CN108560566A - 组合式可回收钢管柱及其深基坑支护方法 - Google Patents
组合式可回收钢管柱及其深基坑支护方法 Download PDFInfo
- Publication number
- CN108560566A CN108560566A CN201810670254.2A CN201810670254A CN108560566A CN 108560566 A CN108560566 A CN 108560566A CN 201810670254 A CN201810670254 A CN 201810670254A CN 108560566 A CN108560566 A CN 108560566A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- clip
- lower section
- upper segment
- linking beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 139
- 239000010959 steel Substances 0.000 title claims abstract description 139
- 238000000034 method Methods 0.000 title claims description 18
- 238000010276 construction Methods 0.000 claims abstract description 34
- 238000013461 design Methods 0.000 claims description 23
- 238000005553 drilling Methods 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 4
- 238000005516 engineering process Methods 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 238000005259 measurement Methods 0.000 claims description 3
- 230000010412 perfusion Effects 0.000 claims description 3
- 238000012797 qualification Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 239000011435 rock Substances 0.000 claims description 3
- 230000007704 transition Effects 0.000 claims description 3
- 241000826860 Trapezium Species 0.000 claims 1
- 210000003205 muscle Anatomy 0.000 claims 1
- 238000004064 recycling Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 2
- 241000233855 Orchidaceae Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810670254.2A CN108560566A (zh) | 2018-06-26 | 2018-06-26 | 组合式可回收钢管柱及其深基坑支护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810670254.2A CN108560566A (zh) | 2018-06-26 | 2018-06-26 | 组合式可回收钢管柱及其深基坑支护方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108560566A true CN108560566A (zh) | 2018-09-21 |
Family
ID=63554488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810670254.2A Pending CN108560566A (zh) | 2018-06-26 | 2018-06-26 | 组合式可回收钢管柱及其深基坑支护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108560566A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610469A (zh) * | 2018-11-30 | 2019-04-12 | 中铁十六局集团地铁工程有限公司 | 一种装配式钢管混凝土支撑及施工方法 |
CN109779382A (zh) * | 2019-03-18 | 2019-05-21 | 国网上海市电力公司 | 一种用于钢管杆施工的可伸缩独脚抱杆组件 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733398A (zh) * | 2012-07-19 | 2012-10-17 | 上海新强劲工程技术有限公司 | 一种组合式可回收的基坑支护内支撑立柱 |
CN105484285A (zh) * | 2015-11-27 | 2016-04-13 | 中国一冶集团有限公司 | 一种拼装钢管混凝土柱式高承台塔吊基础结构及施工方法 |
CN206477451U (zh) * | 2017-01-07 | 2017-09-08 | 中铁十五局集团第五工程有限公司 | 钢管柱与结构梁的连接结构 |
CN107460953A (zh) * | 2017-09-20 | 2017-12-12 | 沈阳建筑大学 | 一种中空钢管混凝土叠合柱与钢筋混凝土梁连接节点 |
CN208517947U (zh) * | 2018-06-26 | 2019-02-19 | 中铁十八局集团第三工程有限公司 | 组合式可回收钢管柱 |
-
2018
- 2018-06-26 CN CN201810670254.2A patent/CN108560566A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733398A (zh) * | 2012-07-19 | 2012-10-17 | 上海新强劲工程技术有限公司 | 一种组合式可回收的基坑支护内支撑立柱 |
CN105484285A (zh) * | 2015-11-27 | 2016-04-13 | 中国一冶集团有限公司 | 一种拼装钢管混凝土柱式高承台塔吊基础结构及施工方法 |
CN206477451U (zh) * | 2017-01-07 | 2017-09-08 | 中铁十五局集团第五工程有限公司 | 钢管柱与结构梁的连接结构 |
CN107460953A (zh) * | 2017-09-20 | 2017-12-12 | 沈阳建筑大学 | 一种中空钢管混凝土叠合柱与钢筋混凝土梁连接节点 |
CN208517947U (zh) * | 2018-06-26 | 2019-02-19 | 中铁十八局集团第三工程有限公司 | 组合式可回收钢管柱 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610469A (zh) * | 2018-11-30 | 2019-04-12 | 中铁十六局集团地铁工程有限公司 | 一种装配式钢管混凝土支撑及施工方法 |
CN109779382A (zh) * | 2019-03-18 | 2019-05-21 | 国网上海市电力公司 | 一种用于钢管杆施工的可伸缩独脚抱杆组件 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107299643B (zh) | 一种基坑内钢格构柱复合式塔吊基础结构及施工方法 | |
CN105256812B (zh) | 基坑预制装配式混凝土支撑结构及其施工方法 | |
CN106013052A (zh) | 钢板桩与沉井组合式地下停车库及其施工方法 | |
CN105863042A (zh) | 一种全钢结构建筑及其施工方法 | |
CN104264683B (zh) | 三面环绕文保建筑凹字形超深基坑分区支护方法 | |
CN110439590A (zh) | 隧道施工方法 | |
CN111622268B (zh) | 基于电力管廊下穿大型刚性箱涵的保护施工方法 | |
JP2016199929A (ja) | 橋梁構築方法、橋梁構築方法で用いる柱体及びガイド手段 | |
CN107355008B (zh) | 一种新增钢管混凝土柱与既有结构的预制连接结构及方法 | |
CN103174132A (zh) | 一种城市地下工程暗挖导洞内小直径桩施工方法 | |
CN108560566A (zh) | 组合式可回收钢管柱及其深基坑支护方法 | |
CN103174131A (zh) | 地下工程暗挖导洞小直径桩施工成套设备系统 | |
CN109056710B (zh) | 一种硬质地层钢管桩及其施工方法 | |
CN108360535A (zh) | 基于排桩与内支撑的基坑支护结构及其施工方法 | |
CN208517947U (zh) | 组合式可回收钢管柱 | |
CN218757453U (zh) | 一种桩基施工用护筒装置 | |
CN110029653B (zh) | 一种抛石海床地基钢管桩基础处理方法 | |
JP6428014B2 (ja) | 逆打ち支柱の構築方法 | |
JP5189946B2 (ja) | 杭孔掘削方法 | |
CN110552519A (zh) | 深基坑装配式安全通道施工方法 | |
CN215629910U (zh) | 一种结构补强的钢立柱桩 | |
CN105002906B (zh) | 一种作为主体结构立柱的捆绑式锚索复合桩结构及其施工方法 | |
CN204849759U (zh) | 一种作为主体结构立柱的捆绑式锚索复合桩结构 | |
CN105064355B (zh) | 一种作为主体结构立柱的锚索复合桩结构及其施工方法 | |
KR200263526Y1 (ko) | 매달아 내려치고 되올려치는 콘크리트 구조물 구축장치 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190517 Address after: 072750 Hebei Baoding Zhuozhou Guanyun Road China Railway Eighteenth Bureau Group Third Engineering Co., Ltd. Applicant after: No.3 Engineering Co., Ltd. of China Railway 18th Bureau Group Co., Ltd. Applicant after: the Eighteenth Bureau of China's Railroad Group Co., Ltd. Applicant after: Jinan track traffic Group Co., Ltd Address before: 072750 Hebei Baoding Zhuozhou Guanyun Road China Railway Eighteenth Bureau Group Third Engineering Co., Ltd. Applicant before: Yao Xiaoning |
|
TA01 | Transfer of patent application right |