CN102041899A - Method for adjusting axis deviation of industrial factory building edge foundation heavy column - Google Patents

Method for adjusting axis deviation of industrial factory building edge foundation heavy column Download PDF

Info

Publication number
CN102041899A
CN102041899A CN2009100709248A CN200910070924A CN102041899A CN 102041899 A CN102041899 A CN 102041899A CN 2009100709248 A CN2009100709248 A CN 2009100709248A CN 200910070924 A CN200910070924 A CN 200910070924A CN 102041899 A CN102041899 A CN 102041899A
Authority
CN
China
Prior art keywords
rim
jack
heavy
misalignment
axe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009100709248A
Other languages
Chinese (zh)
Inventor
刘建国
张鹏飞
宋小强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Construction Co Ltd
Original Assignee
MCC Tiangong Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Construction Co Ltd filed Critical MCC Tiangong Construction Co Ltd
Priority to CN2009100709248A priority Critical patent/CN102041899A/en
Publication of CN102041899A publication Critical patent/CN102041899A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a method for adjusting the axis deviation of an industrial factory building edge foundation heavy column, which comprises the following steps of: (1) hoisting a heavy column into an edge foundation; (2) measuring the verticality and the axis deviation of the heavy column by using a theodolite; and (3) adjusting the axis deviation of the heavy column. The axis deviation adjustment of the heavy column comprises the following steps of: firstly, vertically and fixedly installing vertical steel plates on both ends of the heterotopic surfaces of a horizontal rectangular steel plate respectively for forming a base; reclining the vertical steel plate at one end of the base and the horizontal steel plate to the inner wall and the top surface of the convex part of the edge foundation; reclining a jack base on the vertical steel plate at the other end of the base and attaching the end part of a push rod of a jack to the outer wall of the heavy column; controlling the jack to finish the axis deviation adjustment of the heavy column; and fixing by using a steel wedge with corresponding size. The adjusting method has the advantages of simple and easy operation, high operating safety, attractive edge foundation appearance, higher precision, effective improvement on the construction quality, shortening of the construction time and improvement on the construction efficiency.

Description

The heavy pillar misalignment of axe method of adjustment in industrial premises rim of a cup basis
Technical field
The invention belongs to building field, the heavy pillar misalignment of axe method of adjustment in especially a kind of industrial premises rim of a cup basis.
Background technology
In the installation of industrial premises structure, the real abdomen post of large-scale steel pipe lattice column or steel concrete is generally heavy pillar, be when installing in rectangle or the square rim of a cup basis to structure, its heavy pillar misalignment of axe adjustment adopts sledgehammer to impact gad adjustment usually, being about to heavy pillar, to lift the cross section be in the square rim of a cup basis, after treating that wire rope relaxs one's efforts, verticality with the heavy pillar of transit survey, then gad is put into the wall on heavy pillar and rim of a cup basis, beat the misalignment of axe that gad is adjusted heavy pillar with sledgehammer, adjust back crane decoupling device, can carry out steps such as fluid concrete then, though this kind operation can be adjusted the misalignment of axe of heavy pillar, but there are the following problems: 1, knock the damage that gad causes the rim of a cup base concrete easily with sledgehammer, make the basis unstable, whole workmanship is impacted; 2, whole heavy pillar misalignment of axe adjustment precision control difficulty is bigger, and the engineering time is longer, and efficient is lower; 3, it is relatively poor that sledgehammer impacts the safety of gad operation; 4, rim of a cup basis outward appearance is relatively poor, influences aesthetics.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, provide a kind of industrial premises rim of a cup basis heavy pillar misalignment of axe method of adjustment, operation is simple for this method, effectively improve construction quality, shorten the engineering time, improve efficiency of construction, processing safety height, rim of a cup basis aesthetics are good.
The present invention solves its technical problem and is achieved through the following technical solutions:
The heavy pillar misalignment of axe method of adjustment in a kind of industrial premises rim of a cup basis the steps include: that (1) enters heavy pillar lifting in the rim of a cup basis; (2) verticality and the journal offset degree of the heavy pillar of usefulness transit survey; (3) heavy pillar misalignment of axe is adjusted, its heavy pillar misalignment of axe set-up procedure is: at first horizontal rectangular steel plate antarafacial two ends are vertically installed a vertical steel plate respectively and form a pedestal, the vertical steel plate and the horizontal steel plate of pedestal one end are abutted on the inwall and end face of rim of a cup basis protuberance, jack base is abutted on the vertical steel plate of the pedestal other end, and the push rod end of jack is adjacent to heavy pillar outer wall, the control jack finishes the adjustment of heavy pillar misalignment of axe, fixes with the gad of corresponding size.
And described jack is a kind of of jackscrew, tooth bar jack or hydraulic jack.
And, between the push rod end of described jack and the heavy pillar outer wall wooden unit is installed.
And, between described heavy pillar bottom and the rim of a cup basis steel pad is installed.
And the outstanding equal mounting base of wall and the jack in rim of a cup basis at described heavy pillar place adjusted.
Advantage of the present invention and beneficial effect are:
1, the heavy pillar misalignment of axe set-up procedure of the heavy pillar misalignment of axe method of adjustment in this industrial premises rim of a cup basis is: at first horizontal rectangular steel plate antarafacial two ends are vertically installed a vertical steel plate respectively and form a pedestal, on the inwall and end face that the vertical steel plate and the horizontal steel plate of pedestal one end abutted in the rim of a cup basis, jack base is abutted on the vertical steel plate of the pedestal other end, and the push rod end of jack is adjacent to heavy pillar outer wall, the control jack finishes the adjustment of heavy pillar misalignment of axe, gad with corresponding size is fixed, this kind method can be finely tuned by enough jack, precision is higher, improve the quality of construction, and effectively shortened the engineering time.
2. the jack of the heavy pillar misalignment of axe method of adjustment in this industrial premises rim of a cup basis is a kind of of jackscrew, tooth bar jack or hydraulic jack, between the push rod end of jack and the heavy pillar outer wall wooden unit is installed, can increase the lifting surface area of heavy pillar, reduce damage to heavy pillar, when especially heavy pillar is concrete structure, improved the aesthetic measure of installing.
Between the heavy pillar bottom of 3 heavy pillar misalignment of axe methods of adjustment in industrial premises rim of a cup basis and the rim of a cup basis steel pad is installed, the equal mounting base in four sides and the jack on the rim of a cup basis at heavy pillar place are adjusted, the axis of convenient heavy pillar and the adjustment of verticality can accurate in locating.
4. method of operating of the present invention is simple, effectively improve construction quality, shorten the engineering time, improve efficiency of construction, processing safety height, rim of a cup basis aesthetics are good, is the higher heavy pillar misalignment of axe method of adjustment in industrial premises rim of a cup basis of a kind of accuracy.
Description of drawings
Fig. 1 is a mounting structure schematic diagram of the present invention;
Fig. 2 is the vertical view of Fig. 1.
The specific embodiment
The invention will be further described below by specific embodiment, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
The heavy pillar misalignment of axe method of adjustment in a kind of industrial premises rim of a cup basis, the steps include: that (1) enters heavy pillar 1 usefulness crane lifting in the rim of a cup basis 9, the concrete one-time cast-forming is adopted on the rim of a cup basis, the wall cross section of this rim of a cup basis protuberance 8 becomes rectangle or square, it is square that present embodiment adopts, and behind rigging out, the wire rope that is used to bundle heavy pillar loosens, but not decoupling device, so that the adjustment of heavy pillar and protection; (2) with the verticality and the journal offset degree of the heavy pillar of transit survey, obtain offset dimensions accurately; (3) heavy pillar misalignment of axe is adjusted, the steps include: that at first a horizontal rectangular steel plate 6 antarafacial two ends vertically being installed a vertical steel plate respectively forms a pedestal, the vertical steel plate 7 and the horizontal steel plate of pedestal one end are abutted on the inwall 11 and end face 12 of rim of a cup basis protuberance, jack base 4 is abutted on the vertical steel plate 5 of the pedestal other end, and push rod 3 ends of jack are adjacent to heavy pillar outer wall by a wooden unit 2, the control jack finishes the adjustment of heavy pillar misalignment of axe, gad 13 with corresponding size is fixing, jack is a jackscrew, tooth bar jack or hydraulic jack a kind of, present embodiment adopts hydraulic jack, when carrying out the verticality adjustment, adopt installation steel pad 10 to adjust between heavy pillar bottom and the rim of a cup basis, the present invention also can adjust at outstanding equal mounting base of wall and the jack in the rim of a cup basis at heavy pillar place.

Claims (5)

1. the heavy pillar misalignment of axe method of adjustment in industrial premises rim of a cup basis, comprise that step is: (1) enters heavy pillar lifting in the rim of a cup basis; (2) verticality and the journal offset degree of the heavy pillar of usefulness transit survey; (3) heavy pillar misalignment of axe is adjusted, it is characterized in that: the step of described heavy pillar misalignment of axe adjustment is: at first horizontal rectangular steel plate antarafacial two ends are vertically installed a vertical steel plate respectively and form a pedestal, the vertical steel plate and the horizontal steel plate of pedestal one end are abutted on the inwall and end face of rim of a cup basis protuberance, jack base is abutted on the vertical steel plate of the pedestal other end, and the push rod end of jack is adjacent to heavy pillar outer wall, the control jack finishes the adjustment of heavy pillar misalignment of axe, fixes with gad.
2. the heavy pillar misalignment of axe method of adjustment in industrial premises rim of a cup according to claim 1 basis, it is characterized in that: described jack is a kind of of jackscrew, tooth bar jack or hydraulic jack.
3. the heavy pillar misalignment of axe method of adjustment in industrial premises rim of a cup according to claim 1 basis is characterized in that: between the push rod end of described jack and the heavy pillar outer wall wooden unit is installed.
4. the heavy pillar misalignment of axe method of adjustment in industrial premises rim of a cup according to claim 1 basis is characterized in that: between described heavy pillar bottom and the rim of a cup basis steel pad is installed.
5. the heavy pillar misalignment of axe method of adjustment in industrial premises rim of a cup according to claim 1 basis is characterized in that: the outstanding equal mounting base of wall and the jack in rim of a cup basis at described heavy pillar place adjusted.
CN2009100709248A 2009-10-22 2009-10-22 Method for adjusting axis deviation of industrial factory building edge foundation heavy column Pending CN102041899A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100709248A CN102041899A (en) 2009-10-22 2009-10-22 Method for adjusting axis deviation of industrial factory building edge foundation heavy column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100709248A CN102041899A (en) 2009-10-22 2009-10-22 Method for adjusting axis deviation of industrial factory building edge foundation heavy column

Publications (1)

Publication Number Publication Date
CN102041899A true CN102041899A (en) 2011-05-04

Family

ID=43908408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100709248A Pending CN102041899A (en) 2009-10-22 2009-10-22 Method for adjusting axis deviation of industrial factory building edge foundation heavy column

Country Status (1)

Country Link
CN (1) CN102041899A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434003A (en) * 2011-08-29 2012-05-02 山东寿光第一建筑有限公司 Heavy battened steel column construction process
CN103306533A (en) * 2013-04-01 2013-09-18 广东金辉华集团有限公司 Steel column strip substrate structure system and one-off mounting and fixing method thereof
CN104265000A (en) * 2014-09-12 2015-01-07 北京首钢建设集团有限公司 Column mounting method for cup foundation
CN104612407A (en) * 2014-12-23 2015-05-13 浙江锦鑫建设工程有限公司 Hanging method of special-shaped reinforced concrete prefabricated column
CN105484282A (en) * 2014-09-18 2016-04-13 沈阳铝镁设计研究院有限公司 Leveling device inside cup-shaped foundation of pipe steel support and usage method of leveling device
CN105544991A (en) * 2015-12-04 2016-05-04 华北冶建工程建设有限公司 Concrete column hoisting in situ method
CN108086699A (en) * 2017-11-16 2018-05-29 上海二十冶建设有限公司 The misalignment of axe adjusting apparatus and application method of heavy precast concrete column
CN109722993A (en) * 2018-12-29 2019-05-07 中冶天工集团有限公司 It is a kind of for adjusting the method for adjustment of steel box-girder two-dimensional surface position
CN111005401A (en) * 2019-12-12 2020-04-14 贵州建工集团第一建筑工程有限责任公司 Prefabricated concrete component assembling tower footing foundation
CN112376923A (en) * 2020-06-30 2021-02-19 中国二十二冶集团有限公司 Method for correcting large-volume concrete precast column and special tool thereof
CN115126268A (en) * 2022-07-29 2022-09-30 中国化学工程第六建设有限公司 Cup-rim type foundation steel structure stand column rapid alignment tool and construction method thereof

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434003B (en) * 2011-08-29 2014-04-23 山东寿光第一建筑有限公司 Heavy battened steel column construction process
CN102434003A (en) * 2011-08-29 2012-05-02 山东寿光第一建筑有限公司 Heavy battened steel column construction process
CN103306533A (en) * 2013-04-01 2013-09-18 广东金辉华集团有限公司 Steel column strip substrate structure system and one-off mounting and fixing method thereof
CN104265000A (en) * 2014-09-12 2015-01-07 北京首钢建设集团有限公司 Column mounting method for cup foundation
CN105484282B (en) * 2014-09-18 2017-11-10 沈阳铝镁设计研究院有限公司 Levelling device and its application method in a kind of rim of a cup basis of pipeline steel bracket
CN105484282A (en) * 2014-09-18 2016-04-13 沈阳铝镁设计研究院有限公司 Leveling device inside cup-shaped foundation of pipe steel support and usage method of leveling device
CN104612407A (en) * 2014-12-23 2015-05-13 浙江锦鑫建设工程有限公司 Hanging method of special-shaped reinforced concrete prefabricated column
CN104612407B (en) * 2014-12-23 2016-08-17 浙江锦鑫建设工程有限公司 A kind of hanging method of deformed bar concrete prefabricated column
CN105544991A (en) * 2015-12-04 2016-05-04 华北冶建工程建设有限公司 Concrete column hoisting in situ method
CN108086699A (en) * 2017-11-16 2018-05-29 上海二十冶建设有限公司 The misalignment of axe adjusting apparatus and application method of heavy precast concrete column
CN109722993A (en) * 2018-12-29 2019-05-07 中冶天工集团有限公司 It is a kind of for adjusting the method for adjustment of steel box-girder two-dimensional surface position
CN111005401A (en) * 2019-12-12 2020-04-14 贵州建工集团第一建筑工程有限责任公司 Prefabricated concrete component assembling tower footing foundation
CN112376923A (en) * 2020-06-30 2021-02-19 中国二十二冶集团有限公司 Method for correcting large-volume concrete precast column and special tool thereof
CN115126268A (en) * 2022-07-29 2022-09-30 中国化学工程第六建设有限公司 Cup-rim type foundation steel structure stand column rapid alignment tool and construction method thereof

Similar Documents

Publication Publication Date Title
CN102041899A (en) Method for adjusting axis deviation of industrial factory building edge foundation heavy column
CN201495772U (en) Post-poured band formwork supporting device
CN204151701U (en) Single column pier bridge adds steel structure support overturning or slip resistance analysis bracing means
CN103255717A (en) Method for constructing hit-preventing wall
CN101858055A (en) Setting steel pipe bracket support system of cover beam and construction method thereof
CN201447879U (en) Steel column base calibrating and fine adjusting device
CN204357117U (en) A kind of after-pouring band beam-slab template and lattice column thereof
CN210288418U (en) A bracket structure for subway foundation ditch steel shotcrete
CN203626055U (en) Super-high-rise large-section half-embedded type intensive anchor bar steel column base locating support
CN101476330B (en) Mass concrete elastic base and its construction method
CN202689491U (en) Lower supporting type overhanging scaffold
CN105297756A (en) Assembling type formwork structure
CN201381517Y (en) Elastic concrete plinth for supporting large-scale steam turbine generator
CN205476528U (en) Precast pile device of taking one's place fast
CN211597710U (en) A adjustable shore structure of complete set for post-cast strip construction
CN212742614U (en) Foundation inner stand column positioning and mounting structure
CN203113226U (en) Formwork support system with towering asymmetric concrete cantilever structure
CN204456871U (en) A kind of square tube clamp device
CN203222810U (en) Steel column and base structure system
CN114687567A (en) Ultrahigh heavy embedded part hanging construction tool and method
CN201598652U (en) Bidirectional synchronous construction converting structure
CN201827604U (en) Base for high-precision universal mechanical equipment
CN112030996A (en) A construction platform for foundation ditch crown beam upper portion
CN218881604U (en) Axillary corner template supporting structure
CN216641425U (en) Adjustable supporting device for high-rise building construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20110504