CN111850229A - 一种转炉炉衬装料侧的维护方法 - Google Patents
一种转炉炉衬装料侧的维护方法 Download PDFInfo
- Publication number
- CN111850229A CN111850229A CN202010606361.6A CN202010606361A CN111850229A CN 111850229 A CN111850229 A CN 111850229A CN 202010606361 A CN202010606361 A CN 202010606361A CN 111850229 A CN111850229 A CN 111850229A
- Authority
- CN
- China
- Prior art keywords
- converter
- waste
- furnace
- materials
- filled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/28—Manufacture of steel in the converter
- C21C5/42—Constructional features of converters
- C21C5/44—Refractory linings
- C21C5/441—Equipment used for making or repairing linings
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Carbon Steel Or Casting Steel Manufacturing (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
本发明提供了一种转炉炉衬装料侧的维护方法,包括以下步骤:(1)废砖准备;(2)修补料准备;(3)废砖及修补料装入废钢槽;(4)转炉出钢结束后将炉内炉渣全部倒尽,然后将装有废砖和修补料的废钢槽吊起,快速将物料加入炉内;(5)快速来回摇炉,使物料摊平在所需填补的位置;(6)使用煤气喷枪点火对填补位置的物料进行静置烘烤烧结。本发明的目的是提供一种转炉砖料混补炉衬装料侧的维护方法,达到较单一材料补炉方法更适应各种侵蚀严重的炉况,维护效率更高,以适应转炉高强度冶炼的需要。
Description
技术领域
本发明属于转炉炼钢技术领域,涉及一种转炉炉衬装料侧的维护方法。
背景技术
由于转炉炉衬工作条件恶劣,尤其是目前“低铁耗”模式下,废钢加入比例大,终点氧含量高的情况下,加废钢、兑铁水时对炉衬的冲击及机械磨损造成炉衬剥落,冶炼过程炉气的冲刷,倒渣时高温钢水的侵蚀等,尤其是炉衬装料侧受损更为严重。维护好转炉炉衬,对提升钢水质量、降低生产成本、利于生产组织有着重要意义。
除正常冶炼护炉、溅渣护炉的手段外,需要通过有效的补炉的方式,来对受损的炉衬进行修补,以满足生产的需要。目前常规的炉衬维护方法有湿法喷补(喷补料)及干法垫补(大面料)等。以上常规方法耗时长(60分钟以上)且维护后耐侵蚀性相对较差(维护后一般生产12h左右就会被完全冲刷干净),造成维护效率低。
发明内容
本发明的目的是提供一种转炉砖料混补炉衬装料侧的维护方法,达到较单一材料补炉方法更适应各种侵蚀严重的炉况,维护效率更高,以适应转炉高强度冶炼的需要。
为了实现上述发明目的,本发明提供以下技术方案。
一种转炉炉衬装料侧的维护方法,包括以下步骤:
(1)废砖准备:废砖为拆除钢水罐的废旧内衬料, 材质为镁碳钢包砖,重量百分组成为MgO=74%~80%,C=6%~14%,废砖大小不超过150mm×150mm×100mm,干燥;
(2)修补料准备:修补料为转炉大面用修补料, 干燥粉末状,重量百分组成为MgO=70%~76%,C=6%~14%,SiO2=0.1%~4%,用量为步骤(1)中废砖的1.0~1.5倍;
(3)废砖及修补料装入废钢槽;
(4)转炉出钢结束后将炉内炉渣倒尽,然后将装有废砖和修补料的废钢槽吊起,快速将物料加入炉内;
(5)快速来回摇炉,使物料摊平在所需填补的位置,摇炉角度为0°~90°,摇炉时间50~70s。
(6)使用煤气喷枪点火对填补位置的物料进行静置烘烤烧结50~70min。
与现有技术的普通维护方法相比,本发明通过转炉出钢结束将炉渣全部倒掉后,快速将废砖及修补料使用废钢槽加入炉内,然后来回摇炉将物料摊平在所需填补的位置,最后使用煤气喷枪点火对填补位置的物料进行静置烘烤烧结。较传统炉衬维护方法在物料上不同,时间上不会额外占用,维护效果明显提升,可有效降低维护次数,提升生产效率。
具体实施方式
下面结合实施案例进一步描述。
实施例1:出尽钢后不进行溅渣护炉,将炉渣倒尽。提前准备废砖1t及修补料1.5t的废钢槽吊运至炉前。转炉摇炉摇至炉前50°,使用天车挂槽将废砖及修补料一起加入转炉内;废钢槽退出后,快速来回在0°~90°之间摇炉,使转炉修补料熔化,带动废砖填入转炉装料侧的凹坑处,待加入的物料基本摊平在装料侧所需填补的位置后将转炉停在90°静置。此时炉内废砖被修补料覆盖大部分,补炉厚度约为200mm~500mm。将煤气喷枪点火后从炉口伸入炉内,使火焰正对物料摊平位置进行烧结,烧结时间60分钟后,关煤气喷枪气体后,转炉恢复正常生产。煤气喷枪使用的气体为焦炉煤气。
实施例2:转炉遇检修时,炉口朝前不动炉大于1.5小时。出尽钢后不进行溅渣护炉,将炉渣倒尽。准备好废砖2t及修补料3t,加入空废钢槽内。转炉摇炉摇至炉前50°,使用天车挂槽将废砖及修补料一起加入转炉内;废钢槽退出后,快速来回在0°~90°之间摇炉,使转炉修补料熔化,带动废砖填入转炉装料侧的凹坑处,待加入的物料基本摊平在装料侧所需填补的位置后将转炉停在90°静置。此时炉内废砖被修补料覆盖大部分,补炉厚度约为200mm~600mm。将煤气喷枪点火后从炉口伸入炉内,使火焰正对物料摊平位置进行烧结,烧结保温1.5小时或至检修结束,关煤气喷枪气体后,转炉恢复正常生产。煤气喷枪使用的气体为焦炉煤气。
理化指标如表1、表2、表3。
表1 废镁碳钢包砖理化指标
表2 转炉修补料理化指标
表3 转炉镁碳砖理化指标(GB/T 22589—2017)
Claims (1)
1.一种转炉炉衬装料侧的维护方法,其特征在于包括以下步骤:
(1)废砖准备:废砖为拆除钢水罐的废旧内衬料, 材质为镁碳钢包砖,重量百分组成为MgO=74%~80%,C=6%~14%,废砖大小不超过150mm×150mm×100mm,干燥;
(2)修补料准备:修补料为转炉大面用修补料, 干燥粉末状,重量百分组成为MgO=70%~76%,C=6%~14%,SiO2=0.1%~4%,用量为步骤(1)中废砖的1.0~1.5倍;
(3)废砖及修补料装入废钢槽;
(4)转炉出钢结束后将炉内炉渣倒尽,然后将装有废砖和修补料的废钢槽吊起,快速将物料加入炉内;
(5)快速来回摇炉,使物料摊平在所需填补的位置,摇炉角度为0°~90°,摇炉时间50~70s;
(6)使用煤气喷枪点火对填补位置的物料进行静置烘烤烧结50~70min。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010606361.6A CN111850229A (zh) | 2020-06-29 | 2020-06-29 | 一种转炉炉衬装料侧的维护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010606361.6A CN111850229A (zh) | 2020-06-29 | 2020-06-29 | 一种转炉炉衬装料侧的维护方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111850229A true CN111850229A (zh) | 2020-10-30 |
Family
ID=72988685
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010606361.6A Pending CN111850229A (zh) | 2020-06-29 | 2020-06-29 | 一种转炉炉衬装料侧的维护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111850229A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114657320A (zh) * | 2022-03-30 | 2022-06-24 | 马鞍山钢铁股份有限公司 | 一种转炉耳轴区炉衬侵蚀部位维护方法及维护后的使用方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59222515A (ja) * | 1983-05-30 | 1984-12-14 | Nippon Steel Corp | 転炉の補修方法 |
CN106747500A (zh) * | 2016-12-07 | 2017-05-31 | 钢城集团凉山瑞海实业有限公司 | 转炉大面自流修补料及其制备方法 |
CN109136458A (zh) * | 2018-10-26 | 2019-01-04 | 山东钢铁集团日照有限公司 | 一种转炉速效补炉法 |
CN109593909A (zh) * | 2019-01-15 | 2019-04-09 | 华北理工大学 | 利用废弃镁碳砖对转炉进行修补的方法 |
-
2020
- 2020-06-29 CN CN202010606361.6A patent/CN111850229A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59222515A (ja) * | 1983-05-30 | 1984-12-14 | Nippon Steel Corp | 転炉の補修方法 |
CN106747500A (zh) * | 2016-12-07 | 2017-05-31 | 钢城集团凉山瑞海实业有限公司 | 转炉大面自流修补料及其制备方法 |
CN109136458A (zh) * | 2018-10-26 | 2019-01-04 | 山东钢铁集团日照有限公司 | 一种转炉速效补炉法 |
CN109593909A (zh) * | 2019-01-15 | 2019-04-09 | 华北理工大学 | 利用废弃镁碳砖对转炉进行修补的方法 |
Non-Patent Citations (2)
Title |
---|
刘文戈: "转炉快补料的研制与使用", 《武汉工程职业技术学院学报》 * |
彭学峰等: "基于废旧镁碳砖的转炉热态修补料的研制与应用", 《耐火材料》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114657320A (zh) * | 2022-03-30 | 2022-06-24 | 马鞍山钢铁股份有限公司 | 一种转炉耳轴区炉衬侵蚀部位维护方法及维护后的使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109136458B (zh) | 一种转炉速效补炉法 | |
CN107352977A (zh) | 一种钢包用渣线砖及制备方法 | |
CN109593909B (zh) | 利用废弃镁碳砖对转炉进行修补的方法 | |
CN112409002B (zh) | 一种碳含量大于40%的超高碳镁碳砖及其制备方法 | |
CN106282480A (zh) | 大型转炉炉衬及砌筑方法 | |
CN109678470A (zh) | 一种修补转炉炉衬用的镁质材料及其制备、使用方法 | |
CN112794700A (zh) | 一种转炉修补料及其生产方法 | |
CN112408947A (zh) | 一种钢包用耐高温涂料及制备方法 | |
CN110643780A (zh) | 一种转炉炉底修补方法 | |
CN111004022A (zh) | 半钢罐渣线修补料及其制备方法 | |
CN110317921B (zh) | 一种转炉出钢口的快换方法 | |
CN111850229A (zh) | 一种转炉炉衬装料侧的维护方法 | |
CN114438276A (zh) | 一种缩短转炉冶炼周期的方法 | |
CN113930577A (zh) | 一种炉龄后期转炉炉衬的维护方法 | |
CN112226565B (zh) | 一种熔融还原工艺的快速启动方法 | |
CN101423409B (zh) | 脱硫铁水罐用铝碳衬砖及其生产工艺 | |
CN106977187A (zh) | 矿热炉、铸造用多功能可塑料及其制备方法 | |
CN112408999A (zh) | 一种环境节约型连铸中间包用干式料及其制备方法 | |
CN106995866A (zh) | 一种低成本高效转炉补炉工艺 | |
CN110184406A (zh) | 一种提高废钢加入比的炼钢方法 | |
CN114657320A (zh) | 一种转炉耳轴区炉衬侵蚀部位维护方法及维护后的使用方法 | |
CN114195483A (zh) | 一种矿热炉用补炉料及其施工方法 | |
CN111792920A (zh) | 一种新型环保型转炉快速修补料 | |
CN115323108B (zh) | 一种缩短电炉高铁水比冶炼周期的方法 | |
CN110627485A (zh) | 高隔热钢包砖 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20201030 |
|
WD01 | Invention patent application deemed withdrawn after publication |