CN111962550A - 一种利用地下室顶板作为施工升降机基础的方法 - Google Patents
一种利用地下室顶板作为施工升降机基础的方法 Download PDFInfo
- Publication number
- CN111962550A CN111962550A CN202010393819.4A CN202010393819A CN111962550A CN 111962550 A CN111962550 A CN 111962550A CN 202010393819 A CN202010393819 A CN 202010393819A CN 111962550 A CN111962550 A CN 111962550A
- Authority
- CN
- China
- Prior art keywords
- foundation
- basement
- top plate
- construction elevator
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
一种利用地下室顶板作为施工升降机基础的方法,其特征在于包括以下步骤:a、根据施工升降机安装位置要求在地下室顶板上预留螺杆孔洞,b、在地下室顶板上方铺设砂浆找平层,c、在砂浆找平层上方铺设矩形钢板,d、在预留洞内安装螺杆,完成利用地下室顶板作为施工升降机基础的基础结构设置。本发明的利用地下室顶板作为施工升降机基础的方法具有施工升降机基础结构简单、施工方便,完全满足施工升降机安装要求及安全运行要求,对于型号相同的或固定基座相同的施工升降机通用,钢板可在不同项目上周转使用,同时免去了升降机混凝土基础的制作及拆除外运成本,降低成本,节能环保和降低工程成本的优点。
Description
技术领域
本发明涉及一种施工升降机基础的施工方法,具体地说,是一种利用地下室顶板作为施工升降机基础的方法。
背景技术
民用建筑施工过程中,墙体砌筑、抹灰、安装工程均需要在现场安装施工升降机作为垂直运输设备。一般施工升降机在地下室顶板封顶后安装,按照施工升降机使用说明书要求,需要单独制作施工升降机基础。常规电梯基础的高度为250-300mm,如果升降机的安装位置在地下室顶板上,通常需要在地下室顶板上单独浇筑钢筋混凝土升降机基础,这样增加了施工钢筋混凝土升降机基础的成本。
因此已知的施工升降机基础的施工方法存在着上述种种不便和问题。
发明内容
本发明的目的,在于提出一种安全可靠的利用地下室顶板作为施工升降机基础的方法。
为实现上述目的,本发明的技术解决方案是:
一种利用地下室顶板作为施工升降机基础的方法,其特征在于包括以下步骤:
a、在地下室顶板结构施工时,根据施工升降机安装位置要求在地下室顶板上预留螺杆孔洞;
b、在地下室顶板上方铺设砂浆找平层,砂浆找平层设有配合地下室顶板上预留螺杆孔洞的孔口;
c、在砂浆找平层上方铺设矩形钢板,使矩形钢板的尺寸与施工升降机说明书中的升降机基础尺寸相同,钢板的中心部位设有配合地下室顶板上预留螺杆孔洞的孔口;
d、在预留洞内安装螺杆,就位后用灌浆料灌实,完成利用地下室顶板作为施工升降机基础的基础结构设置。
本发明的利用地下室顶板作为施工升降机基础的方法还可以采用以下的技术措施来进一步实现。
前述的方法,其中所述螺杆孔洞不贯穿地下室顶板,螺杆孔洞底部离地下室顶板板底距离为≤50mm。
前述的方法,其中所述砂浆找平层厚度为≥30mm。
前述的方法,其中所述钢板厚度为≥20mm;矩形钢板尺寸为5m*6.6m。
采用上述技术方案后,本发明的利用地下室顶板作为施工升降机基础的方法具有以下优点:
1、施工升降机基础结构简单、施工方便;
2、工程质量安全可靠,完全满足施工升降机安装要求及安全运行要求,在地下室顶板上安装施工升降机时可代替传统的钢筋混凝土基础使用;
3、对于型号相同的或固定基座相同的施工升降机通用,钢板可在不同项目上周转使用,同时免去了升降机混凝土基础的制作及拆除外运成本,降低成本,节能环保,降低工程成本。
附图说明
图1为本发明实施例的钢板结构示意图;
图2为本发明实施例的施工升降机基础的结构示意图。
图中:1钢板,2钢板孔,3砂浆找平层,4地下室顶板,5螺杆孔洞。
具体实施方式
以下结合实施例及其附图对本发明作更进一步说明。
实施例1
本发明的利用地下室顶板作为施工升降机基础的方法具体操作:
在地下室顶板结构施工时根据施工升降机安装位置要求预留螺杆孔洞,为确保顶板防水效果,预留洞口不贯通,离板底50mm高。
现请参阅图1和图2,图1为本发明实施例的钢板结构示意图,图2为本发明实施例的施工升降机基础的结构示意图。如图所示,所述升降机底座安装过程中,在预留洞内安装螺杆,就位后用灌浆料灌实。为确保地下室顶板4受力均匀,在施工升降机安装位置地下室顶板上放置20mm厚钢板1,钢板中心部位设有与螺杆孔洞5配合的钢板孔2。钢板的尺寸与施工升降机说明书中的施工升降机基础尺寸相同,即5m*6.6m。为确保钢板与地下室顶板紧密接触,在钢板与地下室顶板间用30厚砂浆找平层3。
本发明具有实质性特点和显著的技术进步,本发明的利用地下室顶板作为施工升降机基础的方法可操作性强,施工简便,施工升降机基础完全满足施工升降机安装要求及安全运行要求,在地下室车库顶板上安装施工升降机时可代替传统的钢筋混凝土基础使用。对于型号相同的或固定基座相同的施工电梯通用,钢板可在不同项目上周转使用,同时免去了升降机混凝土基础的制作及拆除外运成本,降低成本,节能环保。
本发明的利用地下室顶板作为施工升降机基础的方法在天津静海绿城项目工程中应用。地下室顶板厚350mm,设置在地下室顶板上的施工升降机均为单独制作升降机基础,直接利用地下室顶板做升降机基础,安全可靠,降低了升降机基础制作及破除外运费用。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变化。因此,所有等同的技术方案也应该属于本发明的范畴,应由各权利要求限定。
Claims (4)
1.一种利用地下室顶板作为施工升降机基础的方法,其特征在于包括以下步骤:
a、在地下室顶板结构施工时,根据施工升降机安装位置要求在地下室顶板上预留螺杆孔洞;
b、在地下室顶板上方铺设砂浆找平层,砂浆找平层设有配合地下室顶板上预留螺杆孔洞的孔口;
c、在砂浆找平层上方铺设矩形钢板,使矩形钢板的尺寸与施工升降机说明书中的升降机基础尺寸相同,钢板的中心部位设有配合地下室顶板上预留螺杆孔洞的孔口;
d、在预留洞内安装螺杆,就位后用灌浆料灌实,完成利用地下室顶板作为施工升降机基础的基础结构设置。
2.如权利要求1所述的利用地下室顶板作为施工升降机基础的方法,其特征在于,所述螺杆孔洞不贯穿地下室顶板,螺杆孔洞底部离地下室顶板板底距离为≤50mm。
3.如权利要求1所述的利用地下室顶板作为施工升降机基础的方法,其特征在于,所述砂浆找平层厚度为≥30mm。
4.如权利要求1所述的利用地下室顶板作为施工升降机基础的方法,其特征在于,所述钢板厚度为≥20mm;矩形钢板尺寸为5m*6.6m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010393819.4A CN111962550A (zh) | 2020-05-11 | 2020-05-11 | 一种利用地下室顶板作为施工升降机基础的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010393819.4A CN111962550A (zh) | 2020-05-11 | 2020-05-11 | 一种利用地下室顶板作为施工升降机基础的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111962550A true CN111962550A (zh) | 2020-11-20 |
Family
ID=73357991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010393819.4A Pending CN111962550A (zh) | 2020-05-11 | 2020-05-11 | 一种利用地下室顶板作为施工升降机基础的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111962550A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105347142A (zh) * | 2015-11-24 | 2016-02-24 | 上海中锦建设集团股份有限公司 | 一种施工升降机安装在地下室顶板上的穿板安装方法 |
CN205116211U (zh) * | 2015-08-28 | 2016-03-30 | 中建三局第三建设工程有限责任公司 | 应用于地下室顶板沉降后浇带处的施工电梯基础装置 |
CN106703073A (zh) * | 2016-12-30 | 2017-05-24 | 中国建筑第八工程局有限公司 | 超高层施工升降机免回顶钢梁基础及其施工方法 |
US20190152749A1 (en) * | 2017-09-15 | 2019-05-23 | Greenfield Products, Llc | Crane Mat System and Method |
CN110077933A (zh) * | 2019-04-09 | 2019-08-02 | 广东易佳梯科技有限公司 | 一种模块化电梯井道的安装工艺 |
CN111042594A (zh) * | 2019-12-28 | 2020-04-21 | 山东天齐置业集团股份有限公司 | 车库顶板沉降后浇带处升降机基础施工工艺 |
-
2020
- 2020-05-11 CN CN202010393819.4A patent/CN111962550A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205116211U (zh) * | 2015-08-28 | 2016-03-30 | 中建三局第三建设工程有限责任公司 | 应用于地下室顶板沉降后浇带处的施工电梯基础装置 |
CN105347142A (zh) * | 2015-11-24 | 2016-02-24 | 上海中锦建设集团股份有限公司 | 一种施工升降机安装在地下室顶板上的穿板安装方法 |
CN106703073A (zh) * | 2016-12-30 | 2017-05-24 | 中国建筑第八工程局有限公司 | 超高层施工升降机免回顶钢梁基础及其施工方法 |
US20190152749A1 (en) * | 2017-09-15 | 2019-05-23 | Greenfield Products, Llc | Crane Mat System and Method |
CN110077933A (zh) * | 2019-04-09 | 2019-08-02 | 广东易佳梯科技有限公司 | 一种模块化电梯井道的安装工艺 |
CN111042594A (zh) * | 2019-12-28 | 2020-04-21 | 山东天齐置业集团股份有限公司 | 车库顶板沉降后浇带处升降机基础施工工艺 |
Non-Patent Citations (1)
Title |
---|
风飘絮: "地下室顶板施工升降机安拆方案", 《道客巴巴》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638940A (zh) | 一种装配式高层住宅混凝土预制构件施工工法 | |
CN105672664A (zh) | 整体保温墙板建筑体系 | |
CN106351358A (zh) | 装配式钢结构住宅夹心保温混凝土外墙板制造及安装方法 | |
CN109667376A (zh) | 适用于钢结构h型钢梁的新型叠合楼盖及其施工方法 | |
CN111648555A (zh) | 层叠式预制混凝土电梯井道 | |
CN111962550A (zh) | 一种利用地下室顶板作为施工升降机基础的方法 | |
CN109267578B (zh) | 一种斜面素混凝土结构及其施工方法 | |
CN209703805U (zh) | 一种适用于钢结构h型钢梁的新型叠合楼盖 | |
KR20220019346A (ko) | 기존 지하 외벽의 보강을 통한 신설 건물의 지하 증축 및 역타 공법 | |
CN111424921A (zh) | 一种地铁车站预制轨顶风道后开孔施工方法 | |
CN116575602A (zh) | 一种装配式建筑竖向预制构件连接安装方法 | |
CN218374567U (zh) | 一种可定位可免抹灰的alc墙板加固结构 | |
CN110670638A (zh) | 装配式住宅地下室结构膨胀加强带无缝施工方法 | |
CN116104224A (zh) | 一种外墙保温一体化缝隙拼装构造节点及施工方法 | |
CN110593449A (zh) | 一种装配式轻质竖条板式承重墙结构及其施工方法 | |
CN212613905U (zh) | 既有建筑中电梯的安装结构 | |
CN215563374U (zh) | 一种alc板安装结构 | |
CN113718938A (zh) | 一种装配式建筑及其构件的锚固方法 | |
CN210482370U (zh) | 轨道交通装配式内墙 | |
CN113958088A (zh) | 一种装配式电梯井 | |
CN107142956A (zh) | 一种预制装配式电梯基础 | |
GB2407828A (en) | Prefabricated structural masonry wall panel | |
CN219931248U (zh) | 装配式钢结构外挂预制墙体与地下室顶板连接构造 | |
CN216974064U (zh) | 一种装配式电梯井的井道单元及井道 | |
CN216974063U (zh) | 一种装配式电梯井的顶盖结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201120 |
|
RJ01 | Rejection of invention patent application after publication |