CN112049409A - 一种电梯井剪力墙模板的安装方法 - Google Patents
一种电梯井剪力墙模板的安装方法 Download PDFInfo
- Publication number
- CN112049409A CN112049409A CN202010876085.5A CN202010876085A CN112049409A CN 112049409 A CN112049409 A CN 112049409A CN 202010876085 A CN202010876085 A CN 202010876085A CN 112049409 A CN112049409 A CN 112049409A
- Authority
- CN
- China
- Prior art keywords
- template
- elevator shaft
- shear wall
- reinforcing
- installing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/005—Lift shafts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
一种电梯井剪力墙模板的安装方法,其特征在于包括以下步骤:a、钢筋制作,b、钢筋网安装,c、混凝土浇筑,d、模板制作,e、模板安装与加固。本发明的电梯井剪力墙模板的安装方法具有模板安装步骤设计科学合理,可操作性强,工程质量安全可靠,提高砼质量,减少渗水隐患,降低建筑成本和确保作业人员安全的优点。
Description
技术领域
本发明涉及一种混凝土浇筑用模板,具体地说,是一种电梯井剪力墙模板的安装方法。
背景技术
高层建筑电梯井剪力墙施工普遍采用预埋工字钢搭设操作井架,或者搭设简易的支撑钢平台进行操作,但是穿墙工字钢预留洞口影响混凝土结构,同时增加渗水隐患,钢平台安全性较差,作业人员安全性也得不到保障。
因此已知的电梯井砼结构施工方式存在着上述种种不便和问题。
发明内容
本发明的目的,在于提出一种安全可靠的电梯井剪力墙模板的安装方法。
为实现上述目的,本发明的技术解决方案是:
一种电梯井剪力墙模板的安装方法,其特征在于包括以下步骤:
a、钢筋制作
根据图纸设计电梯井井道截面呈矩形,确定电梯井井道的宽度和深度,制作若干钢筋,使钢筋的长度分别比电梯井井道的宽度、深度各长300mm,钢筋为直形长条钢筋,长条钢筋的两端各设弯钩,弯钩长度为150mm;
b、钢筋网安装
将制作加工完成的钢筋按间距150mm,单层双向布置于井道内,每根钢筋两边各深入井道剪力墙内150mm,弯钩朝下埋入楼板混凝土内;
c、混凝土浇筑
当电梯井钢筋网安装完成后,浇筑下层混凝土,振捣密实;
d、模板制作
电梯井内侧模板材料选用胶合板,内侧模板下端按两槽口的间距150mm,切割预留若干钢筋穿入槽口;外侧模板采胶合板制作拼接,模板制作尺寸应配合电梯井的长、宽、高度;
e、模板安装与加固
将加工拼接好的模板吊装至电梯井剪力墙内外两侧,电梯井内侧模板安装时将预留的钢筋穿入槽口与预埋钢筋逐一对应,落在钢筋网上,外侧模板吊装至剪力墙外侧边线,然后用对拉螺杆和钢管将内外侧模板进行加固,矫正模板垂直度完成电梯井模板安装。
本发明的电梯井剪力墙模板的安装方法还可以采用以下的技术措施来进一步实现。
前述的方法,其中所述钢筋直径为≥10mm。
前述的方法,其中所述胶合板厚度为≥18mm。
前述的方法,其中所述钢筋穿入槽口尺寸为20*50mm矩形。
采用上述技术方案后,本发明的电梯井剪力墙模板的安装方法具有以下优点:
1、模板安装步骤设计科学合理,可操作性强;
2、工程质量安全可靠,提高砼质量,减少渗水隐患;
3、降低建筑成本,确保作业人员安全。
附图说明
图1为本发明实施例的直形长条钢筋结构示意图;
图2为本发明实施例的电梯井截面结构示意图;
图3为本发明实施例的电梯井模板安装示意图。
具体实施方式
以下结合实施例及其附图对本发明作更进一步说明。
实施例1
本发明的电梯井剪力墙模板的安装工艺流程:
钢筋制作—钢筋网安装—下层混凝土浇筑—上层模板制作—模板安装与加固。
本发明的电梯井剪力墙模板的安装方法,包括以下步骤:
a、钢筋制作
现请参阅图1,图1为本发明实施例的直形长条钢筋结构示意图。如图所示,所述确定电梯井井道净尺寸宽度(B)和深度(L),采用φ10mm钢筋加工长度为B+300mm、L+300mm井道钢筋1,两端弯钩长度150mm。
b、钢筋网安装
将制作加工完成的钢筋纵横交叉排列织成钢筋网,钢筋网按间距150mm设置,单层双向布置于井道内,使每根钢筋两边各插入井道剪力墙2内150mm,弯钩朝下埋入楼板混凝土内。图2为本发明实施例的电梯井截面结构示意图。
c、混凝土浇筑
当电梯井钢筋网安装完成后,浇筑下层混凝土,振捣密实。
d、模板制作
电梯井内侧模板4材料选用18mm厚胶合板,下端按间距150mm切割预留20*50mm钢筋穿入槽;外侧模板3材料选用18mm厚胶合板制作拼接,模板制作尺寸应与电梯井的长(L)、宽(B)、高(H)相同。
e、模板安装与加固
图3为本发明实施例的电梯井模板安装示意图。将制作好的模板吊装至电梯井剪力墙2外侧,电梯井内侧模板安装时将预留的20*50mm钢筋穿入槽口5与预埋钢筋逐一对应,落在钢筋网上,外侧模板吊装至剪力墙外侧边线,然后用对拉螺杆和钢管将内外侧模板进行加固,矫正模板垂直度完成电梯井模板安装。
本发明具有实质性特点和显著的技术进步,本发明的电梯井剪力墙模板的安装方法,提高砼质量,减少渗水隐患,降低建筑成本,同时确保作业人员安全。
本发明的电梯井剪力墙模板的安装方法在江西省萍乡市上栗县城镇化基础项目工程中应用,施工方便,安全可靠,取得较好的经济效益。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变化。因此,所有等同的技术方案也应该属于本发明的范畴,应由各权利要求限定。
Claims (4)
1.一种电梯井剪力墙模板的安装方法,其特征在于包括以下步骤:
a、钢筋制作
根据图纸设计电梯井井道截面呈矩形,确定电梯井井道的宽度和深度,制作若干钢筋,使钢筋的长度分别比电梯井井道的宽度、深度各长300mm,钢筋为直形长条钢筋,长条钢筋的两端各设弯钩,弯钩长度为150mm;
b、钢筋网安装
将制作加工完成的钢筋按间距150mm,单层双向布置于井道内,每根钢筋两边各深入井道剪力墙内150mm,弯钩朝下埋入楼板混凝土内;
c、混凝土浇筑
当电梯井钢筋网安装完成后,浇筑下层混凝土,振捣密实;
d、模板制作
电梯井内侧模板材料选用胶合板,内侧模板下端按两槽口的间距150mm,切割预留若干钢筋穿入槽口;外侧模板采胶合板制作拼接,模板制作尺寸应配合电梯井的长、宽、高度;
e、模板安装与加固
将加工拼接好的模板吊装至电梯井剪力墙内外两侧,电梯井内侧模板安装时将预留的钢筋穿入槽口与预埋钢筋逐一对应,落在钢筋网上,外侧模板吊装至剪力墙外侧边线,然后用对拉螺杆和钢管将内外侧模板进行加固,矫正模板垂直度完成电梯井模板安装。
2.如权利要求1所述的电梯井剪力墙模板的安装方法,其特征在于,所述钢筋直径为≥10mm。
3.如权利要求1所述的电梯井剪力墙模板的安装方法,其特征在于,所述胶合板厚度为≥18mm。
4.如权利要求1所述的电梯井剪力墙模板的安装方法,其特征在于,所述钢筋穿入槽口尺寸为20*50mm矩形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010876085.5A CN112049409A (zh) | 2020-08-27 | 2020-08-27 | 一种电梯井剪力墙模板的安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010876085.5A CN112049409A (zh) | 2020-08-27 | 2020-08-27 | 一种电梯井剪力墙模板的安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112049409A true CN112049409A (zh) | 2020-12-08 |
Family
ID=73600502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010876085.5A Pending CN112049409A (zh) | 2020-08-27 | 2020-08-27 | 一种电梯井剪力墙模板的安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112049409A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115095106A (zh) * | 2022-05-31 | 2022-09-23 | 上海宝冶集团有限公司 | 一种电梯井道结构及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000240281A (ja) * | 1999-02-23 | 2000-09-05 | Engel Sangyo:Kk | 合成樹脂型枠による基礎施工法 |
JP2001220894A (ja) * | 2000-02-07 | 2001-08-17 | Ohbayashi Corp | スパイラル式スリップフォーム工法における打継目の処理方法 |
CN2804267Y (zh) * | 2005-03-26 | 2006-08-09 | 马忠 | 一种建筑模板及该建筑模板所用的组件 |
CN201343865Y (zh) * | 2008-12-25 | 2009-11-11 | 马忠 | 建筑模板所用的组件 |
CN103628684A (zh) * | 2013-12-12 | 2014-03-12 | 中国建筑第八工程局有限公司 | 一种同时浇筑楼板和剪力墙的施工方法 |
-
2020
- 2020-08-27 CN CN202010876085.5A patent/CN112049409A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000240281A (ja) * | 1999-02-23 | 2000-09-05 | Engel Sangyo:Kk | 合成樹脂型枠による基礎施工法 |
JP2001220894A (ja) * | 2000-02-07 | 2001-08-17 | Ohbayashi Corp | スパイラル式スリップフォーム工法における打継目の処理方法 |
CN2804267Y (zh) * | 2005-03-26 | 2006-08-09 | 马忠 | 一种建筑模板及该建筑模板所用的组件 |
CN201343865Y (zh) * | 2008-12-25 | 2009-11-11 | 马忠 | 建筑模板所用的组件 |
CN103628684A (zh) * | 2013-12-12 | 2014-03-12 | 中国建筑第八工程局有限公司 | 一种同时浇筑楼板和剪力墙的施工方法 |
Non-Patent Citations (1)
Title |
---|
王士川主编: "《施工技术》", 31 January 2000, 冶金工业出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115095106A (zh) * | 2022-05-31 | 2022-09-23 | 上海宝冶集团有限公司 | 一种电梯井道结构及其施工方法 |
CN115095106B (zh) * | 2022-05-31 | 2024-01-30 | 上海宝冶集团有限公司 | 一种电梯井道结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110700420B (zh) | 一种装配式建筑的预制墙体和装配结构及其施工方法 | |
KR101903628B1 (ko) | 내진 성능이 강화된 더블 pc벽체 및 이를 이용한 pc벽체 구조물의 시공방법 | |
CN108678220B (zh) | 一种钢筋模板一体化安装的混凝土剪力墙 | |
CN107254933A (zh) | 高层装配式单排通孔预制剪力墙及其装配结构和施工方法 | |
US8650830B2 (en) | Method of basement construction | |
CN113719029A (zh) | 一种基于暗牛腿的装配式梁柱连接节点及其施工方法 | |
CN109487955A (zh) | 一种预制混凝土柱原位现浇施工方法 | |
CN112049409A (zh) | 一种电梯井剪力墙模板的安装方法 | |
CN205976167U (zh) | 基于可拆卸式定位控制件现浇楼板结构 | |
CN105347142B (zh) | 一种施工升降机安装在地下室顶板上的穿板安装方法 | |
CN106120871B (zh) | 一种地下室外墙后浇带外侧模板施工方法 | |
CN107100322A (zh) | 后张法竖向预应力现浇混凝土柱结构及施工方法 | |
CN217870407U (zh) | 一种拼接式导墙 | |
CN206070598U (zh) | 一种地下室外墙后浇带外侧模板及其固定结构 | |
KR20110050898A (ko) | 콘크리트 일체성을 향상시키는 수직조인트 부재 | |
CN110725441B (zh) | 装配式建筑大型木丝水泥墙板与建筑框架结构的钢砼铸接结构 | |
CN210597742U (zh) | 一种剪力墙 | |
KR20090114000A (ko) | 터널 천단부 보강 구조물 및 이를 이용한 터널 천단부보강공법 | |
CN209941733U (zh) | 一种挡墙 | |
CN211923636U (zh) | 一种预制板加固装置 | |
KR100860592B1 (ko) | Pc블럭 적층시공용 가설구조 | |
CN210288358U (zh) | 一种灌注桩钢筋笼组件 | |
CN110629794B (zh) | 一种旋流井外壁模板施工方法 | |
KR200293048Y1 (ko) | 프리스트레스가 도입된 지하벽을 이용한 흙막이 구조 | |
CN216865603U (zh) | 装配式钢管柱结构空心板组合墙体 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201208 |
|
RJ01 | Rejection of invention patent application after publication |