CN112282767A CN202011132512.5A CN202011132512A CN112282767A CN 112282767 A CN112282767 A CN 112282767A CN 202011132512 A CN202011132512 A CN 202011132512A CN 112282767 A CN112282767 A CN 112282767A
Authority
CN
China
Prior art keywords
pile
ultra
soil body
grouting
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011132512.5A
Other languages
Chinese (zh)
Inventor
郑书朝
魏元博
樊勋
范志强
倪黄磊
勾顺涛
沈强儒
曹慧
钱王苹
王轶
项子儒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xuchen Traffic Technology Development Co ltd
Original Assignee
Jiangsu Xuchen Traffic Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xuchen Traffic Technology Development Co ltd filed Critical Jiangsu Xuchen Traffic Technology Development Co ltd
Priority to CN202011132512.5A priority Critical patent/CN112282767A/en
Publication of CN112282767A publication Critical patent/CN112282767A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • E21D9/002Injection methods characterised by the chemical composition used
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Architecture (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a construction method for ultra-deep reinforcement of a shield end soil body under water-rich silty-fine sand geology, which comprises the following steps: pile forming test, preparation before construction, in-place of a stirrer, preparation of slurry, drilling and grouting, lifting and stirring, repeated vertical stirring and acceptance inspection. The construction method for ultra-deep reinforcement of the shield end soil body under the water-rich silty-fine sand geology utilizes the ultra-deep triaxial mixing pile to reinforce the soil body, and the ultra-deep triaxial mixing pile is additionally arranged on the outer side of a reinforcing body to serve as a waterproof curtain to prevent the groundwater and sand gushing outside a foundation pit from entering the end well during the entering and exiting of the shield machine, so that the occurrence of water gushing and sand gushing which are most likely to occur in the process of entering and exiting the shield machine is greatly reduced, and the risk of entering and exiting the shield in the full-section silty layer is solved.

Description

Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology
Technical Field
The invention belongs to the field of buildings, and particularly relates to an ultra-deep reinforcement construction method for a shield end soil body under water-rich silty-fine sand geology.
Background
With the advance of the urbanization construction process and the maturity of the shield method technology, the shield method is more and more applied to tunnel engineering in the three-dimensional development of urban space. The safety risk problem caused by the fact that the shield enters and exits the hole under the unfavorable geological working condition gradually attracts attention of the whole industry, and the field worthy of discussion and development is how to effectively reinforce the soil body so as to ensure the safety of the shield in the process of entering and exiting the hole.
Under the development condition and the technical background of the current industry, a plurality of alternative schemes are provided for ultra-deep soil body reinforcement and waterproof curtain construction under unfavorable geology. The construction of the triple high-pressure jet grouting pile is used as a conventional soil body reinforcing mode, the triple high-pressure jet grouting pile has a fatal defect under the geological condition of a water-rich powder fine sand layer, namely, the pile diameter cannot be effectively ensured, and the reinforcing soil body is loosened due to the fact that cement paste is easy to lose due to the large permeability coefficient under the geological condition of the soil layer.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a construction method for ultra-deep reinforcement of a shield end soil body under water-rich silt geology.
In order to achieve the purpose, the invention provides the following technical scheme: a shield end soil body ultra-deep reinforcement construction method under water-rich silty-fine sand geology comprises the following steps:
a. pile-forming test, before construction, pile-forming test is carried out, the drilling and lifting speed of the test pile is controlled to be 0.5m/min, and pile-forming parameters are determined according to the coring result of the test pile;
b. preparing before construction, finding and removing all ground and underground obstacles, measuring a pile placing position according to a reinforced pile plan, and excavating a guide channel according to the central line of a three-axis mixing pile at the pile placing position;
c. the mixer is in place: the triaxial mixing pile machine is in place according to the designed pile position, a steel plate is laid under the pile machine, the levelness of a chassis of the pile machine and the verticality of a pile frame are adjusted, and the verticality of the pile frame is controlled to be less than 1/250;
d. preparing slurry: preparing slurry by combining portland cement with bentonite, wherein the water-cement ratio is controlled to be 1-1.5: 1, pouring the prepared slurry into an aggregate pond to be continuously stirred, wherein the specific gravity of the cement slurry is 1.37, the seepage amount of the cement is 20 percent, and the seepage amount of the bentonite is two thousandth;
e. drilling and grouting: the drill bit of the triaxial mixing pile starts to drill at the speed of 0.5m/min, grouting is started after the drilling depth reaches 10m, the grouting amount is 50-60% of the rated grouting amount during drilling,
f. lifting and stirring: after the drill bit reaches the designed depth, lifting at the speed of 0.5m/min, stirring while lifting, and continuously injecting slurry, wherein the injection amount of the slurry is 40-50 of the rated amount;
g. repeating up-and-down stirring: and lifting the triaxial mixing pile to the top surface, then sinking to the bottom again, then lifting again, and repeating for multiple times.
h. And (4) acceptance: after the construction of the mixing pile is completed, the mixing pile is detected and accepted according to design drawings and relevant standard requirements, and the construction quality is ensured to meet the requirements.
Preferably, the plane view of the reinforcing piles comprises a soil body reinforcing area formed by a plurality of rows of reinforcing piles, ultra-deep triaxial stirring piles are arranged outside the reinforcing area and serve as water-stop curtains, and the stirring piles of the water-stop curtains are constructed by sleeving and driving.
Preferably, in the grouting operation of the steps e and f, the grouting pressure is 3-4 MPa, and the grouting flow is 85L/min.
Preferably, the number of repetitions in step g is 4.
Preferably, the overlapping between two adjacent piles is carried out within 24 hours, and if the overlapping exceeds 24 hours, the grouting amount is increased by 20 percent when the next pile is constructed, and the lifting speed is reduced to 0.3 m/min.
Preferably, for two piles which cannot be overlapped, local pile repair or high-pressure jet grouting pile reinforcement treatment is carried out between the two piles, the overlapping thickness of the pile repair is 10cm, and the outer side of the pile repair is blocked by high-pressure jet grouting.
Compared with the prior art, the construction method for ultra-deep reinforcement of the shield end soil body under the water-rich silt geology disclosed by the invention has the following beneficial effects:
soil body reinforcement with the depth larger than 30m is realized by adopting an ultra-deep triaxial mixing pile;
the method is characterized in that an ultra-deep triaxial mixing pile is used for soil body reinforcement, and the ultra-deep triaxial mixing pile is additionally arranged on the outer side of a reinforcement body to serve as a waterproof curtain for preventing groundwater and sand gushing outside a foundation pit from entering an end well during the entering and exiting of the shield machine, so that the occurrence of water gushing and sand phenomena which are most likely to occur in the process of entering and exiting the tunnel of the shield machine is greatly reduced, and the risk of entering and exiting the tunnel of the shield in a full-section silt layer is solved;
the bentonite is added into the slurry to properly improve the water-cement ratio, so that the prepared slurry can not only ensure the strength and water-stop performance of the constructed cement soil, but also ensure that the prepared slurry has stronger fluidity to ensure that a drilling machine is easy to cut and stir the soil, thereby reducing the working torque of the drilling machine, and avoiding the loosening of a reinforced soil body caused by hole wall collapse under adverse geological conditions
Aiming at the characteristic that the water-rich silt geology is easy to collapse, the lifting speed is strictly controlled, the vacuum negative pressure can be avoided while the sufficient stirring is ensured, and therefore the problem of pile body mud clamping caused by the collapse of the hole wall is avoided.
Detailed Description
The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to specific embodiments of the present invention.
The invention discloses a construction method for ultra-deep reinforcement of shield end soil body under water-rich silty-fine sand geology, which comprises the following steps of arranging a plurality of rows of ultra-deep triaxial stirring piles at an end well to serve as soil body reinforcement, arranging the ultra-deep triaxial stirring piles at the outer side to serve as a waterproof curtain, and constructing the stirring piles of the waterproof curtain by sleeving and beating, wherein the construction method comprises the following steps:
a. and (3) performing a pile-forming test, wherein the pile-forming test is performed before construction, the drilling and lifting speed of a test pile is controlled to be 0.5m/min, coring is performed within 35-50 days from the next day after the test pile construction, the coring position is 1/2 of the radius of the pile body, and construction parameters and cement paste stirring parameters during pile forming are determined according to the coring result of the test pile.
b. Preparing before construction, finding and removing all ground and underground obstacles, measuring a pile placing position according to a reinforced pile plane diagram, excavating a guide channel according to the central line of a three-axis stirring pile at the pile placing position, paying attention to the existence of underground pipelines, creeks and other soft soil layers for excavating the guide channel, and treating in time to ensure the safety of construction pipelines, wherein the bearing capacity of a foundation can meet the requirements of self weight and stable walking of a three-axis pile machine; b1, leveling the construction site, and removing the above-ground and underground obstacles;
b2, controlling the pile placing of the point according to the plane drawing coordinates, and simultaneously placing the pile position control line;
b3, carrying out row-by-row construction on the three-axis mixing piles, determining the initial pile position of each row of piles according to a field control point, and determining the positioning control line of the row;
b4, accurately positioning the mixing pile machine according to the marked pile position after the mixing pile machine arrives at the site, gradually increasing the design interval backwards row by row, re-determining the positioning control line of each row of piles, and measuring the backward movement distance of the control line through a tape measure; b5, determining the translation distance between piles along the axis direction, jumping to construct large sides at two sides, and constructing small middle parts;
b6, each row of piles is measured, positioned and rechecked, the deviation of the displacement of each pile driver is controlled within 5cm through a measuring tape, and construction can be started after the pile driver is qualified.
c. The mixer is in place: the triaxial mixing pile machine is in place according to the designed pile position, a steel plate is laid under the pile machine, the levelness of a chassis of the pile machine and the verticality of a pile frame are adjusted, and the verticality of the pile frame is controlled to be less than 1/250;
and (3) conducting elevation guiding measurement according to a level base point, determining the ground elevation and the reinforcement depth (including the depth of an empty pile and the depth of a real pile), and before construction, clearly marking a drill bit on a pile machine upright column by using an obvious mark to reach the elevation positions of the top and the bottom of the real pile.
During construction, the team leader uniformly commands the pile driver to be in place, the conditions of the upper part, the lower part, the left part and the right part are clearly seen before moving, the obstacles are found to be cleared in time, and the positioning condition is checked and corrected in time after moving; the pile driver is stable and straight, and a total station instrument or a plumb bob is used for observation to ensure the verticality of the drilling machine; after the pile is formed, the deviation of the center of the pile cannot exceed 20mm, and the deviation of the verticality of the pile body cannot exceed 1/250.
d. Preparing slurry: preparing slurry by combining portland cement with bentonite, wherein the water-cement ratio is controlled to be 1-1.5: 1, pouring the prepared slurry into an aggregate pond to be continuously stirred, wherein the specific gravity of the cement slurry is 1.37, the seepage amount of the cement is 20 percent, and the seepage amount of the bentonite is two thousandth;
the bentonite is added into the slurry to properly improve the water-cement ratio, so that the prepared slurry can ensure the strength and water-stopping performance of the constructed cement soil, and simultaneously has stronger fluidity to ensure that a drilling machine is easy to cut and stir the soil, thereby reducing the working torque of the drilling machine, and avoiding the loose reinforced soil body caused by hole wall collapse under adverse geological conditions
The stirring time of the cement paste is not less than 2-3 min, the cement paste is filtered and poured into a material collecting pool, and then the stirring is carried out continuously, so that the cement segregation and grouting are prevented from being carried out continuously and cannot be interrupted. A slurry mixing construction platform is built on a construction site, a bulk cement bucket is arranged near the platform, slurry is trial mixed before starting, after cement slurry is prepared, the dead time is not more than 2 hours,
e. drilling and grouting: the drill bit of the triaxial mixing pile starts to drill at the speed of 0.5m/min, grouting is started after the drilling depth reaches 10m, and the grouting amount is 50-60% of the rated grouting amount during drilling;
and during grouting, controlling the grouting pressure to be 3-4 MPa and the grouting flow to be 85L/min.
f. Lifting and stirring: after the drill bit reaches the designed depth, lifting at the speed of 0.5m/min, stirring while lifting, and continuously injecting slurry, wherein the injection amount of the slurry is 40-50 of the rated amount;
g. repeating up-and-down stirring: and lifting the triaxial mixing pile to the top surface, then sinking to the bottom again, then lifting again, and repeating for 4 times.
h. And (4) acceptance: after the construction of the mixing pile is completed, the mixing pile is detected and accepted according to design drawings and relevant standard requirements, and the construction quality is ensured to meet the requirements.
When the pile is formed, the overlapping between two adjacent piles needs to be carried out within 24 hours, if the overlapping exceeds 24 hours, the grouting amount is increased by 20 percent during the construction of the next pile, and the lifting speed is reduced to 0.3 m/min. For two piles which cannot be overlapped, local pile repairing or high-pressure jet grouting pile reinforcing treatment is carried out between the two piles, the overlapping thickness of the pile repairing is 10cm, and the outer side of the pile repairing is blocked by high-pressure jet grouting.
Therefore, the scope of the present invention should not be limited to the disclosure of the embodiments, but includes various alternatives and modifications without departing from the scope of the present invention, which is defined by the claims of the present patent application.

Claims (6)

1. A shield end soil body ultra-deep reinforcement construction method under water-rich silty-fine sand geology is characterized by comprising the following steps:
a. pile-forming test, before construction, pile-forming test is carried out, the drilling and lifting speed of the test pile is controlled to be 0.5m/min, and pile-forming parameters are determined according to the coring result of the test pile;
b. preparing before construction, finding and removing all ground and underground obstacles, measuring a pile placing position according to a reinforced pile plan, and excavating a guide channel according to the central line of a three-axis mixing pile at the pile placing position;
c. the mixer is in place: the triaxial mixing pile machine is in place according to the designed pile position, a steel plate is laid under the pile machine, the levelness of a chassis of the pile machine and the verticality of a pile frame are adjusted, and the verticality of the pile frame is controlled to be less than 1/250;
d. preparing slurry: preparing slurry by combining portland cement with bentonite, wherein the water-cement ratio is controlled to be 1-1.5: 1, pouring the prepared slurry into an aggregate pond to be continuously stirred, wherein the specific gravity of the cement slurry is 1.37, the seepage amount of the cement is 20 percent, and the seepage amount of the bentonite is two thousandth;
e. drilling and grouting: the drill bit of the triaxial mixing pile starts to drill at the speed of 0.5m/min, grouting is started after the drilling depth reaches 10m, the grouting amount is 50-60% of the rated grouting amount during drilling,
f. lifting and stirring: after the drill bit reaches the designed depth, lifting at the speed of 0.5m/min, stirring while lifting, and continuously injecting slurry, wherein the injection amount of the slurry is 40-50 of the rated amount;
g. repeating up-and-down stirring: and lifting the triaxial mixing pile to the top surface, then sinking to the bottom again, then lifting again, and repeating for multiple times.
h. And (4) acceptance: after the construction of the mixing pile is completed, the mixing pile is detected and accepted according to design drawings and relevant standard requirements, and the construction quality is ensured to meet the requirements.
2. The ultra-deep reinforcement construction method for the shield end soil body under the water-rich silty-fine sand geology according to claim 1, which is characterized in that: the reinforced pile plane graph comprises a soil body reinforced area formed by a plurality of rows of reinforced piles, ultra-deep triaxial stirring piles are arranged on the outer side of the reinforced area and serve as a waterproof curtain, and the stirring piles of the waterproof curtain are constructed by sleeving and driving.
3. The ultra-deep reinforcement construction method for the shield end soil body under the water-rich silty-fine sand geology according to claim 1, which is characterized in that: and e and f, in the grouting operation, the grouting pressure is 3-4 MPa, and the grouting flow is 85L/min.
4. The ultra-deep reinforcement construction method for the shield end soil body under the water-rich silty-fine sand geology according to claim 1, which is characterized in that: the repetition times in the step g are 4 times.
5. The ultra-deep reinforcement construction method for the shield end soil body under the water-rich silty-fine sand geology according to claim 1, which is characterized in that: and overlapping between two adjacent piles is required to be carried out within 24h, if the overlapping time exceeds 24h, the grouting amount is increased by 20% during the construction of the next pile, and the lifting speed is reduced to 0.3 m/min.
6. The ultra-deep reinforcement construction method for the shield end soil body under the water-rich silty-fine sand geology according to claim 5, which is characterized in that: for two piles which cannot be overlapped, local pile repairing or high-pressure jet grouting pile reinforcing treatment is carried out between the two piles, the overlapping thickness of the pile repairing is 10cm, and the outer side of the pile repairing is blocked by high-pressure jet grouting.
CN202011132512.5A 2020-10-21 2020-10-21 Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology Pending CN112282767A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011132512.5A CN112282767A (en) 2020-10-21 2020-10-21 Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011132512.5A CN112282767A (en) 2020-10-21 2020-10-21 Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology

Publications (1)

Publication Number Publication Date
CN112282767A true CN112282767A (en) 2021-01-29

Family

ID=74424628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011132512.5A Pending CN112282767A (en) 2020-10-21 2020-10-21 Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology

Country Status (1)

Country Link
CN (1) CN112282767A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113089656A (en) * 2021-04-13 2021-07-09 中国五冶集团有限公司 Construction method of triaxial mixing pile
CN113530555A (en) * 2021-06-28 2021-10-22 中铁(上海)投资集团有限公司 Construction method for vertical freezing and cement system combined reinforcement of shield in and out tunnel
CN117552806A (en) * 2024-01-11 2024-02-13 中国建筑一局(集团)有限公司 Grouting reinforcement device and method for shield tunnel in service period
CN118278076A (en) * 2024-03-05 2024-07-02 中铁隧道局集团建设有限公司 Method for determining occlusion thickness of horizontal high-pressure jet grouting pile for weak surrounding rock of tunnel

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA345090A (en) * 1934-10-02 Stern Ottokar Column building method
CN101768961A (en) * 2010-01-22 2010-07-07 中铁二十二局集团第六工程有限公司 Construction method of section-steel triaxial soil-cement mixing pile
CN101871214A (en) * 2009-09-11 2010-10-27 朱奎 Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile
CN102979095A (en) * 2012-12-11 2013-03-20 上海强劲地基工程股份有限公司 Method for constructing triaxial cement-soil mixing piles in ultra-hard soil layer
CN105000843A (en) * 2015-08-03 2015-10-28 云南劲宏建设有限公司 Cement paste for construction of structural steel cement mixing pile and use method of cement paste
CN105926597A (en) * 2016-04-26 2016-09-07 浙江水利水电学院 Cement mixing pile treatment method suitable for reclamation projects
CN106194218A (en) * 2016-08-30 2016-12-07 中铁第四勘察设计院集团有限公司 The shield end soil body reinforcement system in high water head deep and thick sand area
CN106894430A (en) * 2017-01-25 2017-06-27 北京市政建设集团有限责任公司 A kind of three axes agitating pile waterproof curtain construction method
CN108343054A (en) * 2018-02-28 2018-07-31 浙江勤业建工集团有限公司 Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction
CN109098175A (en) * 2018-08-21 2018-12-28 江苏兴厦建设工程集团有限公司 A kind of tri-axes deep mixing pile construction method
CN109458184A (en) * 2018-11-22 2019-03-12 重庆大学 Shallow Section shield construction method under lake
CN110159284A (en) * 2019-05-22 2019-08-23 中铁十一局集团第四工程有限公司 Strand hydraulic reclamation stratum shield machine is ultra-shallow earth-covered, big longitudinal slope originates construction method
CN111411970A (en) * 2020-03-25 2020-07-14 中铁三局集团有限公司 Shield starting construction method under water-rich sand layer geological condition
CN111676956A (en) * 2020-07-13 2020-09-18 中铁十六局集团北京轨道交通工程建设有限公司 Reinforced structure at joint of ground wall and enclosure and reinforced structure construction method

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA345090A (en) * 1934-10-02 Stern Ottokar Column building method
CN101871214A (en) * 2009-09-11 2010-10-27 朱奎 Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile
CN101768961A (en) * 2010-01-22 2010-07-07 中铁二十二局集团第六工程有限公司 Construction method of section-steel triaxial soil-cement mixing pile
CN102979095A (en) * 2012-12-11 2013-03-20 上海强劲地基工程股份有限公司 Method for constructing triaxial cement-soil mixing piles in ultra-hard soil layer
CN105000843A (en) * 2015-08-03 2015-10-28 云南劲宏建设有限公司 Cement paste for construction of structural steel cement mixing pile and use method of cement paste
CN105926597A (en) * 2016-04-26 2016-09-07 浙江水利水电学院 Cement mixing pile treatment method suitable for reclamation projects
CN106194218A (en) * 2016-08-30 2016-12-07 中铁第四勘察设计院集团有限公司 The shield end soil body reinforcement system in high water head deep and thick sand area
CN106894430A (en) * 2017-01-25 2017-06-27 北京市政建设集团有限责任公司 A kind of three axes agitating pile waterproof curtain construction method
CN108343054A (en) * 2018-02-28 2018-07-31 浙江勤业建工集团有限公司 Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction
CN109098175A (en) * 2018-08-21 2018-12-28 江苏兴厦建设工程集团有限公司 A kind of tri-axes deep mixing pile construction method
CN109458184A (en) * 2018-11-22 2019-03-12 重庆大学 Shallow Section shield construction method under lake
CN110159284A (en) * 2019-05-22 2019-08-23 中铁十一局集团第四工程有限公司 Strand hydraulic reclamation stratum shield machine is ultra-shallow earth-covered, big longitudinal slope originates construction method
CN111411970A (en) * 2020-03-25 2020-07-14 中铁三局集团有限公司 Shield starting construction method under water-rich sand layer geological condition
CN111676956A (en) * 2020-07-13 2020-09-18 中铁十六局集团北京轨道交通工程建设有限公司 Reinforced structure at joint of ground wall and enclosure and reinforced structure construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周晓华;何冬;杨平;: "富水地层盾构端头加固方式与工艺研究", 森林工程, no. 06, 15 November 2014 (2014-11-15) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113089656A (en) * 2021-04-13 2021-07-09 中国五冶集团有限公司 Construction method of triaxial mixing pile
CN113530555A (en) * 2021-06-28 2021-10-22 中铁(上海)投资集团有限公司 Construction method for vertical freezing and cement system combined reinforcement of shield in and out tunnel
CN117552806A (en) * 2024-01-11 2024-02-13 中国建筑一局(集团)有限公司 Grouting reinforcement device and method for shield tunnel in service period
CN117552806B (en) * 2024-01-11 2024-04-09 中国建筑一局(集团)有限公司 Grouting reinforcement device and method for shield tunnel in service period
CN118278076A (en) * 2024-03-05 2024-07-02 中铁隧道局集团建设有限公司 Method for determining occlusion thickness of horizontal high-pressure jet grouting pile for weak surrounding rock of tunnel
CN118278076B (en) * 2024-03-05 2024-09-06 中铁隧道局集团建设有限公司 Method for determining occlusion thickness of horizontal high-pressure jet grouting pile for weak surrounding rock of tunnel

Similar Documents

Publication Publication Date Title
AU2020103672A4 (en) Construction method of rotary drilling hole-forming and jet mixing cement-soil occlusion curtain piles
CN112282767A (en) Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology
CN107524138B (en) Construction method of ultra-deep foundation pit underground diaphragm wall
CN108842819B (en) Urban rail transit cable line tunnel construction method
AU2021106928A4 (en) Construction method for excavation of deep pit with triaxial mixing pile waterstop curtains and rotary bored cast-in-place pile supports
CN108316339A (en) A kind of construction method of water penetration geology large size arch bridge base
CN109989392B (en) Construction grooving process for sandy soil underground continuous wall
CN113006109B (en) Construction method of waterproof curtain of foundation pit of highly permeable stratum area
CN108755671B (en) Construction method of triaxial mixing pile of water-rich gravel layer
CN112695763A (en) Deep sludge stratum foundation pit excavation method
CN112900468A (en) Bridge foundation construction method suitable for complex geological conditions
CN114575355B (en) Soil protection construction method
CN112609690A (en) Construction method of rotary drilling cast-in-place pile in sea-filling geological complex area
CN110747848A (en) Construction method of gravel layer foundation deep cement mixing pile diaphragm wall
CN110777775A (en) Foundation pit structure and construction method thereof
CN110344418A (en) The structure and its construction technology of support system in a kind of deep basal pit
CN114934502A (en) Underground diaphragm wall protection groove structure of water-rich sand layer and construction method
CN110984126B (en) Construction method for pre-reinforcing and then forming hole of easy-collapse stratum into cast-in-place pile
CN113431097A (en) Protection structure of shallow foundation building next to deep foundation pit engineering and construction method
CN112609686A (en) Construction method of triaxial mixing pile reinforcing pier in sea reclamation geological complex area
CN112176947A (en) Bank protection construction method for concave bank line of sludge layer foundation
CN111270665A (en) Construction method of triaxial mixing pile
CN111456021A (en) Construction method for reversely making enclosure structure by utilizing RJP piles
CN110762286A (en) Drainage pipe network artificial pipe jacking construction process
CN117107737A (en) Treatment method for shallow stratum structure of weak soil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210129