CN111827374A - 辅助延伸测量逆作法钢柱垂直度的施工方法 - Google Patents
辅助延伸测量逆作法钢柱垂直度的施工方法 Download PDFInfo
- Publication number
- CN111827374A CN111827374A CN202010684066.2A CN202010684066A CN111827374A CN 111827374 A CN111827374 A CN 111827374A CN 202010684066 A CN202010684066 A CN 202010684066A CN 111827374 A CN111827374 A CN 111827374A
- Authority
- CN
- China
- Prior art keywords
- steel column
- measuring
- measuring line
- connecting rod
- perpendicularity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/12—Instruments for setting out fixed angles, e.g. right angles
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C9/00—Measuring inclination, e.g. by clinometers, by levels
- G01C9/12—Measuring inclination, e.g. by clinometers, by levels by using a single pendulum plumb lines G01C15/10
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明提供了一种辅助延伸测量逆作法钢柱的垂直度的施工方法,通过以下步骤实施:S1,制作测量支架以及两个托架,托架中心设有圆孔;S2,在钢柱底部安装一个托架,从钢柱托架的圆孔内穿过测量线并进行绑扎,在钢柱顶部安装另一个托架,将测量线从圆孔内穿出,穿出后的测量线缠绕在连接杆上;S3,安装钢柱,将钢柱上部卡在操作平台上,安装完成后在操作平台上架设测量支架,将连接杆从钢柱顶部上移,两端搭在测量支架顶部,通过连接杆绷紧测量线;S4,移动连接杆,使测量线与圆孔壁不接触,直到测量线与钢柱顶面的圆心重合;S5,对测量线的垂直度进行测量,即为钢柱整体的垂直度。本发明步骤简单,材料易得且周转方便,安全经济。
Description
技术领域
本发明属于建筑施工领域,具体而言,涉及一种辅助延伸测量逆作法钢柱垂直度的施工方法
,用于在多层地下室全逆作法钢柱施工时测量钢柱垂直度。
背景技术
逆作法施工多层地下室是一种从-1层顶板开始施工楼板然后再往地下施工的施工方式,该种施工方式可以以最快的速度施工完顶板结构,这在施工-1层顶板为道路时非常高效,能够快速恢复交通。然而,逆作法施工中钢柱需要安装在泥浆护壁成孔孔灌注桩的孔内,换言之孔内全是粘稠的泥浆,通过常规测量方法无法观测到钢柱,钢柱的垂直度同样也无法获得。
发明内容
针对上述技术问题,本发明提供了一种辅助延伸测量逆作法钢柱的垂直度的施工方法,解决了施工过程钢柱在泥浆中无法测量的技术难题。
本发明采用如下技术方案:
一种辅助延伸测量逆作法钢柱的垂直度的施工方法,通过以下步骤来实施:
S1,制作测量支架以及两个托架,托架的中心设有圆孔,圆孔的圆心与钢柱底面和顶面的圆心重合;
S2,在钢柱底部安装一个托架,从钢柱托架的圆孔内穿过测量线并进行绑扎,在钢柱顶部安装另一个托架,将测量线从圆孔内穿出,穿出后的测量线缠绕在连接杆上;
S3,安装钢柱,将钢柱上部卡在操作平台上,安装完成后在操作平台上架设测量支架,将连接杆从钢柱顶部上移,两端搭在测量支架顶部,通过连接杆绷紧测量线;
S4,移动连接杆,使测量线与圆孔壁不接触,直到测量线与钢柱顶面的圆心重合为止;
S5,对测量线的垂直度进行测量,即为钢柱整体的垂直度。
采用本发明的技术方案的优点在于:由于测量时使测量线与钢柱顶面和底面中心的连线重合,通过获得测量线的垂直度即可得出钢柱的垂直度,施工步骤简单,材料易得且周转方便,达到了安全、经济的目的。
进一步的,托架由两个以上槽钢类结构构成,槽钢类结构的底部横板中心重合地组装在一起。
附图说明
图1是利用本发明的方法测量钢柱垂直度的立面图;
图2是测量支架的结构示意图;
图3是托架的结构示意图;
图4是钢柱安装准备工作示意图;
图5是钢柱底部安装底部托架和测量线的结构示意图;
图6是钢柱顶部安装顶部托架和测量线的结构示意图;
图7是测量线在钢柱顶部调整位置的局部放大图;
图中:1-钢柱;2-底部托架;3-测量线;4-顶部托架;5-测量支架;6-操作平台;7-连接杆;8-圆孔。
具体实施方式
下面将结合附图和具体实施来进一步描述本发明。应当理解,以下描述仅用于清楚地说明本发明,而非对其进行限制。
参考图1至图7,一种辅助延伸测量逆作法钢柱的垂直度的施工方法,通过以下步骤来实施:
S1,使用方管加工一个4米高的测量支架5,测量支架5顶部平面与水平面平行,如图2所示;使用钢板加工两个结构相同的托架,即底部托架2和顶部托架4,每个托架由两个槽钢类结构组成,槽钢类结构的底面横板中心重合地焊接在一起组成十字形结构,十字形托架形成的内部空间的直径与钢柱1的外管径匹配,在重合的中心处钻直径为5mm的圆孔8,如图3所示;当托架放置到钢柱1上后,圆孔8的圆心与钢柱1的圆心重合。本实施例中,槽钢类结构的数量不限于两个。本文的托架也可采用其他形式,例如,一端封闭另一端开口的空心圆筒,圆筒的内径与钢柱的外径匹配,圆筒的圆心处设置圆孔。
S2,在钢柱1底部安装底部托架2,槽钢类结构开口朝上从底部兜住钢柱1,从底部托架2中心的圆孔内穿过测量线3并进行绑扎,使得当测量线3上端受力时,测量线3下端处于钢柱1底面的圆心处,如图5所示,由于本发明中需要测量线3具有较高强度,测量线3采用钢线;在钢柱1顶部安装顶部托架4,槽钢类结构开口朝下扣在钢柱1顶部,将测量线3从圆孔内穿出,穿出后的测量线3缠绕在连接杆7上,缠绕的长度大于等于测量支架5的高度,如图6所示,此时钢柱整体处于安装准备状态,如图4所示。
S3,安装钢柱1,将钢柱1上部卡在操作平台6的安装孔上,安装完成后在操作平台6上方架设测量支架5,测量支架5位于钢柱1的正上方,将连接杆7上缠绕的测量绳3松开,使连接杆7的两端搭在测量支架顶部,通过连接杆7卷绕绷紧测量线3。
S4,移动连接杆7,观测钢柱1内的测量线3和钢柱1中心处的圆孔8的相对位置,当测量绳3在圆孔8中心处与圆孔内壁距离相等时停止移动连接杆7,如图7所示,此时测量线3与钢柱1顶面的圆心重合。
S5,当测量线3底部和顶部与钢柱1底部和顶部的圆心重合时,测量线3的垂直度即可反映钢柱1的垂直度,对测量线3的垂直度进行测量,即为钢柱1整体的垂直度。
本发明很好的解决了多层地下室逆作法施工时,钢柱安装后孔中全是粘稠的泥浆,常规测量方法无法观测到钢柱垂直度的施工难点,施工步骤简单安全,具有良好的实用价值。
以上所述仅是本发明的优选实施方式。本领域技术人员可以在不脱离本发明的思想和范围的条件下做出各种修改和等同变化,这些修改和变化均涵盖在本发明的范围内。
Claims (2)
1.一种辅助延伸测量逆作法钢柱的垂直度的施工方法,其特征在于,通过以下步骤来实施:
S1,制作测量支架以及两个托架,托架的中心设有圆孔,圆孔的圆心与钢柱底面和顶面的圆心重合;
S2,在钢柱底部安装一个托架,从钢柱托架的圆孔内穿过测量线并进行绑扎,在钢柱顶部安装另一个托架,将测量线从圆孔内穿出,穿出后的测量线缠绕在连接杆上;
S3,安装钢柱,将钢柱上部卡在操作平台上,安装完成后在操作平台上架设测量支架,将连接杆从钢柱顶部上移,两端搭在测量支架顶部,通过连接杆绷紧测量线;
S4,移动连接杆,使测量线与圆孔壁不接触,直到测量线与钢柱顶面的圆心重合为止;
S5,对测量线的垂直度进行测量,即为钢柱整体的垂直度。
2.一种如权利要求1所述的辅助延伸测量逆作法钢柱的垂直度的施工方法,其特征在于,托架是由两个以上槽钢类结构构成,槽钢类结构的底部横板中心重合地组装在一起。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010684066.2A CN111827374A (zh) | 2020-07-16 | 2020-07-16 | 辅助延伸测量逆作法钢柱垂直度的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010684066.2A CN111827374A (zh) | 2020-07-16 | 2020-07-16 | 辅助延伸测量逆作法钢柱垂直度的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111827374A true CN111827374A (zh) | 2020-10-27 |
Family
ID=72924270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010684066.2A Withdrawn CN111827374A (zh) | 2020-07-16 | 2020-07-16 | 辅助延伸测量逆作法钢柱垂直度的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111827374A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114000532A (zh) * | 2021-11-17 | 2022-02-01 | 中国二十冶集团有限公司 | 一种杯口基础方形钢柱的安装定位方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201005154A (en) * | 2008-07-21 | 2010-02-01 | jun-wen Wang | Measuring and positioning method of top-down construction steel column and structure thereof |
CN203583497U (zh) * | 2013-12-02 | 2014-05-07 | 中建八局第二建设有限公司 | 一种逆作钢管柱垂直度校正装置 |
CN104453250A (zh) * | 2014-10-28 | 2015-03-25 | 中国二十二冶集团有限公司 | 钢管混凝土柱全逆作的施工方法 |
CN209353341U (zh) * | 2018-11-20 | 2019-09-06 | 中建八局第三建设有限公司 | 一种逆作法一柱一桩中钢柱的定位、校正装置 |
CN210346708U (zh) * | 2019-07-30 | 2020-04-17 | 北京首钢建设集团有限公司 | 一种钢柱安装的测量装置 |
-
2020
- 2020-07-16 CN CN202010684066.2A patent/CN111827374A/zh not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201005154A (en) * | 2008-07-21 | 2010-02-01 | jun-wen Wang | Measuring and positioning method of top-down construction steel column and structure thereof |
CN203583497U (zh) * | 2013-12-02 | 2014-05-07 | 中建八局第二建设有限公司 | 一种逆作钢管柱垂直度校正装置 |
CN104453250A (zh) * | 2014-10-28 | 2015-03-25 | 中国二十二冶集团有限公司 | 钢管混凝土柱全逆作的施工方法 |
CN209353341U (zh) * | 2018-11-20 | 2019-09-06 | 中建八局第三建设有限公司 | 一种逆作法一柱一桩中钢柱的定位、校正装置 |
CN210346708U (zh) * | 2019-07-30 | 2020-04-17 | 北京首钢建设集团有限公司 | 一种钢柱安装的测量装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114000532A (zh) * | 2021-11-17 | 2022-02-01 | 中国二十冶集团有限公司 | 一种杯口基础方形钢柱的安装定位方法 |
CN114000532B (zh) * | 2021-11-17 | 2023-02-21 | 中国二十冶集团有限公司 | 一种杯口基础方形钢柱的安装定位方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102535529A (zh) | 自平衡法桩基承载力试验装置施工方法 | |
CN102493471B (zh) | 结构地脚锚栓悬空安装施工工艺方法 | |
CN107817162B (zh) | 一种扩大头非金属抗浮锚杆快速拉拔试验方法 | |
CN107621412B (zh) | 一种扩大头非金属抗浮锚杆快速拉拔试验装置 | |
CN101942833A (zh) | 无骨架无粘结后张预应力抗拔灌注桩及其施工方法 | |
CN204001428U (zh) | 一种大直径钢管柱柱脚安装预埋定位结构及其柱脚结构 | |
CN108316290B (zh) | 无承台的一柱一桩结构及其施工方法 | |
CN111827374A (zh) | 辅助延伸测量逆作法钢柱垂直度的施工方法 | |
CN114737602A (zh) | 用于地铁车站盖挖逆作钢管混凝土中柱定位方法 | |
CN113737776B (zh) | 一种海相深厚淤泥质土条件下超长钢管桩及其施工方法 | |
CN113605377A (zh) | 一种岩石地层超深钢管柱与抗拔桩联合施工工艺 | |
CN113047437A (zh) | 一种混凝土串桶结构及钢管混凝土浇筑施工方法 | |
CN105347142A (zh) | 一种施工升降机安装在地下室顶板上的穿板安装方法 | |
CN104018682B (zh) | 基于实现工地上钢骨柱拼接的方法 | |
CN111021343A (zh) | 立柱桩的施工方法 | |
CN206144464U (zh) | 用于提高潜水钻机垂直度的控制装置 | |
CN106013096A (zh) | 一种建筑基础施工方法 | |
CN114277786A (zh) | 高强混凝土承载体、压力型抗浮桩及构建方法 | |
JP6703466B2 (ja) | 充填材漏れ防止治具および同治具を用いた合成杭の製造方法 | |
CN205475849U (zh) | 一种钢结构建筑装配式预制混凝土剪力墙 | |
CN108560566A (zh) | 组合式可回收钢管柱及其深基坑支护方法 | |
KR101701495B1 (ko) | 수직, 수평 보강재를 갖는 각형강관 기둥을 이용한 탑다운공법 | |
CN209990019U (zh) | 一种简易拼装式钢管混凝土柱脚 | |
CN204001427U (zh) | 一种钢管柱柱脚安装用定位环板的预埋定位支撑结构 | |
CN112281821A (zh) | 一种钻孔灌注桩施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20201027 |