CN111910826A - A prefabricated ceiling - Google Patents

A prefabricated ceiling Download PDF

Info

Publication number
CN111910826A
CN111910826A CN202010685400.6A CN202010685400A CN111910826A CN 111910826 A CN111910826 A CN 111910826A CN 202010685400 A CN202010685400 A CN 202010685400A CN 111910826 A CN111910826 A CN 111910826A
Authority
CN
China
Prior art keywords
keel
panel
main body
pendant
suspended ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010685400.6A
Other languages
Chinese (zh)
Inventor
李有江
于波
李冬阳
郭钊
李振鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Ruihe Construction Decoration Co Ltd
Original Assignee
Shenzhen Ruihe Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Ruihe Construction Decoration Co Ltd filed Critical Shenzhen Ruihe Construction Decoration Co Ltd
Priority to CN202010685400.6A priority Critical patent/CN111910826A/en
Publication of CN111910826A publication Critical patent/CN111910826A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12—Connections between non-parallel members of the supporting construction
    • E04B9/16—Connections between non-parallel members of the supporting construction the members lying in different planes
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18—Means for suspending the supporting construction
    • E04B9/20—Means for suspending the supporting construction adjustable
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18—Means for suspending the supporting construction
    • E04B9/20—Means for suspending the supporting construction adjustable
    • E04B9/205—Means for suspending the supporting construction adjustable by means of a resilient clip
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/24—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto
    • E04B9/245—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto by means of screws, bolts or clamping strips held against the underside of the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Toys (AREA)

Abstract

本发明公开了一种装配式天花吊顶,包括连接组件、龙骨组件及面板组件,龙骨组件包括与连接组件连接的第一龙骨、挂设于第一龙骨的龙骨挂件以及第二龙骨,第二龙骨包括卡位部和两个连接于卡位部远离第一龙骨一侧的弹性支撑部,两个弹性支撑部间隔相对设置以形成第一避让槽,龙骨挂件上开设有卡槽,第二龙骨通过卡位部与卡槽的配合挂设于龙骨挂件,面板组件包括面板和面板挂件,面板挂件穿过第一避让槽后挂设于两弹性支撑部。本发明的装配式天花吊顶,龙骨挂件挂在第一龙骨上,第二龙骨挂在龙骨挂件上,面板组件挂在第二龙骨上,连接方式简单,方便工人操作,节省时间,降低劳动强度,提高安装施工效率。

Figure 202010685400

The invention discloses an assembled ceiling, comprising a connecting component, a keel component and a panel component. The keel component includes a first keel connected with the connecting component, a keel pendant hanging on the first keel, a second keel, and a second keel. It includes a clamping part and two elastic supporting parts connected to the side of the clamping part away from the first keel. The two elastic supporting parts are arranged opposite to each other to form a first avoidance groove. The keel pendant is provided with a clamping groove, and the second keel passes through it. The clamping part and the clamping groove are matched and hung on the keel pendant. The panel assembly includes a panel and a panel pendant. The panel pendant passes through the first escape groove and is hung on the two elastic support parts. In the assembled ceiling of the invention, the keel pendant is hung on the first keel, the second keel is hung on the keel pendant, the panel assembly is hung on the second keel, the connection method is simple, the operation of the worker is convenient, the time is saved, and the labor intensity is reduced. Improve installation and construction efficiency.

Figure 202010685400

Description

一种装配式天花吊顶A prefabricated ceiling

技术领域technical field

本发明涉及建筑装饰技术领域,尤其涉及一种装配式天花吊顶。The invention relates to the technical field of architectural decoration, in particular to a prefabricated ceiling.

背景技术Background technique

天花板吊顶是房屋居住环境的顶部装修,不仅能营造出丰富多彩的室内空间艺术形象,是室内装饰的重要部分之一。但现有的天花板吊顶施工装配率不高,在施工过程中存在的噪音污染、安装繁琐、施工效率低,材料损耗大、成本高等缺陷。The ceiling is the top decoration of the living environment of the house. It can not only create a colorful artistic image of the interior space, but also is one of the important parts of interior decoration. However, the existing ceiling construction and assembly rate is not high, and there are noise pollution, cumbersome installation, low construction efficiency, large material loss and high cost in the construction process.

发明内容SUMMARY OF THE INVENTION

为了克服现有技术的不足,本发明的目的在于提供一种装配式天花吊顶,构配件标准化生产,可重复安装拆卸、维修更换,循环利用,降低成本,节约材料资源,提高生产加工和安装施工效率。In order to overcome the deficiencies of the prior art, the purpose of the present invention is to provide a prefabricated ceiling with standardized production of components and parts, which can be repeatedly installed and disassembled, repaired and replaced, recycled, used to reduce costs, save material resources, and improve production, processing and installation construction. efficiency.

本发明的目的采用如下技术方案实现:The purpose of the present invention adopts following technical scheme to realize:

一种装配式天花吊顶,包括:A prefabricated ceiling, comprising:

连接组件,用于固定安装至天花板;Connection kit for fixed installation to the ceiling;

龙骨组件,包括第一龙骨、龙骨挂件以及第二龙骨,所述第一龙骨连接于所述连接组件远离天花板的一侧,所述龙骨挂件挂设于所述第一龙骨,所述第二龙骨包括卡位部和两个连接于所述卡位部远离所述第一龙骨一侧的弹性支撑部,两个所述弹性支撑部间隔相对设置以形成第一避让槽,所述龙骨挂件上开设有卡槽,所述第二龙骨通过所述卡位部与所述卡槽的配合挂设于所述龙骨挂件;The keel assembly includes a first keel, a keel pendant and a second keel, the first keel is connected to the side of the connecting assembly away from the ceiling, the keel pendant is hung on the first keel, and the second keel It includes a clamping part and two elastic supporting parts connected to the side of the clamping part away from the first keel, the two elastic supporting parts are arranged opposite to each other at intervals to form a first escape groove, and the keel pendant is provided with There is a card slot, and the second keel is hung on the keel pendant through the cooperation of the locking portion and the card slot;

面板组件,包括面板和固定于所述面板的面板挂件,所述面板挂件穿过所述第一避让槽后挂设于两所述弹性支撑部。The panel assembly includes a panel and a panel hanger fixed on the panel, the panel hanger is hung on the two elastic support parts after passing through the first escape groove.

进一步地,所述第二龙骨还包括两个承托板,每个所述弹性支撑部都与一个所述承托板连接且两个所述承托板相背延伸,所述面板挂件穿过所述第一避让槽后与两个所述承托板抵接。Further, the second keel also includes two support plates, each of the elastic support parts is connected with one of the support plates, and the two support plates extend opposite to each other, and the panel hanger passes through. The first escape groove is in contact with the two support plates.

进一步地,所述面板设有至少两个,所述面板挂件包括固定于所述面板的第一卡扣件和固定于另一相邻所述面板的第二卡扣件,所述第一卡扣件朝向所述第二卡扣件的一侧设有第一凸起和第一凹陷,所述第二卡扣件对位设有第二凹陷和第二凸起,所述第一凸起插入所述第二凹陷,所述第二凸起插入所述第一凹陷。Further, the panel is provided with at least two, and the panel hanger includes a first clip fixed to the panel and a second clip fixed to another adjacent panel, the first clip The side of the fastener facing the second fastener is provided with a first protrusion and a first recess, the second fastener is provided with a second recess and a second protrusion in alignment, and the first protrusion The second depression is inserted, and the second protrusion is inserted into the first depression.

进一步地,所述卡槽呈T字形。Further, the card slot is T-shaped.

进一步地,所述龙骨挂件包括两个间隔相对设置的侧板、连接于两所述侧板之间的连接板、弯折于所述侧板顶端的弯折部、以及固定于所述弯折部并与所述侧板相间隔的延伸部,所述侧板、所述弯折部及所述延伸部围合形成插槽,所述卡槽贯穿所述侧板,所述第一龙骨包括与所述连接组件连接并部分位于两所述侧板之间的主体部、凸设于所述主体部相对两侧的横板、以及弯折于所述横板并向上延伸的立板,所述立板插入所述插槽以将所述龙骨挂架挂设于所述第一龙骨。Further, the keel pendant includes two side plates arranged opposite to each other at intervals, a connecting plate connected between the two side plates, a bending part bent at the top end of the side plate, and a bending part fixed on the bending part. an extension part that is spaced apart from the side plate, the side plate, the bent part and the extension part are enclosed to form a slot, the slot penetrates the side plate, and the first keel includes The main body part is connected with the connecting assembly and is partially located between the two side plates, the transverse plates protruding from the opposite sides of the main body part, and the vertical plates bent on the transverse plates and extending upward, so The vertical plate is inserted into the slot to hang the keel hanger on the first keel.

进一步地,所述龙骨挂件还包括两个分别设于两所述侧板的限位块,两所述限位块分别与所述主体部相对的两侧抵接。Further, the keel pendant further includes two limit blocks respectively disposed on the two side plates, and the two limit blocks are respectively abutted on opposite sides of the main body portion.

进一步地,所述连接组件包括用于预埋在附着结构内的预埋件、与所述第一龙骨连接的连杆构件、以及连接所述预埋件与所述连杆构件的连接件,所述连杆构件包括与所述连接件连接的连接套和与所述第一龙骨连接的螺杆,所述连接套开设有用于与所述螺杆螺纹配合的螺纹孔。Further, the connection assembly includes an embedded part for pre-embedding in the attachment structure, a connecting rod member connected with the first keel, and a connecting part connecting the embedded part and the connecting rod member, The connecting rod member includes a connecting sleeve connected with the connecting piece and a screw rod connected with the first keel, and the connecting sleeve is provided with a threaded hole for screwing with the screw rod.

进一步地,所述螺杆包括螺纹柱和固定于所述螺纹柱底部的支撑板,所述主体部贯穿设有第二避让槽,所述螺纹柱穿过所述第二避让槽,所述支撑板位于所述主体部内并承载所述第一龙骨。Further, the screw includes a threaded column and a support plate fixed at the bottom of the threaded column, the main body is provided with a second escape groove, the threaded column passes through the second escape groove, and the support plate is located within the body portion and carries the first keel.

进一步地,所述第一龙骨还包括固定于所述主体部内部的限位结构,所述支撑板嵌设于所述限位结构与所述主体部之间。Further, the first keel further includes a limiting structure fixed inside the main body portion, and the support plate is embedded between the limiting structure and the main body portion.

进一步地,所述连接组件还包括弹簧和橡胶构件,所述预埋件设有容纳空间,所述弹簧和所述橡胶构件均位于所述容纳空间内,所述橡胶构件开设有安装腔,所述弹簧安装于所述安装腔并套设于所述连接件外,所述连接件的一端穿过所述橡胶构件和所述预埋件后与所述连接套连接。Further, the connection assembly further includes a spring and a rubber member, the embedded part is provided with an accommodating space, the spring and the rubber member are both located in the accommodating space, and the rubber member is provided with an installation cavity, so The spring is installed in the installation cavity and sleeved outside the connecting piece, and one end of the connecting piece is connected with the connecting sleeve after passing through the rubber member and the embedded piece.

相比现有技术,本发明的有益效果在于:由于龙骨挂件挂设在第一龙骨上,第二龙骨又通过卡位部与卡才的配合挂在龙骨挂件上,面板组件则通过面板挂件挂在第二龙骨上,连接方式简单,方便工人操作,节省时间,降低劳动强度,提高安装施工效率,而且使面板组件、第一龙骨、龙骨挂件和第二龙骨可以重复安装拆卸、维修更换和循环利用,降低成本,节约材料资源。Compared with the prior art, the beneficial effects of the present invention are: because the keel pendant is hung on the first keel, the second keel is hung on the keel pendant through the cooperation of the clamping part and the card, and the panel assembly is hung on the panel pendant On the second keel, the connection method is simple, which is convenient for workers to operate, saves time, reduces labor intensity, improves installation and construction efficiency, and enables the panel assembly, the first keel, the keel pendant and the second keel to be repeatedly installed, removed, repaired, replaced and recycled. Utilize, reduce costs and save material resources.

附图说明Description of drawings

图1为本发明实施例提供的装配式天花吊顶安装于天花板时的剖视示意图;1 is a schematic cross-sectional view of a prefabricated ceiling provided by an embodiment of the present invention when it is installed on a ceiling;

图2为本发明实施例提供的装配式天花吊顶另一方向的剖视示意图;Fig. 2 is the cross-sectional schematic diagram of the other direction of the assembled ceiling provided by the embodiment of the present invention;

图3为图2中所示预埋件、弹簧及橡胶构件的剖视示意图;Figure 3 is a schematic cross-sectional view of the embedded part, the spring and the rubber member shown in Figure 2;

图4为图2中所示连接件与连杆构件的部分剖视示意图;FIG. 4 is a partial cross-sectional schematic view of the connecting piece and the connecting rod member shown in FIG. 2;

图5为图4中所示连接套的俯视示意图;Fig. 5 is the top schematic view of the connecting sleeve shown in Fig. 4;

图6为图5的沿A~A线的剖视示意图;6 is a schematic cross-sectional view along line A-A of FIG. 5;

图7为图4中所述连接套的正视示意图;7 is a schematic front view of the connecting sleeve described in FIG. 4;

图8为图4中所示螺杆的结构示意图;Fig. 8 is the structural representation of the screw shown in Fig. 4;

图9为图4中所示连接件的结构示意图;Fig. 9 is the structural representation of the connector shown in Fig. 4;

图10为图1中所示第二龙骨的结构示意图;Fig. 10 is the structural representation of the second keel shown in Fig. 1;

图11为图2中所示龙骨挂件的结构示意图;Fig. 11 is the structural representation of the keel pendant shown in Fig. 2;

图12为图11中所示龙骨挂件另一角度的结构示意图;Figure 12 is a schematic structural diagram of another angle of the keel pendant shown in Figure 11;

图13为图2中所示第一龙骨与螺杆的装配示意图;Fig. 13 is the assembly schematic diagram of the first keel and the screw rod shown in Fig. 2;

图14为图13中所示第一龙骨的结构示意图;Figure 14 is a schematic structural diagram of the first keel shown in Figure 13;

图15为图1中所示龙骨挂件、第二龙骨以及面板组件的剖视示意图;15 is a schematic cross-sectional view of the keel pendant, the second keel, and the panel assembly shown in FIG. 1;

图16为图15中所示面板挂件的分解示意图。FIG. 16 is an exploded schematic view of the panel hanger shown in FIG. 15 .

图中:100、装配式天花吊顶;10、连接组件;20、龙骨组件;30、面板组件;200、天花板;11、预埋件;12、连杆构件;13、连接件;14、弹簧;15、橡胶构件;111、容纳空间;151、安装腔;112、缺口;121、连接套;122、螺杆;1211、螺纹孔;1212、顶板;1213、围壁;1221、螺纹柱;1222、支撑板;131、套设部;132、挂钩部;1321、连杆;1322、支撑块;1323、凹槽;1214、第一通槽;1215、第二通槽;1216、第三通槽;21、第一龙骨;22、龙骨挂件;23、第二龙骨;231、卡位部;232、弹性支撑部;233、承托板;234、第一避让槽;221、卡槽;31、面板;32、面板挂件;33、玻璃胶;321、第一卡扣件;322、第二卡扣件;323、凹腔;3211、第一凸起;3212、第一凹陷;3221、第二凹陷;3222、第二凸起;211、主体部;212、横板;213、立板;214、限位结构;2111、第二避让槽;2141、连接部;2142、凸设部;222、侧板;223、连接板;224、弯折部;225、延伸部;226、限位块;227、插槽。In the figure: 100, prefabricated ceiling; 10, connecting components; 20, keel components; 30, panel components; 200, ceiling; 11, embedded parts; 12, connecting rod components; 13, connecting parts; 14, springs; 15, rubber component; 111, accommodation space; 151, installation cavity; 112, notch; 121, connecting sleeve; 122, screw rod; plate; 131, sleeve part; 132, hook part; 1321, connecting rod; 1322, support block; 1323, groove; 1214, first through groove; 1215, second through groove; 1216, third through groove; 21 , the first keel; 22, the keel pendant; 23, the second keel; 231, the clamping part; 232, the elastic support part; 233, the supporting plate; 234, the first avoidance slot; 221, the card slot; 32, panel pendant; 33, glass glue; 321, first clip; 322, second clip; 323, cavity; 3211, first protrusion; 3212, first depression; 3221, second depression; 3222, the second protrusion; 211, the main body; 212, the horizontal plate; 213, the vertical plate; 214, the limit structure; 2111, the second escape groove; 2141, the connecting part; 223, connecting plate; 224, bending part; 225, extension part; 226, limit block; 227, slot.

具体实施方式Detailed ways

下面,结合附图以及具体实施方式,对本发明做进一步描述,需要说明的是,在不相冲突的前提下,以下描述的各实施例之间或各技术特征之间可以任意组合形成新的实施例。The present invention will be further described below with reference to the accompanying drawings and specific embodiments. It should be noted that, on the premise of no conflict, the embodiments or technical features described below can be combined arbitrarily to form new embodiments. .

需要说明的是,本发明实施例中所有方向性指示(诸如上、下、左、右、前、后、内、外、顶部、底部……)仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。It should be noted that, all directional indications (such as up, down, left, right, front, back, inner, outer, top, bottom...) in the embodiments of the present invention are only used to explain the When the relative positional relationship between the components under the figure) is changed, if the specific posture changes, the directional indication also changes accordingly.

还需要说明的是,当元件被称为“固定于”或“设置于”另一个元件上时,该元件可以直接在另一个元件上或者可能同时存在居中元件。当一个元件被称为“连接”另一个元件,它可以是直接连接另一个元件或者可能同时存在居中元件。It should also be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present.

请参阅图1-图16,本发明实施例提供的一种装配式天花吊顶100,包括连接组件10、龙骨组件20以及面板组件30,连接组件10固定安装至附着结构,附着结构优选为天花板200,龙骨组件20连接在连接组件10的底部,面板组件30又挂设在龙骨组件20的底部。Referring to FIGS. 1 to 16 , a prefabricated ceiling 100 provided by an embodiment of the present invention includes a connecting assembly 10 , a keel assembly 20 and a panel assembly 30 . The connecting assembly 10 is fixedly installed to an attachment structure, and the attachment structure is preferably the ceiling 200 , the keel assembly 20 is connected to the bottom of the connecting assembly 10 , and the panel assembly 30 is hung on the bottom of the keel assembly 20 .

连接组件10包括预埋件11、连杆构件12、连接件13、弹簧14以及橡胶构件15,预埋构件固定至天花板200并开设有容纳空间111,连杆构件12位于预埋件11的下方以用于连接龙骨组件20,橡胶构件15嵌设在容纳空间111内,且橡胶构件15远离连杆构件12的一侧也即顶部凹设有安装腔151,弹簧14安装在安装腔151内并套设于连接件13外,弹簧14的一端与连接件13连接、另一端通过橡胶构件15与预埋件11连接,连接件13的一端位于容纳空间111内、另一端穿过橡胶构件15和预埋件11后与连杆构件12连接。橡胶构件15和弹簧14都具有一定的弹性,当装配式天花吊顶100受到风压或震动等外力作用时,橡胶构件15和弹簧14可以通过产生形变以起到一定的缓冲作用,提高装配式天花吊顶100的抗风压和抗震性能,降低了面板组件30脱离或者损坏的风险,减少损耗和工程事故的发生,提高了住宅安全可靠性。The connecting assembly 10 includes an embedded part 11 , a connecting rod member 12 , a connecting part 13 , a spring 14 and a rubber member 15 . The embedded member is fixed to the ceiling 200 and has a accommodating space 111 , and the connecting rod member 12 is located below the embedded part 11 . For connecting the keel assembly 20, the rubber member 15 is embedded in the accommodating space 111, and the side of the rubber member 15 away from the connecting rod member 12, that is, the top is recessed with a mounting cavity 151, and the spring 14 is mounted in the mounting cavity 151 and The spring 14 is sleeved outside the connector 13, one end of the spring 14 is connected to the connector 13, the other end is connected to the embedded part 11 through the rubber member 15, one end of the connector 13 is located in the accommodating space 111, and the other end passes through the rubber member 15 and the embedded member 11. The embedded part 11 is then connected to the link member 12 . Both the rubber member 15 and the spring 14 have a certain elasticity. When the prefabricated ceiling 100 is subjected to external forces such as wind pressure or vibration, the rubber member 15 and the spring 14 can be deformed to play a certain buffering effect, improving the prefabricated ceiling. The wind pressure resistance and earthquake resistance performance of the suspended ceiling 100 reduces the risk of the panel assembly 30 being detached or damaged, reduces the occurrence of losses and engineering accidents, and improves the safety and reliability of the house.

预埋件11底部的一侧凹设有与容纳空间111连通的缺口112,因此可以在建筑物施工时就在天花板200内预埋所述预埋件11,然后将橡胶构件15、弹簧14以及连接件13装配在一起后,沿水平方向将连接件13插入缺口112,从而将橡胶构件15和弹簧14安装在预埋件11的容纳空间111内,此种安装方式,不需要在现场对天花板200进行钻孔安装膨胀螺栓,避免对天花板200造成损伤,而且不会产生粉尘和噪音,降低污染源,保护环境和施工人员的健康,实现绿色施工。One side of the bottom of the embedded part 11 is recessed with a gap 112 that communicates with the accommodating space 111, so the embedded part 11 can be embedded in the ceiling 200 during construction of the building, and then the rubber member 15, the spring 14 and the After the connectors 13 are assembled together, insert the connectors 13 into the notch 112 in the horizontal direction, so that the rubber member 15 and the spring 14 are installed in the accommodating space 111 of the embedded part 11. This installation method does not require the installation of the ceiling on site. 200 is drilled to install expansion bolts to avoid damage to the ceiling 200, and it will not generate dust and noise, reduce pollution sources, protect the environment and the health of construction workers, and achieve green construction.

连杆构件12包括与连接件13连接的连接套121和与龙骨组件20连接的螺杆122,连接套121开设有螺纹孔1211,螺杆122通过螺纹孔1211与连接套121螺纹连接。由于螺杆122与连接套121是螺纹连接,因此可以旋转螺杆122来调节螺纹底部的高度,在施工时,施工人员可以借助辅助工具站在地面将螺杆122调整到合适高度,然后再通过垫片和紧固件将其锁紧,以使连接套121和螺杆122的连接更加稳定,减少了登高安装时间,提高了施工的安全系数,同时大大降低了施工人员的劳动强度,大幅度提高了安装效率。The connecting rod member 12 includes a connecting sleeve 121 connected with the connecting piece 13 and a screw rod 122 connected with the keel assembly 20 . Since the screw rod 122 and the connecting sleeve 121 are threadedly connected, the screw rod 122 can be rotated to adjust the height of the bottom of the screw thread. During construction, the construction personnel can use auxiliary tools to stand on the ground to adjust the screw rod 122 to a suitable height, and then use the gasket and Fasteners lock it to make the connection between the connecting sleeve 121 and the screw 122 more stable, reduce the time for climbing and installation, improve the safety factor of construction, and at the same time greatly reduce the labor intensity of construction personnel and greatly improve the installation efficiency. .

连接套121包括与连接件13连接的顶板1212和围设于顶板1212底部的围壁1213,围壁1213开设有所述螺纹孔1211,螺杆122包括与围壁1213螺纹连接的螺纹柱1221和固定于螺纹柱1221底部的支撑板1222。The connecting sleeve 121 includes a top plate 1212 connected to the connecting piece 13 and an enclosing wall 1213 surrounding the bottom of the top plate 1212. The enclosing wall 1213 is provided with the threaded hole 1211. A support plate 1222 at the bottom of the threaded post 1221.

连接件13包括用于供弹簧14套设的套设部131和固定于套设部131底部的挂钩部132,连接套121挂设于挂钩部132,挂钩部132包括与套设部131连接的连杆1321和连接于连杆1321远离套设部131一端的支撑块1322,套设部131、连杆1321及支撑块1322围合形成凹槽1323,顶板1212贯穿设有与螺纹孔1211连通的第一通槽1214,围壁1213贯穿设有与第二通槽1215和第三通槽1216,第一通槽1214和第二通槽1215都与螺纹孔1211连通,且第二通槽1215的顶端与第一通槽1214的一端连通、底端与第三通槽1216连通,第三通槽1216在水平方向的尺寸大于第二通槽1215。在将连杆构件12安装到连接件13上时,可以将连杆1321对准第二通槽1215,支撑块1322对准第三通槽1216,然后将支撑块1322推入第三通槽1216内,连杆1321穿过第二通槽1215后进入第一通槽1214,使顶板1212插入凹槽1323内,手松开后,连接套121就会在重力作用下往下运动,使支撑块1322与顶板1212的底部抵接,从而将连杆构件12挂在支撑块1322上,此种连接方式操作简单,便于拆装,可进一步提高施工效率。The connecting piece 13 includes a sleeve portion 131 for the spring 14 to be sleeved and a hook portion 132 fixed at the bottom of the sleeve portion 131 . The connection sleeve 121 is hung on the hook portion 132 , and the hook portion 132 includes a The connecting rod 1321 and the supporting block 1322 connected to one end of the connecting rod 1321 away from the sleeve part 131; The first through-slot 1214 and the surrounding wall 1213 are provided with a second through-slot 1215 and a third through-slot 1216. The top end communicates with one end of the first through groove 1214 , and the bottom end communicates with the third through groove 1216 . The size of the third through groove 1216 in the horizontal direction is larger than that of the second through groove 1215 . When the link member 12 is installed on the connecting piece 13, the link 1321 can be aligned with the second through groove 1215, the support block 1322 can be aligned with the third through groove 1216, and then the support block 1322 can be pushed into the third through groove 1216 Inside, the connecting rod 1321 passes through the second through groove 1215 and then enters the first through groove 1214, so that the top plate 1212 is inserted into the groove 1323. After the hand is released, the connecting sleeve 121 will move downward under the action of gravity, so that the support block 1322 is in contact with the bottom of the top plate 1212, so that the connecting rod member 12 is hung on the support block 1322. This connection method is simple to operate, easy to disassemble and assemble, and can further improve the construction efficiency.

龙骨组件20包括第一龙骨21、龙骨挂件22以及第二龙骨23,第一龙骨21连接于连接组件10远离天花板200的一侧,也即,连接在螺杆122的底部,龙骨固件挂设于第一龙骨21,第二龙骨23位于第一龙骨21的下方并挂设于龙骨挂件22,第二龙骨23与第一龙骨21交叉设置,面板组件30又挂设在第二龙骨23上。挂设的连接方式简单,便于施工人员操作,节省时间,降低劳动强度,提高安装施工效率,而且使第一龙骨21、龙骨挂件22、第二龙骨23以及面板组件可以重复安装拆卸、维修更换和循环利用,降低成本,节约材料资源。The keel assembly 20 includes a first keel 21, a keel pendant 22 and a second keel 23. The first keel 21 is connected to the side of the connecting assembly 10 away from the ceiling 200, that is, connected to the bottom of the screw 122, and the keel fastener is hung on the first keel. A keel 21 , the second keel 23 is located below the first keel 21 and hangs on the keel pendant 22 . The hanging connection method is simple, which is convenient for construction personnel to operate, saves time, reduces labor intensity, improves installation and construction efficiency, and enables the first keel 21, the keel pendant 22, the second keel 23 and the panel components to be repeatedly installed, removed, repaired and replaced. Recycling, reducing costs and saving material resources.

第二龙骨23包括用于与龙骨挂件22配合的卡位部231、两个连接于卡位部231远离第一龙骨21一侧的弹性支撑部232、以及两个分别连接于两所述弹性支撑部232的承托板233,两个弹性支撑部232间隔相对设置以在二者之间形成第一避让槽234,两个承托板233相背延伸,龙骨挂件22上开设有卡槽221,该卡槽221的截面形状大致呈T字形,卡位部231穿过卡槽221后即可将第二龙骨23挂设在龙骨挂件22上。The second keel 23 includes a catch portion 231 for cooperating with the keel pendant 22 , two elastic support portions 232 connected to the side of the catch portion 231 away from the first keel 21 , and two elastic supports respectively connected to the two elastic supports The two elastic support parts 232 are arranged opposite to each other at intervals to form a first avoidance groove 234 therebetween, the two support plates 233 extend opposite to each other, and the keel pendant 22 is provided with a slot 221, The cross-sectional shape of the clamping slot 221 is substantially T-shaped, and the second keel 23 can be hung on the keel pendant 22 after the clamping portion 231 passes through the clamping slot 221 .

面板组件30包括面板31和固定于面板31的面板挂件32,面板31优选为至少两个,相邻两个面板31之间设有玻璃胶33,面板挂件32包括固定于面板31的第一卡扣件321和固定于另一相邻面板31的第二卡扣件322,第一卡扣件321和第二卡扣件322紧密贴合,也即,每个面板31的两端分别设有一个第一卡扣件321和第二卡扣件322,第一卡扣件321和第二卡扣件322相背的两侧均设有一个凹腔323,面板挂件32穿过第一避让槽234后,一个承托板233插入第一卡扣件321上的凹腔323,另一承托板233插入第二卡扣件322上的凹腔323,使得一个弹性支撑部232支撑第一卡扣件321,另一弹性支撑部232支撑第二卡扣件322,从而将面板31挂设在第二龙骨23的底部。面板31、第一卡扣件321及第二卡扣件322可以在工厂内完成组装,以提高现场施工效率,承托板233的设置,增大了面板挂件32与第二龙骨23的接触面积,从而增强了面板组件30与龙骨组件20的连接稳定性。优选地,第一避让槽234的截面形成大致呈梯形,且其尺寸由下至上逐渐减小,也即,第一避让槽234底部尺寸最大,以便面板挂件32插入,而且面板挂件32在插入过程中,面板挂件32会向两侧挤压弹性支撑部232,当面板挂件32对弹性支撑部232的挤压力消失后,弹性支撑部232在自身弹力作用下恢复至原状态并插入凹腔323。The panel assembly 30 includes a panel 31 and a panel hanger 32 fixed to the panel 31 . There are preferably at least two panels 31 , and a glass glue 33 is provided between two adjacent panels 31 . The panel hanger 32 includes a first card fixed to the panel 31 . The fastener 321 and the second fastener 322 fixed to another adjacent panel 31, the first fastener 321 and the second fastener 322 are closely fitted, that is, the two ends of each panel 31 are respectively provided with A first snap piece 321 and a second snap piece 322, the opposite sides of the first snap piece 321 and the second snap piece 322 are provided with a cavity 323, and the panel hanging piece 32 passes through the first escape groove After 234, one supporting plate 233 is inserted into the concave cavity 323 on the first clip 321, and the other supporting plate 233 is inserted into the concave cavity 323 on the second clip 322, so that one elastic support portion 232 supports the first clip. The fastener 321 and the other elastic support portion 232 support the second fastener 322 , so that the panel 31 is hung on the bottom of the second keel 23 . The panel 31 , the first fastener 321 and the second fastener 322 can be assembled in the factory to improve the site construction efficiency. The setting of the support plate 233 increases the contact area between the panel pendant 32 and the second keel 23 , thereby enhancing the connection stability between the panel assembly 30 and the keel assembly 20 . Preferably, the section of the first avoidance groove 234 is substantially trapezoidal, and its size gradually decreases from bottom to top, that is, the size of the bottom of the first avoidance groove 234 is the largest, so that the panel hanger 32 can be inserted, and the panel hanger 32 is inserted during the insertion process. , the panel hanger 32 will press the elastic support portion 232 to both sides. When the pressing force of the panel hanger 32 on the elastic support portion 232 disappears, the elastic support portion 232 will return to its original state under the action of its own elastic force and be inserted into the cavity 323 .

可以理解的是,面板31只设置一个也是可以的,例如,当面板31只有一个时,在面板31的一端设置第一卡扣件321、另一端设置第二卡扣件322,此时面板31仍能通过第一卡扣件321和第二卡扣件322挂设在两个相邻的龙骨挂件22上。It can be understood that only one panel 31 is provided. For example, when there is only one panel 31 , a first fastener 321 is provided at one end of the panel 31 and a second fastener 322 is provided at the other end. At this time, the panel 31 It can still be hung on the two adjacent keel hanging pieces 22 through the first snapping piece 321 and the second snapping piece 322 .

第一卡扣件321朝向第二卡扣件322的一侧设有第一凸起3211和第一凹陷3212,第二卡扣件322朝向第一卡扣件321的一侧对位设有第二凹陷3221和第二凸起3222,第一凸起3211插入第二凹陷3221内,第二凸起3222插入第一凹陷3212内,以防止第一卡扣件321和第二卡扣件322在竖向方向上发生错位。The side of the first fastener 321 facing the second fastener 322 is provided with a first protrusion 3211 and a first recess 3212 , and the side of the second fastener 322 facing the first fastener 321 is provided with a first protrusion 3211 . Two recesses 3221 and second protrusions 3222, the first protrusion 3211 is inserted into the second recess 3221, and the second protrusion 3222 is inserted into the first recess 3212, so as to prevent the first fastener 321 and the second fastener 322 from Misalignment occurs in the vertical direction.

第一龙骨21包括呈中空状的主体部211、两个分别凸设于主体部211相对两侧的横板212、弯折于横板212远离主体部211一端并向上延伸的立板213、以及固定于主体部211内的限位结构214,主体部211的顶部贯穿设有第二避让槽2111,第二避让槽2111从主体部211的一侧朝向另一相对侧延伸,第二避让槽2111的宽度小于支撑板1222的宽度,并大于螺纹柱1221的宽度,因此可以将沿水平方向将螺纹柱1221插入第二避让槽2111内、将支撑板1222插入限位结构214与主体部211之间,从而将第一龙骨21挂在支撑板1222上。限位结构214包括两个固定于主体部211并间隔相对设置的连接部2141和两个分别凸设于两所述连接部2141相向两侧的凸设部2142,第二避让槽2111位于两个连接部2141之间且第二避让槽2111的延伸方向与连接部2141的延伸方向相同,支撑板1222在竖向方向上位于凸设部2142与主体部211之间、在水平方向上位于两个连接部2141之间,限位结构214的设置,可以避让第一龙骨21在水平方向上发生晃动,增强了第一龙骨21的稳定性。The first keel 21 includes a hollow main body portion 211 , two lateral plates 212 respectively protruding from opposite sides of the main body portion 211 , a vertical plate 213 bent at one end of the lateral plate 212 away from the main body portion 211 and extending upward, and The limiting structure 214 is fixed in the main body portion 211. The top of the main body portion 211 is provided with a second avoidance groove 2111. The second avoidance groove 2111 extends from one side of the body portion 211 toward the other opposite side. The second avoidance groove 2111 The width of the threaded rod 1221 is smaller than the width of the supporting plate 1222 and larger than the width of the threaded post 1221. Therefore, the threaded post 1221 can be inserted into the second escape groove 2111 in the horizontal direction, and the supporting plate 1222 can be inserted between the limiting structure 214 and the main body 211. , so that the first keel 21 is hung on the support plate 1222 . The limiting structure 214 includes two connecting portions 2141 fixed to the main body 211 and disposed opposite to each other at intervals, and two protruding portions 2142 respectively protruding on opposite sides of the two connecting portions 2141 , and the second avoiding grooves 2111 are located in the two Between the connection parts 2141 and the extension direction of the second escape groove 2111 is the same as the extension direction of the connection part 2141, the support plate 1222 is located between the protruding part 2142 and the main body part 211 in the vertical direction, and is located between the two in the horizontal direction. Between the connecting parts 2141 , the positioning structure 214 can prevent the first keel 21 from shaking in the horizontal direction, and enhance the stability of the first keel 21 .

龙骨挂件22包括侧板222、连接板223、弯折部224、延伸部225以及限位块226,侧板222、弯折部224、延伸部225以及限位块226都设有两个,两个侧板222间隔相对设置,并相互平行,每个侧板222上都开设有一个卡槽221,卡位部231依次穿过龙骨挂件22上的两个卡槽221,连接板223连接在两个侧板222之间,每个侧板222的顶部都设有一个弯折部224,两个弯折部224相向延伸,每个弯折部224远离侧板222的一端又都设有一个延伸部225,延伸部225与侧板222间隔设置并向下延伸,从而使侧板222、弯折部224及延伸部225围合形成插槽227,两个限位块226分别固定于两个侧板222相向的两侧,并位于连接板223与弯折部224之间,第一龙骨21的主体部211部分位于两个侧板222之间,且主体部211的底部与连接板223抵接,立板213则插入插槽227内,从而将龙骨挂件22挂在第一龙骨21上,同时两个限位块226分别抵住主体部211相对的两侧,以防止龙骨挂件22发生晃动,提高龙骨挂件22的稳定性。The keel pendant 22 includes a side plate 222, a connecting plate 223, a bending part 224, an extending part 225 and a limit block 226. There are two side plates 222, a bending part 224, an extension part 225 and a limit block 226. The side plates 222 are arranged opposite to each other at intervals and are parallel to each other. Each side plate 222 is provided with a card slot 221 . The locking portion 231 passes through the two card slots 221 on the keel pendant 22 in sequence. The connecting plate 223 is connected to the two Between the side plates 222 , a bent portion 224 is provided at the top of each side plate 222 , the two bent portions 224 extend toward each other, and an end of each bent portion 224 away from the side plate 222 is provided with an extension The extension part 225 is spaced apart from the side plate 222 and extends downward, so that the side plate 222, the bending part 224 and the extension part 225 are enclosed to form a slot 227, and the two limit blocks 226 are respectively fixed on the two sides The opposite sides of the plate 222 are located between the connecting plate 223 and the bending portion 224 , the main body portion 211 of the first keel 21 is partially located between the two side plates 222 , and the bottom of the main body portion 211 is in contact with the connecting plate 223 , the vertical plate 213 is inserted into the slot 227, so that the keel pendant 22 is hung on the first keel 21, and at the same time, the two limit blocks 226 are respectively pressed against the opposite sides of the main body 211 to prevent the keel pendant 22 from shaking. The stability of the keel pendant 22 is improved.

优选地,龙骨组件20还包括螺丝,螺丝穿过龙骨挂件22的一个侧板222后与第一龙骨21的主体部211抵接,当拧松该螺丝时,龙骨挂件22即可相对第一龙骨21进行滑动,从而起到调整面板组件20位置的作用,待调整到合适位置后,再拧紧该螺丝,使主体部211与限位块226抵紧,龙骨挂件22就不能再相对第一龙骨21进行运动。Preferably, the keel assembly 20 further includes a screw, and the screw passes through one side plate 222 of the keel pendant 22 and abuts against the main body 211 of the first keel 21. When the screw is loosened, the keel pendant 22 can be opposite to the first keel. 21 slides, so as to adjust the position of the panel assembly 20. After adjusting to the appropriate position, tighten the screw to make the main body 211 and the limit block 226 abut tightly, and the keel pendant 22 can no longer be relative to the first keel 21. Exercise.

上述实施方式仅为本发明的优选实施方式,不能以此来限定本发明保护的范围,本领域的技术人员在本发明的基础上所做的任何非实质性的变化及替换均属于本发明所要求保护的范围。The above-mentioned embodiments are only preferred embodiments of the present invention, and cannot be used to limit the scope of protection of the present invention. Any insubstantial changes and substitutions made by those skilled in the art on the basis of the present invention belong to the scope of the present invention. Scope of protection claimed.

Claims (10)

1. An assembled suspended ceiling, comprising:
a connection assembly for fixed mounting to a ceiling;
the keel component comprises a first keel, a keel hanging piece and a second keel, the first keel is connected to one side, far away from a ceiling, of the connecting component, the keel hanging piece is hung on the first keel, the second keel comprises a clamping part and two elastic supporting parts connected to one side, far away from the first keel, of the clamping part, the two elastic supporting parts are oppositely arranged at intervals to form a first avoidance groove, a clamping groove is formed in the keel hanging piece, and the second keel is hung on the keel hanging piece through the matching of the clamping part and the clamping groove;
the panel assembly comprises a panel and a panel hanging piece fixed on the panel, wherein the panel hanging piece penetrates through the first avoidance groove and then is hung on the two elastic supporting parts.
2. The fabricated suspended ceiling of claim 1, wherein the second runner further comprises two support plates, each of the resilient support portions is connected to one of the support plates and extends opposite to the other of the support plates, and the panel suspension member passes through the first avoidance slot and abuts against the two support plates.
3. The fabricated suspended ceiling of claim 1, wherein the panels are at least two, the panel suspension member comprises a first fastening member fixed on the panel and a second fastening member fixed on another adjacent panel, one side of the first fastening member facing the second fastening member is provided with a first protrusion and a first recess, the second fastening member is provided with a second recess and a second protrusion in an aligned manner, the first protrusion is inserted into the second recess, and the second protrusion is inserted into the first recess.
4. An assembled suspended ceiling according to claim 1, in which the slots are T-shaped.
5. The assembled suspended ceiling according to claim 1, wherein the keel hanger comprises two side plates oppositely arranged at intervals, a connecting plate connected between the two side plates, a bending part bent at the top end of the side plate, and an extending part fixed at the bending part and spaced from the side plates, the bending part and the extending part are enclosed to form a slot, the slot penetrates through the side plates, the first keel comprises a main body part connected with the connecting assembly and partially positioned between the two side plates, transverse plates convexly arranged at two opposite sides of the main body part, and vertical plates bent at the transverse plates and extending upwards, and the vertical plates are inserted into the slot to hang the keel hanger on the first keel.
6. An assembled suspended ceiling according to claim 5, wherein the keel hanger further comprises two limiting blocks respectively disposed on the two side plates, and the two limiting blocks are respectively abutted against two opposite sides of the main body portion.
7. The assembled suspended ceiling of claim 5, wherein the connecting assembly comprises an embedded part embedded in the attachment structure, a connecting rod member connected with the first keel, and a connecting part connecting the embedded part and the connecting rod member, the connecting rod member comprises a connecting sleeve connected with the connecting part and a screw connected with the first keel, and the connecting sleeve is provided with a threaded hole matched with the screw in a threaded manner.
8. The fabricated suspended ceiling of claim 7, wherein the threaded rod comprises a threaded post and a support plate fixed to the bottom of the threaded post, the main body portion is provided with a second avoidance slot extending therethrough, the threaded post passes through the second avoidance slot, and the support plate is located in the main body portion and bears the first keel.
9. The fabricated suspended ceiling of claim 8, wherein the first runner further comprises a limiting structure fixed inside the main body portion, and the support plate is embedded between the limiting structure and the main body portion.
10. The assembled suspended ceiling of claim 7, wherein the connecting assembly further comprises a spring and a rubber member, the embedded part is provided with an accommodating space, the spring and the rubber member are both located in the accommodating space, the rubber member is provided with an installation cavity, the spring is installed in the installation cavity and sleeved outside the connecting piece, and one end of the connecting piece penetrates through the rubber member and the embedded part and then is connected with the connecting sleeve.
CN202010685400.6A 2020-07-16 2020-07-16 A prefabricated ceiling Pending CN111910826A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010685400.6A CN111910826A (en) 2020-07-16 2020-07-16 A prefabricated ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010685400.6A CN111910826A (en) 2020-07-16 2020-07-16 A prefabricated ceiling

Publications (1)

Publication Number Publication Date
CN111910826A true CN111910826A (en) 2020-11-10

Family

ID=73280991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010685400.6A Pending CN111910826A (en) 2020-07-16 2020-07-16 A prefabricated ceiling

Country Status (1)

Country Link
CN (1) CN111910826A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814263A (en) * 2021-02-25 2021-05-18 浙江亚厦装饰股份有限公司 Special-shaped ceiling keel and ceiling mounting method thereof
CN112962796A (en) * 2021-04-08 2021-06-15 华耐住宅科技(天津)有限公司 Wallboard butt joint component and assembled wall system
CN113323235A (en) * 2021-06-30 2021-08-31 浙江亚厦装饰股份有限公司 Assembled sound insulation furred ceiling mounting structure
CN113585603A (en) * 2021-08-09 2021-11-02 浙江亚厦装饰股份有限公司 Keel hoisting structure
CN113719019A (en) * 2021-08-23 2021-11-30 上海蓝天房屋装饰工程有限公司 Assembled feather type suspended ceiling system and construction method thereof
CN115354792A (en) * 2022-08-29 2022-11-18 金螳螂精装科技(苏州)有限公司 Sound-absorbing ceiling structure and construction method thereof
CN116180961A (en) * 2022-11-24 2023-05-30 北京港源建筑装饰工程有限公司 A metal mesh ceiling with keel as a split molding part and its implementation method
WO2024197642A1 (en) * 2023-03-29 2024-10-03 王家寿 Partition board mounting assembly

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013040842A1 (en) * 2011-09-22 2013-03-28 广州市广京装饰材料有限公司 Ceiling panel and installation structure thereof
CN105780998A (en) * 2016-04-22 2016-07-20 深圳瑞和建筑装饰股份有限公司 Reusable ceiling keel system
CN207812795U (en) * 2018-01-18 2018-09-04 深圳市九度空间室内设计有限公司 A kind of mounting structure of aluminium button ceiling
CN109723180A (en) * 2019-01-10 2019-05-07 深圳瑞和建筑装饰股份有限公司 A kind of assembled ceiling structure and its installation method
CN209509296U (en) * 2018-10-12 2019-10-18 北京城建深港建筑装饰工程有限公司 Assembled ceiling structure
CN212641908U (en) * 2020-07-16 2021-03-02 深圳瑞和建筑装饰股份有限公司 Assembled suspended ceiling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013040842A1 (en) * 2011-09-22 2013-03-28 广州市广京装饰材料有限公司 Ceiling panel and installation structure thereof
CN105780998A (en) * 2016-04-22 2016-07-20 深圳瑞和建筑装饰股份有限公司 Reusable ceiling keel system
CN207812795U (en) * 2018-01-18 2018-09-04 深圳市九度空间室内设计有限公司 A kind of mounting structure of aluminium button ceiling
CN209509296U (en) * 2018-10-12 2019-10-18 北京城建深港建筑装饰工程有限公司 Assembled ceiling structure
CN109723180A (en) * 2019-01-10 2019-05-07 深圳瑞和建筑装饰股份有限公司 A kind of assembled ceiling structure and its installation method
CN212641908U (en) * 2020-07-16 2021-03-02 深圳瑞和建筑装饰股份有限公司 Assembled suspended ceiling

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814263A (en) * 2021-02-25 2021-05-18 浙江亚厦装饰股份有限公司 Special-shaped ceiling keel and ceiling mounting method thereof
CN112962796A (en) * 2021-04-08 2021-06-15 华耐住宅科技(天津)有限公司 Wallboard butt joint component and assembled wall system
CN113323235A (en) * 2021-06-30 2021-08-31 浙江亚厦装饰股份有限公司 Assembled sound insulation furred ceiling mounting structure
CN113585603A (en) * 2021-08-09 2021-11-02 浙江亚厦装饰股份有限公司 Keel hoisting structure
CN113719019A (en) * 2021-08-23 2021-11-30 上海蓝天房屋装饰工程有限公司 Assembled feather type suspended ceiling system and construction method thereof
CN115354792A (en) * 2022-08-29 2022-11-18 金螳螂精装科技(苏州)有限公司 Sound-absorbing ceiling structure and construction method thereof
CN115354792B (en) * 2022-08-29 2024-04-19 金螳螂精装科技(苏州)有限公司 Sound-absorbing suspended ceiling structure and construction method thereof
CN116180961A (en) * 2022-11-24 2023-05-30 北京港源建筑装饰工程有限公司 A metal mesh ceiling with keel as a split molding part and its implementation method
CN116180961B (en) * 2022-11-24 2026-06-09 北京港源建筑装饰工程有限公司 Metal mesh suspended ceiling with keels as partition modeling pieces and implementation method thereof
WO2024197642A1 (en) * 2023-03-29 2024-10-03 王家寿 Partition board mounting assembly

Similar Documents

Publication Publication Date Title
CN211421550U (en) Stably-installed ceiling structure
CN211037511U (en) An anti-cracking gypsum board ceiling
CN212641908U (en) Assembled suspended ceiling
CN209145128U (en) A kind of assembled ceiling structure
CN213508989U (en) Assembled heat preservation sandwich wallboard
CN112832477B (en) An exterior wall concrete hanging board
CN206800733U (en) A kind of energy-saving replaceable units curtain wall system
CN211899406U (en) Suspended ceiling connecting assembly and suspended ceiling device
CN110924580B (en) Architectural decoration furred ceiling
CN211949104U (en) Suspension type aluminum plate curtain wall system
CN216840100U (en) Installation and splicing structure for engineering curtain wall
CN207260404U (en) Furred ceiling bulk and furred ceiling
CN109403532B (en) Light and shade joint type ceiling system
CN213806110U (en) Coupling assembling and assembled suspended ceiling
CN210140937U (en) Aluminum alloy curtain wall convenient to disassemble
CN223003607U (en) Suspended ceiling plate mounting structure
CN111075075B (en) A suspended aluminum panel curtain wall system
CN203947648U (en) A kind of Skeleton hanging part structure
CN209397794U (en) Clamping components and curtain wall fixtures
CN220504279U (en) A modular assembly structure of stone curtain wall
CN212176408U (en) A wall panel structure
CN218323623U (en) Ceramic sheet dry-hanging support structure for building external wall
CN209099571U (en) A kind of villa exterior wall insulated structure
CN221665977U (en) LED surface-mounted down lamp
CN110565854B (en) Unit type energy-saving glass curtain wall convenient installation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201110