CN111992686B - Aerial fog full-water combined cooling high-carbon steel continuous casting production method - Google Patents

Aerial fog full-water combined cooling high-carbon steel continuous casting production method Download PDF

Info

Publication number
CN111992686B
CN111992686B CN202010917673.9A CN202010917673A CN111992686B CN 111992686 B CN111992686 B CN 111992686B CN 202010917673 A CN202010917673 A CN 202010917673A CN 111992686 B CN111992686 B CN 111992686B
Authority
CN
China
Prior art keywords
section
water
cooling
carbon steel
continuous casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010917673.9A
Other languages
Chinese (zh)
Other versions
CN111992686A (en
Inventor
汪灿荣
蔡常青
郑原首
许英华
马桂华
林真
丁大龙
杨小志
郑建华
夏帅
陈正权
余胜红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Sangang Minguang Co Ltd
Fujian Sangang Group Co Ltd
Original Assignee
Fujian Sangang Minguang Co Ltd
Fujian Sangang Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Sangang Minguang Co Ltd, Fujian Sangang Group Co Ltd filed Critical Fujian Sangang Minguang Co Ltd
Priority to CN202010917673.9A priority Critical patent/CN111992686B/en
Publication of CN111992686A publication Critical patent/CN111992686A/en
Application granted granted Critical
Publication of CN111992686B publication Critical patent/CN111992686B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/124Accessories for subsequent treating or working cast stock in situ for cooling
    • B22D11/1245Accessories for subsequent treating or working cast stock in situ for cooling using specific cooling agents
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • B22D11/11Treating the molten metal
    • B22D11/114Treating the molten metal by using agitating or vibrating means
    • B22D11/115Treating the molten metal by using agitating or vibrating means by using magnetic fields
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/122Accessories for subsequent treating or working cast stock in situ using magnetic fields

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

The invention discloses an aerial fog full-water combined cooling high-carbon steel continuous casting production method, which relates to the field of high-carbon steel continuous casting processes, wherein aerial fog full-water cooling equipment is used for multi-section cooling, full-water cooling is creatively adopted at the front section, aerial fog cooling is used at the rear section, and a set of unique aerial fog full-water combined cooling high-carbon steel continuous casting production process is formed by matching with the control of various production parameters.

Description

Aerial fog full-water combined cooling high-carbon steel continuous casting production method
Technical Field
The invention relates to the field of high-carbon steel continuous casting process, in particular to an aerial fog full-water combined cooling high-carbon steel continuous casting production method.
Background
Carbon segregation of high-carbon steel is always one of the difficulties in continuous casting production, and the main contradiction is to reduce carbon segregation and avoid the conflict of other casting blank defects such as shrinkage porosity and shrinkage cavity. Methods to control center carbon segregation typically involve 1. using terminal electrical agitation; 2. controlling the superheat degree of the molten steel; 3. cooling with a large specific water amount; 4. pouring at constant drawing speed. The method for controlling the center carbon segregation is practiced in a plurality of domestic steel mills, and has obvious effect. In the case of large specific water cooling, the simple increase of the specific water in production practice can reduce the carbon segregation in the center of the casting blank and simultaneously cause other serious casting blank defects such as center crack of the casting blank. Therefore, the proper high-carbon steel secondary cooling water distribution system and the process are the technical core for ensuring the quality of the high-carbon steel casting blank.
Through patent search, related technologies for secondary cooling devices are disclosed:
the invention discloses a method for controlling the internal quality of a 82B steel type continuous casting billet in a steelmaking continuous casting process, which comprises the following steps: (1) strictly controlling the superheat degree of molten steel in the tundish, and controlling the superheat degree of the molten steel in the tundish to be 10-20 ℃; (2) optimizing the water quantity of the crystallizer and the water quantity of the secondary cooling ratio: 1) the water amount of the crystallizer is 95-110 m3/h, and the temperature difference between the inlet water temperature and the outlet water temperature of cooling water of the crystallizer is less than 10 ℃; 2) closing the cooling water of the secondary cooling 3 section; 3) adjusting the secondary cooling specific water amount to 0.35-0.52L/kg; 4) water is distributed in each section to ensure that the surface temperature of the continuous casting billet in the secondary cooling chamber is uniform; 5) optimizing the nozzles used in each section; (3) automatically controlling the liquid level of the molten steel in the crystallizer; (4) optimizing a water-cooling nozzle and water quantity to basically achieve that a small amount of water flows onto the red blank; (5) and optimizing the electromagnetic stirring parameters. According to the invention, through an optimized process, the internal defect rate of the 82B billet continuous casting billet is reduced to a lower level, and the quality of the 82B continuous casting billet is improved. The high-carbon steel produced by the prior art or the technical scheme described in the patent document still needs to be improved in internal quality, has a high carbon center segregation grade, and has other defects such as low shrinkage cavity and high shrinkage porosity grade of a casting blank, cracks and the like.
Disclosure of Invention
The invention provides an aerosol full-water combined cooling high-carbon steel continuous casting production method, and aims to solve the problems in the prior art.
The invention adopts the following technical scheme:
the method for producing high-carbon steel by continuously casting through combination cooling of all aerial fog and water is characterized by comprising the following steps of: (1) cooling the high-carbon steel by using air-mist full water cooling equipment; the cooling device of the aerial fog full-water cooling equipment cools a foot roller section of a crystallizer and a secondary cooling spraying section; specifically, the cooling device is divided into four sections, namely 0, I, II and III; wherein, the section 0 is fully water-cooled by three rows of PZ5965QZ nozzles, the section I is fully water-cooled by six rows of PZ4565QZ, the section II is gas-spray cooled by five rows of HPZ18060QZ, and the section III is gas-spray cooled by three rows of HPZ18060 QZ; (2) controlling the fluctuation of the liquid level of the crystallizer within +/-5 mm; (3) controlling the electromagnetic stirring parameters of the crystallizer to be 300-320A/4 HZ; (4) and electrically stirring the mixture by adopting the tail end to 90-120A/4 HZ.
Further, the following contents are included: according to the steel grade and the pouring condition, the water quantity control range of each secondary cooling section is as follows: carrying out high-speed dry top-bottom-up cultivation at a specific water content of 1.6-1.8L/kg, carrying out high-speed dry top-up cultivation at a stage 0 at 11-13 m, carrying out high-speed dry top-down cultivation at a stage I at 13-16 m, carrying out high-speed dry top-down cultivation at a stage II at 3-5 m, carrying out high-speed dry top-down cultivation at a stage III at 2-3 m; the air pressure of the section II and the air pressure of the section III are both controlled to be 0.25-0.3 MPa.
Further, the following contents are included: (5) producing high-carbon steel with a section of 160mm multiplied by 160mm by a two-continuous casting machine, wherein the carbon content is controlled to be 0.77-0.82%; (6) controlling the superheat degree of the molten steel of the tundish at 18-32 ℃; (7) controlling the pulling speed of the withdrawal and straightening machine to be 1.75-1.8 m/min.
From the above description of the structure of the present invention, it can be seen that the present invention has the following advantages:
the invention relates to a gas fog full-water cooling device, which is characterized in that gas fog full-water cooling equipment is used for multi-section cooling, the front section is used for full-water cooling, the rear section is used for gas fog cooling, and the control of various production parameters is matched to form a set of unique gas fog full-water combined cooling high-carbon steel continuous casting production process.
Drawings
Fig. 1 is a schematic structural diagram of an aerosol full-water cooling device in the invention.
Detailed Description
The following describes embodiments of the present invention with reference to the drawings.
A high-carbon steel continuous casting production method adopting combination cooling of aerial fog and water comprises the following steps:
(1) the high-carbon steel with the section of 160mm multiplied by 160mm is produced by a two-continuous casting machine, and the carbon content is controlled to be 0.77-0.82 percent.
(2) Controlling the superheat degree of the molten steel in the tundish at 18-32 ℃.
(3) Cooling the high-carbon steel by using an air-mist full water cooling device.
As shown in fig. 1, the all-water aerial fog cooling equipment is a conventional equipment, and mainly comprises a support device 1, a guide device 2 and a cooling device 3. The cooling device 3 comprises a crystallizer foot roller section which is a section 0; also comprises a secondary cold spraying section which is divided into an I section 31, a II section 32 and a III section 33.
As shown in FIG. 1, segment 0 is fully water cooled with three rows of PZ5965QZ nozzles, segment I31 is fully water cooled with six rows of PZ4565QZ, segment II 32 is fully water cooled with five rows of HPZ18060QZ, and segment III 33 is fully water cooled with three rows of HPZ18060 QZ.
In addition, the water quantity control range of each secondary cooling section is as follows: carrying out high-speed dry top-bottom-up cultivation at a specific water content of 1.6-1.8L/kg, carrying out high-speed dry top-up cultivation at a stage 0 at 11-13 m, carrying out high-speed dry top-down cultivation at a stage I at 13-16 m, carrying out high-speed dry top-down cultivation at a stage II at 3-5 m, carrying out high-speed dry top-down cultivation at a stage III at 2-3 m; and the air pressure of the section II and the section III is controlled to be 0.25-0.3 MPa. Preferably, the water quantity control range of each secondary cooling section is as follows: carrying out high-yield high-; and the air pressure of the II section and the III section is controlled to be 0.28 MPa.
(4) Controlling the fluctuation of the liquid level of the crystallizer within +/-5 mm.
(5) Controlling the electromagnetic stirring parameters of the crystallizer at 300-320A/4 HZ. Preferably, the electromagnetic stirring parameter of the crystallizer is controlled to be 320A/4HZ
(6) And electrically stirring the mixture by adopting the tail end to 90-120A/4 HZ. Preferably, the terminal electric agitation is used for 110A/4 HZ.
(7) Controlling the pulling speed of the withdrawal and straightening machine to be 1.75-1.8 m/min. Preferably, the withdrawal speed of the withdrawal and straightening unit is controlled to be 1.75 m/min.
The high-carbon steel produced by the method has good internal quality, the low-power shrinkage cavity and shrinkage porosity of the casting blank are below 0.5 level, other defects such as cracks and the like do not exist, the proportion of the carbon center segregation grade above 1.15 is reduced from 22% to 2%, the quality of the high-carbon steel can be effectively improved, and the drawing wire breakage rate used by subsequent users is reduced.
The above description is only an embodiment of the present invention, but the design concept of the present invention is not limited thereto, and any insubstantial modifications made by using the design concept should fall within the scope of infringing the present invention.

Claims (2)

1. The method for producing high-carbon steel by continuously casting through combination cooling of all aerial fog and water is characterized by comprising the following steps of: (1) cooling the high-carbon steel by using air-mist full water cooling equipment; the cooling device of the aerial fog full-water cooling equipment cools a foot roller section of a crystallizer and a secondary cooling spraying section; specifically, the cooling device is divided into four sections, namely 0, I, II and III; wherein, the section 0 is fully water-cooled by three rows of PZ5965QZ nozzles, the section I is fully water-cooled by six rows of PZ4565QZ, the section II is gas-spray cooled by five rows of HPZ18060QZ, and the section III is gas-spray cooled by three rows of HPZ18060 QZ; according to the steel grade and the pouring condition, the water quantity control range of each secondary cooling section is as follows: carrying out high-speed dry top-bottom-up cultivation at a specific water content of 1.6-1.8L/kg, carrying out high-speed dry top-up cultivation at a stage 0 at 11-13 m, carrying out high-speed dry top-down cultivation at a stage I at 13-16 m, carrying out high-speed dry top-down cultivation at a stage II at 3-5 m, carrying out high-speed dry top-down cultivation at a stage III at 2-3 m; the air pressure of the section II and the air pressure of the section III are both controlled to be 0.25-0.3 Mpa; (2) controlling the fluctuation of the liquid level of the crystallizer within +/-5 mm; (3) controlling the electromagnetic stirring parameters of the crystallizer to be 300-320A/4 HZ; (4) and electrically stirring the mixture by adopting the tail end to 90-120A/4 HZ.
2. The method for producing high-carbon steel through continuous casting through combination cooling of all aerial fog and water according to claim 1, characterized by further comprising the following steps: (5) producing high-carbon steel with a section of 160mm multiplied by 160mm by a two-continuous casting machine, wherein the carbon content is controlled to be 0.77-0.82%; (6) controlling the superheat degree of the molten steel of the tundish at 18-32 ℃; (7) controlling the pulling speed of the withdrawal and straightening machine to be 1.75-1.8 m/min.
CN202010917673.9A 2020-09-03 2020-09-03 Aerial fog full-water combined cooling high-carbon steel continuous casting production method Active CN111992686B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010917673.9A CN111992686B (en) 2020-09-03 2020-09-03 Aerial fog full-water combined cooling high-carbon steel continuous casting production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010917673.9A CN111992686B (en) 2020-09-03 2020-09-03 Aerial fog full-water combined cooling high-carbon steel continuous casting production method

Publications (2)

Publication Number Publication Date
CN111992686A CN111992686A (en) 2020-11-27
CN111992686B true CN111992686B (en) 2021-12-17

Family

ID=73468276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010917673.9A Active CN111992686B (en) 2020-09-03 2020-09-03 Aerial fog full-water combined cooling high-carbon steel continuous casting production method

Country Status (1)

Country Link
CN (1) CN111992686B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113399640A (en) * 2021-06-15 2021-09-17 首钢水城钢铁(集团)有限责任公司 Method for improving quality of casting blank
CN114632918A (en) * 2022-03-25 2022-06-17 福建三钢闽光股份有限公司 Continuous casting high-drawing-speed production method of small square billets
CN116571707B (en) * 2023-07-12 2023-09-12 江苏永钢集团有限公司 Method for improving center shrinkage cavity quality of high-carbon steel continuous casting billet

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07303951A (en) * 1994-03-16 1995-11-21 Nisshin Steel Co Ltd Secondary cooling method for continuous casting and the device thereof
JPH10109150A (en) * 1996-10-07 1998-04-28 Sumitomo Metal Ind Ltd Secondary cooling device for cast slab
CN1560306A (en) * 2004-02-26 2005-01-05 南京钢铁联合有限公司 Production technology of steel containing sulphur easy cuwtting
CN101138785A (en) * 2007-10-19 2008-03-12 攀钢集团攀枝花钢铁研究院 Continuous casting method of bloom
CN101890486A (en) * 2010-07-22 2010-11-24 东北大学 Multiple cooling methods integrated cooling system in strip casting process
JP2011020138A (en) * 2009-07-15 2011-02-03 Jfe Steel Corp Secondary cooling method in continuous casting
CN102699299A (en) * 2012-06-29 2012-10-03 秦皇岛首秦金属材料有限公司 Method for producing high-quality extra thick slab through complete gas atomization secondary cooling mode
CN104087708A (en) * 2014-05-22 2014-10-08 武汉钢铁(集团)公司 Production method of high sulfur, high phosphorus and high strength steel continuous casting slab for heaving broken connecting rod
CN104525880A (en) * 2015-01-21 2015-04-22 山东钢铁股份有限公司 Manufacturing method for round billets with overlarge cross sections
CN105458206A (en) * 2016-01-21 2016-04-06 中冶赛迪工程技术股份有限公司 Secondary cooling method of plate billets
CN106345977A (en) * 2016-11-29 2017-01-25 中冶赛迪工程技术股份有限公司 Secondary cooling method and device of high-speed small square billet or small round billet continuous casting machine
JP2017164805A (en) * 2016-03-18 2017-09-21 新日鐵住金株式会社 Continuous casting method
CN107262690A (en) * 2017-06-29 2017-10-20 中冶连铸技术工程有限责任公司 A kind of two cold water spray equipment for the high pulling rate production of billet caster
CN107475608A (en) * 2017-07-28 2017-12-15 江苏省沙钢钢铁研究院有限公司 A kind of manufacture method for improving low-carbon and adding boron steel wire rod surface quality
JP2018130751A (en) * 2017-02-17 2018-08-23 Jfeスチール株式会社 Method for cooling slab secondarily in continuous casting, and method for casting steel continuously
CN110293212A (en) * 2019-07-25 2019-10-01 中冶赛迪工程技术股份有限公司 Continuous small-billet casting secondary coolingwater control method under the conditions of a kind of high pulling rate
CN111360221A (en) * 2020-04-03 2020-07-03 中天钢铁集团有限公司 Method for eliminating central shrinkage cavity and controlling central segregation of 280mm × 320mm section high-carbon steel
CN111515356A (en) * 2020-03-09 2020-08-11 包头钢铁(集团)有限责任公司 240 × 240mm2Cooling process of continuous casting square billet secondary cooling water system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106987775B (en) * 2017-05-26 2019-01-11 江苏省沙钢钢铁研究院有限公司 A kind of production method for improving low-carbon and adding boron steel wire rod surface quality

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07303951A (en) * 1994-03-16 1995-11-21 Nisshin Steel Co Ltd Secondary cooling method for continuous casting and the device thereof
JPH10109150A (en) * 1996-10-07 1998-04-28 Sumitomo Metal Ind Ltd Secondary cooling device for cast slab
CN1560306A (en) * 2004-02-26 2005-01-05 南京钢铁联合有限公司 Production technology of steel containing sulphur easy cuwtting
CN101138785A (en) * 2007-10-19 2008-03-12 攀钢集团攀枝花钢铁研究院 Continuous casting method of bloom
JP2011020138A (en) * 2009-07-15 2011-02-03 Jfe Steel Corp Secondary cooling method in continuous casting
CN101890486A (en) * 2010-07-22 2010-11-24 东北大学 Multiple cooling methods integrated cooling system in strip casting process
CN102699299A (en) * 2012-06-29 2012-10-03 秦皇岛首秦金属材料有限公司 Method for producing high-quality extra thick slab through complete gas atomization secondary cooling mode
CN104087708A (en) * 2014-05-22 2014-10-08 武汉钢铁(集团)公司 Production method of high sulfur, high phosphorus and high strength steel continuous casting slab for heaving broken connecting rod
CN104525880A (en) * 2015-01-21 2015-04-22 山东钢铁股份有限公司 Manufacturing method for round billets with overlarge cross sections
CN105458206A (en) * 2016-01-21 2016-04-06 中冶赛迪工程技术股份有限公司 Secondary cooling method of plate billets
JP2017164805A (en) * 2016-03-18 2017-09-21 新日鐵住金株式会社 Continuous casting method
CN106345977A (en) * 2016-11-29 2017-01-25 中冶赛迪工程技术股份有限公司 Secondary cooling method and device of high-speed small square billet or small round billet continuous casting machine
JP2018130751A (en) * 2017-02-17 2018-08-23 Jfeスチール株式会社 Method for cooling slab secondarily in continuous casting, and method for casting steel continuously
CN107262690A (en) * 2017-06-29 2017-10-20 中冶连铸技术工程有限责任公司 A kind of two cold water spray equipment for the high pulling rate production of billet caster
CN107475608A (en) * 2017-07-28 2017-12-15 江苏省沙钢钢铁研究院有限公司 A kind of manufacture method for improving low-carbon and adding boron steel wire rod surface quality
CN110293212A (en) * 2019-07-25 2019-10-01 中冶赛迪工程技术股份有限公司 Continuous small-billet casting secondary coolingwater control method under the conditions of a kind of high pulling rate
CN111515356A (en) * 2020-03-09 2020-08-11 包头钢铁(集团)有限责任公司 240 × 240mm2Cooling process of continuous casting square billet secondary cooling water system
CN111360221A (en) * 2020-04-03 2020-07-03 中天钢铁集团有限公司 Method for eliminating central shrinkage cavity and controlling central segregation of 280mm × 320mm section high-carbon steel

Also Published As

Publication number Publication date
CN111992686A (en) 2020-11-27

Similar Documents

Publication Publication Date Title
CN111992686B (en) Aerial fog full-water combined cooling high-carbon steel continuous casting production method
CN106269868A (en) Long product rolling production line and production technology thereof
CN107457379B (en) A kind of production method of high-carbon high-alloy bearing steel large round billet
CN109093084A (en) A kind of production method of continuous-casting sheet billet
CN109852813A (en) Production technology is pricked by a kind of abnormal shape copper bar high efficiency continuous casting company
CN111347020A (en) Method for controlling internal quality of 82B steel type continuous casting billet in steelmaking continuous casting process
CN112792310A (en) Continuous casting production process for producing low-carbon low-silicon wiredrawing steel at high drawing speed
CN112247093B (en) Method for manufacturing continuous casting billet for direct rolling
CN112743053B (en) Crystallizer for solving peritectic steel continuous casting slab surface cracks and control method
CN107186192A (en) It is a kind of to improve the continuous cast method of small billet cord steel segregation
CN100493745C (en) Method for continuously casting sheet band by dual roller
CN114130976A (en) Method for improving center compactness of axle steel large round billet
CN104646641B (en) Pulling rate reduction control method and tundish changing control method in continuous casting system
CN102470429B (en) The continuous casting process of shockproof I-beam base
CN105382232B (en) Method for preventing generation of center line cracks in steel board continuous casting process
CN113198994A (en) Method for improving subcutaneous negative segregation in large round billet crystallizer in continuous casting process
CN110722330A (en) Production method of ultra-low carbon steel wire rod for electric conduction
CN109093087B (en) Casting blank corner heating method
CN110666124A (en) Method for producing cold forging steel at high drawing speed
CN114653912B (en) Production method of large-diameter high-purity compact special steel continuous casting round billet
CN113751683A (en) Method for improving internal quality of SWRH82B billet
CN211360593U (en) Continuous casting system for polygonal casting blank
CN213591708U (en) Round billet continuous casting system
CN112276029A (en) Round billet continuous casting system and continuous casting method
CN112430709A (en) Smelting method for cleaning high-construction steel refining molten steel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant