Real-time management and reminding system for capital construction operation Download PDF

Info

Publication number
CN112184938A
CN112184938A CN202010819206.2A CN202010819206A CN112184938A CN 112184938 A CN112184938 A CN 112184938A CN 202010819206 A CN202010819206 A CN 202010819206A CN 112184938 A CN112184938 A CN 112184938A
Authority
CN
China
Prior art keywords
information
management
capital construction
equipment
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010819206.2A
Other languages
Chinese (zh)
Inventor
陶修冬
覃晓静
蒙亮
张炜
莫静
蓝长盛
王孔耀
叶平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laibin Power Supply Bureau of Guangxi Power Grid Co Ltd
Original Assignee
Laibin Power Supply Bureau of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laibin Power Supply Bureau of Guangxi Power Grid Co Ltd filed Critical Laibin Power Supply Bureau of Guangxi Power Grid Co Ltd
Priority to CN202010819206.2A priority Critical patent/CN112184938A/en
Publication of CN112184938A publication Critical patent/CN112184938A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/10Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C3/00Registering or indicating the condition or the working of machines or other apparatus, other than vehicles
    • G07C3/005Registering or indicating the condition or the working of machines or other apparatus, other than vehicles during manufacturing process
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network

Abstract

The invention provides a real-time management and reminding system for infrastructure operation, and relates to the technical field of power grid infrastructure. The real-time management and reminding system for the capital construction operation comprises operation field related equipment, a risk management and control system, a safety intelligent management and control module and a mobile control terminal, wherein the operation field related equipment comprises a handheld terminal, an industrial video device, a high formwork detection device, a foundation pit detection device, a crane detection device, a capital construction safety gateway device and an active deployment control ball machine, and the safety intelligent management and control module comprises an information processing module, an information storage module and a hardware module corresponding to the operation field related equipment. Through the cooperation of relevant equipment, a risk management and control system, a safe intelligent management and control module and a mobile control terminal of an operation site, various conditions of a capital construction operation site can be quickly coped with, violation warning and violation behavior correction methods are generated, and closed-loop real-time management and reminding are formed.

Description

Real-time management and reminding system for capital construction operation
Technical Field
The invention relates to the technical field of power grid infrastructure, in particular to a real-time management and reminding system for infrastructure operation.
Background
The power grid is a general term for facilities and equipment that link power generation and utilization in a power system. It is an intermediate link for transmitting and distributing electric energy, and is mainly formed from power transmission line, transformer substation, distribution substation and distribution line which are connected into network. The unified whole of power generation and utilization, which is composed of transmission, transformation, distribution equipment and corresponding auxiliary systems, is generally referred to as a power grid.
Various illegal behaviors and equipment faults are avoided in the power grid infrastructure process, the problems cannot be determined one by field workers, the infrastructure process is opaque, some infrastructure finished products which do not accord with relevant standards are put into use, once the problems occur, the brought consequences are very serious, the serious problems occur in time and cannot be timely responded, and then unnecessary loss is caused.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a real-time management and reminding system for capital construction work, which solves the problems that the supervision and management of the site of the capital construction work are not comprehensive enough and cannot rapidly deal with various emergency situations.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the real-time management and reminding system for the capital construction operation comprises operation site related equipment, a risk management and control system, a safe intelligent management and control module and a mobile control terminal, wherein the operation site related equipment comprises a handheld terminal, an industrial video device, a high-rise formwork detection device, a foundation pit detection device, a crane detection device, a capital construction safety gateway device and an active deployment ball machine, the safe intelligent management and control module comprises an information processing module, an information storage module and a hardware module corresponding to the operation site related equipment, the industrial video device and the active deployment ball machine are used for collecting video information of an operation site, the high-rise formwork detection device collects parameters of horizontal displacement, formwork settlement, vertical rod axial force and rod inclination angle of a key part or a weak part of the high-rise formwork, and the foundation pit detection device collects parameters of peripheral horizontal displacement, internal force of a supporting structure, internal force of the supporting structure, safety intelligent management and control module, The system comprises a crane detection device, a capital construction safety gateway device, a handheld terminal, an industrial video device, a high-support model detection device, a foundation pit detection device, a crane detection device, an active control dome camera and a safety intelligent control module, wherein the crane detection device acquires parameters of moment, amplitude, load and tower inclination angle of the crane, the capital construction safety gateway device is used for information safety protection and internet surfing, data connection is established between the capital construction safety gateway device and the handheld terminal, the industrial video device, the high-support model detection device, the foundation pit detection device, the crane detection device and the active control dome camera, relevant parameters or data information is obtained in real time, the relevant parameters or data information is uploaded to the safety intelligent control module through the capital construction safety gateway device, the uploaded relevant parameters or data information are compared with examples prestored in the information processing module through the information processing module, and violation warning and violation behavior correction methods are rapidly analyzed and generated, the real-time warning and violation behavior correcting method comprises the steps that a holder of the handheld terminal warns workers using stations and corrects violation behaviors according to returned information, the risk control system analyzes uploaded contents and feeds the uploaded contents back to a safety intelligent control module, an information processing module generates a violation warning and violation behavior correcting method, the violation warning and violation behavior correcting method is compared with a violation warning and violation behavior correcting method generated by an information storage module according to the stored contents of the information storage module and corrects and generates comparison information, if the results of the two results are basically not deviated, the comparison information is not transmitted to the mobile control terminal, and if the results of the two results are deviated, the comparison information is transmitted to the mobile control terminal immediately, the worker of the mobile control terminal rapidly informs the holder of the holding terminal to correct the behavior, when the information processing module has no comparison example, the information processing module transmits the information uploaded by the capital construction security gateway device to the mobile control terminal, the holder of the handheld terminal can also transmit the information judged by the holder to the mobile control terminal, and the mobile control terminal adopts a violation warning and violation behavior correcting method and stores the violation warning and violation behavior correcting method in the information storage module.
Preferably, the safe intelligent management and control module has basic functions of providing work attendance for field operation personnel, inputting violation notice and supervising the execution of capital construction safety management and control.
Preferably, the information processing module processes the information in an edge calculation manner.
Preferably, the operation site related equipment, the risk management and control system, the safety intelligent management and control module and the mobile control terminal unify a communication protocol and a standard system interface.
Preferably, the safety intelligent management and control module can be carried on a mobile control terminal and can also be arranged on an operation site.
Preferably, the number of the effective samples of the relevant infrastructure contrast content stored in the information storage module is not less than 1000, and the judgment and determination of the effective samples need to be combined with a unified algorithm and platform standard provided by an electric academy of sciences.
(III) advantageous effects
The invention provides a real-time management and reminding system for capital construction operation. The method has the following beneficial effects:
1. the invention can not only supervise the working personnel in the working site, but also know the working state of the infrastructure equipment in real time, and can effectively avoid factors which potentially threaten infrastructure, so that the infrastructure finished product can meet the related technical requirements.
2. The invention can quickly cope with various conditions of an operation site, generate violation warning and violation behavior correction methods, form closed-loop management and reminding, correct potential problems as soon as possible and further improve the quality of infrastructure products.
Drawings
Fig. 1 is a schematic diagram of the principle of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example (b):
as shown in fig. 1, an embodiment of the present invention provides a real-time management and reminding system for infrastructure construction work, including a work site related device, a risk management and control system, a safety intelligent management and control module, and a mobile control terminal, where the work site related device includes a handheld terminal, an industrial video device, a high-rise formwork detection device, a foundation pit detection device, a vehicle crane detection device, a infrastructure safety gateway device, and an active deployment control ball machine, the safety intelligent management and control module includes an information processing module, an information storage module, and a hardware module corresponding to the work site related device, the industrial video device and the active deployment control ball machine are used for collecting video information of a work site, the high-rise formwork detection device collects parameters of horizontal displacement, formwork settlement, vertical rod axial force, and rod inclination angle of a key part or a weak part of the high-rise formwork, and the foundation pit detection device collects parameters of peripheral horizontal displacement, The parameters of internal force and vertical displacement of a supporting structure, the parameters of moment, amplitude, load and tower body inclination angle of a vehicle crane are collected by vehicle crane detection equipment, a capital construction safety gateway equipment is used for carrying out information safety protection and internet surfing, data connection is built between the capital construction safety gateway equipment and a handheld terminal, an industrial video equipment, a high formwork detection equipment, a foundation pit detection equipment, a vehicle crane detection equipment, an active deployment control ball machine and a safety intelligent control module, the service can be continued in a wired connection mode when the network environment of a capital construction operation site is poor, the industrial video equipment, the high formwork detection equipment, the foundation pit detection equipment, the vehicle crane detection equipment and the active deployment control ball machine obtain relevant parameters or data information in real time, the relevant parameters or data information are uploaded to the safety intelligent control module in real time through the capital construction safety gateway equipment, and the uploaded relevant parameters or data information are compared with examples prestored by the information processing module, the violation warning and violation behavior correcting method is quickly analyzed and generated and is transmitted to the mobile control terminal and the risk control system in real time, meanwhile, the violation warning and violation behavior correcting method is transmitted to the handheld terminal through the capital construction security gateway equipment, a holder of the handheld terminal warns and corrects the violation behavior for workers using stations according to transmitted information, the risk control system analyzes the uploaded content and feeds the content back to the safety intelligent control module, the violation warning and violation behavior correcting method is generated by the information processing module, the violation warning and violation behavior correcting method is compared and corrected with the violation warning and violation behavior correcting method generated by the information storage module according to the stored content of the information storage module by the information processing module and generates comparison information, and if the results of the violation warning and violation behavior correcting method are basically free of deviation, the comparison information is not transmitted to the mobile control terminal, if the deviation exists, the deviation is immediately transmitted to the mobile control terminal, a worker of the mobile control terminal rapidly informs a holder holding the terminal to correct the behavior, when the information processing module has no comparison example, the information processing module transmits the information uploaded by the capital construction security gateway device to the mobile control terminal, a holder of the handheld terminal can also transmit the information judged by the holder to the mobile control terminal, the mobile control terminal takes violation warning and violation behavior correcting methods and stores the violation warning and violation behavior correcting methods in the information storage module, if the safety intelligent management and control module cannot receive prompt information of relevant equipment or a risk management and control system in an operation field in real time within 1min, the mobile control terminal is immediately notified and gives an alarm, and a worker can send a technician to quickly overhaul the relevant equipment or line according to the prompt information or the alarm information of the mobile control terminal.
The safety intelligent management and control module has basic functions of providing work attendance for field operation personnel, inputting a violation notice and supervising the execution of capital construction safety management and control.
The information processing module processes information in an edge calculation mode, so that the processing speed can be increased, and real-time management and reminding can be better realized.
The operation field related equipment, the risk management and control system, the safety intelligent management and control module and the mobile control terminal unify a communication protocol and a standard system interface, and the application range of the mobile control terminal can be conveniently expanded.
The safety intelligent management and control module can be carried on the mobile control terminal and can also be arranged on the operation site.
The number of the effective samples of the relevant infrastructure contrast content stored in the information storage module is not less than 1000, and the effective samples are distinguished and determined by combining a unified algorithm and a platform standard provided by an electric academy, so that the information uploaded by relevant equipment on an operation site can be conveniently compared and processed in real time.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a real-time management and warning system for capital construction operation, includes operation on-the-spot relevant equipment, risk management and control system, safe intelligent management and control module, mobile control terminal, its characterized in that: the operation site related equipment comprises a handheld terminal, industrial video equipment, high formwork detection equipment, foundation pit detection equipment, crane detection equipment, capital construction safety gateway equipment and an active deployment and control ball machine, the safe intelligent management and control module comprises an information processing module, an information storage module and a hardware module corresponding to the operation site related equipment, the industrial video equipment and the active deployment and control ball machine are used for collecting video information of an operation site, the high formwork detection equipment collects parameters of horizontal displacement, formwork settlement, vertical rod axial force and rod inclination angle of a key part or a weak part of the high formwork, the foundation pit detection equipment collects parameters of peripheral horizontal displacement, internal force and vertical displacement of a supporting structure of the foundation pit, the crane detection equipment collects parameters of moment, amplitude, load and tower inclination angle of the crane, and the capital construction safety gateway equipment is used for information safety protection and internet surfing, the system is connected with a handheld terminal, an industrial video device, a high-formwork detection device, a foundation pit detection device, a vehicle crane detection device, an active deployment and control ball machine and a safe intelligent management and control module in a data connection mode, the industrial video device, the high-formwork detection device, the foundation pit detection device, the vehicle crane detection device and the active deployment and control ball machine obtain relevant parameters or data information in real time, the relevant parameters or data information is uploaded to the safe intelligent management and control module in real time through a capital construction safety gateway device, the uploaded relevant parameters or data information are compared with examples prestored in an information processing module through the information processing module, violation warnings and violation behavior correction methods are generated through rapid analysis and transmitted to the mobile control terminal and a risk management and control system in real time, and transmitted to the handheld terminal through the capital construction safety gateway device, and a holder of the handheld terminal transmits the industrial video device to the handheld terminal according to the transmitted information, The high-formwork detection equipment, the foundation pit detection equipment, the vehicle-mounted crane detection equipment and the active control dome camera warn the workers using stations and correct illegal behaviors, the risk control system analyzes the uploaded content and feeds back the content to the safety intelligent control module, then the information processing module generates an illegal warning and an illegal behavior correction method, the illegal warning and the illegal behavior correction method are compared and corrected with the illegal warning and the illegal behavior correction method generated by the previous information processing module according to the content stored by the information storage module to generate comparison information, if the two results are basically not deviated, the comparison information is not transmitted to the mobile control terminal, if the deviation exists, the comparison information is transmitted to the mobile control terminal, the workers of the mobile control terminal rapidly inform the holders holding the terminals of behavior correction, and if the information processing module does not have a comparison example, the information uploaded through the infrastructure safety gateway equipment is transmitted to the mobile control terminal by the information processing module, the holder of the handheld terminal can also transmit the information judged by the holder to the mobile control terminal, and the mobile control terminal takes the violation warning and violation behavior correcting method and stores the violation warning and violation behavior correcting method in the information storage module.
2. The real-time management and reminder system for capital construction work of claim 1, characterized in that: the safety intelligent management and control module has basic functions of providing work attendance for field operation personnel, inputting violation notice and supervising the execution of capital construction safety management and control.
3. The real-time management and reminder system for capital construction work of claim 1, characterized in that: the information processing module processes information in an edge calculation mode.
4. The real-time management and reminder system for capital construction work of claim 1, characterized in that: the operation site related equipment, the risk management and control system, the safety intelligent management and control module, the mobile control terminal unify a communication protocol and a standard system interface.
5. The real-time management and reminder system for capital construction work of claim 1, characterized in that: the safety intelligent management and control module can be carried on the mobile control terminal and can also be arranged on an operation site.
6. The real-time management and reminder system for capital construction work of claim 1, characterized in that: the number of the effective samples of the relevant infrastructure contrast content stored in the information storage module is not less than 1000, and the judgment and the determination of the effective samples need to be combined with a unified algorithm and a platform standard provided by an electric academy of sciences.
CN202010819206.2A 2020-08-14 2020-08-14 Real-time management and reminding system for capital construction operation Pending CN112184938A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010819206.2A CN112184938A (en) 2020-08-14 2020-08-14 Real-time management and reminding system for capital construction operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010819206.2A CN112184938A (en) 2020-08-14 2020-08-14 Real-time management and reminding system for capital construction operation

Publications (1)

Publication Number Publication Date
CN112184938A true CN112184938A (en) 2021-01-05

Family

ID=73919242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010819206.2A Pending CN112184938A (en) 2020-08-14 2020-08-14 Real-time management and reminding system for capital construction operation

Country Status (1)

Country Link
CN (1) CN112184938A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113610011A (en) * 2021-09-22 2021-11-05 国网江苏省电力有限公司太仓市供电分公司 AI identification system for distribution network operation site personnel management and control

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102176252A (en) * 2011-01-26 2011-09-07 新疆中钜电子科技有限公司 Equipment and facility safety inspection intelligent patrolling operation system and application method thereof
CN108241963A (en) * 2016-12-27 2018-07-03 云南电网有限责任公司建设分公司 A kind of method, apparatus and managing and control system of project construction management and control
CN108241964A (en) * 2017-11-23 2018-07-03 贵州电网有限责任公司铜仁供电局 Capital construction scene management and control mobile solution platform based on BP artificial nerve network model algorithms
CN109889791A (en) * 2019-04-11 2019-06-14 吉林同益光电科技有限公司 A kind of electric power construction field managing and control system and method
CN110009221A (en) * 2019-03-29 2019-07-12 江苏核电有限公司 A kind of power station operating risk method for safety monitoring
CN110430246A (en) * 2019-07-18 2019-11-08 国网河北省电力有限公司 Capital construction security management and control system
CN111131790A (en) * 2019-12-31 2020-05-08 中国地质工程集团有限公司 Mine restoration remote site construction monitoring system
CN111263107A (en) * 2018-12-03 2020-06-09 浙江宇视科技有限公司 Video data processing method, device, equipment and system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102176252A (en) * 2011-01-26 2011-09-07 新疆中钜电子科技有限公司 Equipment and facility safety inspection intelligent patrolling operation system and application method thereof
CN108241963A (en) * 2016-12-27 2018-07-03 云南电网有限责任公司建设分公司 A kind of method, apparatus and managing and control system of project construction management and control
CN108241964A (en) * 2017-11-23 2018-07-03 贵州电网有限责任公司铜仁供电局 Capital construction scene management and control mobile solution platform based on BP artificial nerve network model algorithms
CN111263107A (en) * 2018-12-03 2020-06-09 浙江宇视科技有限公司 Video data processing method, device, equipment and system
CN110009221A (en) * 2019-03-29 2019-07-12 江苏核电有限公司 A kind of power station operating risk method for safety monitoring
CN109889791A (en) * 2019-04-11 2019-06-14 吉林同益光电科技有限公司 A kind of electric power construction field managing and control system and method
CN110430246A (en) * 2019-07-18 2019-11-08 国网河北省电力有限公司 Capital construction security management and control system
CN111131790A (en) * 2019-12-31 2020-05-08 中国地质工程集团有限公司 Mine restoration remote site construction monitoring system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113610011A (en) * 2021-09-22 2021-11-05 国网江苏省电力有限公司太仓市供电分公司 AI identification system for distribution network operation site personnel management and control

Similar Documents

Publication Publication Date Title
CN106655522B (en) A kind of main station system suitable for electric grid secondary equipment operation management
CN111307823B (en) System and method for detecting typical visual defects of power transformation equipment based on edge cloud cooperation
CN109459664A (en) A kind of detection of distribution network failure and positioning analysis system
CN116187593B (en) Power distribution network fault prediction processing method, device, equipment and storage medium
CN113110177B (en) Monitoring method, monitoring equipment and monitoring system of photovoltaic power station
CN111599031A (en) Inspection data acquisition and analysis method and system for power inspection robot
CN107979010A (en) A kind of station safety protecting method and its system
CN103970098A (en) Intelligent substation auxiliary system integrated monitoring platform
CN110569997A (en) charging station operation maintenance method based on multi-dimensional data system
CN105242626A (en) Line safety intelligent auxiliary monitoring system
CN112184938A (en) Real-time management and reminding system for capital construction operation
CN115225859A (en) Station safety inspection method, device and equipment based on video fusion
CN115494802A (en) Flow operation multi-level safety digital intelligent monitoring system
CN102126679A (en) Tower crane monitoring system with short message early warning function
CN206322303U (en) The power construction safety early warning device of laser combination electric field
CN111474870A (en) Fault diagnosis and detection system based on machine learning
CN104636990A (en) Method of real-time troubleshooting and early warning for shutdown reasons of power grid equipment based on N-1 principle
CN111668935B (en) Substation operation preparation management method and system based on EIM
CN219246187U (en) Highway maintenance operation safety precaution system based on multi-protocol intelligent gateway
CN218767870U (en) Mobile operation monitoring system based on edge calculation
CN111626555A (en) Fire-fighting equipment operation warning and state evaluation system and device
CN111738461A (en) Fault emergency processing system based on ubiquitous power Internet of things
CN113592360B (en) Electric power high-altitude operation strong wind early warning method and system
CN205091588U (en) Supplementary monitoring system of circuit safety intelligence
CN113890187A (en) Intelligent low pressure measurement and control terminal of thing networking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210105