CN101871214A - Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile - Google Patents
Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile Download PDFInfo
- Publication number
- CN101871214A CN101871214A CN200910173222A CN200910173222A CN101871214A CN 101871214 A CN101871214 A CN 101871214A CN 200910173222 A CN200910173222 A CN 200910173222A CN 200910173222 A CN200910173222 A CN 200910173222A CN 101871214 A CN101871214 A CN 101871214A
- Authority
- CN
- China
- Prior art keywords
- pile
- cement mixing
- construction
- mixing pile
- type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004568 cement Substances 0.000 title claims abstract description 57
- 238000010276 construction Methods 0.000 title claims abstract description 43
- 239000002689 soil Substances 0.000 claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 16
- 239000010959 steel Substances 0.000 claims abstract description 16
- 238000000034 method Methods 0.000 claims abstract description 13
- 239000002002 slurry Substances 0.000 claims abstract description 8
- 238000013019 agitation Methods 0.000 claims description 13
- 238000005553 drilling Methods 0.000 claims description 9
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 239000004567 concrete Substances 0.000 claims description 6
- 239000007921 spray Substances 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 4
- 238000003780 insertion Methods 0.000 claims description 4
- 230000037431 insertion Effects 0.000 claims description 4
- 230000002093 peripheral effect Effects 0.000 claims description 4
- 240000002853 Nelumbo nucifera Species 0.000 claims description 3
- 235000006508 Nelumbo nucifera Nutrition 0.000 claims description 3
- 235000006510 Nelumbo pentapetala Nutrition 0.000 claims description 3
- 230000002159 abnormal effect Effects 0.000 claims description 3
- 230000011218 segmentation Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 230000000903 blocking effect Effects 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000003825 pressing Methods 0.000 abstract 1
- 230000008961 swelling Effects 0.000 abstract 1
- 239000004927 clay Substances 0.000 description 5
- 230000008901 benefit Effects 0.000 description 3
- 238000003756 stirring Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 241001310793 Podium Species 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Soil layer | The soil layer title | Bed thickness/m | Natural aqueous rate | Severe | Modulus of compressibility E s1-2/MPa | Bearing capacity of foundation slab/kPa | All side friction/the kPa of stake | End resistance/kPa |
??1 | Clay | ??2.3 | ??45.6 | ??18.05 | ??3.12 | ??60 | ??11 | |
??2 | Sandy silt | ??6.8 | ??39.8 | ??18.63 | ??5.23 | ??130 | ??16 | |
??3 | Mud | ??15.2 | ??72.3 | ??16.45 | ??1.62 | ??45 | ??6 | |
??4 | Mud matter clay | ??3.6 | ??52.5 | ??18.05 | ??3.01 | ??70 | ??10 | |
??5 | Clay | ??5.2 | ??42.8 | ??18.11 | ??3.26 | ??110 | ??14 | ??600 |
??6 | Silty clay | ??14.6 | ??30.6 | ??18.92 | ??18.28 | ??210 | ??21 | ??1100 |
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101732222A CN101871214B (en) | 2009-09-11 | 2009-09-11 | Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101732222A CN101871214B (en) | 2009-09-11 | 2009-09-11 | Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101871214A true CN101871214A (en) | 2010-10-27 |
CN101871214B CN101871214B (en) | 2012-01-04 |
Family
ID=42996285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101732222A Expired - Fee Related CN101871214B (en) | 2009-09-11 | 2009-09-11 | Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101871214B (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103290850A (en) * | 2013-06-20 | 2013-09-11 | 江苏城市职业学院 | Arch combination foundation pit retaining and protection system and construction method thereof |
CN103510509A (en) * | 2013-07-02 | 2014-01-15 | 镇江市城乡建设基础工程有限公司 | Mud counterfort construction method used during pore forming in weathered rock formation with bored pile |
CN103603347A (en) * | 2013-10-31 | 2014-02-26 | 周兆弟 | Anti-soil-accumulation cement mixing precast pile foundation and forming method |
CN105672329A (en) * | 2016-02-29 | 2016-06-15 | 济南轨道交通集团有限公司 | Deep foundation pit large-size prefabricated envelop enclosure and construction method |
CN106522238A (en) * | 2016-11-11 | 2017-03-22 | 上海市机械施工集团有限公司 | Axial loading method for steel supports |
CN106522240A (en) * | 2016-11-11 | 2017-03-22 | 上海市机械施工集团有限公司 | Construction method for synchronously applying prestress to two-way steel supports |
CN107604898A (en) * | 2017-10-07 | 2018-01-19 | 吕琳 | Piling wall is gone along with sb. to guard him in a kind of novel block isolation |
CN108589705A (en) * | 2018-04-25 | 2018-09-28 | 李相峰 | Casing cast-in-place concrete pile |
CN108894211A (en) * | 2018-06-15 | 2018-11-27 | 徐秉凯 | A kind of wall scheme processed of Y-piece mould |
CN109024577A (en) * | 2018-08-24 | 2018-12-18 | 中铁六局集团广州工程有限公司 | Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method |
CN109706940A (en) * | 2019-02-27 | 2019-05-03 | 腾达建设集团股份有限公司 | Foundation pit servo support system setting method |
CN110847164A (en) * | 2019-11-19 | 2020-02-28 | 上海市基础工程集团有限公司 | Construction method of rapid envelope structure of double-wheel milling deep mixing pile with inserted prefabricated part |
CN112282767A (en) * | 2020-10-21 | 2021-01-29 | 江苏旭辰交通科技发展有限公司 | Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology |
-
2009
- 2009-09-11 CN CN2009101732222A patent/CN101871214B/en not_active Expired - Fee Related
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103290850A (en) * | 2013-06-20 | 2013-09-11 | 江苏城市职业学院 | Arch combination foundation pit retaining and protection system and construction method thereof |
CN103510509A (en) * | 2013-07-02 | 2014-01-15 | 镇江市城乡建设基础工程有限公司 | Mud counterfort construction method used during pore forming in weathered rock formation with bored pile |
CN103603347A (en) * | 2013-10-31 | 2014-02-26 | 周兆弟 | Anti-soil-accumulation cement mixing precast pile foundation and forming method |
CN105672329B (en) * | 2016-02-29 | 2017-12-15 | 济南轨道交通集团有限公司 | The large size prefabricated building enclosure of deep basal pit and construction method |
CN105672329A (en) * | 2016-02-29 | 2016-06-15 | 济南轨道交通集团有限公司 | Deep foundation pit large-size prefabricated envelop enclosure and construction method |
CN106522238A (en) * | 2016-11-11 | 2017-03-22 | 上海市机械施工集团有限公司 | Axial loading method for steel supports |
CN106522240A (en) * | 2016-11-11 | 2017-03-22 | 上海市机械施工集团有限公司 | Construction method for synchronously applying prestress to two-way steel supports |
CN106522240B (en) * | 2016-11-11 | 2019-03-12 | 上海市机械施工集团有限公司 | A kind of two-way bracing members are synchronous to apply prestressed construction method |
CN107604898A (en) * | 2017-10-07 | 2018-01-19 | 吕琳 | Piling wall is gone along with sb. to guard him in a kind of novel block isolation |
CN108589705A (en) * | 2018-04-25 | 2018-09-28 | 李相峰 | Casing cast-in-place concrete pile |
CN108894211A (en) * | 2018-06-15 | 2018-11-27 | 徐秉凯 | A kind of wall scheme processed of Y-piece mould |
CN109024577A (en) * | 2018-08-24 | 2018-12-18 | 中铁六局集团广州工程有限公司 | Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method |
CN109706940A (en) * | 2019-02-27 | 2019-05-03 | 腾达建设集团股份有限公司 | Foundation pit servo support system setting method |
CN110847164A (en) * | 2019-11-19 | 2020-02-28 | 上海市基础工程集团有限公司 | Construction method of rapid envelope structure of double-wheel milling deep mixing pile with inserted prefabricated part |
CN112282767A (en) * | 2020-10-21 | 2021-01-29 | 江苏旭辰交通科技发展有限公司 | Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology |
Also Published As
Publication number | Publication date |
---|---|
CN101871214B (en) | 2012-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101871214B (en) | Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile | |
CN102691294B (en) | Construction method of underground continuous wall | |
CN105386408B (en) | Deep-water bridge pile foundation construction method | |
CN104612162B (en) | A kind of Deep Foundation Pit of Metro Stations excavation construction method | |
CN102691300B (en) | Construction method of foundation pit earthwork | |
CN104196034A (en) | Foundation pit construction method employing steel sheet piles as support cofferdam | |
CN105951711A (en) | Enclosing construction method of underground continuous wall of seashore power station | |
CN204491626U (en) | The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine | |
CN110258582B (en) | Inclined support foundation pit supporting structure based on steel pipe pile and Lassen steel plate and construction method | |
CN105953078A (en) | Protection device and protection method of high-pressure gas pipeline | |
CN106498957A (en) | Steel sheet pile cofferdam construction platform and integral construction method | |
CN104727324B (en) | Irregular basement construction method for supporting | |
CN213897154U (en) | Soft soil foundation pit bottom curing structure | |
CN110924401A (en) | Construction foundation pit supporting mode for combined arching and bearing of mixing piles and cast-in-place piles | |
CN114542092A (en) | Shield receiving construction method without bottom plate structure | |
CN111851515B (en) | Adjacent foundation pit cooperative construction enclosure structure and construction method thereof | |
CN108005080A (en) | T-shaped wall+prestressing anchor support body systems approach | |
CN109610508B (en) | Pipe gallery construction method for penetrating built pipe gallery and support replacing structure thereof | |
CN114016495A (en) | Construction method for underground continuous wall system under weak geological conditions in sea reclamation area | |
CN106049516A (en) | Corrugated steel cofferdam hollow digging pile and manufacturing technique thereof | |
CN207582473U (en) | Foundation pit supporting construction | |
CN112065433A (en) | Pipe jacking working well supporting and water stopping assembly and construction method | |
CN205907688U (en) | Manual hole digging pile construction is with self - leveling back pressure device | |
CN205636749U (en) | A excavation supporting system for sandy gravel boulder geological stratification | |
CN212983829U (en) | Miniature pile supporting construction suitable for soft base is handled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: LUO HAIJUN Free format text: FORMER OWNER: ZHU KUI Effective date: 20111027 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20111027 Address after: 325000, No. 65, PU shoe city, Lucheng District, Zhejiang, Wenzhou Applicant after: Luo Haijun Address before: 325000 Wenzhou City, Ouhai province Jingshan Hill group of the building of the 302 room, room 11, Zhejiang Applicant before: Zhu Kui |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: JIANGXI ZHONGXU CONSTRUCTION ENGINEERING CO., LTD. Free format text: FORMER OWNER: LUO HAIJUN Effective date: 20150625 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Sun Chuanyin Inventor before: Zhu Kui |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHU KUI TO: SUN CHUANYIN |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150625 Address after: No. 1619 road 330038 in Jiangxi province Nanchang city Honggutan Red Valley Hongkong international financial center hall thirty floor Patentee after: JIANGXI ZHONGXU CONSTRUCTION ENGINEERING CO., LTD. Address before: 325000, No. 65, PU shoe city, Lucheng District, Zhejiang, Wenzhou Patentee before: Luo Haijun |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120104 Termination date: 20180911 |
|
CF01 | Termination of patent right due to non-payment of annual fee |