CN109024577A - Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method - Google Patents

Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method Download PDF

Info

Publication number
CN109024577A
CN109024577A CN201810979184.9A CN201810979184A CN109024577A CN 109024577 A CN109024577 A CN 109024577A CN 201810979184 A CN201810979184 A CN 201810979184A CN 109024577 A CN109024577 A CN 109024577A
Authority
CN
China
Prior art keywords
stake
mixing pile
heart
support bar
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810979184.9A
Other languages
Chinese (zh)
Inventor
许孔祥
宋凯
赵娟
刘文好
周道国
呼志强
严广玉
张靖
温强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Railway Group Engineering Co. Ltd.
China Railway Sixth Group Co Ltd
Original Assignee
Guangzhou Railway Group Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Railway Group Engineering Co Ltd filed Critical Guangzhou Railway Group Engineering Co Ltd
Priority to CN201810979184.9A priority Critical patent/CN109024577A/en
Publication of CN109024577A publication Critical patent/CN109024577A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

This application involves technical field of building construction, and more particularly, to a kind of engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method, engineering method stake stake heart positioning auxiliary device includes locating rack, support frame and positioning rope;The casing for the mixing pile machine that one end of locating rack is used to be connected in guide groove, there are two hitch points for the other end setting of locating rack, and two hitch points are hung with sash weight respectively;Positioning rope setting is provided with length framing label on the support frame, on positioning rope;Projection of two sash weights along its vertical line direction respectively falls in framing and marks corresponding both ends.It can be seen that, by the way that locating rack is arranged, it realizes the outer of a heart and puts extraction, avoid positioning rope by the destruction of excessive slurries, and then ensure that the accuracy for utilizing the positioning rope guide pile heart again, furthermore, it avoids using the straight-bar guide pile heart, is influenced smaller by the factors such as artificially putting, furthermore present apparatus installation is simple, without moving repeatedly adjustment, operation is simplified.

Description

Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method
Technical field
This application involves technical field of building construction, more particularly, to a kind of engineering method stake stake heart positioning auxiliary device and engineering method Stake stake heart localization method.
Background technique
Currently, SMW engineering method stake is also known as Rigid cable wall, i.e., the steel such as H profile steel are inserted into cement mixing method Material makes simultaneously so as to form with some strength and rigidity, continuous whole, jointless underground wall body together Have the function of stress and impervious two kinds.After the completion of its Support Function, fashioned iron can extract recycling.
In the construction of SMW engineering method stake, the fast accurate control of mixing pile stake heart position is one that construction enterprises face Problem.Specifically, the SMW engineering method stake stake heart position construction common method there are two types of.One is by setting from stake heart fixed range Horizontalization row stake bit-type steel, and framing stake position is identified in fashioned iron surface lacquer or welding short steel rod, it identifies and hangs down by fashioned iron surface Directly put straight-bar and carry out stake heart plane positioning, identified on straight-bar the fixed range from the stake heart or its with a distance from subtract drilling rod half Diameter, principle upper straight rod line are identified and are stirred drilling rod center by framing;It is another that parallel stake bit-type steel is changed to positioning cord, Positioning rope is parallel at the fixed range of stake position and fixes, the paste color adhesive tape identification pile position on filament, similarly by by straight Bar positions lower turn of drilling rod.In both the above method by straight-bar position drilling rod under indexing set, and guarantee straight-bar vertically put and By the way that artificially control is affected in the operating process of drilling rod axle center, when improving precision with a distance from the stake heart by reducing, outside mixing pile Overflow slurries and drilling rod falls stirring soil and may destroy positioning filament, puts when being positioned using parallel fashioned iron and to move fashioned iron more numb It is tired.The artificial control of stake heart positioning causes SMW engineering method stake stake heart deviation long-term existence, and H profile steel insertion is influenced when serious and is enclosed Protect water stopping function.
Summary of the invention
The application's is designed to provide a kind of engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method, with Solve artificial control straight-bar vertical pendulum existing in the prior art and put guide pile heart plan-position easily to cause position error, furthermore when When improving precision with a distance from the stake heart by reducing positioning cord, the stirring soil that the excessive slurries of mixing pile and drilling rod are fallen may be destroyed The more troublesome technical problem of fashioned iron is put and moved when positioning filament, and positioning using parallel fashioned iron.
This application provides a kind of engineering method stake stake heart positioning auxiliary devices, comprising: locating rack and positioning rope;Wherein, institute Positioning rope is stated for being placed in the outside of piling guide groove, is provided with length framing label on positioning rope along its length;Its In, the casing for the mixing pile machine that one end of the locating rack is used to be connected in guide groove, the other end of the locating rack There are two hitch points for setting, and two hitch points are hung with sash weight respectively;Support frame is set to the lower section of the sash weight, and The positioning rope is arranged on support frame as described above;Direction is extended along on positioning rope is provided with length framing label, and described point The length of width label is equal with the distance between the drill rod axis at the mixing pile machine both ends;The vertical line direction of two sash weights It is perpendicular with the extending direction of the positioning rope;One of them described sash weight intersects at described along the sash weight extending direction The end point of framing label, sash weight described in another one intersect at the another of the framing label along the sash weight extending direction On end point.
In the above-mentioned technical solutions, further, the axis line of mixing pile machine both ends drilling rod and the guiding ditch The stake heart line of preset construction mixing pile is located along the same line in slot;The line of two hitch points is parallel to described stir Mix an axis line for machine both ends drilling rod;The flat outside wall surface of the straightway of the mixing pile machine casing is also parallel with the mixing pile The axis line of machine both ends drilling rod;The positioning rope connects also parallel with the stake heart of construction mixing pile preset in the guide groove Line;Positioning rope distance of the stake heart line of preset construction mixing pile in the guide groove is equal to the hitch point The distance of flat outside wall surface apart from the mixing pile machine casing, the casing thickness of the mixing pile machine, the casing flat inner wall Identity distance from the mixing pile machine blade it is outer peripheral with a distance from and the sum of the mixing pile machine blade radius;The framing label Length is equal to the distance between two drill rod axis at the mixing pile machine both ends.
In any of the above-described technical solution, further, the locating rack includes first support bar and second support bar; Wherein, the quantity of the first support bar is two;Two first support bars are symmetrically disposed on the second support bar Both ends, and two first support bars, with the perpendicular connection of the second support bar, two first support bars are separate One end of the second support bar is used to be connected to the planar end surface of the casing;The first support bar and second support Bar is in the same plane, and the plane is perpendicular to the planar end surface of the casing and the vertical line direction of the sash weight, and institute The length for stating second support bar is equal with the distance between the drill rod axis at the mixing pile machine both ends;The first support bar is hung down Directly in the flat outside wall surface of the straightway of the mixing pile machine casing, and the length extension line of the first support bar is stirred by described Mix the axis that a machine corresponds to drilling rod;The hitch point is arranged at the first support bar and the second support bar crosspoint.
In any of the above-described technical solution, further, the locating rack further includes two the first reinforcing bars, described in two First reinforcing bar is symmetricly set on the two sides centered on the midpoint of the second support bar;First reinforcing bar is arranged in institute It states between first support bar and the second support bar.
In any of the above-described technical solution, further, the locating rack further includes multiple second reinforcing bars, multiple described Second reinforcing bar is arranged along the length direction of the second support bar;Multiple second reinforcing bars are supported with described first Bar and the second support bar are located in Different Plane;The multiple described one end of second reinforcing bar far from the second support bar For being connected to the outer surface of the mixing pile machine casing.
In any of the above-described technical solution, further, support frame as described above includes the first locating rod and the second locating rod; Wherein, one end of the positioning rope is arranged in first locating rod, and the other end of the positioning rope is arranged described second In locating rod.
In any of the above-described technical solution, further, the top of the sash weight is lower than the positioning rope.
In any of the above-described technical solution, further, the locating rack is weldingly connected with the casing and connects;Or it is described fixed It is provided with magnet on the frame of position, the locating rack is adsorbed on the casing by the magnet.
In any of the above-described technical solution, further, the framing label is adhesive on the positioning rope.
In any of the above-described technical solution, further, the sash weight is connected to the hitch point by the sash weight rope Place.
Present invention also provides a kind of engineering method stake stake heart localization methods, including engineering method stake described in any of the above-described technical solution Stake heart positioning auxiliary device, thus, whole advantageous effects with the device, here, repeating no more.
Present invention also provides a kind of engineering method stake stake heart localization methods, comprising the following steps:
Step 100. determines the stake heart position of construction mixing pile according to drawing, further according to the model and positioning of mixing pile machine The size of frame calculate hitch point in the guide groove it is preset construction mixing pile stake heart line reference outside put away from From, by the positioning rope be placed into the guide groove it is preset construction mixing pile stake heart line be equal to the reference It puts at the position of distance outside;
The locating rack of the engineering method stake stake heart positioning auxiliary device is mounted on the casing of the mixing pile machine by step 200. On;
Step 300. is respectively along the stake heart line direction for being parallel to preset construction mixing pile in the guide groove 10 And the mobile mixing pile machine in its vertical line direction, and make a sash weight of the engineering method stake stake heart positioning auxiliary device along institute The vertical line direction for stating sash weight is fallen on the end point of the framing label on the positioning rope, the engineering method stake stake heart positioning auxiliary dress Another sash weight set is fallen in along the vertical line direction of the sash weight on another endpoint of the label of the framing on the positioning rope.
Compared with prior art, the application has the beneficial effect that
Engineering method stake stake heart positioning auxiliary device provided by the present application, including a kind of engineering method stake stake heart positioning auxiliary device includes Locating rack, support frame and positioning rope;Wherein, one end of locating rack is used to be connected to the casing of mixing pile machine, locating rack There are two hitch points for other end setting, and two hitch points are hung with sash weight respectively;Support frame is set to the ground of the lower section of sash weight On face, and positioning rope setting is on the support frame;Length framing label is provided on positioning rope along its length, and framing marks Length it is equal with the distance between the drill rod axis at mixing pile machine both ends;The extending directions of two sash weights prolongs with positioning rope It is perpendicular to stretch direction;Two sash weights fall in corresponding framing along extending direction, that is, vertical direction projection of sash weight just and mark Two-end-point at.
Use the process of the engineering method stake stake heart positioning auxiliary device guide pile heart are as follows: guide groove is set out according to drawing in advance first The stake heart of interior construction mixing pile, the size of model and locating rack further according to the mixing pile machine of selection obtain hitch point distance The vertical range of preset mixing pile stake heart line in guide groove, then positioning rope is moved to preset in guide groove Mixing pile stake heart line is equal on the position of above-mentioned distance, and positioning rope is parallel to the preset mixing pile stake heart in guide groove at this time Line, and an end of positioning rope is adjusted at preset position, this engineering method stake stake heart positioning auxiliary dress will be then installed The mixing pile machine set is placed in the guide groove, and respectively along mixing pile stake preset in guide groove heart line direction with And its mobile mixing pile machine in vertical line direction, so that the extending direction, that is, vertical direction of a sash weight on support frame along sash weight Projection falls in one end of framing label, another sash weight on support frame along sash weight the projection of extending direction, that is, vertical direction The other end for falling framing label, at this point, the stake heart position of the piling of mixing pile machine has determined, it is seen that realize and utilize this engineering method Stake stake heart positioning auxiliary device realizes the quick guide pile heart, and avoids using traditional straight-bar localization method, thus by people It influences smaller the factors such as to put, and extractions is put to the outer of the stake heart since the locating rack using the present apparatus realizes, so that positioning Rope farther out, thus avoids excessive slurries and falls on positioning rope, and then anti-fastening apart from guide groove and mixing pile machine Position rope is destroyed, and guarantees stake heart positioning accuracy, in addition, present apparatus installation is simple, without moving repeatedly adjustment, simplifies behaviour Make.
As it can be seen that this engineering method stake stake heart positioning auxiliary device is realized the outer of a heart and puts extraction, guaranteed by setting locating rack Positioning rope not will receive the destruction of the excessive slurries of guide groove, and then ensure that the standard for utilizing the positioning rope guide pile heart again True property, in addition, avoid using straight-bar and the fashioned iron guide pile heart, by artificially put etc. factors influenced it is smaller, in addition, the present apparatus Installation is simple, without moving repeatedly adjustment, simplifies operation.
Engineering method stake stake heart localization method provided by the present application realizes a heart using engineering method stake stake heart positioning auxiliary device Quickly positioning, it is simple, convenient, and extraction is put to the outer of the stake heart due to realizing, so that positioning rope is without being only close to Guide groove, thus positioning rope is avoided by mud contamination, so that positioning rope is reusable, and accurate positioning.
Engineering method stake stake heart localization method provided by the present application can be realized the quick positioning of a heart, and accuracy is high, is not necessarily to It adjusts repeatedly.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the application specific embodiment or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the application, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of engineering method stake stake heart positioning auxiliary device provided by the embodiments of the present application;
Fig. 2 is the another structural schematic diagram of engineering method stake stake heart positioning auxiliary device provided by the embodiments of the present application;
Fig. 3 is the structural schematic diagram of locating rack provided by the embodiments of the present application;
Fig. 4 is the another structural schematic diagram of locating rack provided by the embodiments of the present application;
Fig. 5 is the another structural schematic diagram of locating rack provided by the embodiments of the present application;
Fig. 6 is the another structural schematic diagram of locating rack provided by the embodiments of the present application;
Fig. 7 is the another structural schematic diagram of locating rack provided by the embodiments of the present application.
Appended drawing reference:
1- locating rack, 101- first support bar, 102- second support bar, the first reinforcing bar of 103-, the second reinforcing bar of 104-, 105- hitch point, 106- third reinforcing bar, 2- support frame, 3- positioning rope, 4- framing label, 5- sash weight, 6- fixed ring, 7- are fixed Rope, 8- mounting post, 9- mixing pile machine, 91,92- drilling rod, 93- blade, 94- casing, 10- guide groove, 11- construction mixing pile.
Specific embodiment
It is clearly and completely described below in conjunction with technical solution of the attached drawing to the application, it is clear that described implementation Example is some embodiments of the present application, instead of all the embodiments.
The component of the embodiment of the present application for usually describing and showing in attached drawing here can be with a variety of different configurations To arrange and design.Therefore, the detailed description of the embodiments herein provided in the accompanying drawings is not intended to limit below and is wanted The scope of the present application of protection is sought, but is merely representative of the selected embodiment of the application.
Based on the embodiment in the application, those of ordinary skill in the art are obtained without making creative work The every other embodiment obtained, shall fall in the protection scope of this application.
In the description of the present application, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for describe the application and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore should not be understood as the limitation to the application.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present application, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in application.
The engineering method stake stake heart positioning auxiliary device according to the application some embodiments is described referring to Fig. 1 to Fig. 7 And engineering method stake stake heart localization method.
Referring to figure 1 and figure 2, embodiments herein provides a kind of engineering method stake stake heart positioning auxiliary device, comprising: Locating rack 1 and positioning rope 3;Wherein, positioning rope 3 is used to be placed in the outside of piling guide groove, side along its length on positioning rope 3 To being provided with length framing label 4;One end of locating rack 1 is used for the mixing pile machine casing 94 being connected in guide groove 10, There are two hitch points 105 for the other end setting of locating rack 1, and two hitch points 105 are hung with sash weight respectively;Two sash weights 5 Vertical line direction is perpendicular with the extending direction of positioning rope 3, and one of sash weight 5 intersects at end point along its vertical line direction On, another one sash weight is along another endpoint that the projection in its vertical line direction intersects at framing label 4.
Engineering method stake stake heart positioning auxiliary device provided by the present application, including locating rack 1, support frame 2 and positioning rope 3;Its In, one end of locating rack 1 is used to be connected to the casing 94 of mixing pile machine 9, and there are two hitch points for the other end setting of locating rack 1 105, and two hitch points 105 are hung with sash weight 5 respectively;Support frame 2 is set on the ground of the lower section of sash weight 5;On positioning rope 3 It is provided with length framing label 4, and the drilling rod 91 and brill of the length e of framing label 4 and 9 both ends of mixing pile machine along its length The distance between 92 axis of bar d is equal;The extending direction of two sash weights 5 is perpendicular with the extending direction of positioning rope 3;Two are hung Hammer 5 is fallen at the two-end-point of corresponding framing label 4 just along extending direction, that is, vertical direction projection of sash weight 5.
Use the process of the engineering method stake stake heart positioning auxiliary device guide pile heart are as follows: guide groove is set out according to drawing in advance first The stake heart of interior construction mixing pile 11, obtains hitch point further according to the model of mixing pile machine 9 and the size of locating rack of selection 105 in guide groove preset mixing pile stake heart line vertical range, then positioning rope 3 is moved to apart from guide groove Interior preset mixing pile stake heart line is equal on the position of above-mentioned distance, and positioning rope 3 is parallel to preset in guide groove at this time Mixing pile stake heart line, and an end of positioning rope 3 is adjusted at preset position, this engineering method stake stake heart will be installed at this time The mixing pile machine 9 of positioning auxiliary device is placed in the guide groove 10, and respectively along mixing pile preset in guide groove The mobile mixing pile machine 9 in stake heart line direction and its vertical line direction, so that prolonging along sash weight 5 of sash weight 5 on support frame 2 The projection for stretching the i.e. vertical direction in direction falls in one end of framing label 4, another prolonging along sash weight 5 of sash weight 5 on support frame 2 The projection for stretching the i.e. vertical direction in direction falls the other end of framing label 4, at this point, the stake heart position of the piling of mixing pile machine 9 is Through determination, it is seen that realizing realizes the quick guide pile heart using this engineering method stake stake heart positioning auxiliary device, and avoids using and pass The straight-bar localization method of system, thus by artificially put etc. factors influenced it is smaller, and due to being realized using the locating rack 1 of the present apparatus Extraction is put to the outer of the stake heart so that positioning rope 3 apart from guide groove 10 and mixing pile machine 9 farther out, thus avoid excessive Slurries are fallen on positioning rope 3, and then prevent positioning rope 3 from being destroyed, and guarantee stake heart positioning accuracy, in addition, the present apparatus is pacified Dress is simple, without moving repeatedly adjustment, simplifies operation.
As it can be seen that this engineering method stake stake heart positioning auxiliary device is realized the outer of a heart and puts extraction, protected by setting locating rack 1 It has demonstrate,proved positioning rope 3 not and will receive the destruction of the excessive slurries of guide groove, and then ensure that and utilize the 3 guide pile heart of positioning rope again Accuracy, in addition, avoid using straight-bar and the fashioned iron guide pile heart, by artificially put etc. factors influenced it is smaller, in addition, this Device installation is simple, without moving repeatedly adjustment, simplifies operation.
Wherein, optionally, the vertical line direction of sash weight 5 is vertical direction;The extending direction of positioning rope 3 is horizontal direction.
Wherein, optionally, mixing pile machine 9 can be selected according to actual needs.
Wherein, optionally, it can determine the diameter of the radius of its blade 93, drilling rod 91 according to the model etc. of mixing pile machine 9, protect The distance between thickness and the adjacent center line of drilling rod 91 of cylinder 94 etc..
Wherein, optionally, sash weight 5 is suspended at hitch point 105 by sash weight line.
Wherein, optionally, the planar end surface of locating rack 1 and the casing 94 of mixing pile machine, which is connected by welding, connects, but not only limits In this.
In one embodiment of the application, it is preferable that as depicted in figs. 1 and 2, the axis of mixing pile machine both ends drilling rod connects The stake heart line of line and construction mixing pile 11 preset in guide groove 10 is located along the same line;The company of two hitch points 105 Line is parallel to the axis line of mixing pile machine both ends drilling rod;The flat outside wall surface of the straightway of mixing pile machine casing 94 is also parallel with stirring Mix an axis line for machine both ends drilling rod;The stake heart of the positioning rope 3 also parallel with construction mixing pile 11 preset in guide groove 10 Line;Positioning rope 3 in guide groove 10 it is preset construction mixing pile 11 stake heart line distance be equal to hitch point 105 away from Flat inner wall distance from the flat outside wall surface distance a of mixing pile machine casing 94,94 thickness of casing of mixing pile machine, casing 94 is stirred Mix the sum of a machine blade outer peripheral distance b and mixing pile machine blade radius c;The length of framing label 4 is equal to mixing pile machine The distance between 92 axis of two drilling rods 91 and drilling rod at both ends.
In this embodiment, positioning rope 3 in guide groove 10 it is preset construction mixing pile 11 stake heart line away from From the outer edge distance shield for being equal to the distance a of planar end surface of the casing 94 with a distance from hitch point 105, the thickness of casing, blade 93 Cylinder 94 the sum of the 93 radius c three of distance b and blade of flat inner wall of straightway, thus positioning rope 3 can be placed on away from From in guide groove 10, the stake heart line of preset construction mixing pile 11 is equal at the position of above-mentioned sum of the distance, and by positioning rope 3 are moved to specified original position along the stake heart line direction of construction mixing pile 11 preset in guide groove 10, are moving The dynamic mixing pile machine 9 for being equipped with the present apparatus, so that the projection of two sash weights 5 along vertical direction in the present apparatus is fallen in point just The both ends of width label 4.
In one embodiment of the application, it is preferable that as shown in Figures 3 to 5, locating rack 1 includes first support bar 101 And first support bar 102;Wherein, the quantity of first support bar 101 is two;Two first support bars 101 are symmetrically disposed on The both ends of first support bar 102, and two first support bars 101 with the perpendicular connection of first support bar 102, two first Strut 101 is used to be connected to the planar end surface of casing 94 far from one end of first support bar 102;First support bar 101 and first Support rod 102 is in the same plane, and plane is perpendicular to the planar end surface of casing 94 and the extending direction of sash weight 5, and first The length of support rod 102 is equal with the distance between 91 axis of drilling rod at 9 both ends of mixing pile machine;First support bar 101 perpendicular to The planar end surface of mixing pile machine 9, and the length extension line of first support bar 101 corresponds to the axis of drilling rod by mixing pile machine;Suspension Point 105 is arranged at 102 crosspoint of first support bar 101 and first support bar.
In this embodiment, between the axis of two drilling rods 91 that a machine both ends are calculated according to the mixing pile machine of selection 9 Distance d, the length of first support bar 102 is determined according to this distance, selects first of suitable length according to actual needs The length f of strut 101, the both ends of first support bar 102 link together with corresponding first support bar 101 respectively, and even Junction forms hitch point 105, passes through sash weight line at hitch point 105 and hangs sash weight 5, so that the vertical line of sash weight 5 is along vertical side To.As it can be seen that the extraction of the outer shifting to the 9 piling pile heart of mixing pile machine is realized by first support bar 102, convenient for by piling pile machine Pile driving position is corresponding with the construction stake heart position of mixing pile 11 preset in guide groove 10.Wherein, first support bar 101 with First support bar 102 can be by being welded together, but is not limited only to this.Wherein, first support bar 101 and mixing pile machine 9 End face be connected by welding and connect, certainly, be not limited only to this.
In one embodiment of the application, it is preferable that first support bar 101 and first support bar 102 are flexible Formula structure.
In this embodiment, first support bar 101 and first support bar 102 are telescopic structure, so that the present apparatus Suitable for the mixing pile machine 9 of different model, the length of first support bar 101 and first support bar 102 can be adjusted at any time, with Make that it is suitable for unused mixing pile machines 9.
In one embodiment of the application, it is preferable that as shown in Figures 3 to 5, first support bar 101 and first 102 intersection of strut is provided with mounting post 8, and mounting post 8 is for hanging sash weight 5.In this embodiment, setting due to mounting post 8 It sets, only need to the vertical line winding of hanging of sash weight 5 be hitched mounting post 8 and can realize fixation to sash weight 5, it is simple, convenient.
In one embodiment of the application, it is preferable that as shown in Figures 3 to 5, locating rack 1 further includes two first and adds Solid rod 103, two the first reinforcing bars 103 are symmetricly set on the two sides centered on the midpoint of first support bar 102;First reinforces Bar 103 is arranged between first support bar 101 and first support bar 102.
In this embodiment, the first reinforcing bar 103 plays the role of reinforcing first support bar 101 and first support bar 102, So that the intensity of 1 entirety of locating rack is higher, it is hardly damaged.
In one embodiment of the application, it is preferable that as shown in Figure 3 and Figure 5, locating rack 1 further include multiple second plus Solid rod 104, multiple second reinforcing bars 104 are arranged along the length direction of first support bar 102;Multiple second reinforcing bars 104 are It is located in Different Plane with first support bar 101 and first support bar 102;Multiple second reinforcing bars 104 are far from the first support One end of bar 102 is used to be connected to the outer surface of 9 casing 94 of mixing pile machine.
In this embodiment, as shown in Figure 3 and Figure 5, the second reinforcing bar 104 and first support bar 101, first support bar 102 and first reinforcing bar 103 to be formed by planar shaped at a certain angle, and the second reinforcing bar 104 is arranged in mixing pile machine Between casing 94 and first support bar 102, the second reinforcing bar 104, which plays, reinforces the whole effect of locating rack 1, so that locating rack 1 Whole intensity is higher.Wherein, optionally, when the quantity of the second reinforcing bar 104 is two, one of them second reinforcing bar 104 are arranged in one end of first support bar 102, and the another of first support bar 102 is arranged in the second reinforcing bar of another one 104 End.Wherein, optionally, the second reinforcing bar 104 is located at the top of first support bar 101 and first support bar 102.Wherein, optional Ground, as shown in figure 4, locating rack 1 further includes multiple third reinforcing bars 106, multiple third reinforcing bars 106 are along first support bar 102 length direction arrangement;Multiple third reinforcing bars 106 are located at from first support bar 101 and first support bar 102 different In plane, multiple third reinforcing bars 106 are used to be connected to the appearance of mixing pile machine casing 94 far from one end of first support bar 102 Face, and third reinforcing bar 106 is located at the lower section of first support bar 101 and first support bar 102.
In one embodiment of the application, it is preferable that as depicted in figs. 1 and 2, support frame 2 include the first locating rod with And second locating rod;Wherein, one end of positioning rope 3 is arranged in the first locating rod, and the other end setting of positioning rope 3 is fixed second On the bar of position.
In this embodiment, the distance of planar end surface of the hitch point 105 apart from the casing 94, the thickness of casing 94 are calculated Degree, flat interior and exterior of the blade 93 apart from 94 straightway of casing the sum of 93 radius of distance and blade after, fixed first will determine The stake heart line that position bar and the second locating rod are moved to the preset construction mixing pile 11 in guide groove 10 is equal to this At the position of sum, and the first locating rod is moved into the stake heart line of preset construction mixing pile 11 in guide groove 10 At the preset position of extending direction, while ensuring that the first locating rod and the line of the second locating rod are parallel in guide groove 10 in advance If construction mixing pile 11 stake heart line, at this point, one end of positioning rope 3 is fixed in the first locating rod again, positioning rope 3 The other end is fixed in the second locating rod, so that the fixation to positioning rope 3 is realized, fixed according to framing label 4 on positioning rope 3 The position stake heart.
In one embodiment of the application, it is preferable that as shown in Figure 1, the top of sash weight 5 is lower than positioning rope 3.
In this embodiment, the top of sash weight 5 is lower than positioning rope 3, right convenient for sash weight 5 and the framing label 4 on positioning rope 3 Standard, convenient for observation.
In one embodiment of the application, it is preferable that locating rack 1 is weldingly connected with casing 94 and connects;Or it is set on locating rack 1 It is equipped with magnet, locating rack 1 is adsorbed on casing 94 by magnet.(not shown)
In this embodiment, locating rack 1 can be linked together by way of welding with mixing pile machine 9, so that locating rack 1 It is more stable, it is not easy to shake.Locating rack 1 can also be embedded with magnet, and the outside wall surface of mixing pile machine casing 94 is adsorbed on using magnet On, facilitate installation and removal.
In one embodiment of the application, it is preferable that as shown in figure 5, locating rack 1 further includes fixed rope 7, locating rack 1 On be provided with two fixed rings 6 being spaced apart along the planar end surface of 9 casing 94 of mixing pile machine, one end of fixed rope 7 with One of fixed ring 6 is connected, and the other end and the another one fixed ring of fixed rope 7 are detachably connected.
It in this embodiment, can be by positioning rope 3 when locating rack 1 to be connected in the outside wall surface of 9 casing 94 of mixing pile machine One end disassembled from one of positioning ring, enwind mixing pile machine 9 for positioning rope more than 3 times, and finally by positioning rope 3 Free end be fixed in another positioning ring 6, so that locating rack 1 be helped to be located on the casing 94 of mixing pile machine 9, play into one Walk the effect reinforced.
In one embodiment of the application, it is preferable that framing label 4 is adhesive on positioning rope 3.(not shown)
In this embodiment, framing label 4 is adhesive on positioning rope 3, is adjusted at any time convenient for framing label 4 in positioning rope 3 On position and replacement etc., keep its applicability stronger.
Present invention also provides a kind of engineering method stake stake heart localization methods, including engineering method stake stake described in any of the above-described embodiment Heart positioning auxiliary device, thus, whole advantageous effects with the device, here, repeating no more.
Shown in Figure 6, embodiments herein, which also provides, a kind of utilizes engineering method stake stake described in any of the above-described embodiment The engineering method stake stake heart localization method of heart positioning auxiliary device, comprising the following steps:
Step 101, the stake heart position that construction mixing pile is determined according to drawing, model further according to mixing pile machine 9 and fixed The size of position frame calculates the reference of the hitch point 15 stake heart line of preset construction mixing pile in guide groove 10 Distance is put outside, the stake heart line that the positioning rope 3 is placed into the preset construction mixing pile in guide groove 10 is equal to and is drawn At the position for putting distance outside;
Step 102, the shield that the locating rack 1 of the engineering method stake stake heart positioning auxiliary device is mounted on to the mixing pile machine 9 On cylinder 94;
Step 103, respectively along be parallel in guide groove 10 it is preset construction mixing pile stake heart line direction and The mobile mixing pile machine 9 in its vertical line direction, and make a sash weight 5 of the engineering method stake stake heart positioning auxiliary device along described The vertical line direction of sash weight 5 is fallen on the end point of the framing label 4 on the positioning rope 3, the engineering method stake stake heart positioning auxiliary Another sash weight 5 of device falls in the other end of the framing label 4 on the positioning rope 3 along the vertical line direction of the sash weight 5 Point on.
Step 101, the stake heart position that construction mixing pile 11 is determined according to drawing, model further according to mixing pile machine 9 and The size of locating rack calculates the hitch point 105 stake heart line of preset construction mixing pile 11 in guide groove 10 Reference is outer to put distance, and the positioning rope 3 is placed into the stake heart line of the preset construction mixing pile 11 in guide groove 10 It is outer equal to reference to put at the position of distance;
Step 102, the shield that the locating rack 1 of the engineering method stake stake heart positioning auxiliary device is mounted on to the mixing pile machine 9 On cylinder 94;
Step 103, respectively along be parallel in guide groove 10 it is preset construction mixing pile 11 stake heart line direction with And its mobile mixing pile machine 9 in vertical line direction, and make a sash weight 5 of the engineering method stake stake heart positioning auxiliary device along institute The vertical line direction for stating sash weight 5 is fallen on the end point of the framing label 4 on the positioning rope 3, and the engineering method stake stake heart positioning is auxiliary The framing label 4 for helping another sash weight 5 of device to be fallen on the positioning rope 3 along the vertical line direction of the sash weight 5 it is another On endpoint.
Engineering method pile driving construction system provided by the present application uses the process of the engineering method stake stake heart positioning auxiliary device guide pile heart Are as follows: obtain hitch point 105 in guide groove 10 according to the size of the parameter of the mixing pile machine of selection 9 and locating rack first The distance of the stake heart line of preset construction mixing pile 11, then positioning rope 3 is moved to preset in guide groove 10 apply The stake heart line of work mixing pile 11 is equal on the position of above-mentioned distance, and positioning rope 3 is parallel to preset in guide groove 10 at this time The stake heart line of construction mixing pile 11, and an end of positioning rope 3 is adjusted at preset position, this work will be installed at this time The mixing pile machine 9 of method stake stake heart positioning auxiliary device is placed in the guide groove 10, and is parallel in guide groove 10 and is preset Construction mixing pile 11 the mobile mixing pile machine 9 in stake heart line direction and its vertical line direction so that one on support frame 2 is hung Hammer 5 falls in one end of framing label 4 along extending direction, that is, vertical direction projection of sash weight 5, another on support frame 2 is hung Hammer 5 falls the other end of framing label 4 along extending direction, that is, vertical direction projection of sash weight 5, at this point, mixing pile machine 9 The stake heart position of piling has determined.Wherein, wherein optionally, distance of the positioning rope 3 apart from 10 center line of guide groove Distance and blade 93 half of the distance, blade 93 of planar end surface equal to hitch point 105 apart from the casing 94 apart from casing 94 The sum of diameter three, thus positioning rope 3 can be placed on to the position that the center line apart from guide groove 10 is equal to above-mentioned sum of the distance Place, and positioning rope 3 is moved to specified original position along the extending direction of guide groove 10, this dress is installed in movement The agitating device set, so that the projection of two sash weights 5 along vertical direction in the present apparatus falls in the two of framing label 4 just End.Wherein, the distance of the stake heart line of preset construction mixing pile 11 in guide groove of positioning rope 3 is equal to hitch point distance The distance a of the flat outside wall surface of mixing pile machine casing, the casing thickness of mixing pile machine, casing flat inner wall apart from mixing pile machine leaf The sum of piece outer peripheral distance b and mixing pile machine blade radius c.
In the preferred embodiment of the engineering method stake stake heart localization method, step 102 includes:
Step 1022 measures length is equal to the distance between axis of two drilling rods 91 of 9 end of mixing pile machine first Support rod 102;
Step 1024, the both ends that two first support bars 101 are symmetrically disposed on to first support bar 102, and two One support rod 101 with the perpendicular connection of the first support bar 102, then by the vertically connection of two first support bars 101 To the flat outside wall surface of the straightway of the casing 94 of mixing pile machine 9.
In the preferred embodiment of the engineering method pile driving construction system, step 103 includes: respectively along being parallel to the guide groove 10 The mobile mixing pile machine 9 in stake heart line direction and its vertical line direction of interior preset construction mixing pile 11, so that second support bar The projection of the sash weight 5 at 102 both ends along vertical direction respectively falls in the corresponding both ends of the positioning rope 3.
Shown in Figure 7, the embodiment of the invention also provides a kind of engineering method stake stake heart localization methods, comprising:
Step 201, the stake heart position that construction mixing pile 11 is determined according to drawing, model further according to mixing pile machine 9 and The flat outside wall surface distance that straightway of the hitch point 105 apart from 9 casing 94 of mixing pile machine is calculated in the size of locating rack 1 calculates The outer of stake heart line of preset construction mixing pile 11 puts distance in 105 guide groove 10 of hitch point, and the positioning rope 3 is placed Stake heart line to construction mixing pile 11 preset in guide groove 10 is equal at the position for putting distance outside;
Step 202 measures first that length is equal to the distance between axis of two drilling rods 91 of 9 end of mixing pile machine Strut 102;
Step 203, the both ends that two first support bars 101 are symmetrically disposed on to first support bar 102, and two first Support rod 101 with the perpendicular connection of the first support bar 102, then two first support bars 101 is vertically connected to In the flat outside wall surface of the straightway of the casing 94 of mixing pile machine 9;
Step 204 includes: to connect respectively along the stake heart for being parallel to preset construction mixing pile 11 in guide groove 10 The mobile mixing pile machine 9 in line direction and its vertical line direction, so that the throwing of the sash weight 5 at 2 both ends of the second support frame along vertical direction Shadow respectively falls in the corresponding both ends of the positioning rope 3.
Engineering method stake stake heart localization method provided by the present application, it is fixed by setting using this engineering method stake stake heart positioning auxiliary device Position frame 1, realizes the outer of a heart and puts extraction, ensure that destruction of the positioning rope 3 by excessive slurries, and then ensure that sharp again With the accuracy of the 3 guide pile heart of positioning rope, in addition, avoid using the straight-bar guide pile heart, by artificially put etc. factors influenced compared with It is small, in addition, present apparatus installation is simple, without moving repeatedly adjustment, simplify operation.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the application, rather than its limitations;To the greatest extent Pipe is described in detail the application referring to foregoing embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, each embodiment technology of the application that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of engineering method stake stake heart positioning auxiliary device characterized by comprising locating rack and positioning rope;
Wherein, the positioning rope is used to be placed in the outside of piling guide groove, is provided with length along its length on positioning rope Framing label;
One end of the locating rack is used for the mixing pile machine casing being connected in guide groove, and the other end of the locating rack is set Hitch point there are two setting, and two hitch points are hung with sash weight respectively;The vertical line direction of two sash weights with it is described The extending direction of positioning rope is perpendicular, and one of them described sash weight intersects at one end of the framing label along its vertical line direction On point, sash weight described in another one is along another endpoint that its vertical line direction intersects at the framing label.
2. engineering method stake stake heart positioning auxiliary device according to claim 1, which is characterized in that bore at the mixing pile machine both ends The axis line of bar and the stake heart line of construction mixing pile preset in the guide groove are located along the same line;Described in two The line of hitch point is parallel to the axis line of mixing pile machine both ends drilling rod;The straightway of the mixing pile machine casing is put down Axis line of the outside wall surface also parallel with mixing pile machine both ends drilling rod;The positioning rope is also parallel in the guide groove The stake heart line of preset construction mixing pile;The stake heart of the positioning rope preset construction mixing pile in the guide groove The distance of line is equal to distance, the shield of the mixing pile machine of flat outside wall surface of the hitch point apart from the mixing pile machine casing Barrel thickness, the casing flat inner wall apart from the outer peripheral distance of the mixing pile machine blade and the mixing pile machine blade The sum of radius;The length of the framing label is equal to the distance between two drill rod axis at the mixing pile machine both ends.
3. engineering method stake stake heart positioning auxiliary device according to claim 2, which is characterized in that the locating rack includes first Support rod and second support bar;Wherein, the quantity of the first support bar is two;Two first support bars are symmetrically set Be placed in the both ends of the second support bar, and two first support bars with the perpendicular connection of the second support bar, two A first support bar is used to be connected to the planar end surface of the casing far from one end of the second support bar;Described first Support rod is in the same plane with the second support bar, and the plane is perpendicular to the planar end surface of the casing and described The vertical line direction of sash weight, and the distance between the length of the second support bar and the drill rod axis at the mixing pile machine both ends phase Deng;Flat outside wall surface of the first support bar perpendicular to the straightway of the mixing pile machine casing, and the first support bar Length extension line corresponds to the axis of drilling rod by the mixing pile machine;Hitch point setting the first support bar with it is described At second support bar crosspoint.
4. engineering method stake stake heart positioning auxiliary device according to claim 3, which is characterized in that the locating rack further includes two A first reinforcing bar, two first reinforcing bars are symmetricly set on the two sides centered on the midpoint of the second support bar; First reinforcing bar is arranged between the first support bar and the second support bar.
5. engineering method stake stake heart positioning auxiliary device according to claim 4, which is characterized in that the locating rack further includes more A second reinforcing bar, multiple second reinforcing bars are arranged along the length direction of the second support bar;Multiple described second Reinforcing bar is located in Different Plane with the first support bar and the second support bar;Multiple second reinforcing bars are remote One end from the second support bar is used to be connected to the outer surface of the mixing pile machine casing.
6. engineering method stake stake heart positioning auxiliary device according to claim 1, which is characterized in that it further include support frame, it is described Support frame is used to support the positioning rope;Support frame as described above includes the first locating rod and the second locating rod;Wherein, the positioning One end of rope is arranged in first locating rod, and the other end of the positioning rope is arranged in second locating rod.
7. engineering method stake stake heart positioning auxiliary device according to any one of claim 1 to 6, which is characterized in that described to hang The top of hammer is lower than the positioning rope.
8. engineering method stake stake heart positioning auxiliary device according to any one of claim 1 to 6, which is characterized in that described fixed Position frame is weldingly connected with the casing to be connect;Or magnet is provided on the locating rack, the locating rack is adsorbed by the magnet On the casing.
9. engineering method stake stake heart positioning auxiliary device according to any one of claim 1 to 6, which is characterized in that described point Width label is adhesive on the positioning rope.
10. a kind of engineering method stake stake heart localization method characterized by comprising
Step 100. determines the stake heart position of construction mixing pile according to drawing, model further according to the mixing pile machine and described The size distance of locating rack calculates the stake heart of the hitch point preset construction mixing pile in the guide groove Distance is put outside the reference of line, the positioning rope is placed into the stake heart of the preset construction mixing pile in the guide groove Line, which is equal to outside the reference, to be put at the position of distance;
The locating rack is mounted on the casing of the mixing pile machine by step 200.;
Step 300. respectively along be parallel in the guide groove it is preset construction mixing pile stake heart line direction and institute The mobile mixing pile machine in vertical line direction of a heart line is stated, and makes a sash weight of the engineering method stake stake heart positioning auxiliary device It is fallen in along the vertical line direction of the sash weight on the end point of the label of the framing on the positioning rope, the engineering method stake stake heart positioning Another sash weight of auxiliary device falls in the other end of the label of the framing on the positioning rope along the vertical line direction of the sash weight Point on.
CN201810979184.9A 2018-08-24 2018-08-24 Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method Pending CN109024577A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810979184.9A CN109024577A (en) 2018-08-24 2018-08-24 Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810979184.9A CN109024577A (en) 2018-08-24 2018-08-24 Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method

Publications (1)

Publication Number Publication Date
CN109024577A true CN109024577A (en) 2018-12-18

Family

ID=64624559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810979184.9A Pending CN109024577A (en) 2018-08-24 2018-08-24 Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method

Country Status (1)

Country Link
CN (1) CN109024577A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114349312A (en) * 2021-12-27 2022-04-15 河北光兴半导体技术有限公司 Method for butt-jointing glass forming equipment and feeding device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006037492A (en) * 2004-07-27 2006-02-09 Takenaka Komuten Co Ltd Pile head processing construction method of cast-in-place concrete pile
CN101864765A (en) * 2010-06-30 2010-10-20 东南大学 Two-way stirring based SMW construction method and tri-axial stirring equipment
CN101871214A (en) * 2009-09-11 2010-10-27 朱奎 Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile
US20120012391A1 (en) * 2010-07-19 2012-01-19 Soilmec S.P.A. Drilling device for executing diaphragm walls and method thereof
CN103850248A (en) * 2012-12-07 2014-06-11 中建四局第五建筑工程有限公司 Construction process and device of end-bearing pile hole
CN203795878U (en) * 2014-03-26 2014-08-27 中国化学工程第十三建设有限公司 Center positioning device for high-rising building under construction
CN104746510A (en) * 2015-03-24 2015-07-01 浙江省长城建设集团有限公司 Profile steel insertion positioning device and construction method thereof
CN106013091A (en) * 2016-06-30 2016-10-12 中国五冶集团有限公司 Steel reinforcement cage positioning device and positioning method used for building construction
CN106869193A (en) * 2017-01-22 2017-06-20 中国建筑第八工程局有限公司 Stake heart centering method and grout pile heart centralising device during filling pile construction
CN208815512U (en) * 2018-08-24 2019-05-03 中铁六局集团有限公司 Engineering method stake stake heart positioning auxiliary device and engineering method pile driving construction system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006037492A (en) * 2004-07-27 2006-02-09 Takenaka Komuten Co Ltd Pile head processing construction method of cast-in-place concrete pile
CN101871214A (en) * 2009-09-11 2010-10-27 朱奎 Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile
CN101864765A (en) * 2010-06-30 2010-10-20 东南大学 Two-way stirring based SMW construction method and tri-axial stirring equipment
US20120012391A1 (en) * 2010-07-19 2012-01-19 Soilmec S.P.A. Drilling device for executing diaphragm walls and method thereof
CN103850248A (en) * 2012-12-07 2014-06-11 中建四局第五建筑工程有限公司 Construction process and device of end-bearing pile hole
CN203795878U (en) * 2014-03-26 2014-08-27 中国化学工程第十三建设有限公司 Center positioning device for high-rising building under construction
CN104746510A (en) * 2015-03-24 2015-07-01 浙江省长城建设集团有限公司 Profile steel insertion positioning device and construction method thereof
CN106013091A (en) * 2016-06-30 2016-10-12 中国五冶集团有限公司 Steel reinforcement cage positioning device and positioning method used for building construction
CN106869193A (en) * 2017-01-22 2017-06-20 中国建筑第八工程局有限公司 Stake heart centering method and grout pile heart centralising device during filling pile construction
CN208815512U (en) * 2018-08-24 2019-05-03 中铁六局集团有限公司 Engineering method stake stake heart positioning auxiliary device and engineering method pile driving construction system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114349312A (en) * 2021-12-27 2022-04-15 河北光兴半导体技术有限公司 Method for butt-jointing glass forming equipment and feeding device

Similar Documents

Publication Publication Date Title
CN205156916U (en) Detection apparatus for be used for constructional steel form setting straightness that hangs down
JP6310198B2 (en) Pier construction method
CN108643192A (en) Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method
CN104833294B (en) Pile pile verticality measurement device and measuring method
CN105735319A (en) Quick positioning and verticality-adjusting device for large-diameter steel-pipe upright column pile and construction method
CN208815512U (en) Engineering method stake stake heart positioning auxiliary device and engineering method pile driving construction system
CN109024577A (en) Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method
CN210918297U (en) Auxiliary device for positioning embedded bolt
CN104897143A (en) Cylinder forced centering observation pillar and embedment method thereof
CN208650087U (en) Steel pipe column fast-positioning device for contrary sequence method
CN109435046A (en) A kind of adjustable positioning tool of PC dry wall embedded bar installation
CN106869193A (en) Stake heart centering method and grout pile heart centralising device during filling pile construction
CN108386208B (en) A kind of method for rapidly positioning of tunnel hole location
CN109555155A (en) The construction method of construction underground structure under building
CN108571008A (en) Lid digs station steel pipe column positioning construction method
CN207244627U (en) It is a kind of be used for have empty hole lattice stand column pile positioner
CN109113040B (en) It is measured in observation platform and its construction method and water in water and measures observation system
CN108612097B (en) Pile position centering device and pile position centering process applying same
CN214656935U (en) Accurate positioning device for triaxial mixing pile
CN104989101B (en) Discharging platform construction method
CN210164421U (en) Visual accurate positioning device for construction of three-axis stirring pile
CN105625424A (en) Device used for controlling perpendicularity and azimuth angle of rectangular bracket pile and construction method
CN113356185A (en) Assembled underground station steel pipe column and accurate installation method thereof
CN206330577U (en) A kind of mobile integrated concrete measuring table
CN106592609B (en) A kind of operating method for placing lattice column in deep well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181227

Address after: 100036 Wanshou Road, Haidian District, Beijing, No. 2

Applicant after: The Sixth Engineering Bureau Group Co., Ltd., China Railway

Applicant after: Guangzhou Railway Group Engineering Co. Ltd.

Address before: 511400 Unit 101, Building 18, Tian'an Headquarters Center, 555 North Panyu Avenue, Donghuan Street, Panyu District, Guangzhou City, Guangdong Province

Applicant before: Guangzhou Railway Group Engineering Co. Ltd.

TA01 Transfer of patent application right