CN112376923A - Method for correcting large-volume concrete precast column and special tool thereof - Google Patents

Method for correcting large-volume concrete precast column and special tool thereof Download PDF

Info

Publication number
CN112376923A
CN112376923A CN202010614736.3A CN202010614736A CN112376923A CN 112376923 A CN112376923 A CN 112376923A CN 202010614736 A CN202010614736 A CN 202010614736A CN 112376923 A CN112376923 A CN 112376923A
Authority
CN
China
Prior art keywords
foundation
column
cup
wire rope
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010614736.3A
Other languages
Chinese (zh)
Inventor
张丽伟
燕伟
张登辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202010614736.3A priority Critical patent/CN112376923A/en
Publication of CN112376923A publication Critical patent/CN112376923A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

The invention provides a method for correcting a large-volume concrete precast column, which comprises the following steps: embedding a plurality of small iron rings around the cup mouth foundation; after the cup rim foundation is manufactured, an iron cushion block is placed at the bottom of the cup rim foundation, so that the top surface elevation of the cup rim foundation is flush with the ink line marking line which is prefabricated on the prefabricated column; winding a steel wire rope on the column bracket; after the prefabricated column is arranged in the cup mouth foundation, the cup mouth ink line is aligned, and two ends of the steel wire rope are respectively connected with the chain block; the chain block is fixed on a small iron ring with the offset direction opposite to that of the prefabricated column; pulling the chain block to straighten the prefabricated column, and finally taking down the steel wire rope and the chain block; the invention also provides a special tool for the correction method of the large-volume concrete precast column, wherein an iron cushion block is arranged on the bottom surface of the cup opening and is raised at the bottom of the cup opening foundation; a small iron ring is embedded around the cup mouth foundation; the steel wire rope is wound on the part above the bracket of the prefabricated column, and two ends of the steel wire rope are respectively provided with a chain block; the chain block is fixedly connected with a small iron ring at the position opposite to the offset direction of the prefabricated column.

Description

Method for correcting large-volume concrete precast column and special tool thereof
Technical Field
The invention relates to the field of building construction, in particular to a large-volume concrete precast column straightening and mounting method and a special tool thereof.
Background
The concrete precast column straightening comprises two contents: plane position correction and perpendicularity correction. During the straightening operation, the plane position of the column is generally corrected first, and after the plane position is corrected completely, the verticality of the column is corrected.
In the prior art, the plane position is corrected by marking the axis of a foundation on a foundation cup mouth by using ink lines, marking the axis of a column body on a prefabricated column, and aligning the axis shot on the foundation cup mouth with the axis of the column body.
In the prior art, two theodolites are adopted for correcting the verticality and are respectively arranged on two sides of the front surface of a column, and the theodolites must be erected on an axial line to ensure that the sight of a telescope is vertical to an observation surface so as to prevent measurement errors caused by the fact that an upper measuring point and a lower measuring point are not on the same vertical surface. In the traditional method, a sledge hammer is used for striking a steel wedge during correction. The side with large deviation is corrected first, and the side with small deviation is corrected later. If the deviation numbers of the two directions are close, the small surface is corrected first, and then the large surface is corrected. After correcting the right direction, slightly tightening the four wedges with two opposite surfaces, and correcting the other direction. This method is feasible for prefabricated columns of relatively low weight, but is very labour-and time-consuming and inefficient if the mass of the prefabricated column is high. A new precast column straightening method is researched according to actual field requirements.
Disclosure of Invention
The present invention is directed to a method suitable for aligning large volume concrete columns. In order to achieve the purpose, the invention provides the following specific technical means:
a method for correcting a large-volume concrete precast column comprises the following steps:
1) when the cup foundation is bound with steel bars, a plurality of small iron rings with the diameter of 18mm are arranged around the cup foundation, and the small iron rings are pre-embedded in concrete when the foundation is poured;
2) after the cup rim foundation is manufactured, an iron cushion block is placed at the bottom of the cup rim foundation, the thickness of the iron cushion block is the difference value between the designed length part of the prefabricated column inserted into the cup rim in the drawing and the actual depth of the cup rim, and the top surface elevation of the cup rim foundation is aligned with the ink line marking line which is manufactured in advance on the prefabricated column;
3) winding a steel wire rope on the column bracket before the prefabricated column is hoisted;
4) after the prefabricated column is arranged in the cup mouth foundation, the cup mouth ink line is aligned, and two ends of the steel wire rope are respectively connected with the chain block;
5) determining the offset direction of the prefabricated column by means of a theodolite, and fixing the chain block to a small iron ring opposite to the offset direction of the prefabricated column;
6) pulling the chain block to straighten the prefabricated column, and finally taking down the steel wire rope and the chain block.
Compared with the traditional method, the precast column straightening method has the following advantages: 1) the steel wire rope replaces the original hammer and a plurality of steel wedges, and the installation is convenient; 2) the mode of prefabricated post location with reverse drawknot slope replaces throwing into the post side of steel wedge at different sides, different points respectively, has saved manpower and material resources greatly, and the alignment is fast. 3) The straightening tools such as the steel wire rope and the chain block can be used in a turnover way.
The invention also provides a special tool for the correction method of the large-volume concrete precast column, which comprises an iron cushion block, at least one steel wire rope, a chain block and a small iron ring fixed on the foundation ground, wherein the iron cushion block is arranged at the bottom of the cup foundation and is higher than the bottom surface of the cup; the small iron ring is pre-buried around the cup opening foundation; the steel wire rope is wound on the part above the bracket of the prefabricated column, and two ends of the steel wire rope are respectively provided with a chain block; the chain block is fixedly connected with a small iron ring at the position opposite to the offset direction of the prefabricated column.
The tool is simple in structure and convenient to operate, an operation platform is not required, correction can be conveniently performed on a plurality of inclined directions of the prefabricated column, and the correction direction can be changed at any time.
Drawings
FIG. 1 is a schematic view of a calibration operation according to the present invention;
fig. 2 is a schematic diagram of the arrangement of the steel cord according to the present invention.
Detailed Description
The technical scheme of the invention is clearly and completely described in the following with reference to the accompanying drawings.
The invention provides a method for correcting a large-volume concrete precast column, which is shown by combining the accompanying drawings 1 and 2:
1) when the cup foundation 1 is bound with and rolled with the steel bars, a plurality of small iron rings 4 with the diameter of 18mm are arranged around the cup foundation, and the small iron rings 4 are pre-embedded in concrete when the foundation is poured.
2) After the cup rim foundation 1 is manufactured, an iron cushion block 3 is placed at the bottom of the cup rim foundation 1, the thickness of the iron cushion block 3 is the difference value between the designed length part of the prefabricated column 2 inserted into the cup rim and the actual depth of the cup rim in a drawing, and the top surface elevation of the cup rim foundation 1 is flush with the ink line marking line which is made on the prefabricated column 2 in advance. The thickness of the iron shim block 3 in the embodiment of the present invention is 100mm x 15 mm. The iron cushion blocks 3 can reduce the friction force between the prefabricated column 2 and the bottom surface of the cup rim foundation 1, and the thickness of the cushion blocks is determined when the cup bottom of the prefabricated column is leveled.
3) And before the prefabricated column 2 is lifted, a steel wire rope 6 with the thickness of 20mm is wound on the bracket of the column.
4) After the prefabricated column 2 is arranged in the cup rim foundation 1, the cup rim ink line is aligned, and two ends of the steel wire rope 6 are respectively connected with the chain block 5.
5) The offset direction of the prefabricated column 2 is determined by means of theodolites and a chain block 5 is fixed to a small iron ring 4 opposite to the offset direction of the column.
6) Pulling the chain block 5 to straighten the prefabricated column 2, and finally taking down the steel wire rope 6 and the chain block 5.
The special tool for the large-volume concrete precast column correcting method comprises an iron cushion block 3, at least one steel wire rope 6, a chain block 5 and a small iron ring 4 fixed on the ground of a foundation, wherein the iron cushion block 3 is arranged at the bottom of a cup rim foundation 1 and is higher than the bottom surface of the cup rim; the small iron ring 4 is pre-embedded around the cup mouth foundation 1; the steel wire rope 6 is wound on the bracket part of the prefabricated column 2, and two ends of the steel wire rope are respectively provided with a chain block 5; the chain block 5 is fixedly connected with the small iron ring 4 at the position opposite to the offset direction of the prefabricated column 2.
Compared with the traditional method, the precast column straightening method has the following advantages: 1) the steel wire rope replaces the original hammer and a plurality of steel wedges, and the installation is convenient; 2) the mode of prefabricated post location with reverse drawknot slope replaces throwing into the post side of steel wedge at different sides, different points respectively, has saved manpower and material resources greatly, and the alignment is fast. 3) The straightening tools such as the steel wire rope and the chain block can be used in a turnover way.

Claims (2)

1. A method for correcting a large-volume concrete precast column comprises the following specific operation steps:
1) when the cup rim foundation (1) is bound and rolled with steel bars, a plurality of small iron rings (4) with the diameter of 18mm are arranged around the cup rim foundation, and the small iron rings (4) are pre-embedded in concrete when the foundation is poured;
2) after the cup rim foundation (1) is manufactured, an iron cushion block (3) is placed at the bottom of the cup rim foundation (1), the thickness of the iron cushion block (3) is the difference value between the designed length part of the prefabricated column (2) inserted into the cup rim and the actual depth of the cup rim in a drawing, and the top surface elevation of the cup rim foundation (1) is aligned with the ink line marking line which is manufactured in advance on the prefabricated column (2);
3) winding a steel wire rope (6) on the column bracket before the prefabricated column (2) is lifted;
4) after the prefabricated column (2) is arranged in the cup rim foundation (1), the cup rim ink line is aligned, and two ends of the steel wire rope (6) are respectively connected with the chain block (5);
5) determining the offset direction of the prefabricated column (2) by means of a theodolite, and fixing a chain block (5) on a small iron ring (4) opposite to the offset direction of the prefabricated column (2);
6) pulling the chain block (5) to straighten the prefabricated column (2), and finally taking down the steel wire rope (6) and the chain block (5).
2. A special tool for a method of calibrating a large volume precast concrete column of claim 1, wherein: the iron cup comprises an iron cushion block (3), at least one steel wire rope (6), a chain block (5) and a small iron ring (4) fixed on the ground of a foundation, wherein the iron cushion block (3) is arranged at the bottom of a cup rim foundation (1) to heighten the bottom surface of the cup rim; the small iron ring (4) is pre-embedded around the cup mouth foundation; the steel wire rope (6) is wound on the upper part of the bracket of the prefabricated column, and two ends of the steel wire rope are respectively provided with a chain block (5); the chain block (5) is fixedly connected with a small iron ring (4) at the position opposite to the offset direction of the prefabricated column (2).
CN202010614736.3A 2020-06-30 2020-06-30 Method for correcting large-volume concrete precast column and special tool thereof Pending CN112376923A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010614736.3A CN112376923A (en) 2020-06-30 2020-06-30 Method for correcting large-volume concrete precast column and special tool thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010614736.3A CN112376923A (en) 2020-06-30 2020-06-30 Method for correcting large-volume concrete precast column and special tool thereof

Publications (1)

Publication Number Publication Date
CN112376923A true CN112376923A (en) 2021-02-19

Family

ID=74586378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010614736.3A Pending CN112376923A (en) 2020-06-30 2020-06-30 Method for correcting large-volume concrete precast column and special tool thereof

Country Status (1)

Country Link
CN (1) CN112376923A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395339A (en) * 2020-03-23 2020-07-10 中国一冶集团有限公司 Mounting structure and mounting method for accurately embedding cast-in-situ bored pile casing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102041899A (en) * 2009-10-22 2011-05-04 中冶天工建设有限公司 Method for adjusting axis deviation of industrial factory building edge foundation heavy column
CN108166749A (en) * 2017-12-21 2018-06-15 北京首钢建设集团有限公司 A kind of construction method of superelevation bare concrete wall steel form
CN110817678A (en) * 2019-10-31 2020-02-21 中国三冶集团有限公司 Hoisting method of prefabricated column
CN212249279U (en) * 2020-06-30 2020-12-29 中国二十二冶集团有限公司 Special tool for correcting large-volume concrete prefabricated column

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102041899A (en) * 2009-10-22 2011-05-04 中冶天工建设有限公司 Method for adjusting axis deviation of industrial factory building edge foundation heavy column
CN108166749A (en) * 2017-12-21 2018-06-15 北京首钢建设集团有限公司 A kind of construction method of superelevation bare concrete wall steel form
CN110817678A (en) * 2019-10-31 2020-02-21 中国三冶集团有限公司 Hoisting method of prefabricated column
CN212249279U (en) * 2020-06-30 2020-12-29 中国二十二冶集团有限公司 Special tool for correcting large-volume concrete prefabricated column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395339A (en) * 2020-03-23 2020-07-10 中国一冶集团有限公司 Mounting structure and mounting method for accurately embedding cast-in-situ bored pile casing

Similar Documents

Publication Publication Date Title
CN111851565B (en) Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof
CN110219326B (en) Reverse construction method one-column one-pile underwater verticality adjusting construction process
CN112900450A (en) Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method
CN111962504A (en) Construction method for covering and digging top-down permanent steel pipe column
CN105863042A (en) All-steel structure building and construction method thereof
CN111236217A (en) Pile foundation reinforcement cage elevation and centering positioning device and method
JP2819447B2 (en) Building settlement settlement method
CN112376923A (en) Method for correcting large-volume concrete precast column and special tool thereof
CN212249279U (en) Special tool for correcting large-volume concrete prefabricated column
CN103061454A (en) Locating method of installing concrete filled steel tubular column in underground deep hole
CN110470133B (en) Installation method of rotary kiln
CN101684651B (en) Ultralong and ultradeep prestressed high strength concrete centrifuge tube pile construction method
CN103132494A (en) Embedded anchor cone accurate positioning method
CN212771968U (en) Full-prefabricated assembled bridge bearing platform positioning system
CN103276725B (en) Construction structure and construction method of anchor pile for large-tonnage test pile
CN212742614U (en) Foundation inner stand column positioning and mounting structure
CN208701748U (en) It is inverse to make stage integration vertical support system
CN114197894A (en) Construction method of large concrete funnel
CN211499464U (en) Steel pipe concrete composite column for high-rise building and reinforcing system thereof
CN108798042B (en) Steel pipe column integrated construction verticality adjusting method
CN113187154A (en) Construction and installation method of concrete precast column
CN214942601U (en) A positioning tool that is arranged in prefabricated construction conversion layer accurate play muscle of shear force wall reinforcing bar
CN209636842U (en) Tower-crane foundation structure in the engineering of group hole
CN113005910B (en) Construction method of adjustable cable saddle integral high-precision positioning structure
CN215212446U (en) Equipment for mounting and correcting prefabricated column

Legal Events