CN111943025B - Plate hoisting device for building construction - Google Patents

Plate hoisting device for building construction Download PDF

Info

Publication number
CN111943025B
CN111943025B CN202010808189.2A CN202010808189A CN111943025B CN 111943025 B CN111943025 B CN 111943025B CN 202010808189 A CN202010808189 A CN 202010808189A CN 111943025 B CN111943025 B CN 111943025B
Authority
CN
China
Prior art keywords
bearing plate
plate
floating seat
sliding
transfer pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010808189.2A
Other languages
Chinese (zh)
Other versions
CN111943025A (en
Inventor
蔡郴
周玉廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pengcheng Construction Group Co ltd
Original Assignee
Pengcheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pengcheng Construction Group Co ltd filed Critical Pengcheng Construction Group Co ltd
Priority to CN202010808189.2A priority Critical patent/CN111943025B/en
Publication of CN111943025A publication Critical patent/CN111943025A/en
Application granted granted Critical
Publication of CN111943025B publication Critical patent/CN111943025B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • B66C1/28Duplicate, e.g. pivoted, members engaging the loads from two sides
    • B66C1/30Duplicate, e.g. pivoted, members engaging the loads from two sides and also arranged to grip the sides of the loads
    • B66C1/32Duplicate, e.g. pivoted, members engaging the loads from two sides and also arranged to grip the sides of the loads of piled or stacked articles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a sheet material hoisting device for housing construction, it includes the bearing plate, be connected with the roof through the montant on the bearing plate, bearing plate center department wears to establish and sliding connection has the floating seat along the length direction of montant, the interior embedding of floating seat upper surface is rotated and is connected with the first ball of wearing out the floating seat upper surface, floating seat lower surface is provided with and is used for making first ball wear out the bracing piece of bearing plate upper surface with ground looks butt, sliding connection has the support plate that is used for towards floating seat reciprocating sliding in the both sides of floating seat between bearing plate and the roof, the roof is provided with the fluting along the slip direction of support plate, two support plates are respectively through slider and fluting sliding connection, two sliders wear out the isometric down tube that is connected with of slotted rotation respectively, the one end that the slider was kept away from to two down tubes passes through the hanging scaffold, the down tube rotates with the hanging scaffold to be connected, be provided with the couple on the hanging scaffold. This application has the effect of the security when promoting handling panel.

Description

Plate hoisting device for building construction
Technical Field
The application relates to the technical field of house construction, in particular to a plate hoisting device for house construction.
Background
At present, in the process of hoisting plates, the plates are mostly stacked together, and after the plates are uniformly bound, the bound plates are hoisted to a construction position by a hoisting machine.
Among the correlation technique, chinese patent with publication number CN110077951A discloses a panel overhead hoist for housing construction, and it includes gallows, hanger plate frame, and the gallows includes hanger plate, four hoist cables, lifting hook, and the hanger plate is a circular steel sheet, and the upper surface center of circular steel sheet is equipped with the lifting hook, and equidistant four hoist cables that set up on circular steel sheet lower surface circumference, hanger plate frame are a steel frame, and steel frame includes two rectangle fixed plates, two slides, four stands, wherein: the free ends of the four suspension ropes are fixedly connected with the sliding plates on two sides of the two sliding plates after the upper fixing plate passes through the corresponding pulley mechanisms and the through holes, so that the two sliding plates can be opened and closed along with the tightness of the suspension ropes to clamp or loosen the hoisting plates.
To the above-mentioned correlation technique, the inventor thinks that after panel was put on the fixed plate, panel did not put the center department of fixed plate for two slides are respectively apart from the distance of panel side different, thereby cause two slides to clip panel after, in the in-process of carrying out the handling to the hanger plate frame, cause the hanger plate frame to take place the slope easily, have that panel does not press from both sides tightly and lead to the defect that panel drops from the hanger plate frame of slope.
Disclosure of Invention
In order to improve the safety when handling panel, this application provides a panel hoisting device for housing construction.
The application provides a sheet material overhead hoist for housing construction, adopts following technical scheme:
the utility model provides a sheet material overhead hoist for housing construction, includes the bearing plate, be connected with the roof through the montant on the bearing plate, bearing plate center department wears to establish and sliding connection has the floating seat along the length direction of montant, the interior embedding of floating seat upper surface is rotated and is connected with the first ball of wearing out the floating seat upper surface, floating seat lower surface is provided with and is used for making first ball wear out the bracing piece of bearing plate upper surface with ground looks butt, have in the both sides sliding connection of floating seat between bearing plate and the roof and be used for towards the floating seat reciprocating sliding's support plate, the roof is provided with the fluting along the slip direction of support plate, two support the plate respectively through the slider with fluting sliding connection, two the slider is worn out grooved rotation respectively and is connected with isometric down tube, two the one end that the slider was kept away from to the down tube passes through the hanging scaffold, the down tube rotates with the hanging scaffold and is connected, be provided with the couple on the hanging scaffold.
By adopting the technical scheme, when the plate needs to be hoisted and placed on the ground, the supporting rod is abutted against the ground, so that the floating seat drives the first ball to penetrate out of the upper surface of the bearing plate, and the plate is abutted against the first ball on the floating seat in the process of placing the plate into the bearing plate, so that the plate can roll along with the first ball; the crane drives the hanging scaffold to ascend through the hook, and in the process of ascending of the hanging scaffold, the hanging scaffold drives the two sliding blocks to slide oppositely through the inclined rod, so that the two sliding blocks respectively drive the abutting plates to slide towards the floating seat, and the two abutting plates clamp the plates on the floating seat; in the process that two support plates clamp the plate on the floating seat, because two inclined rods are equal in length, the hanging scaffold rises above the central position of the top plate, so that the two support plates are respectively and equidistantly pulled to the middle of the bearing plate through the inclined rods, the support plates on two sides can automatically clamp two sides of the lifted plate, and meanwhile, the lower end face of the plate is abutted to the first ball, so that the plate can automatically slide to the central position of the floating seat under the abutting action of the support plates, the center of the plate moves towards the center of the floating seat, the risk of inclination of the hanging plate frame is reduced, and the plate is effectively prevented from falling from the inclined hanging plate frame.
Preferably, the guide rod is vertically arranged at the center of the top plate in the groove, the hanging scaffold is hollow and sleeved outside the guide rod and is connected with the guide rod in a sliding mode, the anti-falling part is arranged at one end, far away from the top plate, of the guide rod, and the hanging scaffold penetrates through the anti-falling part through the connecting rope and is connected with the hook above the anti-falling part.
By adopting the technical scheme, the guide rod is arranged in the slot at the center of the top plate, so that the hanging scaffold can drive two isometric inclined rods to move simultaneously along the length direction of the guide rod, and the inclined rods can respectively draw two abutting plates to the middle of the bearing plate at equal intervals through the sliding blocks.
Preferably, the opposite surfaces of the two abutting plates are embedded and are connected with second balls in a rotating mode.
Through adopting above-mentioned technical scheme, through being provided with the second ball, at the in-process that carries out the handling to panel, under the effect of lacking ground to the bracing piece butt, the floating seat can fall automatically and break away from the butt with panel to make panel can be through second ball lapse to the bearing plate under the tight circumstances of butt plate clamp, so that the bearing plate can continue to provide the holding power for panel.
Preferably, a pull rope is connected to the hanging scaffold towards the bearing plate.
Through adopting above-mentioned technical scheme, after panel handling to needs place position department, constructor passes through the pulling stay cord, and stay cord pulling platform sling downwards slides along the length direction of guide bar to make the down tube drive two blocks of buttresses board and slide mutually oppositely through the slider, thereby break away from the butt to panel, the constructor of being convenient for takes out panel.
Preferably, one end of the pull rope, which is far away from the hanging scaffold, is provided with a pull ring.
Through adopting above-mentioned technical scheme, through be provided with the pull ring on the stay cord, the constructor of being convenient for drives the platform sling lapse after through the pull ring to the stay cord pulling.
Preferably, the two opposite surfaces of the abutting plates are respectively provided with a first baffle and a second baffle on two sides along a direction perpendicular to the sliding direction of the abutting plates, the first baffle is in sliding connection with the abutting plates along the direction perpendicular to the sliding direction of the abutting plates, the second baffle is fixedly connected with the abutting plates, and the abutting plates are in threaded connection with a first threaded rod abutted against the first baffle along the sliding direction of the first baffle.
Through adopting above-mentioned technical scheme, at the in-process that carries out the handling to panel, just straight when connecting the rope for two are supported the board and press from both sides tight to the center department of bearing plate, twist first threaded rod, make first threaded rod and first baffle looks butt back, and promote first baffle and promote panel and second baffle looks butt, thereby stop four sides of panel, reduced the risk that panel dropped at the handling in-process.
Preferably, wear to establish and sliding connection has the transfer lever along the perpendicular to board slip direction in the bearing plate, transfer lever one end is worn out the bearing plate, the one end that the bearing plate was worn out to the transfer lever is rotated and is connected with the gyro wheel, transfer lever up end and bearing plate looks parallel and level, the bearing plate rotates in a side that the bearing plate was worn out to the transfer lever and is connected with the dog that is used for the butt transfer lever, the transfer lever is including first transfer lever and the second transfer lever that from top to bottom sets up, first transfer lever wear to establish and sliding connection in the second transfer lever, the second transfer lever wear to establish and threaded connection have with the second threaded rod of bottom surface looks butt under the first transfer lever, second threaded rod one end is worn out the lower bottom surface of second transfer lever.
Through adopting above-mentioned technical scheme, putting into the in-process on the bearing plate with panel, pull out the transfer pole from the bearing plate through the gyro wheel earlier, the rethread is twisted the second threaded rod, make first transfer pole rebound, make the upper surface of first transfer pole be higher than the upper surface of first ball, thereby under the condition that does not support board and roof to block, be convenient for constructor is manual or put into panel to the transfer pole through fork truck on, remove the transfer pole again, thereby bring panel into on the bearing plate, because the upper surface of first transfer pole is higher than the upper surface of first ball, so first ball can not cause the entering of panel to block, rethread twists the second threaded rod, make first transfer pole downstream, make the upper surface of first transfer pole be lower than the upper surface of first ball, thereby make panel and first ball looks butt, finally, through rotating the dog, make the dog block the transfer pole, avoid in handling in-process, the transfer pole follows the interior roll-off of bearing plate.
Preferably, butterfly nuts are arranged on the first threaded rod and the second threaded rod.
Through adopting above-mentioned technical scheme, through being provided with butterfly nut, the constructor of being convenient for twists respectively first screw rod and second screw rod through butterfly nut and moves.
In summary, the present application includes at least one of the following beneficial technical effects:
when the plate needs to be hoisted and placed on the ground, the supporting rod is abutted against the ground, so that the floating seat drives the first ball to penetrate out of the upper surface of the bearing plate, and the plate is abutted against the first ball on the floating seat in the process of placing the plate into the bearing plate, so that the plate can roll along with the first ball; the crane drives the hanging scaffold to ascend through the hook, and in the process of ascending of the hanging scaffold, the hanging scaffold drives the two sliding blocks to slide oppositely through the inclined rod, so that the two sliding blocks respectively drive the abutting plates to slide towards the floating seat, and the two abutting plates clamp the plates on the floating seat; in the process that the two abutting plates clamp the plate on the floating seat, because the two inclined rods are equal in length, the hanging scaffold rises above the central position of the top plate, so that the two abutting plates are respectively pulled to the middle of the bearing plate at equal intervals through the inclined rods, the abutting plates at two sides can automatically clamp two sides of the lifted plate, and meanwhile, the plate can automatically slide to the central position of the floating seat under the abutting action of the abutting plates through the abutting of the lower end surfaces of the plate and the first ball, so that the center of the plate moves towards the center of the floating seat, the inclination risk of the hanging plate frame is reduced, and the plate is effectively prevented from falling from the inclined hanging plate frame;
in the process of putting plate into the bearing plate, pull out the transfer rod from the bearing plate through the gyro wheel earlier, the rethread twists the second threaded rod, make first transfer rod rebound, make the upper surface of first transfer rod be higher than the upper surface of first ball, thereby under the condition that no offset plate and roof block, be convenient for constructor is manual or put into plate to the transfer rod through fork truck on, rethread transfer rod removes, thereby bring plate into on the bearing plate, because the upper surface of first transfer rod is higher than the upper surface of first ball, so first ball can not cause the entering of plate to block, rethread twists the second threaded rod, make first transfer rod downstream, make the upper surface of first transfer rod be lower than the upper surface of first ball, thereby make plate and first ball looks butt, finally, through rotating the dog, make the dog block the handling transfer rod, avoid in-process, the transfer rod follows the interior roll-off of bearing plate.
Drawings
FIG. 1 is a schematic view showing the overall construction of a panel lifting apparatus for building construction;
fig. 2 is an exploded view of the load bearing plate.
Description of reference numerals: 1. a bearing plate; 2. a vertical rod; 3. a top plate; 4. a floating seat; 5. a first ball bearing; 6. a support bar; 7. a resisting plate; 8. slotting; 9. a slider; 10. a diagonal bar; 11. a hanging scaffold; 12. hooking; 13. a guide bar; 14. an anti-drop part; 16. a second ball bearing; 17. pulling a rope; 18. a pull ring; 19. a first baffle plate; 20. a second baffle; 21. a first threaded rod; 22. connecting ropes; 23. a transfer rod; 231. a first transfer bar; 232. a second transfer bar; 24. a roller; 25. a stopper; 26. a second threaded rod; 27. butterfly nuts.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses a panel hoisting device for building construction.
Referring to fig. 1, a plate lifting device for building construction comprises a bearing plate 1, wherein four corners of the bearing plate 1 are respectively welded with top plates 3 above the bearing plate 1 through vertical rods 2. Bearing plate 1 center department wears to establish and sliding connection has floating seat 4 along the length direction of montant 2, and the interior embedding of floating seat 4 upper surface rotates and is connected with the first ball 5 of wearing out floating seat 4 upper surface, and floating seat 4 lower surface is provided with and is used for making first ball 5 wear out the backup pad of bearing plate 1 upper surface with ground looks butt (see fig. 2). Supporting plates 7 used for sliding towards the floating seat 4 in a reciprocating mode are connected between the bearing plate 1 and the top plate 3 on two sides of the floating seat 4 in a sliding mode, dovetail grooves are formed in the bearing plate 1 and the top plate 3 along the sliding direction of the supporting plates 7 respectively, and the upper side and the lower side of the supporting plates 7 are embedded in the dovetail grooves through dovetail blocks respectively and are in sliding connection with the dovetail grooves.
Referring to fig. 1, the upper end surface of the top plate 3 is provided with a slot 8 communicated with the dovetail groove along the sliding direction of the abutting plates 7, the dovetail blocks on the two abutting plates 7 are respectively connected with the slot 8 in a sliding manner through slide blocks 9, and the two slide blocks 9 are respectively connected with isometric sway rods 10 through hinges penetrating through the slot 8. A guide rod 13 is vertically welded at the center of the top plate 3 in the slot 8, and the guide rod 13 is sleeved and connected with a hanging scaffold 11 with a hollow inner part in a sliding mode along the length direction of the guide rod. The end of the guide rod 13 away from the top plate 3 is welded with a retaining part 14, and the retaining part 14 is an iron block with a size larger than that of the guide block in the embodiment. The hanging scaffold 11 passes through the anti-falling part 14 through the connecting ropes 22, and is connected with the hook 12 above the anti-falling part 14, and the two connecting ropes 22 are symmetrical about the central line of the bearing plate 1. The hanging scaffold 11 is connected with a pull rope 17 towards the bearing plate 1, and one end of the pull rope 17 far away from the hanging scaffold 11 is provided with a pull ring 18, so that a constructor can pull the pull rope 17 downwards to pull the hanging scaffold 11 through the pull ring 18.
Referring to fig. 1, the opposite surfaces of the two abutting plates 7 are embedded and rotatably connected with second balls 16, so that the plates can slide towards the bearing plate 1 conveniently. The opposite surfaces of the two abutting plates 7 are respectively provided with a first baffle plate 19 and a second baffle plate 20 on two sides along the direction perpendicular to the sliding direction of the abutting plates 7, the first baffle plate 19 is in sliding connection with the abutting plates 7 along the direction perpendicular to the sliding direction of the abutting plates 7, and the second baffle plate 20 is welded with the abutting plates 7. A side plate is welded at one end, far away from the second baffle plate 20, of the abutting plate 7, a first threaded rod 21 which is abutted to the first baffle plate 19 is arranged on the side plate in a penetrating mode along the sliding direction of the first baffle plate 19 and in threaded connection with the abutting plate 7, and a butterfly nut 27 is welded on the first threaded rod 21.
Referring to fig. 2, a transfer rod 23 is inserted and slidably connected in the bearing plate 1 along a direction perpendicular to the sliding direction of the abutting plate 7, and one end of the transfer rod 23 penetrates through the bearing plate 1. Two transfer rods 23 are respectively arranged at two sides of the floating seat 4, and the two transfer rods 23 are connected through a connecting rod. The one end that transfer rod 23 wore out bearing plate 1 rotates and is connected with gyro wheel 24, and transfer rod 23 up end and bearing plate 1 looks parallel and level, bearing plate 1 are rotated in a side that transfer rod 23 wore out bearing plate 1 and are connected with the dog 25 that is used for the butt connecting rod. The transfer rod 23 comprises a first transfer rod 231 and a second transfer rod 232 which are arranged from top to bottom, the first transfer rod 231 is arranged in a penetrating mode and connected in the second transfer rod 232 in a sliding mode, the second transfer rod 232 is arranged in a penetrating mode and connected with a second threaded rod 26 which is connected with the first transfer rod 231 in a threaded mode, the bottom face of the second transfer rod 232 is penetrated through one end of the second threaded rod 26, and the butterfly nut 27 is welded to the bottom face of the second transfer rod 232.
The implementation process of the plate hoisting device for the house building construction in the embodiment of the application is as follows: when the plate needs to be lifted and transported, the bearing plate 1 is placed on the ground, the supporting rod 6 is abutted against the ground, and the floating seat 4 drives the first ball 5 to penetrate out of the upper surface of the bearing plate 1. Then, the stopper 25 is rotated to disengage the stopper 25 from the transfer rod 23, the transfer rod 23 is pulled out from the bearing plate 1 by the roller 24, and the second threaded rod 26 is screwed by the wing nut 27 to move the first transfer rod 231 upward, so that the upper surface of the first transfer rod 231 is higher than the upper surface of the first ball 5.
Constructor can put into panel to the transfer pole 23 on by bare-handed or through fork truck, remove transfer pole 23 again to bring panel into to the bearing plate 1 on. And then the second threaded rod 26 is screwed by the butterfly nut 27, so that the first transfer rod 231 moves downwards, the upper surface of the first transfer rod 231 is lower than the upper surface of the first ball 5, and the plate is abutted to the first ball 5. Finally, the stopper 25 blocks the transfer lever 23 by rotating the stopper 25.
The crane drives the hanging scaffold 11 to ascend through the hook 12, and in the process that the hanging scaffold 11 ascends along the length direction of the guide rod 13, the hanging scaffold 11 drives the two sliding blocks 9 to slide oppositely through the inclined rod 10, so that the two sliding blocks 9 respectively drive the abutting plates 7 to slide towards the floating seat 4, and the two abutting plates 7 clamp the plate on the floating seat 4; in the process that two support plates 7 clamp the plate on the floating seat 4, because two inclined rods 10 are equal in length, the hanging scaffold 11 rises above the central position of the top plate 3, so that the two support plates 7 are respectively drawn close to the middle of the bearing plate 1 at equal intervals through the inclined rods 10, the support plates 7 on two sides can automatically clamp two sides of the lifted plate, and meanwhile, the lower end surfaces of the plate are abutted with the first balls 5, so that the plate can automatically slide to the central position of the floating seat 4 under the abutting action of the support plates 7, and the center of the plate moves towards the center of the floating seat 4.
In the process of hoisting the plate, when the connecting rope 22 is just tightened to be straight, so that the two abutting plates 7 clamp the plate to the center of the bearing plate 1, the first threaded rod 21 is screwed, the first threaded rod 21 is abutted to the first baffle plate 19, and the first baffle plate 19 is pushed to push the plate to be abutted to the second baffle plate 20, so that four side surfaces of the plate are blocked. Meanwhile, in the process of hoisting the plate, the floating seat 4 can automatically fall off and be separated from the support of the plate under the action of the support rod 6 which is short of the ground, so that the plate can slide downwards to the bearing plate 1 through the second ball 16 under the condition that the support plate 7 is clamped, and the bearing plate 1 can continuously provide supporting force for the plate.
After handling panel to construction position, through pull ring 18 pulling stay cord 17, stay cord 17 pulling platform sling 11 slides downwards along the length direction of guide bar 13 to make down tube 10 drive two and support the slip of board 7 back of the body mutually through slider 9, thereby break away from the butt to panel, the constructor of being convenient for takes out panel.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (6)

1. A plate hoisting device for building construction is characterized in that: the lifting device comprises a bearing plate (1), wherein a top plate (3) is connected to the bearing plate (1) through a vertical rod (2), a floating seat (4) is arranged at the center of the bearing plate (1) in a penetrating manner and connected in a sliding manner along the length direction of the vertical rod (2), a first ball (5) penetrating out of the upper surface of the floating seat (4) is embedded in the upper surface of the floating seat (4) in a rotating manner, a support rod (6) used for abutting against the ground to enable the first ball (5) to penetrate out of the upper surface of the bearing plate (1) is arranged on the lower surface of the floating seat (4), two abutting plates (7) used for sliding towards the floating seat (4) are connected between the bearing plate (1) and the top plate (3) in a sliding manner on two sides of the floating seat (4), a slot (8) is arranged on the top plate (3) along the sliding direction of the abutting plates (7), the two abutting plates (7) are respectively connected with the slot (8) in a sliding manner through sliding blocks (9), the two sliding blocks (9) penetrate out of the sliding blocks (8) and are connected with an inclined rod (10) with a hanging disc (11), and one end of each inclined rod (10) far away from the hanging disc (11), and are connected with a hanging disc (11) which is connected with a hanging disc (11);
a first baffle plate (19) and a second baffle plate (20) are respectively arranged on two opposite sides of two abutting plates (7) along the direction perpendicular to the sliding direction of the abutting plates (7), the first baffle plate (19) is in sliding connection with the abutting plates (7) along the direction perpendicular to the sliding direction of the abutting plates (7), the second baffle plate (20) is fixedly connected with the abutting plates (7), and the abutting plates (7) are in threaded connection with first threaded rods (21) abutting against the first baffle plates (19) along the sliding direction of the first baffle plates (19);
wear to establish and sliding connection has transfer pole (23) along perpendicular to support board (7) slip direction in bearing plate (1), transfer pole (23) one end is worn out bearing plate (1), one end that bearing plate (1) was worn out in transfer pole (23) is rotated and is connected with gyro wheel (24), transfer pole (23) up end and bearing plate (1) looks parallel and level, bearing plate (1) is worn out a side rotation that bearing plate (1) was worn out in transfer pole (23) and is connected with dog (25) that are used for butt transfer pole (23), transfer pole (23) are including first transfer pole (231) and second transfer pole (232) that from top to bottom set up, first transfer pole (231) wear to establish and sliding connection in second transfer pole (232), second transfer pole (232) wear to establish and threaded connection have with second threaded rod (26) of first transfer pole (231) lower bottom surface looks butt, second threaded rod (26) one end is worn out the lower bottom surface of second transfer pole (232).
2. A panel lifting device for building construction according to claim 1, wherein: the vertical guide bar (13) that is provided with in the center of roof (3) in fluting (8), the inside cavity of hanging scaffold (11) and cover locate outside guide bar (13) and with guide bar (13) sliding connection, the one end that roof (3) were kept away from in guide bar (13) is provided with anticreep portion (14), hanging scaffold (11) are passed anticreep portion (14) through connecting rope (22) and are linked to each other with couple (12) in the top of anticreep portion (14).
3. A panel lifting device for building construction according to claim 1, wherein: and a second ball (16) is embedded in one surface of the two abutting plates (7) opposite to each other and is connected with the abutting plates in a rotating way.
4. A panel lifting device for building construction according to claim 2, wherein: the hanging scaffold (11) is connected with a pull rope (17) towards the bearing plate (1).
5. A panel lifting device for building construction according to claim 4, wherein: and one end of the pull rope (17) far away from the hanging scaffold (11) is provided with a pull ring (18).
6. A panel lifting device for building construction according to claim 1, wherein: and butterfly nuts (27) are arranged on the first threaded rod (21) and the second threaded rod (26).
CN202010808189.2A 2020-08-12 2020-08-12 Plate hoisting device for building construction Active CN111943025B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010808189.2A CN111943025B (en) 2020-08-12 2020-08-12 Plate hoisting device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010808189.2A CN111943025B (en) 2020-08-12 2020-08-12 Plate hoisting device for building construction

Publications (2)

Publication Number Publication Date
CN111943025A CN111943025A (en) 2020-11-17
CN111943025B true CN111943025B (en) 2023-03-24

Family

ID=73333364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010808189.2A Active CN111943025B (en) 2020-08-12 2020-08-12 Plate hoisting device for building construction

Country Status (1)

Country Link
CN (1) CN111943025B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112719868B (en) * 2020-12-25 2022-10-28 南充市嘉恒建设工程质量检测有限公司 Anti-permeability apparatus dismounting device
CN113173494B (en) * 2021-05-17 2022-07-29 中建四局第三建设有限公司 Plate lifting equipment for building construction

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106364831B (en) * 2016-09-29 2018-06-19 三峡大学 A kind of high position cargo fetching device
CN107499802B (en) * 2017-08-10 2019-04-30 徐州德坤电气科技有限公司 A kind of application method of the logistics code fetch vehicle suitable for freight container
CN107697796A (en) * 2017-11-06 2018-02-16 黄石市华天自动化设备有限公司 A kind of movable suspender
CN108408354A (en) * 2018-05-15 2018-08-17 连云港森福木业有限公司 Plank and timber transfer carriage
CN110077951B (en) * 2019-04-10 2020-09-11 五冶集团上海有限公司 Plate hoisting device for building construction
CN110316652B (en) * 2019-05-10 2020-07-24 郑州铁路职业技术学院 Railway freight lifting device

Also Published As

Publication number Publication date
CN111943025A (en) 2020-11-17

Similar Documents

Publication Publication Date Title
CN111943025B (en) Plate hoisting device for building construction
CN110077951B (en) Plate hoisting device for building construction
CN114538274A (en) Pole hoist and mount fixture
CN210480708U (en) Automatic rope arranging device for coal mine winch
CN210103356U (en) Device for safely and quickly transferring CCTV robot into pipeline
CN210480714U (en) Pipeline lifting device for construction
CN105819321B (en) A kind of anti-skidding clamping device of mine hoist
CN202346582U (en) Large diameter steel bar hoisting clamp
CN201495028U (en) Horizontal hoisting tool for large-tonnage concrete segments of tunnel
CN209839329U (en) Support frame is used in water supply pipe installation
CN215331379U (en) Elevator shaft lifting operation platform
CN113006726A (en) Adjustable lifting device for rapidly grabbing and dragging reinforcement cage in slurry hole
CN209740488U (en) Special electric lifting appliance for cold-rolled roller
CN213294483U (en) Novel portable high-rise hoisting machine
CN218320183U (en) Aluminum coil crane bearing frame
CN210825115U (en) Plane materiel conveying device in high-altitude installation operation
CN220578727U (en) Steel plate clamp lifting appliance convenient for hooking
CN218786497U (en) Roof steel structure vertical transportation device
CN220363377U (en) Hanging material carrying device for construction
CN217756517U (en) Metallurgical crane
CN218754637U (en) Tilting building keel hoist and mount pulley gear
CN215854603U (en) Rotatable lifting sling
CN116986493B (en) Crane
CN215626385U (en) Curtain wall unit body hoisting system
CN217128914U (en) A material promotes hanging flower basket for building engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant