玉娇
冯超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Changle Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Changle Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Changle Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202011486011.7A priority Critical patent/CN112467620B/en
Publication of CN112467620A publication Critical patent/CN112467620A/en
Application granted granted Critical
Publication of CN112467620B publication Critical patent/CN112467620B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention relates to a shielding device and a shielding method for live construction. The technical scheme includes that the shielding device for live construction comprises a shielding plate, a clamping block II is arranged on the back face of the shielding plate, one face of the clamping block II is connected with the shielding plate through a fixing rod, a clamping block I is arranged on the other face of the clamping block II, the opposite faces of the clamping block I and the clamping block II are in tooth shapes matched with each other, and the clamping block I and the clamping block II are used for being matched with angle steel or square steel for clamping a steel frame electric tower. The invention has the beneficial effects that the tooth-shaped surface of the clamping block can be matched with the shapes of the angle steel and the square steel, so that the shielding device can be adapted to the electric tower with a steel frame structure, and the shape is fitted and clamped firmly; meanwhile, the steel frame is clamped through the matching of the clamping blocks, the shielding device can be directly installed at any construction position without being placed on the ground in advance, and the use is more flexible; meanwhile, the shielding method provided by the invention is convenient to operate and high in safety.

Description

Shielding device and shielding method for live construction
Technical Field
The invention relates to the field of electric power construction equipment, in particular to a shielding device for live construction and a shielding method for live construction.
Background
In the '10 kV overhead distribution line live working management standard', an effective distance is required to be kept to be not less than 0.3 m in low-voltage live working, and if the safe distance cannot be ensured, an insulating baffle, a pipe, cloth and other insulating measures are required to be adopted.
In the prior art, a utility pole shelter disclosed in CN107834426B includes two sleeve-type shelters that can slide up and down, so as to effectively shelter the utility pole. However, the shielding cover is only suitable for cylindrical telegraph poles, and cannot be used for electric towers which are widely used in transformer substations or suburbs and are built by angle steel or square steel, and the sleeve cover body needs to be placed on the ground, the maximum height is limited, and cables are erected at a high position, so that the shielding cover cannot be effectively used in some cases.
Disclosure of Invention
The invention provides a shielding device for live construction, which is adaptive to a steel frame electric tower, is more widely applied and is flexible to use, and aims to solve the problem that the existing electric pole shielding cover cannot be used for the steel frame electric tower.
In order to solve the problems, the technical scheme adopted by the invention is that the shielding device for the live construction comprises a shielding plate, wherein a second clamping block is arranged on the back surface of the shielding plate, one surface of the second clamping block is connected with the shielding plate through a fixed rod, a first clamping block is arranged on the other surface of the second clamping block, the opposite surfaces of the first clamping block and the second clamping block are in mutually matched tooth shapes, and the first clamping block and the second clamping block are used for being matched with and clamping angle steel or square steel of the steel frame electric tower. The tooth-shaped surface of the clamping block can be matched with the shapes of angle steel and square steel, so that the shielding device can be adapted to an electric tower with a steel frame structure, and the shape is fit with and clamped firmly; meanwhile, the steel frame is clamped through the matching of the clamping blocks, the shielding device can be directly installed at any construction position, the shielding device does not need to be placed on the ground in advance, and the shielding device is more flexible to use.
Preferably, the shielding plate comprises a connecting plate, the fixing rod is arranged on the back of the connecting plate, a left folded plate and a right folded plate are arranged on two sides of the connecting plate respectively and are connected with the connecting plate through hinges respectively, and the left folded plate and the right folded plate can rotate around the hinges. The shielding surface can be adjusted, the appearance characteristics of the multi-edge and multi-surface of the steel frame electric tower are matched, and meanwhile, the folding, storage and transportation are realized, so that the space is saved.
Preferably, a connecting part is arranged on one side of the right folding plate opposite to the hinged edge of the connecting plate, a connecting part is arranged on one side of the left folding plate opposite to the hinged edge of the connecting plate, the connecting part protrudes out of the sidelines of the left folding plate and the right folding plate, and a shaft pin hole is formed in the connecting part. The shielding devices can be combined and connected, and the folded plate can not be accidentally opened to lose the shielding and isolating effects when the shielding devices are combined and used.
Preferably, the dead lever includes sleeve and telescopic link, and telescopic link one end is pegged graft in the sleeve, and the telescopic link can stretch out and draw back and rotate in the sleeve, and the other end at the telescopic link is fixed to clamp splice two, still is equipped with fixing bolt on the sleeve, and fixing bolt is used for screwing up the position of fixed telescopic link. The distance between the shielding surface and the electric tower can be adjusted, and the device is suitable for construction occasions with different safety distances.
Preferably, the first clamping block, the second clamping block and the fixing rod are respectively provided with two clamping blocks. The stress is more uniform and the installation is firmer.
Preferably, one side of the first clamping block is provided with a screw rod, the same side of the second clamping block is provided with a mounting hole, the screw rod penetrates through the mounting hole, the screw rod is provided with two clamping nuts, and the two clamping nuts are respectively positioned on two sides of the mounting hole. The distance between the clamping blocks is convenient to adjust, and the clamping is firm.
Preferably, the front surface of the left folded plate is provided with a reflective strip which is arranged on the upper edge and the lower edge of the front surface of the left folded plate and the opposite edges of the hinged edge; the front of the right folded plate is provided with a reflective strip which is arranged on the upper edge and the lower edge of the front of the right folded plate and the opposite edges of the hinged edge. The junction probably has the clearance, sets up reflective stripe and warns, avoids workman, instrument card to go into the clearance.
Preferably, the screening device further comprises a shaft pin, the shaft pin is matched with the shaft pin hole, and the shaft pin is used for connecting the two screening devices. The installation and the connection are convenient and fast, and the operation is convenient.
Preferably, the front surface of the connecting plate is also provided with a shaft pin fixing seat, the shaft pin fixing seat is provided with a through hole, and the shaft pin is inserted into the through hole. Can accomodate integrative the depositing of pivot, avoid losing.
Based on the shielding device, the invention also provides a shielding method for live construction, which comprises the following steps:
A. selecting a certain number of shielding devices according to the construction positions;
B. an installation procedure:
respectively arranging the first clamping block and the second clamping block at two sides of angle steel or square steel of the steel frame electric tower at a construction position;
adjusting a clamping nut to enable the first clamping block and the second clamping block to clamp the angle steel or the square steel, wherein the right-angle appearance of the angle steel or the square steel is clamped by the tooth-shaped opposite surfaces of the first clamping block and the second clamping block;
the connecting plate is set at a position which is not less than a safe distance away from the electric tower by adjusting the telescopic rod and the sleeve;
adjusting the angles of the left folded plate and the right folded plate;
mounting another shielding device at an adjacent position;
C. a combination procedure:
the shaft pin penetrates through shaft pin holes which are close to each other in two adjacent shielding devices;
D. repeating the installation process and the combination process;
completely shielding the construction position;
and inserting the rest shaft pin into the shaft pin fixing seat.
According to the technical scheme, the invention has the advantages that:
1. the shielding device can be adapted to an electric tower with a steel frame structure, and the shape is fitted and clamped firmly;
2. the clamping blocks are matched with the clamping steel frame, so that the shielding device can be directly installed at any construction position without being placed on the ground in advance, and the use is more flexible;
3. a plurality of shielding devices can be combined for use and can shield different construction positions;
4. the folded plate design can be adapted to a complex shielding surface and is convenient to store;
5. after combination, the connection is firm and is not loosened;
6. the distance between the shielding surface and the electric tower is adjustable, and the device is suitable for the safe distance of various construction rules;
7. has warning function.
Meanwhile, the shielding method provided by the invention is convenient to operate and high in safety.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings used in the description will be briefly introduced, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is a schematic structural view of the back side of the embodiment of the present invention.
Fig. 3 is a schematic front view of an embodiment of the present invention.
FIG. 4 is a schematic top view of an embodiment of the present invention.
FIG. 5 is a schematic view of the structure of the present invention in connection with use.
In the figure: 1-1, a left folded plate, 1-2, a right folded plate, 2, a connecting plate, 3, a hinge, 4, a connecting part, 5, an axle pin fixing seat, 6-1, a first clamping block, 6-2, a second clamping block, 7, a screw rod, 8, an expansion rod, 9, a sleeve, 10, a fixing bolt, 11, a light reflecting strip, 12, an axle pin and 13, a clamping nut;
00-1. first shade device, 00-2. second shade device, 00-3. third shade device.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings in the present embodiment, and it is apparent that the embodiments described below are only a part of embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the scope of protection of this patent.
As shown in fig. 1-4, a shielding device for live construction (hereinafter referred to as shielding device) comprises a connecting plate 2, wherein two sides of the connecting plate 2 are respectively provided with a left folded plate 1-1 and a right folded plate 1-2, the left folded plate 1-1 and the right folded plate 1-2 are respectively connected with the connecting plate 2 through hinges 3, the left folded plate 1-1 and the right folded plate 1-2 can rotate by taking the hinges 3 as axes, a connecting part 4 is arranged at one side of the right folded plate 1-2 opposite to the hinged edge of the connecting plate 2, a connecting part 4 is arranged at one side of the left folded plate 1-1 opposite to the hinged edge of the connecting plate 2, the connecting part 4 protrudes out of the border line of the left folded plate 1-1 and the right folded plate 1-2, and a pivot hole is formed in the connecting part 4. The front surface (the surface facing the outside after installation is taken as the front surface, and the surface facing the electric tower is taken as the back surface) of the left folded plate 1-1 is provided with a reflective strip 11, and the reflective strip 11 is arranged on the upper edge, the lower edge and the opposite edge of the hinged edge of the front surface of the left folded plate 1-1; the front surface of the right folded plate 1-2 is provided with a reflective strip 11, the reflective strip 11 is arranged on the upper edge and the lower edge of the front surface of the right folded plate 1-2 and the opposite edges of the hinged edge, and the reflective strip 11 is used for warning the boundary of the shielding device. The back of the connecting plate 2 is provided with an upper sleeve 9 and a lower sleeve 9, one end of the telescopic rod 8 is inserted in the sleeve 9, the telescopic rod 8 can stretch out and draw back and rotate in the sleeve 9, the sleeve 9 is also provided with a fixing bolt 10, the fixing bolt 10 is used for screwing and fixing the position of the telescopic rod 8, the other end of the telescopic rod 2 is provided with a clamping block II 6-2, one surface of the clamping block II 6-2 is connected with the baffle plate through a fixing rod, the other surface of the clamping block II 6-2 is provided with a clamping block I6-1, the opposite surfaces of the clamping block II 6-1 and the clamping block II 6-2 are in a mutually matched tooth shape, one side of the clamping block I6-1 is provided with a screw rod 7, the same side of the clamping block II 6-2 is provided with a mounting hole, the screw rod 7 passes through the mounting hole, the screw rod 7 is provided with two clamping nuts 13, the two clamping nuts 13 are respectively positioned at two sides of the mounting hole, and the clamping nuts 13 are adjusted, the first clamping block 6-1 and the second clamping block 6-2 are matched to clamp angle steel or square steel of the steel frame electric tower.
As shown in fig. 5, a plurality of shielding devices can be combined for use, when the shielding devices are combined, the right folded plate of the first shielding device 00-1 is attached to the edge line of the left folded plate of the second shielding device 00-2, the right folded plate of the second shielding device 00-2 is attached to the edge line of the left folded plate of the third shielding device 00-3, and so on, the plurality of shielding devices are matched to complete the shielding of a complex construction surface, and in order to ensure the firmness of the combination, the adjacent folded plates are fixed by inserting the shaft pin 12 into the shaft pin hole of the connecting part 4; the front of the connecting plate 2 is also provided with a shaft pin fixing seat 5, and the shaft pin 12 is inserted into the shaft pin fixing seat 5 when not used, so that the loss is avoided.
It should be noted that the first, second and third shielding devices are only used for illustrating the connection manner, but not for limitation, and the specific number of the shielding devices should be determined according to the specific construction situation.
Based on the device, the invention also provides a live construction shielding method, which comprises the following steps:
A. selecting a certain number of shielding devices according to the construction positions;
B. an installation procedure:
respectively arranging a first clamping block 6-1 and a second clamping block 6-2 at two sides of angle steel or square steel of the steel frame electric tower at a construction position;
adjusting a clamping nut 13 to enable the first clamping block 6-1 and the second clamping block 6-2 to clamp the angle steel or the square steel, wherein the right-angle shape of the angle steel or the square steel is clamped by the tooth-shaped opposite surfaces of the first clamping block 6-1 and the second clamping block 6-2;
the connecting plate 2 is set at a position which is not less than a safe distance from the electric tower by adjusting the telescopic rod 8 and the sleeve 9;
adjusting the angles of the left folded plate 1-1 and the right folded plate 1-2;
mounting another shielding device at an adjacent position;
C. a combination procedure:
the shaft pin 12 passes through the shaft pin holes which are close to each other in the two adjacent shielding devices;
D. repeating the mounting process and the combining process, and mounting all the shielding devices in required number;
completely shielding the construction position;
the remaining shaft pin 12 is inserted into the shaft pin holder 5.
The above embodiment shows that the beneficial effects of the invention are as follows: the shielding device can be adapted to an electric tower with a steel frame structure, and the shape is fitted and clamped firmly; the clamping blocks are matched with the clamping steel frame, so that the shielding device can be directly installed at any construction position without being placed on the ground in advance, and the use is more flexible; a plurality of shielding devices can be combined for use and can shield different construction positions; the folded plate design can be adapted to a complex shielding surface and is convenient to store; after combination, the connection is firm and is not loosened; the distance between the shielding surface and the electric tower is adjustable, and the device is suitable for the safe distance of various construction rules; has warning function; meanwhile, the shielding method provided by the invention is convenient to operate and high in safety.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (8)

1. The shielding device for live construction is characterized by comprising a shielding plate, wherein a second clamping block (6-2) is arranged on the back of the shielding plate, one surface of the second clamping block (6-2) is connected with the shielding plate through a fixed rod, a first clamping block (6-1) is arranged on the other surface of the second clamping block (6-2), the opposite surfaces of the first clamping block (6-1) and the second clamping block (6-2) are in tooth shapes matched with each other, and the first clamping block (6-1) and the second clamping block (6-2) are used for matching and clamping angle steel or square steel of a steel frame electric tower;
the shielding plate comprises a connecting plate (2), the fixing rod is arranged on the back of the connecting plate (2), a left folded plate (1-1) and a right folded plate (1-2) are respectively arranged on two sides of the connecting plate (2), the left folded plate (1-1) and the right folded plate (1-2) are respectively connected with the connecting plate (2) through hinges (3), and the left folded plate (1-1) and the right folded plate (1-2) can rotate by taking the hinges (3) as axes;
the foldable folding table is characterized in that a connecting portion (4) is arranged on one side, opposite to the hinged side, of the right folding plate (1-2) and the connecting plate (2), a connecting portion (4) is arranged on one side, opposite to the hinged side, of the left folding plate (1-1) and the connecting plate (2), the connecting portion (4) protrudes out of the side line of the left folding plate (1-1) and the side line of the right folding plate (1-2), and a shaft pin hole is formed in the connecting portion (4).
2. The shielding device for electrified construction as claimed in claim 1, wherein the fixing rod comprises a sleeve (9) and a telescopic rod (8), one end of the telescopic rod (8) is inserted into the sleeve (9), the telescopic rod (8) can be extended and retracted in the sleeve (9) and can rotate, the second clamping block (6-2) is fixed at the other end of the telescopic rod (8), the sleeve (9) is further provided with a fixing bolt (10), and the fixing bolt (10) is used for screwing and fixing the position of the telescopic rod (8).
3. The shielding apparatus for electrified construction as claimed in claim 1, wherein there are two of the first clamping block (6-1), the second clamping block (6-2) and the fixing rod, respectively.
4. The shielding device for electrified construction according to claim 1, wherein a screw rod (7) is arranged on one side of the first clamping block (6-1), a mounting hole is arranged on the same side of the second clamping block (6-2), the screw rod (7) passes through the mounting hole, two clamping nuts (13) are arranged on the screw rod (7), and the two clamping nuts (13) are respectively arranged on two sides of the mounting hole.
5. The shielding device for electrified construction as claimed in claim 1, wherein the front surface of the left folding plate (1-1) is provided with a reflective strip (11), and the reflective strip (11) is arranged on the upper edge, the lower edge and the opposite edge of the hinged edge of the front surface of the left folding plate (1-1); the front of the right folded plate (1-2) is provided with a reflective strip (11), and the reflective strip (11) is arranged on the upper edge and the lower edge of the front of the right folded plate (1-2) and the opposite edges of the hinged edge.
6. A screening arrangement for hot-line work according to claim 1, further comprising a shaft pin (12), said shaft pin (12) cooperating with said shaft pin hole, said shaft pin (12) being adapted to connect two screening arrangements.
7. The shielding device for electrified construction as claimed in claim 6, wherein a shaft pin fixing seat (5) is further disposed on the front surface of the connecting plate (2), a through hole is formed on the shaft pin fixing seat (5), and the shaft pin (12) is inserted into the through hole.
8. A live construction shielding method is characterized by comprising the following steps:
A. selecting a certain number of shielding devices according to the construction positions;
B. an installation procedure:
respectively arranging a first clamping block (6-1) and a second clamping block (6-2) at two sides of angle steel or square steel of the steel frame electric tower at a construction position;
adjusting a clamping nut (13) to enable the first clamping block (6-1) and the second clamping block (6-2) to clamp the angle steel or the square steel, wherein the right-angle appearance of the angle steel or the square steel is clamped by the tooth-shaped opposite surfaces of the first clamping block (6-1) and the second clamping block (6-2);
the connecting plate (2) is set at a position which is not less than a safe distance away from the electric tower by adjusting the telescopic rod (8) and the sleeve (9);
the angles of the left folded plate (1-1) and the right folded plate (1-2) are adjusted;
mounting another shielding device at an adjacent position;
C. a combination procedure:
a shaft pin (12) passes through shaft pin holes which are close to each other in two adjacent shielding devices;
D. repeating the installation process and the combination process;
completely shielding the construction position;
and inserting the rest shaft pin (12) into the shaft pin fixing seat (5).
CN202011486011.7A 2020-12-16 2020-12-16 Shielding device and shielding method for live construction Active CN112467620B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011486011.7A CN112467620B (en) 2020-12-16 2020-12-16 Shielding device and shielding method for live construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011486011.7A CN112467620B (en) 2020-12-16 2020-12-16 Shielding device and shielding method for live construction

Publications (2)

Publication Number Publication Date
CN112467620A CN112467620A (en) 2021-03-09
CN112467620B true CN112467620B (en) 2022-04-15

Family

ID=74802998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011486011.7A Active CN112467620B (en) 2020-12-16 2020-12-16 Shielding device and shielding method for live construction

Country Status (1)

Country Link
CN (1) CN112467620B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114284937B (en) * 2021-11-30 2023-10-03 国网陕西省电力有限公司电力科学研究院 Electricity isolation device for safe live working on electric pole
CN114944621B (en) * 2022-07-25 2022-12-30 广东电网有限责任公司佛山供电局 External-breakage-preventing acousto-optic warning device and assembling and disassembling method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204682125U (en) * 2015-06-17 2015-10-07 谢海鹏 A kind of collapsible swinery for preventing epidemic
CN108756417A (en) * 2018-05-25 2018-11-06 深圳市雷凌广通技术研发有限公司 A kind of Guywire tower convenient for adjusting of anti-aging corrosion
CN208088897U (en) * 2018-04-17 2018-11-13 河北金能电力科技股份有限公司 A kind of electric pole construction mask

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7671280B1 (en) * 2007-02-28 2010-03-02 The United States Of America As Represented By The United States Department Of Energy Bird guard
CN209608216U (en) * 2018-11-26 2019-11-08 国网浙江省电力有限公司杭州供电公司 Arrester charged for replacement insulation barrier on a kind of safe switch cross-arm
CN110265922B (en) * 2019-05-31 2020-12-29 国网山东省电力公司平阴县供电公司 Insulating cover that shields
CN110492372A (en) * 2019-09-24 2019-11-22 国网宁夏电力有限公司培训中心 A kind of charged for replacement special insulation barrier for drop-out fuse protector
CN110957673A (en) * 2019-12-30 2020-04-03 国网辽宁省电力有限公司鞍山供电公司 Combined assembly type high-voltage live-line work comprehensive shielding device and use method
CN211908194U (en) * 2020-03-23 2020-11-10 寇辉朝 10kV joins in marriage net non-power-failure operation and shields cover with multi-functional cross arm

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204682125U (en) * 2015-06-17 2015-10-07 谢海鹏 A kind of collapsible swinery for preventing epidemic
CN208088897U (en) * 2018-04-17 2018-11-13 河北金能电力科技股份有限公司 A kind of electric pole construction mask
CN108756417A (en) * 2018-05-25 2018-11-06 深圳市雷凌广通技术研发有限公司 A kind of Guywire tower convenient for adjusting of anti-aging corrosion

Also Published As

Publication number Publication date
CN112467620A (en) 2021-03-09

Similar Documents

Publication Publication Date Title
CN112467620B (en) Shielding device and shielding method for live construction
CN206990657U (en) A kind of electric metering box installing mechanism of adjustable angle
CN105811306A (en) Insulation crossarm for live line work
CN213063451U (en) Rush-repair device for power engineering
US20230010233A1 (en) Electric Generator Protective Cover
CN208024045U (en) A kind of novel power transmission and distribution electric pole
CN217934929U (en) Cable bridge rack
CN112952708B (en) Triangle clamping plate type spacing rod for live working
CN105846182A (en) Compact low-voltage grounding wire
CN209313343U (en) A kind of construction building cable bearer
CN210074726U (en) Wire spacing support
CN210245281U (en) Conductive rod easy to adjust and install
CN211063144U (en) Convenient folding insulating support for transformer equipment that contracts
CN217469334U (en) Outdoor bus bridge lightning protection device
CN212323572U (en) Transmission line crossing point block net pulley device
CN205944844U (en) Box -type substation of dais is stretched in area
CN211081234U (en) Hard isolation fence device for overhauling high-voltage switch cabinet of transformer substation
CN215378403U (en) Electric power engineering cable protection device
CN219998999U (en) Pipeline clamp
CN217106433U (en) Multifunctional protection device for building safety
CN219286951U (en) Spliced electric power cabinet
CN212695680U (en) Be applied to overhead line's electric power fitting
CN217606574U (en) Electric power aluminum alloy tube generating line
CN209217651U (en) A kind of Novel bus duct
CN217370213U (en) On-site cable terminal forming device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant