CN112095886A - Assembled ceiling and installation method - Google Patents

Assembled ceiling and installation method Download PDF

Info

Publication number
CN112095886A
CN112095886A CN202011010104.2A CN202011010104A CN112095886A CN 112095886 A CN112095886 A CN 112095886A CN 202011010104 A CN202011010104 A CN 202011010104A CN 112095886 A CN112095886 A CN 112095886A
Authority
CN
China
Prior art keywords
pipe
keel
fixed
main
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011010104.2A
Other languages
Chinese (zh)
Inventor
刘曙光
胡学稼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhicheng Huateng Decoration Engineering Co ltd
Original Assignee
Beijing Zhicheng Huateng Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhicheng Huateng Decoration Engineering Co ltd filed Critical Beijing Zhicheng Huateng Decoration Engineering Co ltd
Priority to CN202011010104.2A priority Critical patent/CN112095886A/en
Publication of CN112095886A publication Critical patent/CN112095886A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The application relates to an assembled ceiling and an installation method, the assembled ceiling comprises a main keel, secondary keels and a ceiling plate, a level detection device comprises a clamping block, two liquid containing pipes, a first connecting pipe and a second connecting pipe, the clamping block is arranged on the main keel in a clamping mode and provided with two clamping blocks, the liquid containing pipes are arranged on the clamping block and contain liquid and are made of transparent materials, scale marks are uniformly distributed on the outer side walls of the liquid containing pipes along the height direction of the liquid containing pipes, and two ends of the first connecting pipe and the second connecting pipe are respectively communicated with the two liquid containing pipes and are respectively located on the upper side and the lower side of the liquid level of the liquid in the liquid containing pipes. This application is through installing two flourishing liquid pipes on main joist length direction's both ends to can observe the liquid level height in the flourishing liquid pipe, make the height of liquid level in the flourishing liquid pipe be in on same horizontal plane, with this reduce the crooked probability of main joist, reduced the furred ceiling board and can be in uneven probability after installing the main joist, improved the lower problem of furred ceiling board security.

Description

Assembled ceiling and installation method
Technical Field
The application relates to the technical field of suspended ceilings, in particular to an assembled suspended ceiling and an installation method.
Background
The suspended ceiling decoration is one of the most common decorations in interior decoration, and suspended ceiling structure includes furred ceiling connecting device and furred ceiling board usually, and furred ceiling connecting device fixes on the building body and provide the fixed department of furred ceiling board, and the furred ceiling board generally adopts gypsum board, light metal decorative board, PVC decorative board etc.. Suspended ceiling generally adopts the jib to be fixed with the roof, adopts limit keel component and wall to be connected to guarantee the firm of suspended ceiling.
Among the correlation technique, can refer to the chinese patent that application publication number is CN105464273A, it discloses a novel furred ceiling mounting structure, it is by the main joist, hang the piece, the connecting piece, secondary joist and furred ceiling board are constituteed, it is fixed with the jib that a jib connector is passed through to hang one end, it is fixed with the main joist that the other end of piece passes through the main joist connector, the connecting piece is connected with the main joist through the fashioned elbow structure of its one side, the both sides at the top of secondary joist "worker" font can the holding make it fixed with the connecting piece in slot structure, the lower part both sides of secondary joist "worker" font are connected with the groove structure cooperation of furred ceiling board side respectively, beneficial effect is: the furred ceiling board side shaping is fluted structure, and is pegged graft fixedly with fossil fragments through groove structure, compares than traditional fix with screw mode, and it is convenient to have the equipment, dismantles advantages such as convenient, and the face of furred ceiling board does not receive destruction because of the installation simultaneously.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: the main joist is fixed generally and is that the staff fixes, though can use the spirit level to detect the levelness of main joist at fixed in-process, but the length of general main joist is longer, therefore the spirit level can only generally be placed main joist a place, thereby the accuracy of the main joist levelness of detection is relatively poor, consequently can be in uneven state after the main joist is installed to the furred ceiling board, consequently the atress inequality of furred ceiling, thereby the security that leads to the furred ceiling is lower.
Disclosure of Invention
In order to improve the problem that the safety of a suspended ceiling plate is lower, the application provides an assembled suspended ceiling and an installation method.
First aspect, the application provides a pin-connected panel furred ceiling adopts following technical scheme:
an assembled suspended ceiling comprises a main keel and a secondary keel which are arranged on a wall body, and a suspended ceiling plate which is arranged on the main keel and the secondary keel, wherein the levelness of the main keel is detected by a level detection device when the main keel is installed, the level detection device is detachably arranged on the main keel,
level detection device includes joint piece, flourishing liquid pipe, first connecting pipe and second connecting pipe, joint piece joint sets up on the main joist and is provided with two, flourishing liquid pipe setting just has contained liquid and is made by transparent material on the joint piece, it is provided with the scale mark along flourishing liquid pipe direction of height equipartition on the flourishing liquid pipe lateral wall, the both ends of first connecting pipe and second connecting pipe communicate and are located the upper and lower both sides of flourishing liquid pipe liquid level respectively with two flourishing liquid pipes respectively.
Through adopting above-mentioned technical scheme, install the main joist with joint piece joint, and wherein two joint pieces are located main joist length direction's both ends, consequently install two flourishing liquid pipes on the main joist, thereby can observe the liquid level height in the flourishing liquid pipe, strike the main joist and make the height of flourishing liquid pipe interior liquid level be in same horizontal plane, simultaneously when installing two adjacent main joists, install two flourishing liquid pipes on two main joists, with this probability that has reduced the main joist skew, the probability that can be in unevenness after having reduced the furred ceiling board and installing the main joist has reduced the uneven probability of furred ceiling atress, the lower problem of furred ceiling security has been improved.
Optionally, the main keel is mounted on the wall body through a connecting mechanism, the connecting mechanism comprises a connecting plate and an expansion screw rod,
the expansion screw is arranged on the wall body, penetrates through the connecting holes and is provided with a connecting nut which is abutted against the connecting plate;
be provided with the fixing device who goes on fixing to the joint piece on the joint piece, fixing device includes clamping screw, star type handle, clamping screw threaded connection just supports tightly on the joint piece and fixes the joint piece position, star type handle sets up on clamping screw.
By adopting the technical scheme, the expansion screw is installed on the wall body, then the expansion screw penetrates through the connecting hole and abuts against the wall body, a worker flattens the main keel according to experience, the connecting nut is in threaded connection with the expansion screw so as to abut against the connecting plate, and then the main keel is in a horizontal state through the horizontal detection device, and finally the connecting nut is screwed to abut against the connecting plate so as to fix the main keel;
the star-shaped handle is twisted to drive the fixing screw to be far away from the main keel, so that the liquid containing pipe can be detached by pulling the clamping block; install the main joist with joint piece joint on, twist and move star type handle and drive clamping screw and support tightly to the main joist on to this comes fixed joint piece and flourishing liquid pipe, has improved the stability of flourishing liquid pipe, has improved the stability when flourishing liquid pipe detects the main joist levelness.
Optionally, first connecting pipe and second connecting pipe all can be dismantled with two flourishing liquid pipes through connecting device and are connected, connecting device includes the fixed pipe of first fixed pipe, second, thread bush, first fixed pipe sets up on flourishing liquid pipe, the fixed pipe setting of second is on first connecting pipe and the external diameter is greater than the external diameter of first connecting pipe, the thread bush rotates to set up on first connecting pipe and threaded connection is on first fixed pipe and makes the fixed pipe of first fixed pipe and second contradict together.
The first connecting pipe and the second connecting pipe are fixed in length, but the main keels are different in length, so that the first connecting pipe and the second connecting pipe are required to be replaced to adapt to the main keels with different lengths, and the first connecting pipe and the second connecting pipe are longer in length, so that the horizontal detection device is extremely inconvenient to carry;
by adopting the technical scheme, the pipe orifice of the first fixed pipe faces upwards, the threaded sleeve is screwed to separate the threaded sleeve from the first fixed pipe, then the first connecting pipe is replaced, and the threaded sleeve is screwed to be connected to the first fixed pipe in a threaded manner, so that the first connecting pipe and the second connecting pipe are replaced; after using simultaneously to accomplish, dismantle the back with first connecting pipe from first fixed pipe, use screw cap threaded connection to on first fixed pipe and the fixed pipe of second to this seals first fixed pipe and the fixed pipe of second, consequently can separately accomodate flourishing liquid pipe, first connecting pipe and second connecting pipe, has improved the convenience that level detection device carried.
Optionally, the top end of the liquid containing pipe is connected with a sealing cover in a threaded manner, and the first connecting pipe and the second connecting pipe are both arranged in a spiral manner and have elasticity.
By adopting the technical scheme, the sealing cover is screwed to be detached from the liquid containing pipe, so that the liquid in the liquid containing pipe can be replaced or added; simultaneously first connecting pipe and second connecting pipe are the heliciform and have elasticity, consequently, the length direction of main joist changes the back, flourishing liquid pipe position changes the back, first connecting pipe and second connecting pipe also can be in the same place the shrink under the effect of elasticity, convenience when using has been improved, and when accomodating first connecting pipe and second connecting pipe, first connecting pipe and second connecting pipe shrink together under the effect of elasticity, the shared space of first connecting pipe and second connecting pipe has been saved and has been carried, convenience when carrying first connecting pipe and second connecting pipe has been improved.
Optionally, be provided with the strutting arrangement with wall connection on the secondary joist, strutting arrangement includes fixed fossil fragments, connecting rod, fixed fossil fragments set up on the wall body and are located the secondary joist top, the connecting rod both ends are connected and the equipartition is provided with a plurality ofly with fixed fossil fragments and secondary joist through supporting screw respectively.
Through adopting above-mentioned technical scheme, the general length of secondary joist is longer, and the secondary joist only both ends are connected with the main joist, therefore secondary joist stability is relatively poor, and the security of furred ceiling is relatively poor, supports the secondary joist through connecting rod and fixed fossil fragments, has improved the stability of secondary joist, has improved the security of furred ceiling.
Optionally, flush with the lower surface of main joist and secondary joist on the furred ceiling board lower surface, it has the one deck to brush on the furred ceiling board lower surface with the gypsum layer of main joist and secondary joist lower surface even as an organic whole, all be provided with on main joist and the secondary joist and be used for fixed furred ceiling board and the bolt head is located the inside set screw of main joist and secondary joist.
After the ceiling board is installed, a gypsum layer needs to be painted on the lower surfaces of the main keel, the secondary keel and the ceiling board, and the gypsum layer enables the lower surface of the ceiling to be in a flat state and can fill gaps;
through adopting above-mentioned technical scheme, the furred ceiling board lower surface flushes with main joist and secondary joist lower surface, consequently has improved the convenience when plastering the gypsum layer, and fixed screw head is located inside main joist and the secondary joist simultaneously to set screw can not form the interference when plastering the gypsum layer, has further improved the convenience when plastering the gypsum layer.
Optionally, set up the through-hole that set screw passed on the main joist, set up on the upper and lower two surfaces of main joist with the bar hole and the waist shape hole of through-hole intercommunication, set screw can slide on the bar hole and can support tightly to the waist shape hole on.
When the ceiling board is fixed, a fixing screw is needed to be used for fixing, so that the ceiling board is installed on the main keel, then the fixing screw penetrates through the main keel and is connected to the ceiling board in a threaded manner to fix the ceiling board, and each ceiling board generally needs a plurality of fixing screws to be fixed, so that a worker needs to carry a plurality of fixing screws with him or her, and the ceiling board is positioned on the main keel and is connected to the ceiling board in a threaded manner through the main keel, so that the fixing screws are not easy to be connected to the ceiling board in a threaded manner, and especially when the position of the ceiling board is staggered, the installation of the fixing screws is more troublesome, and the efficiency of installing the ceiling board is reduced;
through adopting above-mentioned technical scheme, on being connected to the furred ceiling board with set screw threaded connection, then pass the through-hole with set screw and make the furred ceiling board place the main joist on, promote the furred ceiling board and make set screw remove on bar hole and waist shape hole, then can twist and move set screw and make set screw support tightly to waist shape hole on to this fixes the furred ceiling board, thereby need not to hand-carry a plurality of set screws, and also can be more convenient during the installation set screw, the efficiency of installation furred ceiling has been improved.
Optionally, be located two be provided with the mounting bracket on the secondary joist between the furred ceiling board, be provided with the mounting screw that just is used for fixed mounting bracket with set screw size on the mounting bracket, be provided with the backup pad of seting up the access hole on the mounting bracket, it is provided with the access door that blocks the access hole to rotate in the backup pad, be provided with the fixed establishment of fixed access door in the backup pad.
Because pipelines or lines are arranged above the ceiling plate, and when the wall body above the ceiling plate leaks water, the pipelines and lines are overhauled by checking the condition above the ceiling plate, so that an access door is necessary to be arranged for checking or overhauling;
through adopting above-mentioned technical scheme, open fixed establishment, then can promote the access door and open the access door to this comes to detect the condition of furred ceiling board top or overhauls pipeline and circuit, after, rotates the access door and sets up in the backup pad, closes the position that fixed establishment fixed the access door.
It is optional, fixed establishment includes fixed plate, turning block, gyro wheel, torsional spring, joint board, the access door is placed in the backup pad and is offered the recess of being convenient for to exert oneself, the fixed plate sets up on the access door, the turning block rotates through the dwang and sets up in the backup pad and be provided with two, the gyro wheel rotates and sets up and keeps away from one of dwang at the turning block and serve, the torsional spring cover is established on the dwang and both ends support respectively tightly on two turning blocks, the joint board sets up on the fixed plate, and two the gyro wheel supports under the effect of torsional spring and presses the joint board and fix a position the joint board.
By adopting the technical scheme, a hand stretches into the groove to push the access door, the access door drives the clamping plate to move, and the clamping plate moves to push the two rollers to be away from each other, so that the access door can be opened; rotate the access door and drive the joint board and get into between two gyro wheels, so the joint board promotes two gyro wheels and makes the joint board get into between two gyro wheels, and on the backup pad was contradicted to the access door, two gyro wheels supported under the effect of torsional spring and pressed on the joint board and fix a position the access door.
In a second aspect, the application provides a method for installing an assembled ceiling, which adopts the following technical scheme:
a mounting method of an assembled ceiling comprises the following mounting steps:
s1, construction preparation, measurement site and drawing;
s2, preparing materials, namely preparing materials with proper sizes according to drawings;
s3, installing a suspended ceiling, namely installing the suspended ceiling in the first aspect;
the installation process comprises the following steps:
a. installing a main keel, and detecting the levelness of the main keel by using a level detection device when the main keel is installed;
b. installing a secondary keel, and installing the secondary keel on the main keel;
c. installing a supporting device, installing the fixed keel on the wall top, and then respectively installing the two ends of the connecting rod on the fixed keel and the secondary keel;
d. installing a ceiling board, installing the ceiling board between the main keel and the secondary keel and between the two secondary keels, and fixing the ceiling board through fixing screws;
and S4, plastering the whole lower plane of the ceiling board, the main keel and the secondary keel by using gypsum powder.
By adopting the technical scheme, the levelness of the main keel is detected through the level detection device, so that the levelness of the ceiling board after being installed is improved, the probability that the ceiling board is uneven after being installed on the main keel is reduced, the probability that the ceiling is uneven in stress is reduced, and the problem of low safety of the ceiling is solved; meanwhile, the stability of the secondary keel is improved through the supporting device, and the safety of the suspended ceiling is improved.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the two liquid containing pipes are arranged at the two ends of the main keel in the length direction, so that the liquid level height in the liquid containing pipes can be observed, the liquid level height in the liquid containing pipes is enabled to be on the same horizontal plane, the probability of deflection of the main keel is reduced, the probability that the ceiling board is uneven after being arranged on the main keel is reduced, and the problem of low safety of the ceiling board is solved;
2. replacing the first connecting pipe and the second connecting pipe by screwing the thread bush; meanwhile, after the first connecting pipe is detached from the first fixing pipe, the first connecting pipe is connected to the first fixing pipe and the second fixing pipe through the threaded cap in a threaded mode, so that the liquid containing pipe, the first connecting pipe and the second connecting pipe can be separately stored, and the carrying convenience of the level detection device is improved; the first connecting pipe and the second connecting pipe are spiral and elastic, so that the convenience in use is improved, the space occupied by carrying the first connecting pipe and the second connecting pipe is saved, and the convenience in carrying the first connecting pipe and the second connecting pipe is improved;
3. through on being connected to the furred ceiling board with set screw threaded connection, then pass the through-hole with set screw, promote the furred ceiling board and make set screw remove bar hole and waist shape hole on, then can twist set screw and support tightly to waist shape hole on to this fixes the furred ceiling board, thereby need not to hand-carry a plurality of set screws, also can be more convenient when installing set screw moreover, has improved the efficiency of installation furred ceiling.
Drawings
FIG. 1 is a schematic perspective view of the present application;
FIG. 2 is a partial structural schematic of the present application;
FIG. 3 is a schematic view of the level detecting device of the present application in use;
FIG. 4 is a schematic view of the construction of the fastening device and the connecting device of the present application, wherein the connecting device has been exploded;
figure 5 is a schematic view of the construction of the cross runners and support means of the present application;
FIG. 6 is a schematic structural view of the mounting bracket and the upper part of the mounting bracket of the present application, wherein the access door is in an open position;
fig. 7 is a schematic structural view of the fixing mechanism of the present application, in which the rotating block and the side wall of the mount are cut away.
Reference numerals: 1. a main keel; 11. a base plate; 12. a vertical plate; 2. a secondary keel; 21. a transverse plate; 22. a vertical plate; 23. a through hole; 24. a strip-shaped hole; 25. a waist-shaped hole; 3. a ceiling plate; 31. a set screw; 32. a mounting frame; 33. mounting screws; 34. a support plate; 341. a mounting seat; 342. rotating the rod; 35. an access hole; 36. an access door; 361. a groove; 4. a connecting mechanism; 41. a connecting plate; 411. connecting holes; 42. an expansion screw; 421. a connecting nut; 5. a level detection device; 51. a clamping block; 511. a clamping groove; 52. a liquid containing pipe; 521. scale lines; 522. sealing the cover; 53. a first connecting pipe; 54. a second connecting pipe; 6. a fixing device; 61. fixing the screw rod; 62. a star-shaped handle; 63. a connecting device; 64. a first stationary tube; 641. pressing the pipe; 642. inserting the groove; 643. a seal ring; 65. a second stationary tube; 66. a threaded sleeve; 7. a support device; 71. fixing the keel; 711. a support groove; 712. a support screw; 72. a connecting rod; 721. connecting blocks; 8. a fixing mechanism; 81. a fixing plate; 82. rotating the block; 821. a rotating groove; 83. a roller; 84. a torsion spring; 85. the joint board.
Detailed Description
The present application is described in further detail below with reference to figures 1-7.
The embodiment of the application discloses a pin-connected panel furred ceiling.
Referring to fig. 1, the assembly type suspended ceiling comprises a main keel 1 installed on a wall body and a secondary keel 2 installed on the main keel 1, and a suspended ceiling plate 3 is installed on the main keel 1 and the secondary keel 2.
Referring to fig. 1 and 2, four main keels 1 are arranged, the four main keels 1 are mounted on four side walls of a wall body, each main keel 1 comprises a bottom plate 11 and a vertical plate 12 integrally arranged at one end of each bottom plate 11, each vertical plate 12 protrudes out of the upper surface of each bottom plate 11, the bottom plates 11 and the vertical plates 12 are parallel in length direction, and the main keels 1 are in an L shape along the projection of the bottom plates 11 in length direction; the two ends of the four main keels 1 are connected together and matched to form a square-shaped structure, and meanwhile, the four main keels 1 are installed on a wall body through the connecting mechanisms 4.
The connecting mechanism 4 comprises connecting plates 41 and expansion screws 42, the connecting plates 41 are fixedly arranged on the upper surface of the vertical plate 12, three connecting plates 41 are arranged in an array along the length direction of the vertical plate 12, and the side wall of one side, far away from the wall body, of each connecting plate 41 is provided with a vertical connecting hole 411; the expansion screw rods 42 are installed on the wall body and horizontally penetrate out of the connecting holes 411, the outer diameter of each expansion screw rod 42 is smaller than the width of each connecting hole 411, and the number of the expansion screw rods 42 is the same as that of the connecting plates 41; the main keel 1 is installed on the wall body, so that the expansion screw 42 penetrates out of the connecting hole 411, the vertical plate 12 is abutted to the wall body, and the expansion screw 42 is in threaded connection with a connecting nut 421 for fixing the connecting plate 41.
Referring to fig. 3 and 4, the levelness of the bottom plate 11 is detected by the level detection device 5 when the main keel 1 is installed, the level detection device 5 is detachably arranged on the main keel 1, the level detection device 5 comprises a clamping block 51, a liquid containing pipe 52, a first connecting pipe 53 and a second connecting pipe 54, the clamping block 51 is provided with two clamping blocks and is installed at two ends of the bottom plate 11 in a clamping manner, a clamping groove 511 which penetrates through the clamping block 51 and is matched with the bottom plate 11 in a clamping manner is formed in the clamping block 51, a fixing device 6 for fixing the clamping block 51 is arranged on the clamping block 51, the fixing device 6 comprises a fixing screw 61 and a star-shaped handle 62, the fixing screw 61 vertically penetrates through the bottom end of the clamping block 51 upwards to extend into the clamping groove 511, and the fixing screw 61 is in threaded connection with the clamping block 51 and tightly abuts against the; a star handle 62 is mounted on the bottom end of the fixing screw 61.
The liquid containing pipe 52 is fixedly installed at the top end of the clamping block 51, the liquid containing pipe 52 is made of transparent materials, common transparent materials are made of toughened glass, scale marks 521 are arranged on the side wall of the liquid containing pipe 52, a plurality of scale marks 521 are uniformly distributed along the height direction of the liquid containing pipe 52, liquid is contained in the liquid containing pipe 52, and the liquid generally adopts oil; the top end of the liquid containing tube 52 is open, a first thread section is provided on the outer side wall of the liquid containing tube 52 and on one side close to the top end of the liquid containing tube 52, and a sealing cap 522 for sealing the top end opening of the liquid containing tube 52 is connected to the thread of the first thread section.
The first connecting pipe 53 and the second connecting pipe 54 are detachably mounted on the side wall of the opposite side of the two liquid containing pipes 52 through the connecting device 63, the first connecting pipe 53 and the second connecting pipe 54 are communicated with the liquid containing pipes 52, the first connecting pipe 53 and the second connecting pipe 54 are respectively positioned at the upper side and the lower side of the liquid level in the liquid containing pipes 52, and the first connecting pipe 53 and the second connecting pipe 54 are arranged in a spiral shape and have elasticity, so that the first connecting pipe 53 and the second connecting pipe 54 can be contracted together under the action of elasticity without acting force.
Taking the connecting device 63 connected to the first connecting tube 53 as an example, the connecting device 63 includes a first fixing tube 64, a second fixing tube 65, and a threaded sleeve 66, the first fixing tube 64 is fixedly installed on the liquid containing tube 52, the first fixing tube 64 is communicated with the inside of the liquid containing tube 52 and is in a horizontal state, a pressing tube 641 having an outer diameter larger than that of the first fixing tube 64 is fixedly installed at one end of the first fixing tube 64 far away from the liquid containing tube 52, and a second threaded section is opened at one end of the pressing tube 641 far away from the first fixing tube 64.
The second fixing pipes 65 are fixedly installed at two ends of the first connecting pipe 53, the outer diameter of the second fixing pipes 65 is larger than that of the first connecting pipe 53, the threaded sleeves 66 are slidably sleeved on the first connecting pipe 53, the threaded sleeves 66 are in threaded connection with the second threaded section, and the abutting pipes 641 and the second fixing pipes 65 are abutted together; an annular insertion groove 642 is formed at one end of the pressure-resisting pipe 641 close to the second fixing pipe 65, and a sealing ring 643 tightly pressed against the second fixing pipe 65 is clamped on the insertion groove 642.
Referring to fig. 2 and 5, secondary joist 2 is provided with a plurality ofly along 12 length direction equipartitions of vertical board, and secondary joist 2 both ends respectively with two relative bottom plate 11 fixed connection on the main joist 1, secondary joist 2 includes diaphragm 21 and the riser 22 of fixed mounting on diaphragm 21 upper surface, and diaphragm 21 and riser 22 length direction are parallel, the riser 22 is located diaphragm 21 width direction's middle part position simultaneously, the both ends of riser 22 and diaphragm 21 length direction flush, riser 22 and diaphragm 21 are the T font along the projection of riser 22 length direction, the upper surface of diaphragm 21 and the upper surface of bottom plate 11 flush.
The secondary keel 2 is provided with a supporting device 7 connected with the top of the wall body, the supporting device 7 comprises a fixed keel 71 and a connecting rod 72, the length direction of the fixed keel 71 is parallel to that of the vertical plate 22, the fixed keel 71 is fixedly arranged on the top of the wall body through an expansion screw, and two opposite side walls of the fixed keel 71 and the vertical plate 22 are provided with supporting grooves 711; connecting rod 72 is vertical state and upper and lower both ends fixed mounting has connecting block 721, but connecting block 721 joint is installed on supporting groove 711, all installs supporting screw 712 on fixed fossil fragments 71 and the riser 22, and supporting screw 712 level passes fixed fossil fragments 71 and riser 22 and extends to in supporting groove 711 and with connecting block 721 threaded connection, and the head of supporting screw 712 is located inside fixed fossil fragments 71 and riser 22 simultaneously.
The suspended ceiling plates 3 are erected on the bottom plate 11 and the adjacent transverse plates 21, two ends of each suspended ceiling plate 3 are abutted against the vertical plates 12 and the vertical plates 22, the suspended ceiling plates 3 are erected on the adjacent two transverse plates 21, and two ends of each suspended ceiling plate 3 are in contact with the two vertical plates 22; the plurality of the ceiling boards 3 are arranged at intervals along the length direction of the vertical board 22, the plurality of the ceiling boards 3 are abutted together, the ceiling boards 3 are fixed through fixing screws 31, the fixing screws 31 vertically penetrate through the lower surfaces of the bottom board 11 and the transverse board 21 and are in threaded connection with the ceiling boards 3, the two ends of the ceiling boards 3, which are in contact with the transverse board 21 and the vertical board 22, are provided with the fixing screws 31, and meanwhile, the lower surfaces of the ceiling boards 3 are flush with the lower surfaces of the transverse board 21 and the bottom board 11; a gypsum layer is painted on the lower surfaces of the bottom plate 11, the ceiling plate 3 and the transverse plate 21.
The through hole 23, the strip-shaped hole 24 and the waist-shaped hole 25 which have the same structure are arranged on the transverse plate 21 and the bottom plate 11 and correspond to the fixing screw 31, the structure arranged on the transverse plate 21 is used as an example for explanation below, the through hole 23 penetrates through the upper surface and the lower surface of the transverse plate 21 and can be used for the head of the fixing screw 31 to pass through, the strip-shaped hole 24 and the waist-shaped hole 25 are arranged on the upper surface and the lower surface of the transverse plate 21, the width of the strip-shaped hole 24 is smaller than the diameter of the through hole 23, the diameter of the circular arc of the waist-shaped hole 25 is the same as that of the round hole, meanwhile, the length directions of the strip-shaped hole 24 and the waist-shaped hole 25 are parallel to the length direction of the transverse plate 21, one end of.
The fixing screw 31 is screwed to the ceiling plate 3, the ceiling plate 3 is placed on the transverse plate 21 and the bottom plate 11, the fixing screw 31 penetrates through the through hole 23, then the ceiling plate 3 is pushed to enable the fixing screw 31 to move to the strip-shaped hole 24, the head of the fixing screw 31 enters the waist-shaped hole 25, after the ceiling plate 3 is pushed to the installation position, the fixing screw 31 is screwed to enable the head of the fixing screw 31 to be tightly abutted to the bottom of the waist-shaped hole 25, and the head of the fixing screw 31 is located in the waist-shaped hole 25, so that the ceiling plate 3 is fixed.
Referring to fig. 1 and 6, a mounting bracket 32 is erected on the transverse plate 21 between the two risers 22, the shape and size of the outer side wall of the mounting bracket 32 are the same as those of the outer side wall of the ceiling plate 3, a mounting screw 33 for fixing the mounting bracket 32 is also mounted on the mounting bracket 32, the shape and size of the mounting screw 33 are the same as those of the fixing screw 31, and the method for mounting the mounting screw 33 on the transverse plate 21 is the same as that for mounting the fixing screw 31 on the transverse plate 21; fixed mounting has backup pad 34 on the mounting bracket 32 inside wall, and backup pad 34 lower surface all flushes with mounting bracket 32 and furred ceiling board 3 lower surface, has seted up access hole 35 on the backup pad 34, rotates on the backup pad 34 upper surface to install the access door 36 that blocks access hole 35, and the conflict of access door 36 lower surface is on backup pad 34 upper surface.
Referring to fig. 6 and 7, a fixing mechanism 8 for fixing the access door 36 is arranged on the support plate 34, the fixing mechanism 8 includes a fixing plate 81, a rotating block 82, a roller 83, a torsion spring 84 and a clamping plate 85, a groove 361 for facilitating fingers to extend into is formed in the lower surface of the access door 36 and on the side far away from the access door 36, and a worker uses the groove 361 to assist in rotating the access door 36; the fixing plate 81 is fixedly arranged at one end of the access door 36 far away from the rotation, and the fixing plate 81 is positioned at one side close to the upper surface of the access door 36; fixed mounting has mount pad 341 on the backup pad 34 upper surface that is located fixed plate 81 below, and mount pad 341 rotates to install and is horizontally dwang 342, and turning block 82 is provided with two, and the one end of turning block 82 all rotates and installs on dwang 342, and the vertical upwards setting of one end that dwang 342 was kept away from to turning block 82, has seted up on the lateral wall of the relative one side of two turning blocks 82 and has rotated groove 821, and the top intercommunication of rotating groove 821 and turning block 82.
The rollers 83 are respectively rotatably mounted on the rotating grooves 821 of the two rotating blocks 82, the rollers 83 are located above the rotating rod 342, the upper surfaces of the rollers are protruded out of the top ends of the rotating blocks 82, the torsion spring 84 is sleeved on the rotating rod 342, two ends of the torsion spring 84 are respectively abutted against the side walls of the rotating grooves 821 of the two rotating blocks 82, and meanwhile, the contact point between the torsion spring 84 and the rotating groove 821 is located on the side wall of the rotating groove 821 close to one side of the mounting base 341; clamping plate 85 fixed mounting is on fixed plate 81 lower surface, and clamping plate 85 is ohm-shaped, and two gyro wheels 83 support under the effect of torsional spring 84 and press and come to fix a position clamping plate 85 on clamping plate 85.
The working principle of the embodiment of the application is as follows:
the expansion screw rod 42 is fixedly installed on a wall body, the main keel 1 is installed on the expansion screw rod 42, the expansion screw rod 42 penetrates through the connecting hole 411 and the vertical plate 12 is abutted to the wall body, a worker flattens the main keel 1 according to experience, the connecting nut 421 is in threaded connection with the expansion screw rod 42, the connecting nut 421 is abutted to the connecting plate 41 to preliminarily position the main keel 1, the two clamping blocks 51 are clamped and installed on two ends of the length direction of the bottom plate 11 and screws the fixing screw rod 61 to fix, the position of the bottom plate 11 is knocked to enable the height in the liquid containing pipes 52 to be on the same horizontal plane, finally the connecting nut 421 is screwed to be abutted to the connecting plate 41 to fix the position of the main keel 1, and meanwhile, when the adjacent main keels 1 are installed, the two liquid containing pipes 52 are respectively installed on the adjacent two main keels 1, so that the adjacent two main keels 1 can be on the, with this levelness that has improved a plurality of main joist 1 upper plate 11 has reduced the probability that can be in unevenness after main joist 1 is installed to furred ceiling board 3, has reduced the uneven probability of furred ceiling atress, has improved the lower problem of furred ceiling security.
The two ends of the transverse plate 21 of the secondary keel 2 are butted against the bottom plates 11 on the two opposite main keels 1, the secondary keel 2 can not fall off from the bottom plate 11 under the action of friction force, because the bottom plate 11 is in a flat state, only a common level gauge is needed to be placed on the upper surface of the transverse plate 21 near one end of the bottom plate 11 and the upper surface of the bottom plate 11, when the level gauge is in a horizontal state, the whole transverse plate 21 is also in a flat state, then the level gauge can be taken away to weld and fix the joint of the bottom plate 11 and the transverse plate 21, so as to improve the levelness when the suspended ceiling plate 3 is installed on the transverse plate 21, the fixed keel 71 is installed on the wall top, the two ends of the connecting rod 72 are installed on the fixed keel 71 and the vertical plate 22 through the supporting screws 712, support secondary joist 2 with this, improved secondary joist 2's stability to this security that improves the furred ceiling.
The fixing screws 31 are connected to the ceiling plate 3 in a threaded mode, then the fixing screws 31 penetrate through the through holes 23, so that the ceiling plate 3 is placed on the bottom plate 11 and the transverse plate 21 or the two transverse plates 21, the ceiling plate 3 is pushed, the fixing screws 31 move to the strip-shaped holes 24 and the kidney-shaped holes 25, then the fixing screws 31 can be screwed, the heads of the fixing screws 31 are tightly abutted to the kidney-shaped holes 25, and the ceiling plate 3 is fixed accordingly, a plurality of fixing screws 31 do not need to be carried with a user, the fixing screws 31 are convenient to install, and ceiling installation efficiency is improved; and the mounting bracket 32 and the access door 36 can be mounted to the two cross plates 21 by mounting the ceiling tiles 3.
The access door 36 is pushed to disengage the catching plate 85 from between the two rollers 83, so that the access door 36 can be opened to inspect the condition above the ceiling plate 3 or to inspect the pipes and lines; rotating the access door 36 drives the latch plate 85 into between the two rollers 83, and the access door 36 abuts against the support plate 34, and the two rollers 83 abut against the two latch plates 85 under the action of the torsion spring 84 to position the access door 36.
After the liquid containing pipe 52 is used, the opening of the first fixed pipe 64 on the liquid containing pipe 52 faces upwards, then the threaded sleeve 66 is screwed to replace the first connecting pipe 53 or the second connecting pipe 54, when the liquid containing pipe 52 needs to be carried around, the first connecting pipe 53 and the second connecting pipe 54 are detached, and the threaded cover is connected to the first fixed pipe 64 through threads to seal the first fixed pipe 64, so that the liquid containing pipe 52, the clamping block 51, the first connecting pipe 53 and the second connecting pipe 54 can be separately stored, the first connecting pipe 53 and the second connecting pipe 54 are contracted together under the action of elastic force, the space occupied by the first connecting pipe 53 and the second connecting pipe 54 is reduced, and the carrying convenience of the level detecting device 5 is improved.
The embodiment of the application also discloses an installation method of the assembled ceiling.
With reference to fig. 1 and 3, the following installation steps are included:
s1, construction preparation, measurement site and drawing;
s2, preparing materials, namely preparing materials with proper sizes according to drawings;
s3, installing a suspended ceiling;
the installation process comprises the following steps:
a. installing a main keel 1, and detecting the levelness of the main keel 1 by using a level detection device 5 when the main keel 1 is installed;
b. installing a secondary keel 2, and fixedly installing the secondary keel 2 on the main keel 1;
c. installing a supporting device 7, fixedly installing a fixed keel 71 on the wall top, and then installing two ends of a connecting rod 72 on the fixed keel 71 and the secondary keel 2;
with reference to figures 1 and 2 of the drawings,
d. installing a ceiling board 3, installing the ceiling board 3 between a main keel 1 and a secondary keel 2 and between two secondary keels 2, fixing the ceiling board 3 through a fixing screw 31, and then installing an installation frame 32 on the two secondary keels 2 so as to install an access door 36;
and S4, plastering the whole lower plane of the ceiling board 3, the main keel 1 and the secondary keel 2 by using gypsum powder.
The working principle of the embodiment of the application is as follows:
the levelness detection device 5 is used for detecting the levelness of the main keel 1, so that the levelness of the ceiling board 3 after installation is improved, the probability that the ceiling board 3 is uneven after installation on the main keel 1 is reduced, and the problem of low ceiling safety is solved; simultaneously, the stability of the secondary keel 2 is improved through the supporting device 7, and the safety of the suspended ceiling is improved.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a pin-connected panel furred ceiling, is including setting up main joist (1) and secondary joist (2) on the wall body, setting furred ceiling board (3) on main joist (1) and secondary joist (2), its characterized in that: when the main keel (1) is installed, the levelness of the main keel (1) is detected through the horizontal detection device (5), the horizontal detection device (5) is detachably arranged on the main keel (1),
horizontal detection device (5) are including joint piece (51), flourishing liquid pipe (52), first connecting pipe (53) and second connecting pipe (54), joint piece (51) joint sets up on main joist (1) and is provided with two, flourishing liquid pipe (52) set up on joint piece (51) and have contained liquid and make by transparent material, it is provided with scale mark (521) along flourishing liquid pipe (52) direction of height equipartition on liquid pipe (52) lateral wall to contain, the both ends of first connecting pipe (53) and second connecting pipe (54) communicate with two flourishing liquid pipe (52) respectively and are located the upper and lower both sides of liquid level in flourishing liquid pipe (52) respectively.
2. The pin-connected panel suspended ceiling of claim 1, characterized in that: the main keel (1) is arranged on a wall body through a connecting mechanism (4), the connecting mechanism (4) comprises a connecting plate (41) and an expansion screw rod (42),
the connecting plates (41) are arranged on the main keel (1) and at least two connecting holes (411) are formed in the connecting plates, the expansion screw (42) is arranged on the wall body, penetrates through the connecting holes (411) and is provided with a connecting nut (421) abutting against the connecting plates (41);
be provided with on joint piece (51) and carry out fixing device (6) fixed to joint piece (51), fixing device (6) include clamping screw (61), star type handle (62), clamping screw (61) threaded connection just supports tightly on main joist (1) on joint piece (51) and fixes joint piece (51) position, star type handle (62) set up on clamping screw (61).
3. The pin-connected panel suspended ceiling of claim 1, characterized in that: first connecting pipe (53) and second connecting pipe (54) all are connected with two flourishing liquid pipes (52) can dismantle through connecting device (63), connecting device (63) include first fixed pipe (64), the fixed pipe of second (65), thread bush (66), first fixed pipe (64) set up on flourishing liquid pipe (52), the fixed pipe of second (65) set up on first connecting pipe (53) and the external diameter is greater than the external diameter of first connecting pipe (53), thread bush (66) rotate set up on first connecting pipe (53) and threaded connection on first fixed pipe (64) and make first fixed pipe (64) and the fixed pipe of second (65) contradict together.
4. The pin-connected panel suspended ceiling of claim 1, characterized in that: the top end of the liquid containing pipe (52) is connected with a sealing cover (522) in a threaded mode, and the first connecting pipe (53) and the second connecting pipe (54) are both arranged in a spiral mode and have elasticity.
5. The pin-connected panel suspended ceiling of claim 1, characterized in that: be provided with strutting arrangement (7) with wall connection on secondary joist (2), strutting arrangement (7) are including fixed fossil fragments (71), connecting rod (72), fixed fossil fragments (71) set up on the wall body and are located secondary joist (2) top, connecting rod (72) both ends are connected and the equipartition is provided with a plurality ofly through holding screw (712) and fixed fossil fragments (71) and secondary joist (2) respectively.
6. The pin-connected panel suspended ceiling of claim 1, characterized in that: the suspended ceiling plate is characterized in that the lower surface of the suspended ceiling plate (3) is flush with the lower surfaces of the main keel (1) and the secondary keel (2), the lower surface of the suspended ceiling plate (3) is painted with a gypsum layer which integrates the lower surfaces of the main keel (1) and the secondary keel (2), and the main keel (1) and the secondary keel (2) are provided with fixing screws (31) which are used for fixing the suspended ceiling plate (3) and are located inside the main keel (1) and the secondary keel (2) at the head parts.
7. The pin-connected panel suspended ceiling of claim 6, characterized in that: set up through-hole (23) that set screw (31) passed on main joist (1), set up on two surfaces about main joist (1) strip hole (24) and waist shape hole (25) with through-hole (23) intercommunication, set screw (31) can slide on strip hole (24) and can support tightly on waist shape hole (25).
8. The pin-connected panel suspended ceiling of claim 1, characterized in that: be located two be provided with mounting bracket (32) on secondary joist (2) between furred ceiling board (3), be provided with mounting screw (33) the same and be used for fixed mounting bracket (32) with set screw (31) size on mounting bracket (32), be provided with backup pad (34) of seting up access hole (35) on mounting bracket (32), it is provided with access door (36) that block access hole (35) to rotate on backup pad (34), be provided with fixed establishment (8) of fixed access door (36) on backup pad (34).
9. The pin-connected panel suspended ceiling of claim 8, wherein: the fixing mechanism (8) comprises a fixing plate (81), a rotating block (82), a roller (83), a torsion spring (84) and a clamping plate (85), the access door (36) is arranged on the support plate (34) and is provided with a groove (361) convenient for force application, the fixed plate (81) is arranged on the access door (36), the rotating blocks (82) are rotatably arranged on the supporting plate (34) through the rotating rods (342) and are provided with two rotating blocks, the roller (83) is rotatably arranged at one end of the rotating block (82) far away from the rotating rod (342), the torsion spring (84) is sleeved on the rotating rod (342), two ends of the torsion spring respectively abut against the two rotating blocks (82), the clamping plate (85) is arranged on the fixed plate (81), and the two rollers (83) are pressed on the clamping plate (85) under the action of the torsion spring (84) to position the clamping plate (85).
10. The mounting method of the assembled ceiling is characterized by comprising the following steps: the method comprises the following installation steps:
s1, construction preparation, measurement site and drawing;
s2, preparing materials, namely preparing materials with proper sizes according to drawings;
s3, installing the suspended ceiling, wherein the suspended ceiling is installed according to any one of claims 1 to 9;
the installation process comprises the following steps:
a. installing a main keel (1), and detecting the levelness of the main keel (1) by using a horizontal detection device (5) when the main keel (1) is installed;
b. installing a secondary keel (2), and installing the secondary keel (2) on the main keel (1);
c. the mounting and supporting device (7) is used for mounting the fixed keel (71) on the wall top, and then the two ends of the connecting rod (72) are respectively mounted on the fixed keel (71) and the secondary keel (2);
d. installing a ceiling plate (3), installing the ceiling plate (3) between the main keel (1) and the secondary keel (2) and between the two secondary keels (2), and fixing the ceiling plate (3) through a fixing screw (31);
and S4, plastering, namely plastering the whole lower planes of the ceiling board (3), the main keel (1) and the secondary keel (2) by using gypsum powder.
CN202011010104.2A 2020-09-23 2020-09-23 Assembled ceiling and installation method Pending CN112095886A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011010104.2A CN112095886A (en) 2020-09-23 2020-09-23 Assembled ceiling and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011010104.2A CN112095886A (en) 2020-09-23 2020-09-23 Assembled ceiling and installation method

Publications (1)

Publication Number Publication Date
CN112095886A true CN112095886A (en) 2020-12-18

Family

ID=73756086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011010104.2A Pending CN112095886A (en) 2020-09-23 2020-09-23 Assembled ceiling and installation method

Country Status (1)

Country Link
CN (1) CN112095886A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338525A (en) * 2021-05-28 2021-09-03 南京深圳装饰安装工程有限公司 High-rise suspended ceiling structure and construction method thereof
CN114352042A (en) * 2021-12-31 2022-04-15 北京乐孚装饰工程有限公司 Hotel is fossil fragments fixed position device for architectural surface

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101038160A (en) * 2007-04-19 2007-09-19 胡昌烜 Three-dimensional universal horizon equipment and method for using same
US20080028693A1 (en) * 2006-08-02 2008-02-07 Mccauley Kerry Panel installation system
CN109930734A (en) * 2019-04-23 2019-06-25 台州市易家装饰有限公司 A kind of plaster tablet suspended ceiling construction method
CN209277372U (en) * 2018-08-14 2019-08-20 上海啸佳建筑科技有限公司 A kind of energy-saving integrated anti-dropout ceiling structure
CN210032297U (en) * 2019-05-27 2020-02-07 西安市鑫龙建筑装饰工程(集团)有限公司 Light steel keel suspended ceiling
CN211473034U (en) * 2019-12-16 2020-09-11 重庆拓达建设(集团)有限公司 Integrated kitchen ceiling structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080028693A1 (en) * 2006-08-02 2008-02-07 Mccauley Kerry Panel installation system
CN101038160A (en) * 2007-04-19 2007-09-19 胡昌烜 Three-dimensional universal horizon equipment and method for using same
CN209277372U (en) * 2018-08-14 2019-08-20 上海啸佳建筑科技有限公司 A kind of energy-saving integrated anti-dropout ceiling structure
CN109930734A (en) * 2019-04-23 2019-06-25 台州市易家装饰有限公司 A kind of plaster tablet suspended ceiling construction method
CN210032297U (en) * 2019-05-27 2020-02-07 西安市鑫龙建筑装饰工程(集团)有限公司 Light steel keel suspended ceiling
CN211473034U (en) * 2019-12-16 2020-09-11 重庆拓达建设(集团)有限公司 Integrated kitchen ceiling structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338525A (en) * 2021-05-28 2021-09-03 南京深圳装饰安装工程有限公司 High-rise suspended ceiling structure and construction method thereof
CN114352042A (en) * 2021-12-31 2022-04-15 北京乐孚装饰工程有限公司 Hotel is fossil fragments fixed position device for architectural surface
CN114352042B (en) * 2021-12-31 2023-07-14 广东马尚装饰设计集团有限公司 Keel fixing and positioning device for hotel decoration surface layer

Similar Documents

Publication Publication Date Title
CN112095886A (en) Assembled ceiling and installation method
CN101302886B (en) Movable floor support and method for mounting floor using the same
CN111910826A (en) Assembled suspended ceiling
CN204475767U (en) Wall decoration building materials hang special part
CN214062060U (en) Unit curtain wall with shaped window
CN220188210U (en) Reinforcing steel bar strength detection device based on constructional engineering
JP2006511745A5 (en)
CN218541305U (en) Assembled is exterior wallboard fossil fragments for building
CN116575632A (en) Suspended ceiling assembly and assembled suspended ceiling
CN206844552U (en) The cladding supporting and limiting device of wall brick
CN104612358B (en) A kind of hanging method of wall decoration building materials
CN105298145A (en) Vertical external sun-shading welding-free construction method of hidden-frame curtain wall
CN214039757U (en) Horizontal ruler for building detection
CN212802218U (en) Ceiling decorative board connection structure
CN213927556U (en) Hang muscle mounting tool
CN212984291U (en) A quick mounting structure for building curtain adorns outward
CN205444782U (en) Install pendant structure of wall ceramic tile fast
CN104652753A (en) Special accessory for hanging wall decoration building materials
CN219909496U (en) Glass curtain wall supporting device and glass curtain wall system
CN207086976U (en) A kind of architectural engineering drilling bracket
CN213206780U (en) Hydraulic engineering's pipeline support frame
CN215630646U (en) Steel structure earthquake-resistant structure for building engineering
CN211257652U (en) House decoration pendant installation device
CN221896216U (en) Building engineering template strutting arrangement
CN220889145U (en) Keel frame connecting structure for house construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 07b02, 7th floor, No.4, Fufeng Road, Fengtai District, Beijing 100071

Applicant after: Beijing Zhicheng Huateng Construction Engineering Co.,Ltd.

Address before: 07b02, 7th floor, No.4, Fufeng Road, Fengtai District, Beijing 100071

Applicant before: Beijing Zhicheng Huateng Decoration Engineering Co.,Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20201218

RJ01 Rejection of invention patent application after publication