CN112095427A - Highway maintenance device - Google Patents

Highway maintenance device Download PDF

Info

Publication number
CN112095427A
CN112095427A CN202010964139.3A CN202010964139A CN112095427A CN 112095427 A CN112095427 A CN 112095427A CN 202010964139 A CN202010964139 A CN 202010964139A CN 112095427 A CN112095427 A CN 112095427A
Authority
CN
China
Prior art keywords
fixedly connected
sides
plates
rod
maintenance device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010964139.3A
Other languages
Chinese (zh)
Inventor
谢更礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010964139.3A priority Critical patent/CN112095427A/en
Publication of CN112095427A publication Critical patent/CN112095427A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/096Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for forming, opening-out, cleaning, drying or heating and filling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a highway maintenance device, which comprises a rectangular frame and is characterized in that: the invention relates to the field of highway maintenance, in particular to a highway maintenance device. This device can realize sweeping out the back through the rubbish of brush roller in with ground crack, and the granule in the box falls into to the crack in, fills up the crack, carries out once heating to the pitch granule through snakelike electric heat wire after filling up, spouts the fire to the pitch granule through a set of shower nozzle and melts, has reduced the manpower.

Description

Highway maintenance device
Technical Field
The invention relates to the field of highway maintenance, in particular to a highway maintenance device.
Background
The maintenance of highways is very important for the use of highways, bituminous pavements being the types of pavements made with bituminous materials mixed with mineral materials. The asphalt binder improves the capability of the paving aggregate to resist damage of traveling vehicles and natural factors to the pavement, and enables the pavement to be smooth, less in dust, impermeable and durable. Therefore, bituminous paving is the advanced pavement that is adopted most extensively in road construction, and the highway road surface made by pitch uses the back for a long time, the pot hole appears easily, if not in time carry out the road surface repair, not only influence the use, and easy ponding laying dust, more importantly, the pot hole continues to enlarge under heavily pressing easily, improve cost of maintenance, current quick repair mode is for artifical rubbish sweep out in the crack, adopt the manual work to pour asphalt solution into to crack in carry out the crack repair, if the highway crack is too much, need use a large amount of manpowers, and the intensity of labour who repairs highway production for a long time is great, waste time and energy, so be in urgent need of making a highway maintenance device.
Disclosure of Invention
The invention aims to provide a highway maintenance device which is used for repairing highway cracks.
The invention adopts the following technical scheme to realize the purpose of the invention:
the utility model provides a highway maintenance device, includes the rectangle frame, characterized by: one side of the rectangular frame is fixedly connected with one end of the handle;
one end of a supporting rod is fixedly connected to the middle of one side of the rectangular frame, the other two corners of the lower side of the rectangular frame are respectively and fixedly connected with the upper ends of the corresponding mounting rods, and the opposite sides of the two long rods of the rectangular frame are respectively and fixedly connected with the lower part of one side of the charging barrel;
the central shaft bearing on the upper side of the transverse plate of the U-shaped rod is connected with one end of the lower side of the support plate, the lower parts of one sides of two vertical plates of the U-shaped rod are respectively in bearing connection with one end of a corresponding wheel first mounting shaft, and the lower parts of one sides of the two mounting rods are respectively in bearing connection with one end of a corresponding wheel second mounting shaft;
the upper parts of the two sides of the charging barrel are respectively and fixedly connected with one side of the corresponding sleeve, and the lower end of the charging barrel is fixedly communicated with the upper end of the discharging pipe.
As a further limitation of the technical solution, the two lead screws are located in the corresponding sleeves, the upper ends of the two lead screws are respectively in bearing connection and penetrate through the corresponding upper ends of the sleeves, the upper ends of the two lead screws are respectively fixedly connected with the middle parts of the lower sides of the corresponding belt pulleys, the two belt pulleys are connected through a belt, the upper side of one belt pulley is fixedly connected with the middle part of the lower side of the turntable, the upper ends of the two rectangular frame plates are respectively embedded in the corresponding lower parts of the sleeves, the lower ends of the two lead screws respectively penetrate through the middle parts of the corresponding upper transverse plates of the rectangular frame plates, the lower ends of the two lead screws are respectively in threaded connection and penetrate through the middle parts of the corresponding sliders, and the two.
As this technical scheme's further injects, two U-shaped plate diaphragm upside middle part that rectangle deckle board lower extreme fixed connection corresponds respectively, one riser lower part of U-shaped plate is equipped with the mounting hole, one the fixed intercommunication pipe one end in another riser one side lower part of U-shaped plate, pipe one side is equipped with the chute, two the even board one end that fixed connection corresponds is distinguished in the relative one side middle part of U-shaped plate diaphragm, two link the relative one end of board annular ring one side that fixed connection corresponds respectively, the discharging pipe inlays to be located in the annular ring, the fixed intercommunication box upside middle part of annular ring lower extreme, the box is the bottomless case, one link board downside fixed connection riser upper end, riser lower extreme fixed connection strip shaped plate upside middle part, strip shaped plate downside fixed connection snakelike heating wire upside.
As the further injeciton of the technical scheme, the lower parts of two sides of the box body are respectively provided with corresponding rectangular through grooves, the rectangular through grooves correspond to two, one side of the box body is respectively provided with a corresponding first guide hole, the other two sides of the box body are respectively provided with a corresponding second guide hole, the upper part of one side of the box body is fixedly connected with one end of an L-shaped plate transverse plate, the two ends of the two sides of the box body are respectively and fixedly connected with one end of a corresponding mounting block, one side of the mounting block is respectively connected with one end of a corresponding roller mounting shaft through a bearing, one side of the L-shaped plate vertical plate is fixedly.
As a further limitation of the technical scheme, opposite ends of two guide rods respectively penetrate through the corresponding first guide holes, the other end of one guide rod is fixedly connected with the output end of the air cylinder, the other ends of the lower sides of the two guide rods are respectively fixedly connected with the middle parts of the upper sides of the corresponding rectangular blocks, the lower parts of the opposite ends of the two rectangular blocks are respectively fixedly connected with the middle parts of one sides of the corresponding movable plates, the opposite ends of the two movable plates respectively penetrate through the corresponding rectangular through grooves, the other ends of the two sides of the two guide rods are respectively hinged with one ends of the corresponding bent rods, the other ends of the two bent rods are respectively hinged with one ends of one sides of the corresponding second guide rods, and the opposite ends of the two guide rods respectively penetrate through the corresponding.
As a further limitation of the technical scheme, one end of the rotary drum is embedded in the mounting hole, the other end of the upper side of the rotary drum is fixedly connected with the lower end of the swing rod, one end of the rectangular rod penetrates through the rotary drum, the other end of the rectangular rod is fixedly connected with one end of a liquefied gas pipe, the lower side of the liquefied gas pipe is fixedly communicated with the upper ends of a group of uniformly distributed spray heads, the other end of the outer side of the liquefied gas pipe is fixedly connected with one side of a ball, the other end of the liquefied gas pipe penetrates through the circular pipe, and the ball is.
As a further limitation of the technical scheme, the lower part of one side of the vertical plate of the other U-shaped plate is fixedly connected with a motor, the output end of the motor penetrates through the U-shaped plate, the output end of the motor is fixedly connected with one end of a brush roller, and the other end of the brush roller is connected with a shaft bearing and penetrates through the lower part of the other vertical plate of the U-shaped plate.
As a further limitation of the technical scheme, one end of a central shaft at the other end of the brush roller is fixedly connected with one end of a rotating rod, the other end of the rotating rod is hinged with one end of a swinging rod, and the other end of the swinging rod is hinged with the upper end of the swinging rod.
Compared with the prior art, the invention has the advantages and positive effects that:
1. this device can realize sweeping out the back through the rubbish of brush roller in with ground crack, and the granule in the box falls into to the crack in, fills up the crack, carries out once heating to the pitch granule through snakelike electric heat wire after filling up, spouts the fire to the pitch granule through a set of shower nozzle and melts, has reduced the manpower.
2. This device can realize making pitch granule adhere each other together after once heating pitch granule through snakelike electric heating wire, and the air current when avoiding the flame projecting is spout pitch granule from the crack.
3. The device can replace manual cleaning and manual pouring of asphalt solution, reduce labor intensity and improve working efficiency.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic perspective view of the present invention.
Fig. 3 is a three-dimensional schematic view of the present invention.
Fig. 4 is a schematic perspective view of the present invention.
Fig. 5 is a schematic perspective view of the present invention.
FIG. 6 is a first view of the connection structure of some parts according to the present invention.
FIG. 7 is a second schematic view of the connection structure of some parts according to the present invention.
Fig. 8 is a third schematic view of a part of the connection structure of the components of the present invention.
Fig. 9 is a fourth schematic view of the connection structure of parts according to the present invention.
Fig. 10 is a schematic view showing a part of the connection structure of the components of the present invention.
Fig. 11 is a schematic view six of the connection structure of parts of the present invention.
Fig. 12 is a seventh schematic view of a part of the connection structure of the present invention.
Fig. 13 is a first schematic view of a connection structure of parts of the cartridge 1, the discharge pipe 15, and the case 20 according to the present invention after being cut.
FIG. 14 is a second schematic view showing a connection structure of parts of the cartridge 1, the discharge pipe 15 and the case 20 of the present invention after being cut.
Fig. 15 is a partial enlarged view of the invention at a in fig. 4.
In the figure: 1. a material cylinder, 2, a belt, 3, a rotating disk, 4, a sleeve, 5, a rectangular frame, 6, a handle, 7, a supporting rod, 8, a first wheel, 9, a second wheel, 10, a movable plate, 11, a mounting rod, 12, a U-shaped rod, 13, a belt pulley, 14, an annular ring, 15, a material discharging pipe, 16, a rectangular frame plate, 17, a sliding block, 18, a lead screw, 19, a second swing rod, 20, a box body, 21, a brush roller, 22, a rotating rod, 23, a serpentine heating wire, 24, a mounting hole, 25, a vertical plate, 26, a strip-shaped plate, 27, an L-shaped plate, 28, a first guide hole, 29, a mounting block, 30, a second guide hole, 31, a connecting plate, 32, a rectangular through groove, 33, a first guide rod, 34, a chute, 35, a rotating cylinder, 36, a rectangular rod, 37, a sphere, 38, a roller, 39, a rectangular block, 40, a round pipe, 41, a motor, 42, a U-shaped plate, 43, A liquefied gas pipe 47, a spray head 48 and a first swing rod.
Detailed Description
An embodiment of the present invention will be described in detail below with reference to the accompanying drawings, but it should be understood that the scope of the present invention is not limited to the embodiment.
As shown in fig. 1-15, the present invention comprises a rectangular frame 5, one side of the rectangular frame 5 is fixedly connected with one end of a handle 6;
one end of a supporting rod 7 is fixedly connected to the middle of one side of the rectangular frame 5, the other two corners of the lower side of the rectangular frame 5 are respectively and fixedly connected with the upper ends of corresponding mounting rods 11, and the opposite sides of two long rods of the rectangular frame 5 are respectively and fixedly connected with the lower part of one side of the charging barrel 1;
the central shaft bearing on the upper side of the transverse plate of the U-shaped rod 12 is connected with one end of the lower side of the support plate 7, the lower parts of one sides of two vertical plates of the U-shaped rod 12 are respectively in bearing connection with one end of a corresponding mounting shaft of a first wheel 8, and the lower parts of one sides of two mounting rods 11 are respectively in bearing connection with one end of a corresponding mounting shaft of a second wheel 9;
the upper parts of two sides of the charging barrel 1 are respectively fixedly connected with one side of the corresponding sleeve 4, and the lower end of the charging barrel 1 is fixedly communicated with the upper end of the discharging pipe 15.
The two lead screws 18 are positioned in the corresponding sleeves 4, the upper ends of the two lead screws 18 are respectively in bearing connection and penetrate through the upper ends of the corresponding sleeves 4, the upper ends of the two lead screws 18 are respectively fixedly connected with the middle parts of the lower sides of the corresponding belt pulleys 13, the two belt pulleys 13 are connected through the belt 2, the upper side of one belt pulley 13 is fixedly connected with the middle part of the lower side of the turntable 3, the upper ends of the two rectangular frame plates 16 are respectively embedded in the corresponding lower parts of the sleeves 4, the lower ends of the two lead screws 18 respectively penetrate through the middle parts of the upper transverse plates of the corresponding rectangular frame plates 16, the lower ends of the two lead screws 18 are respectively in threaded connection and penetrate through the middle parts of the corresponding sliding blocks 17, and the two sliding blocks 17 are respectively.
The lower ends of the two rectangular frame plates 16 are respectively fixedly connected with the middle parts of the upper sides of the transverse plates of the corresponding U-shaped plates 42, the lower part of one vertical plate of one U-shaped plate 42 is provided with a mounting hole 24, the lower part of one side of the other vertical plate of one U-shaped plate 42 is fixedly communicated with one end of a circular tube 40, one side of the circular tube 40 is provided with a chute 34, the middle parts of the opposite sides of the transverse plates of the two U-shaped plates 42 are respectively and fixedly connected with one end of the corresponding connecting plate 31, the opposite ends of the two connecting plates 31 are respectively and fixedly connected with one side of the corresponding annular ring 14, the discharge pipe 15 is embedded in the annular ring 14, the lower end of the annular ring 14 is fixedly communicated with the middle part of the upper side of the box body 20, the box body 20 is a bottomless box, the lower side of one connecting plate 31 is fixedly connected with the upper end of a vertical plate 25, the lower end of the vertical plate 25 is fixedly connected with the middle part of the upper side of the strip-shaped plate 26, and the lower side of the strip-shaped plate 26 is fixedly connected with the upper side of the snake-shaped electric heating wire 23.
The lower part of two sides of the box body 20 is respectively provided with a corresponding rectangular through groove 32, the rectangular through groove 23 is correspondingly arranged, one side of the box body 20 is respectively provided with a corresponding first guide hole 28, the other two sides of the box body 20 are respectively provided with a corresponding second guide hole 30, the upper part of one side of the box body 20 is fixedly connected with one end of a transverse plate 27 of the L-shaped plate 27, the two ends of the two sides of the box body 20 are respectively fixedly connected with one end of a corresponding mounting block 29, one side of the mounting block 29 is respectively connected with one end of a mounting shaft of a corresponding roller 38 through a bearing, one side of a vertical plate of the L-shaped plate 27 is.
The opposite ends of the two first guide rods 33 respectively penetrate through the corresponding first guide holes 28, the other end of one first guide rod 33 is fixedly connected with the output end of the air cylinder 43, the other ends of the lower sides of the two first guide rods 33 are respectively fixedly connected with the middle parts of the upper sides of the corresponding rectangular blocks 39, the lower parts of the opposite ends of the two rectangular blocks 39 are respectively fixedly connected with the middle parts of one sides of the corresponding movable plates 10, the opposite ends of the two movable plates 10 respectively penetrate through the corresponding rectangular through grooves 32, the other ends of the two sides of the two first guide rods 33 are respectively hinged with one end of the corresponding bent rod 44, the other ends of the two bent rods 44 are respectively hinged with one end of one side of the corresponding second guide rod 45, and the opposite ends of the two second.
One end of the rotary drum 35 is embedded in the mounting hole 24, the other end of the upper side of the rotary drum 35 is fixedly connected with the lower end of a first swing rod 48, one end of a rectangular rod 36 penetrates through the rotary drum 35, the other end of the rectangular rod 36 is fixedly connected with one end of a liquefied gas pipe 46, the lower side of the liquefied gas pipe 46 is fixedly communicated with the upper ends of a group of uniformly distributed spray heads 47, the other end of the outer side of the liquefied gas pipe 46 is fixedly connected with one side of a ball 37, the other end of the liquefied gas pipe 46 penetrates through the circular pipe 40, and the ball 37 is embedded.
The lower part of one vertical plate side of the other U-shaped plate 42 is fixedly connected with a motor 41, the output end of the motor 41 penetrates through the U-shaped plate 42, the output end of the motor 41 is fixedly connected with one end of a brush roller 21, and the other end of the brush roller 21 is connected with a shaft bearing and penetrates through the lower part of the other vertical plate of the U-shaped plate 42.
One end of a central shaft at the other end of the brush roller 21 is fixedly connected with one end of a rotating rod 22, the other end of the rotating rod 22 is hinged with one end of a second oscillating rod 19, and the other end of the second oscillating rod 19 is hinged with the upper end of the first oscillating rod 48.
The lower ends of a set of the rollers 38 are slightly below the underside of the housing 20.
The working process of the invention is as follows: before the device is used, the box body 20 is at the highest position, the output end of the air cylinder 43 is in an extending state, the opposite sides of the two movable plates 10 are mutually attached, the lower side of the box body 20 is blocked by the two movable plates 10, the two rectangular frame plates 16 are at the highest position, the upper sides of the two sliding blocks 17 are respectively attached to the inner upper sides of the corresponding rectangular frame plates 16, as shown in figures 1, 2 and 13, when the device is used, asphalt particles are poured into the charging barrel 1, the particles slide into the box body 20 along the discharging pipe 15, the liquefied gas tank and the electric box are respectively placed on a following engineering truck, the discharging end of the liquefied gas tank is communicated with one end of a pipe 46, the two electric connecting ends of the snake-shaped electric heating wire 23 are respectively and electrically connected with the electric connecting end corresponding to the electric box, a worker holds the handle 6 to push the device, the liquefied gas is driven to slide forwards by the two wheels I8 and the two wheels II 9, when the first wheels 8 drive the device to change the moving direction, when the device is pushed to a road section to be repaired, the pushing of the handle 6 is stopped, the rotating disc 3 is rotated, the rotating disc 3 drives the corresponding belt pulley 13 to rotate, one belt pulley 13 drives the other belt pulley 13 to rotate through the belt 2, the two belt pulleys 13 drive the corresponding lead screws 18 to rotate, the two lead screws 18 drive the corresponding slide blocks 17 to slide downwards, the two rectangular frame plates 16 follow the corresponding slide blocks 17 to slide downwards along the corresponding sleeves 4, the two rectangular frame plates 16 drive the corresponding U-shaped plates 42 to slide downwards, the two U-shaped plates 42 drive the box body 20 to slide downwards through the corresponding connecting plates 31, the box body 20 drives the annular ring 14 to slide downwards along the discharge pipe 15, when the lower ends of the two groups of rollers 38 are attached to the upper side of the ground, the rotating disc 3 is stopped to rotate, a small gap is left between the box body 20 and the ground, so, starting the air cylinder 43, retracting the output end of the air cylinder 43 to drive the corresponding first guide rods 33 to slide along the corresponding first guide holes 28, driving the corresponding set of bent rods 44 to swing by one first guide rod 33, driving the corresponding second guide rods 45 to slide along the corresponding second guide holes 30 in the direction of approaching each other by one set of bent rods 44, driving the other first guide rods 33 to slide along the corresponding first guide holes 28 by the other set of bent rods 44, driving the two first guide rods 33 to slide in the direction of separating from each other by the two first guide rods 33, driving the corresponding rectangular blocks 39 to slide in the direction of separating from each other by the two first guide rods 33, driving the corresponding movable plates 10 to slide along the corresponding rectangular through grooves 32 in the direction of separating from each other by the two rectangular blocks 39, stopping the air cylinder 43 after the output end of the air cylinder 43 is fully retracted, and at the moment, the two movable plates 10 are at the positions farthest from each other, as shown in fig. 4 and 5, when the lower opening of the box body 20 leaks, the motor 41 is started, the motor 41 drives the brush roller 21 to rotate, the brush roller 21 drives the rotating rod 22 to rotate, the rotating rod 22 drives the second oscillating rod 19 to oscillate, the second oscillating rod 19 drives the first oscillating rod 48 to oscillate, the first oscillating rod 48 drives the rotary drum 35 to reciprocally rotate along the mounting hole 24, the rotary drum 35 drives the rectangular rod 36 to reciprocally oscillate, the rectangular rod 36 drives the liquefied gas pipe 46 to reciprocally oscillate, the liquefied gas pipe 46 drives the ball 37 to reciprocally slide along the inclined groove 34, the ball 37 drives the liquefied gas pipe 46 to reciprocally oscillate and simultaneously reciprocally slide along the cylinder 40, the liquefied gas pipe 46 drives the rectangular rod 36 to reciprocally slide along the rotary drum 35, the liquefied gas pipe 46 drives the group of nozzles 47 to reciprocally oscillate and simultaneously reciprocally slide, the electric box and the liquefied gas tank are started, the serpentine heating wire 23 starts heating, the group of nozzles 47 starts to, the device is pushed to a crack position to be filled, the four rollers 38 roll along the ground to avoid the lower side of the box body 20 from being directly attached to the ground to cause abrasion of the box body 20, because a gap between the lower side of the box body 20 and the ground is small, asphalt particles cannot fall out, after garbage in the crack is cleaned through the brush rollers 21, when the crack is positioned on the lower side of the box body 20, the asphalt particles fall into the crack to fill the crack, the device continues to advance, the snake-shaped electric heating wire 23 heats the asphalt particles in the crack to melt the surface layers of the asphalt particles and adhere to each other, the device continues to advance, the group of spray heads 47 reciprocally slide to spray fire and melt the asphalt particles in the crack while reciprocally swinging, the melted asphalt solution repairs the gap of a road, after one crack is repaired, the liquefied gas tank is closed, the device is pushed to another crack position, the liquefied gas tank is started, repair the second crack, the operation process is the same, no longer give unnecessary details, after using, close electronic box, liquefied gas storage tank and motor 41, start cylinder 43 again with the shutoff of box 20 downside, reverse rotation carousel 3, two sliders 17 drive corresponding rectangle framed panels 16 upwards to slide along in the sleeve 4 that corresponds, resume the device to initial position.
The above disclosure is only one specific embodiment of the present invention, but the present invention is not limited thereto, and any variations that can be made by those skilled in the art are intended to fall within the scope of the present invention.

Claims (8)

1. The utility model provides a highway maintenance device, includes rectangle frame (5), characterized by: one side of the rectangular frame (5) is fixedly connected with one end of a handle (6);
the middle part of one side of the rectangular frame (5) is fixedly connected with one end of a supporting rod (7), the other two corners of the lower side of the rectangular frame (5) are respectively and fixedly connected with the upper ends of corresponding mounting rods (11), and the opposite sides of two long rods of the rectangular frame (5) are respectively and fixedly connected with the lower part of one side of the charging barrel (1);
a central shaft on the upper side of a transverse plate of the U-shaped rod (12) is in bearing connection with one end of the lower side of the support plate (7), the lower parts of one sides of two vertical plates of the U-shaped rod (12) are in bearing connection with one end of a corresponding mounting shaft of a first wheel (8), and the lower parts of one sides of two mounting rods (11) are in bearing connection with one end of a corresponding mounting shaft of a second wheel (9);
the upper parts of two sides of the charging barrel (1) are respectively fixedly connected with one side of the corresponding sleeve (4), and the lower end of the charging barrel (1) is fixedly communicated with the upper end of the discharging pipe (15).
2. A road maintenance device according to claim 1, wherein: the two lead screws (18) are respectively positioned in the corresponding sleeves (4), the upper ends of the two lead screws (18) are respectively in bearing connection and penetrate through the corresponding upper ends of the sleeves (4), the upper ends of the two lead screws (18) are respectively fixedly connected with the lower middle parts of the corresponding belt pulleys (13), the two belt pulleys (13) are connected through a belt (2), one belt pulley (13) is fixedly connected with the lower middle part of the lower side of the turntable (3) at the upper side, the upper ends of the two rectangular frame plates (16) are respectively embedded in the corresponding lower parts of the sleeves (4), the lower ends of the two lead screws (18) respectively penetrate through the corresponding upper transverse plate middle parts of the rectangular frame plates (16), the lower ends of the two lead screws (18) are respectively in threaded connection and penetrate through the corresponding middle parts of the sliding blocks (17), and the two sliding blocks (17) are respectively embedded in the corresponding inner sides of the.
3. A road maintenance device according to claim 2, wherein: the lower ends of the rectangular frame plates (16) are respectively fixedly connected with the middle parts of the upper sides of the transverse plates of the corresponding U-shaped plates (42), one of the U-shaped plates (42) is provided with a mounting hole (24) at the lower part of one side of the other vertical plate of the U-shaped plate (42) and is fixedly communicated with one end of a round pipe (40), one side of the round pipe (40) is provided with a chute (34), the middle parts of the opposite sides of the transverse plates of the U-shaped plates (42) are respectively fixedly connected with one ends of corresponding connecting plates (31), the opposite ends of the two connecting plates (31) are respectively fixedly connected with one side of the corresponding annular ring (14), the discharge pipe (15) is embedded in the annular ring (14), the lower ends of the annular ring (14) are fixedly communicated with the middle parts of the upper sides of the box bodies (20), one of the lower sides of the connecting plates (31) is fixedly connected with the upper ends of the vertical plates (25), and, the lower side of the strip-shaped plate (26) is fixedly connected with the upper side of the snake-shaped electric heating wire (23).
4. A road maintenance device according to claim 3, wherein: the utility model discloses a box, including box (20), rectangle through groove (32), two, rectangle through groove (23) place box (20) one side is equipped with corresponding guiding hole one (28) respectively, box (20) both sides are equipped with corresponding guiding hole two (30) respectively in addition, box (20) one side upper portion fixed connection L shaped plate (27) diaphragm one end, installation piece (29) one end that box (20) both sides both ends fixed connection corresponds respectively, two gyro wheel (38) installation axle one end that corresponds is connected to installation piece (29) one side bearing respectively, L shaped plate (27) riser one side fixed connection cylinder (43), cylinder (43) output passes L shaped plate (27).
5. A road maintenance device according to claim 4, wherein: the opposite ends of the first guide rods (33) penetrate through the corresponding first guide holes (28), the other ends of the first guide rods (33) are fixedly connected with the output end of the air cylinder (43), the lower sides of the first guide rods (33) are fixedly connected with the middle parts of the upper sides of the corresponding rectangular blocks (39), the lower parts of the opposite ends of the rectangular blocks (39) are fixedly connected with the middle parts of one sides of the corresponding movable plates (10), the opposite ends of the movable plates (10) penetrate through the corresponding rectangular through grooves (32), the other ends of the two sides of the first guide rods (33) are hinged with one ends of the corresponding bent rods (44), the other ends of the bent rods (44) are hinged with one ends of the corresponding second guide rods (45), and the opposite ends of the second guide rods (45) penetrate through the corresponding second guide holes (30).
6. A road maintenance device according to claim 5, wherein: rotary drum (35) one end is inlayed and is located in mounting hole (24), rotary drum (35) upside other end fixed connection pendulum rod (48) lower extreme, rectangle pole (36) one end is passed in rotary drum (35), rectangle pole (36) other end fixed connection pipe (46) one end for liquefied gas, shower nozzle (47) upper end that a set of even arranging of fixed intercommunication of pipe (46) downside for liquefied gas, pipe (46) outside other end fixed connection spheroid (37) one side for liquefied gas, pipe (46) other end passes in pipe (40), spheroid (37) are inlayed and are located in chute (34).
7. A road maintenance device according to claim 6, wherein: the lower part of one side of the vertical plate of the other U-shaped plate (42) is fixedly connected with a motor (41), the output end of the motor (41) penetrates through the U-shaped plate (42), the output end of the motor (41) is fixedly connected with one end of a brush roller (21), and the other end of the brush roller (21) is connected with a shaft bearing and penetrates through the lower part of the other vertical plate of the U-shaped plate (42).
8. A road maintenance device according to claim 7, wherein: one end of a central shaft at the other end of the brush roller (21) is fixedly connected with one end of a rotating rod (22), the other end of the rotating rod (22) is hinged with one end of a second oscillating rod (19), and the other end of the second oscillating rod (19) is hinged with the upper end of the first oscillating rod (48).
CN202010964139.3A 2020-09-15 2020-09-15 Highway maintenance device Pending CN112095427A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010964139.3A CN112095427A (en) 2020-09-15 2020-09-15 Highway maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010964139.3A CN112095427A (en) 2020-09-15 2020-09-15 Highway maintenance device

Publications (1)

Publication Number Publication Date
CN112095427A true CN112095427A (en) 2020-12-18

Family

ID=73752570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010964139.3A Pending CN112095427A (en) 2020-09-15 2020-09-15 Highway maintenance device

Country Status (1)

Country Link
CN (1) CN112095427A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356094A (en) * 2021-07-13 2021-09-07 重庆交通大学 Road and bridge repair and supplement fixing device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170268183A1 (en) * 2016-03-15 2017-09-21 Willamette Valley Company Device for reinstatement of a micro-trench
CN108396627A (en) * 2018-03-19 2018-08-14 钱幼华 A kind of constructing device of traffic route maintenance preheating cleaning
CN208395693U (en) * 2018-05-14 2019-01-18 袁海鸿 A kind of device for highway bridge crack repairing
CN110565496A (en) * 2019-10-19 2019-12-13 杨雨 road repairing device and method
CN210507083U (en) * 2019-08-15 2020-05-12 房传平 Highway road surface crack pitch patching device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170268183A1 (en) * 2016-03-15 2017-09-21 Willamette Valley Company Device for reinstatement of a micro-trench
CN108396627A (en) * 2018-03-19 2018-08-14 钱幼华 A kind of constructing device of traffic route maintenance preheating cleaning
CN208395693U (en) * 2018-05-14 2019-01-18 袁海鸿 A kind of device for highway bridge crack repairing
CN210507083U (en) * 2019-08-15 2020-05-12 房传平 Highway road surface crack pitch patching device
CN110565496A (en) * 2019-10-19 2019-12-13 杨雨 road repairing device and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张争奇: "《高速公路沥青路面维修养护技术》", 30 September 2010, 北京:人民交通出版社 *
纪斌等: "《机械原理课程设计》", 31 August 2018, 西安:西北工业大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356094A (en) * 2021-07-13 2021-09-07 重庆交通大学 Road and bridge repair and supplement fixing device

Similar Documents

Publication Publication Date Title
CN110359350B (en) Road and bridge bituminous pavement crack detects prosthetic devices
CN110258277A (en) Town road Asphalt Concrete Pavement Maintenance structure and its construction method
CN206646386U (en) A kind of pitch-rood
CN111827061A (en) Highway restores all-in-one
CN215104552U (en) Highway is cementation of fissures device for bituminous paving maintenance
CN112813785A (en) Repairing device and method for highway maintenance
CN113174820A (en) Pavement crack repairing pretreatment system and method based on road and bridge
CN215366736U (en) Asphalt pavement crack repairing device
CN112095427A (en) Highway maintenance device
CN209891027U (en) Highway subgrade maintenance road surface cementation of fissures device
CN108149555B (en) Leveling machine for road repairing construction
CN210766321U (en) Highway crack pouring device
CN111962367B (en) Intelligent asphalt crack pouring device and method
CN219710018U (en) Road crack repair ditching device
CN214271620U (en) Highway subgrade maintenance road surface cementation of fissures device
CN208072156U (en) A kind of municipal works asphalt pavement joint cutting prosthetic device
CN115198616A (en) A mending device for bituminous paving crack
CN112281613B (en) Highway patching device with oil spout cooling effect
CN210395065U (en) A fluting road patching all-in-one for highway is repaired
CN208136692U (en) A kind of highway maintenance cementation of fissures device
CN112832092A (en) Asphalt laying device for building construction and laying method thereof
CN219385951U (en) Grouting machine for traffic engineering
CN218667055U (en) Highway concrete crack repair equipment
CN220927462U (en) Concrete pavement repairing device
CN220035296U (en) Novel pavement brick sewing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201218

RJ01 Rejection of invention patent application after publication