CN219909496U - Glass curtain wall supporting device and glass curtain wall system - Google Patents
Glass curtain wall supporting device and glass curtain wall system Download PDFInfo
- Publication number
- CN219909496U CN219909496U CN202320281496.9U CN202320281496U CN219909496U CN 219909496 U CN219909496 U CN 219909496U CN 202320281496 U CN202320281496 U CN 202320281496U CN 219909496 U CN219909496 U CN 219909496U
- Authority
- CN
- China
- Prior art keywords
- glass curtain
- curtain wall
- connecting pipe
- steel
- sash
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011521 glass Substances 0.000 title claims abstract description 98
- 230000000670 limiting effect Effects 0.000 claims abstract description 27
- 229910000831 Steel Inorganic materials 0.000 claims description 32
- 239000010959 steel Substances 0.000 claims description 32
- 230000000694 effects Effects 0.000 abstract description 7
- 238000009434 installation Methods 0.000 description 10
- 238000000034 method Methods 0.000 description 8
- 210000001503 joint Anatomy 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052755 nonmetal Inorganic materials 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model relates to a glass curtain wall supporting device and a glass curtain wall system, in particular to the technical field of glass curtain walls, which comprises a plurality of stand columns arranged on a wall body and cross beams arranged between adjacent stand columns, wherein the stand columns and the cross beams are staggered to form a plurality of frames for installing glass panels, each edge of each frame is provided with a connecting piece, each connecting piece comprises a supporting seat arranged on the frame and a propping plate rotationally arranged on the supporting seat through a rotating shaft, the rotating shaft is arranged along the length direction of the frame edge where the rotating shaft is positioned, a first limiting plate is arranged on the supporting seat on one side, away from the frame, of each propping plate, when the propping plates are parallel to the wall surface, the first limiting plates are propped against the corresponding plates, and the distance between the propping plates and the frames is adjustable. The utility model has the effect of improving the working efficiency.
Description
Technical Field
The utility model relates to the technical field of glass curtain walls, in particular to a glass curtain wall supporting device and a glass curtain wall system.
Background
The curtain wall is an outer wall enclosure of a building, is not bearing, is hung like a curtain, is also called as a curtain wall, and is a light wall with a decorative effect commonly used in modern large-scale and high-rise buildings. Curtain walls are generally composed of panels and a rear supporting structure system, and according to the materials of the panels, the curtain walls can be classified into glass curtain walls, metal plate curtain walls and non-metal plate (except glass) curtain walls, wherein the glass curtain walls are widely used due to the advantages of beautiful appearance, energy saving, easy maintenance and the like.
The main process flow of the glass curtain wall is as follows: firstly, installing upright posts and cross beams on the periphery of a building, forming a sash by transverse and longitudinal interlacing of the upright posts and the cross beams, then installing a glass panel in the sash, clamping glass on the upright posts by using a pressing plate, then fixing the pressing plate on the upright posts by using bolts, and after the pressing plate is installed, applying sealant to screws on the pressing plate and connecting joints of the pressing plate and scraping.
To the above-mentioned related art, when transporting glass panels to the installation floor and installing, place the mounted position with glass panels after, every glass panels is pushed down fixedly in proper order through four clamp plates of week side, and glass panels topples over when preventing to fix the clamp plate in proper order, need inside and outside respectively two persons hold up glass panels for a long time and install, work efficiency is low.
Disclosure of Invention
In order to improve construction efficiency, the utility model provides a glass curtain wall supporting device and a glass curtain wall system.
The utility model provides a glass curtain wall supporting device and a glass curtain wall system, which adopt the following technical scheme:
the utility model provides a glass curtain wall strutting arrangement and glass curtain wall system, includes a plurality of stands and locating on the wall body adjacent crossbeam between the stand, the stand with the crossbeam is crisscross to form a plurality of grills that are used for installing glass panels, each edge of grills all is equipped with the connecting piece, the connecting piece is including locating supporting seat on the grills and locating through the pivot rotation butt plate on the supporting seat, the pivot sets up along the length direction on its place grills limit, butt plate keep away from be equipped with first limiting plate on the supporting seat of grills one side, butt plate with when the wall of wall body is parallel, first limiting plate butt plate, butt plate with interval between the grills is adjustable.
By adopting the technical scheme, when the glass panel is installed, the glass panel is moved along the vertical wall direction, when the glass panel is abutted against the abutting plates, the abutting plates rotate, the glass panel is continuously moved into the sash and is moved to a proper position, the four abutting plates at the periphery of the glass panel are quickly reset, the abutting plates are matched with the first limiting plate to limit the glass panel, the distance between the abutting plates and the glass panel is adjusted, one side surface of the glass panel is abutted against the sash, and the other side surface of the glass panel is abutted against the abutting plates, so that the fixed installation of the glass panel is realized; compared with the prior art, the method has the advantages that the pressing plates are fixed by bolts in sequence for limiting, each pressing plate is fixed for a long time, the limiting and the fixing are separated, the plurality of abutting plates are quickly reset for limiting, the trouble that a plurality of persons need to support the glass panel in a matched mode for a long time is reduced, on the premise that safety is guaranteed, the installation of each glass can be completed by only two persons or one person, more glass can be installed by the same number of workers, and the overall working efficiency is improved.
Optionally, the supporting seat includes the I-steel of locating on the sash and slides and locate connecting pipe on the I-steel, the connecting pipe is followed perpendicularly the wall direction of wall body slides, still be equipped with on the connecting pipe and be used for fixing the connecting pipe with the locking piece of I-steel.
Through adopting above-mentioned technical scheme, along perpendicular wall direction sliding connection pipe, the rethread locking piece is fixed can realize the regulation of butt board and sash interval, and simple structure is firm, adjust conveniently.
Optionally, the locking piece includes a bolt, and the bolt is threaded through the connecting pipe and the i-steel in turn.
Through adopting above-mentioned technical scheme, after the connecting pipe activity is to suitable position, use the bolt with connecting pipe and I-steel thread tightening, the locking is convenient, firm.
Optionally, a temporary locking plate is inserted on the i-steel, and the temporary locking plate is abutted to one side, close to the sash, of the connecting pipe.
Through adopting above-mentioned technical scheme, before removing glass panels, slide connecting pipe makes to leave enough space between butt board and the sash and resets, inserts temporary locking board on the I-steel this moment, realizes the temporary locking of connecting pipe, reduces the possibility that the in-process connecting pipe of removing glass panels removes the influence use, and temporary locking is with, simple structure, temporary locking are convenient.
Optionally, one end of the temporary locking plate is provided with an expanded diameter part, and the other end of the temporary locking plate is provided with a rubber head.
Through adopting above-mentioned technical scheme, be equipped with the rubber head one end with temporary locking plate and insert the I-steel in and run through, when the expanded footpath portion butt I-steel outside, the rubber head butt I-steel is inboard, so guarantee that temporary locking plate can not drop in the use, the specific elasticity of rubber head, the plug is convenient.
Optionally, a torsion spring is arranged on the rotating shaft.
Through adopting above-mentioned technical scheme, the torsional spring makes the butt board automatic re-setting, and when the glass panel moved to with butt board butt and continue to remove, the butt board revolute the pivot and rotates, and the torsional spring produces moment of torsion, and when the glass panel moved to with the sash butt, glass panel and butt board separation, butt board automatic re-setting under the moment of torsion effect of torsional spring, convenient to use.
Optionally, the connecting pipe is equipped with along its length direction with the spacing groove of I-steel web adaptation, I-steel web activity joint with in the spacing groove, I-steel both ends are located the second limiting plate of connecting pipe butt.
Through adopting above-mentioned technical scheme, the second limiting plate is spacing to the displacement of connecting pipe in its length direction of extension, reduces the possibility that the connecting pipe produced the position deviation along its length direction in-process sliding connection pipe, guarantees the location accuracy of follow-up locking piece.
The glass curtain wall system comprises the glass panel, wherein the glass panel is fixed with a wall body through the glass curtain wall supporting device.
In summary, the present utility model includes at least one of the following beneficial technical effects:
1. through setting up the connecting piece, the connecting piece includes supporting seat and rotates the butt joint board of connection, has reduced the trouble that needs many people to cooperate for a long time to hold up the glass panel, under the prerequisite of guaranteeing the security, install every glass only need two people or alone can accomplish, and more glasses of staff's the same quantity can be installed, has improved whole work efficiency;
2. through setting up interim locking plate, before removing glass panels, slide connecting pipe makes leaving enough space between butt board and the sash and resets, inserts interim locking plate on the I-steel this moment, realizes the interim locking of connecting pipe, reduces the in-process connecting pipe of removing glass panels and removes the possibility that influences the use, and interim locking usefulness, simple structure, interim locking are convenient.
Drawings
FIG. 1 is a schematic view showing the overall structure of a glass curtain wall supporting apparatus in an installed state according to an embodiment of the present utility model;
FIG. 2 is an exploded view of the connector of FIG. 1;
FIG. 3 is a schematic view showing the overall structure of a glass curtain wall supporting apparatus in a temporary fixing state according to an embodiment of the present utility model;
fig. 4 is an exploded view of the connector of fig. 3.
Reference numerals: 1. a column; 2. a cross beam; 3. a sash; 4. a support base; 41. i-steel; 411. a second limiting plate; 412. a threaded hole; 413. a temporary fixing hole; 42. a connecting pipe; 421. a limit groove; 422. a bolt; 43. a first limiting plate; 5. an abutting plate; 6. a rotating shaft; 61. a torsion spring; 7. a temporary positioning rod; 8. a glass panel.
Detailed Description
The present utility model will be described in further detail with reference to the accompanying drawings.
Example 1:
embodiment 1 discloses a glass curtain wall supporting device. Referring to fig. 1 and 2, a glass curtain wall supporting device comprises upright posts and cross beams arranged between adjacent upright posts, wherein the upright posts and the cross beams are transversely and longitudinally staggered to form a frame for installing a glass panel, a group of frames are used for displaying, connecting pieces are arranged on four sides of each frame, each connecting piece comprises a supporting seat arranged on each frame and a propping plate rotationally arranged on each supporting seat through a rotating shaft, the rotating shafts are arranged along the length direction of the frame side where each rotating shaft is arranged, torsion springs are arranged on the rotating shafts, a first limiting plate is further arranged on each supporting seat on one side, away from each frame, of each propping plate, each frame, each supporting seat and each propping plate form a limiting area for placing the glass panel, and the distance between each propping plate and each frame is adjustable; during installation, refer to fig. 3, move glass panel along perpendicular wall direction to the sash, abutting plate unidirectional rotation when meetting glass panel, make glass panel can continue to remove to spacing district, until with the sash butt, refer to fig. 1, four abutting plates of week side reset under the elasticity effect of torsional spring, adjust abutting plate and sash interval this moment, until glass panel one side and sash butt, the opposite side and abutting plate butt, realize glass panel's installation, the whole process has four abutting plates and first limiting plate cooperation to carry out spacingly to glass panel, the possibility that glass panel emptyd at the installation change in-process has been reduced, only need two people to install a glass panel even alone, whole work efficiency has been improved.
Referring to fig. 2, the support base includes an i-steel welded on the sash and a connecting pipe slidably disposed on the web of the i-steel, two ends of the i-steel are welded with second limiting plates, the abutting plates are rotatably connected to the connecting pipe through a rotating shaft, the first limiting plates are welded on the connecting pipe, the connecting pipe is provided with limiting grooves adapted to the web of the i-steel along the length direction of the connecting pipe, the web of the i-steel is slidably clamped in the limiting grooves, the connecting pipe slides along the direction of a vertical wall under the limiting action of the second limiting plates, the connecting pipe is further provided with locking pieces, the locking pieces are bolts screwed on the connecting pipe, threaded holes adapted to the bolts are formed in the i-steel, and after the connecting pipe is slid to a proper position, the bolts are screwed into the threaded holes to fix the glass panel.
In addition, referring to fig. 4, the web of the i-steel is further inserted with a temporary positioning rod, one end of the temporary positioning rod is an expanded diameter portion, the other end of the temporary positioning rod is fixed with a rubber head, the web of the i-steel is provided with a temporary positioning hole adapted to the temporary positioning rod, the rubber head is inserted into the temporary positioning hole to realize temporary positioning, and before temporary installation, the temporary positioning rod is inserted into the web, so that the temporary positioning rod is abutted to a connecting pipe, the spacing between the abutting plate and a sash is fixed, the glass panel is moved into a limiting area, and the possibility that the connecting pipe slides to influence the installation of the glass panel in the use process is reduced.
The implementation principle of the embodiment 1 is as follows: before installation, the connecting pipe is slid to maximize the distance between the abutting plate and the sash, and then the temporary positioning rod is inserted into the I-steel to realize temporary positioning of the position of the connecting pipe; then, the glass panel is moved towards the wall surface until the glass panel abuts against the sash, the abutting plates at the periphery of the glass panel automatically reset under the action of the elasticity of the torsion spring, the limit of the glass panel is realized, and the possibility of toppling of the glass panel during fixing is reduced; under the prerequisite of guaranteeing the security, pull out temporary positioning pole, slide connecting pipe, until glass panel one side and sash butt, opposite side and butt board butt, use the bolt fastening to accomplish glass panel's fixed again, install the apron at last and can accomplish the installation, simple to operate.
Example 2:
embodiment 2 discloses a glass curtain wall system, including glass panel, and glass panel is fixed with the wall body through glass curtain wall strutting arrangement in embodiment 1.
The above embodiments are not intended to limit the scope of the present utility model, so: all equivalent changes in structure, shape and principle of the utility model should be covered in the scope of protection of the utility model.
Claims (8)
1. The utility model provides a glass curtain wall strutting arrangement, is applied to between glass panel and the wall body, including locating a plurality of stands on the wall body and locating adjacently crossbeam between the stand, the stand with the crossbeam is crisscross to form a plurality of grills that are used for installing glass panel, its characterized in that: each edge of sash all is equipped with the connecting piece, the connecting piece is including locating supporting seat on the sash and rotate through the pivot and locate the butt board on the supporting seat, the pivot sets up along the length direction on its place sash limit, the butt board is kept away from be equipped with first limiting plate on the supporting seat of sash one side, the butt board with when the wall of wall body is parallel, first limiting plate butt board, the butt board with the interval between the sash is adjustable.
2. A glass curtain wall support device according to claim 1, wherein: the support seat comprises I-steel arranged on the sash and a connecting pipe arranged on the I-steel in a sliding mode, the connecting pipe slides along the direction perpendicular to the wall surface of the wall body, and a locking piece used for fixing the connecting pipe and the I-steel is further arranged on the connecting pipe.
3. A glass curtain wall support device according to claim 2, wherein: the locking piece comprises a bolt, and the bolt sequentially penetrates through the connecting pipe and the I-steel in a threaded mode.
4. A glass curtain wall support device according to claim 2, wherein: the temporary locking plate is also inserted on the I-steel and is abutted with one side, close to the sash, of the connecting pipe.
5. The glass curtain wall support device according to claim 4, wherein: one end of the temporary locking plate is provided with an expanding part, and the other end of the temporary locking plate is provided with a rubber head.
6. A glass curtain wall support device according to claim 1, wherein: and a torsion spring is arranged on the rotating shaft.
7. A glass curtain wall support device according to claim 2, wherein: the connecting pipe is provided with a limiting groove matched with the I-steel web along the length direction of the connecting pipe, the I-steel web is movably clamped with the limiting groove, and two ends of the I-steel are arranged on a second limiting plate which is abutted to the connecting pipe.
8. A glass curtain wall system based on a glass curtain wall support device according to any one of claims 1 to 7, comprising: and the glass panel is fixed with the wall body through a glass curtain wall supporting device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320281496.9U CN219909496U (en) | 2023-02-21 | 2023-02-21 | Glass curtain wall supporting device and glass curtain wall system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320281496.9U CN219909496U (en) | 2023-02-21 | 2023-02-21 | Glass curtain wall supporting device and glass curtain wall system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219909496U true CN219909496U (en) | 2023-10-27 |
Family
ID=88465515
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320281496.9U Active CN219909496U (en) | 2023-02-21 | 2023-02-21 | Glass curtain wall supporting device and glass curtain wall system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219909496U (en) |
-
2023
- 2023-02-21 CN CN202320281496.9U patent/CN219909496U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112095862A (en) | Building curtain wall mounting structure and building curtain wall mounting method | |
CN216476431U (en) | Curtain installation auxiliary device for civil engineering | |
CN219909496U (en) | Glass curtain wall supporting device and glass curtain wall system | |
CN112156391B (en) | Safety belt hanging support | |
CN115637839B (en) | Quick assembly disassembly structure for building scaffold | |
CN117188778A (en) | Installation method of steel structure conversion layer of ceiling | |
CN210395771U (en) | Mounting structure convenient to dismantle building curtain | |
CN212715764U (en) | Hang stone material curtain node structure futilely | |
CN215978543U (en) | Construction steel bar location structure | |
CN212715565U (en) | Pendant for supporting external corner of stone curtain wall | |
CN213710503U (en) | Steel structure bearing frame for building engineering | |
CN110106810B (en) | Positioning device for mounting corrugated plate on guardrail upright post and construction method thereof | |
CN210947717U (en) | Formwork support for building | |
CN112554397B (en) | Special-shaped curtain wall system | |
CN219196664U (en) | Scaffold for hydropower installation | |
CN220150627U (en) | Adjustable mounting structure of curtain wall | |
CN220434297U (en) | Succinct firm guardrail mounting structure | |
CN207092453U (en) | Wood veneer mounting structure in a kind of decorative engineering room | |
CN216587656U (en) | Anti-skid right-angle fastener for steel pipe support | |
CN220580296U (en) | Fixed connection device for building curtain wall engineering | |
CN220337644U (en) | Fire control pipeline mounting bracket for fire engineering | |
CN217419700U (en) | Water retaining device is used in hydraulic engineering construction with adjustable | |
CN219548337U (en) | Engineering construction work frame with protection architecture | |
CN219671780U (en) | But height-adjusting's curtain | |
CN221546041U (en) | Curtain wall connecting piece convenient to install |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |