CN111997623A - 隧道帷幕注浆施工方法 - Google Patents
隧道帷幕注浆施工方法 Download PDFInfo
- Publication number
- CN111997623A CN111997623A CN202010824274.8A CN202010824274A CN111997623A CN 111997623 A CN111997623 A CN 111997623A CN 202010824274 A CN202010824274 A CN 202010824274A CN 111997623 A CN111997623 A CN 111997623A
- Authority
- CN
- China
- Prior art keywords
- grouting
- construction
- grout stopping
- hole
- stopping wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
- E21D9/002—Injection methods characterised by the chemical composition used
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
隧道帷幕注浆施工方法涉及隧道施工领域。主要是为解决目前隧道施工中采取超前管棚或小导管加注浆方式进行超前支护,施工过程中极易发生溜塌掉块或初支变形的问题而发明的。靠近掌子面上、中台阶设置砼止浆墙,封堵墙周边设置钢管与围岩连接形成整体,拱部上台阶未与掌子面密贴部位泵送混凝土回填密实,分次浇注时埋设接茬筋。作业平台表面采用混凝土浇注,采用全断面超前帷幕注浆加固,注浆范围为开挖轮廓线外5m,注浆采用水泥浆,全断面超前注浆采用全孔一次性注浆工艺,注浆施工采用多功能地质钻机开孔,并安设止水闸阀,再通过孔口管钻设孔进行注浆施工。优点是不需过大扰动前方软弱围岩,通过施工止浆墙来确保工作面的施工安全。
Description
技术领域:
本发明涉及隧道施工领域,具体是涉及一种隧道帷幕注浆施工方法。
背景技术:
目前隧道施工中,探明前方围岩破碎或富水时一般采取超前管棚或小导管加注浆的方式进行超前支护。此种方式仅可适用于一般地段,对于围岩极破碎及含水量大的地段依然无法平稳渡过,施工过程中极易发生溜塌掉块或者初支变形的情况。
发明内容:
本发明所要解决的技术问题是提供一种能保证前方围岩稳定,避免溜塌变形等情况的发生的隧道帷幕注浆施工方法。
上述目的是这样实现的:
采取“注浆加固、加筋锚固、超前管棚”的原则进行;
一,注浆工作面施工布置;
⑴上断面止浆墙施工:止浆墙浇注前,清理基地虚碴至密实基底,确保止浆墙基底落于实处。将工作面涌水采用管道进行集中引排归位,施工面处于无水状态,保证止浆墙施工质量。止浆墙施作区域,靠近掌子面上、中台阶设置2~3m厚的C25砼止浆墙,嵌入围岩不小于50cm,底部设置在下台阶,封堵墙周边设置2环Ф42㎜钢管与围岩连接,形成整体,钢管环向间距1m,每根长3m;当止浆墙基础为软弱围岩时,应对止浆墙基础进行加固处理。拱部上台阶未与掌子面密贴部位泵送C25混凝土回填密实。以便止浆墙浇注完成后,通过导管进行注浆对止浆墙与初支护间的裂隙进行注浆封闭,分次浇注时需埋设接茬筋。
⑵钻机施工平台施作,由于围岩破碎并存在软弱夹层,遇水泥化严重,作业平台表面采用C25模注混凝土浇注,厚度30cm,与上下断面止浆墙连接成为整体,形成净空5m,长不小于10m的钻机作业平台。
二,超前注浆加固范围;
采用全断面超前帷幕注浆加固,注浆范围为开挖轮廓线外5m,注浆采用水泥浆,水泥采用425号普通硅酸盐水泥,水泥浆水灰比=0.5~0.8:1,注浆参数,单孔有效扩散半径设计为2.0m,终孔间距不大于3.0m;钻孔孔径Φ108㎜)。施工中可对薄弱位置考虑增加注浆孔。
三,注浆工艺及方式;
⑴全断面超前注浆采用全孔一次性注浆的施工工艺,施工中可根据地质和实际情况调整。
⑵注浆施工采用多功能地质钻机开Φ108mm孔,终孔直径不小于Φ90mm。开孔深1.8m安设2.0m长Φ89mm孔口管,并安设止水闸阀,再通过孔口管钻设Φ89mm的孔进行注浆施工。
⑶注浆先进行终孔断面注浆孔钻注施工,再对补充断面孔进行注浆施工。
四,注浆材料;
注浆材料以普通水泥浆液为主,水泥水玻璃双液浆为辅。施工过程根据地质情况及地层吸浆情况进行材料种类及配比选择调整。
本工艺的优点:本工艺不需过大扰动前方软弱围岩,通过施工止浆墙来确保工作面的施工安全,然后进行长距离、高压力钻孔注浆,待浆液凝固后将前方围岩加固。拆除止浆墙开挖时可保证前方围岩稳定,避免溜塌变形等情况的发生,保证施工安全。
具体实施方式:
一,注浆工作面施工布置;
⑴上断面止浆墙施工:止浆墙浇注前,清理基地虚碴至密实基底,确保止浆墙基底落于实处。将工作面涌水采用管道进行集中引排归位,施工面处于无水状态,保证止浆墙施工质量。止浆墙施作区域,靠近掌子面上、中台阶设置2~3m厚的C25砼止浆墙,嵌入围岩不小于50cm,底部设置在下台阶,封堵墙周边设置2环Ф42㎜钢管与围岩连接,形成整体,钢管环向间距1m,每根长3m;当止浆墙基础为软弱围岩时,应对止浆墙基础进行加固处理。拱部上台阶未与掌子面密贴部位泵送C25混凝土回填密实。以便止浆墙浇注完成后,通过导管进行注浆对止浆墙与初支护间的裂隙进行注浆封闭,分次浇注时需埋设接茬筋。
⑵钻机施工平台施作,由于围岩破碎并存在软弱夹层,遇水泥化严重,作业平台表面采用C25模注混凝土浇注,厚度30cm,与上下断面止浆墙连接成为整体,形成净空5m,长不小于10m的钻机作业平台。
二,超前注浆加固范围;
采用全断面超前帷幕注浆加固,注浆范围为开挖轮廓线外5m,注浆采用水泥浆,水泥采用425号普通硅酸盐水泥,水泥浆水灰比=0.5~0.8:1,注浆参数,单孔有效扩散半径设计为2.0m,终孔间距不大于3.0m;钻孔孔径Φ108㎜。施工中可对薄弱位置考虑增加注浆孔。
三,注浆工艺及方式;
⑴全断面超前注浆采用全孔一次性注浆的施工工艺,施工中可根据地质和实际情况调整。
⑵注浆施工采用多功能地质钻机开Φ108mm孔,终孔直径不小于Φ90mm。开孔深1.8m安设2.0m长Φ89mm孔口管,并安设止水闸阀,再通过孔口管钻设Φ89mm的孔进行注浆施工。
⑶注浆先进行终孔断面注浆孔钻注施工,再对补充断面孔进行注浆施工。
四,注浆材料;
注浆材料以普通水泥浆液为主,水泥水玻璃双液浆为辅。施工过程根据地质情况及地层吸浆情况进行材料种类及配比选择调整。
Claims (1)
1.隧道帷幕注浆施工方法,其特征是:
一,注浆工作面施工布置;
⑴上断面止浆墙施工:止浆墙浇注前,清理基地虚碴至密实基底,确保止浆墙基底落于实处;将工作面涌水采用管道进行集中引排归位,施工面处于无水状态,保证止浆墙施工质量;止浆墙施作区域,靠近掌子面上、中台阶设置2~3m厚的C25砼止浆墙,嵌入围岩不小于50cm,底部设置在下台阶,封堵墙周边设置2环Ф42㎜钢管与围岩连接,形成整体,钢管环向间距1m,每根长3m;当止浆墙基础为软弱围岩时,对止浆墙基础进行加固处理;拱部上台阶未与掌子面密贴部位泵送C25混凝土回填密实;以便止浆墙浇注完成后,通过导管进行注浆对止浆墙与初支护间的裂隙进行注浆封闭,分次浇注时需埋设接茬筋;
⑵钻机施工平台施作,由于围岩破碎并存在软弱夹层,遇水泥化严重,作业平台表面采用C25模注混凝土浇注,厚度30cm,与上下断面止浆墙连接成为整体,形成净空5m,长不小于10m的钻机作业平台;
二,超前注浆加固范围;
采用全断面超前帷幕注浆加固,注浆范围为开挖轮廓线外5m,注浆采用水泥浆,水泥采用425号普通硅酸盐水泥,水泥浆水灰比=0.5~0.8:1,注浆参数,单孔有效扩散半径设计为2.0m,终孔间距不大于3.0m;钻孔孔径Φ108㎜;
三,注浆工艺及方式;
⑴全断面超前注浆采用全孔一次性注浆的施工工艺;
⑵注浆施工采用多功能地质钻机开Φ108mm孔,终孔直径不小于Φ90mm;开孔深1.8m安设2.0m长Φ89mm孔口管,并安设止水闸阀,再通过孔口管钻设Φ89mm的孔进行注浆施工;
⑶注浆先进行终孔断面注浆孔钻注施工,再对补充断面孔进行注浆施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010824274.8A CN111997623A (zh) | 2020-08-17 | 2020-08-17 | 隧道帷幕注浆施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010824274.8A CN111997623A (zh) | 2020-08-17 | 2020-08-17 | 隧道帷幕注浆施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111997623A true CN111997623A (zh) | 2020-11-27 |
Family
ID=73473910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010824274.8A Pending CN111997623A (zh) | 2020-08-17 | 2020-08-17 | 隧道帷幕注浆施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111997623A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113982642A (zh) * | 2021-10-21 | 2022-01-28 | 山东省公路桥梁建设集团有限公司 | 一种超前帷幕的浇筑方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3968655A (en) * | 1973-07-13 | 1976-07-13 | Mcglothlin William K | Method of reinforcing tunnels before excavation |
KR100562938B1 (ko) * | 2003-08-20 | 2006-03-22 | 주식회사 우지스 | 터널공동 충전용 방수기포그라우팅공법 |
CN101638987A (zh) * | 2009-07-24 | 2010-02-03 | 中铁二十一局集团有限公司 | 用帷幕注浆加止浆墙穿越高压富水断裂带的隧道施工方法 |
CN101994513A (zh) * | 2010-10-30 | 2011-03-30 | 中铁十二局集团第二工程有限公司 | 上半断面完成全断面帷幕注浆隧道施工方法 |
CN102493822A (zh) * | 2011-12-29 | 2012-06-13 | 中铁二十三局集团有限公司 | 一种通过富水断层影响带的隧道的帷幕注浆施工方法 |
-
2020
- 2020-08-17 CN CN202010824274.8A patent/CN111997623A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3968655A (en) * | 1973-07-13 | 1976-07-13 | Mcglothlin William K | Method of reinforcing tunnels before excavation |
KR100562938B1 (ko) * | 2003-08-20 | 2006-03-22 | 주식회사 우지스 | 터널공동 충전용 방수기포그라우팅공법 |
CN101638987A (zh) * | 2009-07-24 | 2010-02-03 | 中铁二十一局集团有限公司 | 用帷幕注浆加止浆墙穿越高压富水断裂带的隧道施工方法 |
CN101994513A (zh) * | 2010-10-30 | 2011-03-30 | 中铁十二局集团第二工程有限公司 | 上半断面完成全断面帷幕注浆隧道施工方法 |
CN102493822A (zh) * | 2011-12-29 | 2012-06-13 | 中铁二十三局集团有限公司 | 一种通过富水断层影响带的隧道的帷幕注浆施工方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113982642A (zh) * | 2021-10-21 | 2022-01-28 | 山东省公路桥梁建设集团有限公司 | 一种超前帷幕的浇筑方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021223573A1 (zh) | 新增暗挖通道与既有站厅层连通接驳施工结构 | |
CN106014201B (zh) | 一种隧道注浆帷幕外泄水钻孔安全施工工艺 | |
CN103334770B (zh) | 一种长大反坡隧道超高水压富水破碎带施工方法 | |
CN110821503B (zh) | 一种超深盾构区间风井先隧后主体施工方法 | |
CN112431599B (zh) | 上软下硬地层的隧道开挖方法 | |
CN205742213U (zh) | 基坑支护结构 | |
CN103277120A (zh) | 一种非全深冻结立井解冻后的涌水防治方法 | |
CN108643935A (zh) | 富水浅埋地质下隧道的施工方法 | |
CN110735653A (zh) | 一种针对火成岩富水断层的深孔后退式注浆堵水施工方法 | |
CN107725056A (zh) | 一种穿越淤泥质地层隧道全环超前快速注浆施工方法 | |
CN104499479A (zh) | 一种穿越砂砾石回填层的挖孔桩施工方法 | |
CN207892653U (zh) | 适用于风化残积土层裂隙带的减压疏水结构 | |
CN108661650A (zh) | 一种富水岩浆岩地区深大竖井井筒施工方法 | |
CN114109442B (zh) | 隧道岩溶破碎带溜塌半断面帷幕前进式注浆加固处理方法 | |
CN107965325B (zh) | 一种小净距浅埋隧道初支拱架更换施工方法 | |
CN102128038B (zh) | 一种隧道管棚快速施工方法 | |
CN216342131U (zh) | 盾构隧道侵限桩处理加固结构 | |
CN110206071A (zh) | 一种地下连续墙接缝加固方法与装置 | |
CN108661652B (zh) | 矿山法隧道内盾构始发和接收端头加固装置和方法 | |
CN111997623A (zh) | 隧道帷幕注浆施工方法 | |
CN112145203A (zh) | 全断面前进式分段注浆施工方法及重叠隧道施工工法 | |
CN114737979B (zh) | 一种盾构区间连续下穿大直径输水管线的施工方法 | |
CN100451247C (zh) | 防空洞加固施工工艺 | |
CN113404517B (zh) | 一种隧道突泥涌水的施工方法 | |
KR101745363B1 (ko) | 복합 가시설 및 이의 시공방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201231 Address after: 111000 No. 17 Heping Road, Baita District, Liaoning, Liaoyang Applicant after: CHINA RAILWAY 19TH BUREAU GROUP 2ND Co.,Ltd. Applicant after: CHINA RAILWAY 19 BUREAU GROUP Co.,Ltd. Address before: 111000 No. 17 Heping Road, Baita District, Liaoning, Liaoyang Applicant before: CHINA RAILWAY 19TH BUREAU GROUP 2ND Co.,Ltd. |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20201127 |