CN111827025A CN202010637339.8A CN202010637339A CN111827025A CN 111827025 A CN111827025 A CN 111827025A CN 202010637339 A CN202010637339 A CN 202010637339A CN 111827025 A CN111827025 A CN 111827025A
Authority
CN
China
Prior art keywords
road
retaining wall
wall
rail train
main road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010637339.8A
Other languages
Chinese (zh)
Inventor
张大章
江智鹏
刘稳
钱卫
谢寒松
李华旭
刘相屏
邓文杰
马文昊
江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN202010637339.8A priority Critical patent/CN111827025A/en
Publication of CN111827025A publication Critical patent/CN111827025A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/002Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • E01F15/08Continuous barriers extending along roads or between traffic lanes essentially made of walls or wall-like elements ; Cable-linked blocks
    • E01F15/081Continuous barriers extending along roads or between traffic lanes essentially made of walls or wall-like elements ; Cable-linked blocks characterised by the use of a specific material
    • E01F15/083Continuous barriers extending along roads or between traffic lanes essentially made of walls or wall-like elements ; Cable-linked blocks characterised by the use of a specific material using concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0275Retaining or protecting walls characterised by constructional features cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The embodiment of the application discloses an intelligent rail train road structure and a construction method thereof, wherein the intelligent rail train road structure comprises a main road for intelligent rail train passing; the retaining wall, the retaining wall surface of the retaining wall is abutted against the lateral part of the main road, and the top end of the retaining wall extends upwards to a position which is not lower than the road surface height of the main road; the side, deviating from the wall surface of the retaining wall, of the retaining wall abuts against the side part of the auxiliary road, the road surface height of the auxiliary road is lower than that of the main road, and the bottom end of the retaining wall extends downwards and is embedded between the main road and the auxiliary road; and the anti-collision wall is fixed at the top end of the retaining wall. The intelligent rail train road structure and the construction method thereof have the advantage of good safety.

Description

Intelligent rail train road structure and construction method thereof
Technical Field
The application relates to the field of rail transit, in particular to an intelligent rail train road structure and a construction method thereof.
Background
The intelligent rail train belongs to the rail traffic mode of medium and low traffic volume. Different from the operation of wheel rail systems such as trams, subways and the like along physical tracks, the intelligent rail train is used as one of rubber wheel systems, a virtual track following control technology is adopted, virtual track lines on the road surface are identified through various vehicle-mounted sensors, the train is controlled to run on a set virtual track, and the intelligent operation is realized by utilizing the existing road or a newly-built road. Under the condition of building a new road, a main road and two municipal roads (auxiliary roads) on two sides are built together, the main road is used for the intelligent rail train to run, and the auxiliary roads serve social vehicles and pedestrians. In the transition section range of the intelligent rail train road, a main road and auxiliary roads on two sides are generally arranged to be at different heights so as to be convenient for isolating social vehicles from the intelligent rail train.
But different from the flat road surface which is used for the common social vehicles to run independently, the intelligent rail train road structure has more problems; under the normal running condition of the intelligent rail train, the intelligent rail train runs along the set virtual rail for a long time and can continuously play a role of ground stacking on one side of the main road, so that long-term lateral extrusion force is generated on a main road curb belt, the stability of side slopes on two sides of the main road is influenced, the possibility of instability and damage of the main road side slopes is increased, and potential structural safety hazards exist; because the height difference exists between the main road and the auxiliary roads on the two sides, the height difference of partial road sections can reach or even exceed 2m, once the intelligent rail train is out of control, the intelligent rail train rushes into the auxiliary roads on the two sides, and serious casualties and economic losses can be caused.
Disclosure of Invention
In view of this, the embodiments of the present application are expected to provide an intelligent rail train road structure and a construction method thereof, so as to solve the safety problem of the current intelligent rail train road structure.
In order to achieve the above purpose, the technical solution of the embodiment of the present application is implemented as follows:
intelligent rail train road structure includes: a main road for intelligent rail train passing; the retaining wall, the retaining wall surface of the retaining wall is abutted against the lateral part of the main road, and the top end of the retaining wall extends upwards to a position which is not lower than the road surface height of the main road;
the side, deviating from the wall surface of the retaining wall, of the retaining wall abuts against the side part of the auxiliary road, the road surface height of the auxiliary road is lower than that of the main road, and the bottom end of the retaining wall extends downwards and is embedded between the main road and the auxiliary road; and the anti-collision wall is fixed at the top end of the retaining wall.
Furthermore, the number of the auxiliary roads is two, the number of the retaining walls is two, and the number of the anti-collision walls is two; two rows of retaining wall surfaces of the retaining walls are respectively abutted against the side parts on the two sides of the main road, the two auxiliary roads are correspondingly arranged on one side, away from the main road, of the corresponding retaining wall, and two rows of anti-collision walls are correspondingly fixed on the top ends of the retaining walls.
Further, the retaining wall comprises a vertical wall body and a drain hole which penetrates through the vertical wall body along the horizontal direction; the top end of the vertical wall body is fixedly connected with the anti-collision wall, and the soil-retaining wall surface is a side wall surface of the vertical wall body facing to the side part of the main road; the bottom end of the vertical wall extends downwards to be embedded between the main road and the auxiliary road.
Further, the retaining wall includes a lateral plate body; the first end of the transverse plate body is embedded in the main road, and the second end of the transverse plate body is embedded in the auxiliary road; the bottom end of the vertical wall body extends downwards until being fixedly connected with the transverse plate body.
Furthermore, the retaining wall comprises a reserved steel bar head, and the anti-collision wall is of a reinforced concrete structure cast in situ; one end of the reserved steel bar head is buried at the top end of the vertical wall body in an embedded mode, and the other end of the reserved steel bar head is welded and fixed with the steel bars in the anti-collision wall.
Further, the retaining wall includes a reinforcing plate; the reinforcing plate is arranged at the joint of the vertical wall body and the transverse plate body and is fixedly connected with the vertical wall body and the transverse plate body respectively.
Furthermore, the retaining wall and the anti-collision wall are both of reinforced concrete structures, and the reinforcing steel bars in the retaining wall extend upwards until the reinforcing steel bars penetrate out of one end of the vertical wall body, which is far away from the transverse plate body, so as to form a reserved reinforcing steel bar head; and the steel bars in the anti-collision wall are welded and fixed with the reserved steel bar heads.
Further, the reinforcing plate is triangular, wherein a first side edge of the reinforcing plate is fixedly connected with the transverse plate body and extends to the end part of the second end of the transverse plate body; the second side edge of the reinforcing plate is fixedly connected with the vertical wall and extends to the end part of one end, far away from the transverse plate body, of the vertical wall.
Further, the smart rail train road structure comprises a signal transceiver; the signal transceiver is buried in the anti-collision wall to determine the relative position of the intelligent rail train and the anti-collision wall.
Further, the level of the middle part of the main road is higher than the level of the two sides; and/or the height of one side of the auxiliary road far away from the main road is lower than that of one side of the auxiliary road close to the main road.
Further, the main road comprises a base and a reverse filtering layer, the reverse filtering layer is arranged on the side portion of the base, and a retaining wall surface of the retaining wall is abutted to the reverse filtering layer.
Further, the main road comprises a pavement layer, the pavement layer is arranged at the top end of the base, and the top end of the retaining wall extends upwards to a position which is not lower than the height of the pavement layer; the pavement layer is coated with traffic marks for intelligent train identification.
The construction method of the intelligent rail train road structure comprises the following steps: constructing a side road on the roadbed; pouring retaining walls on the side parts of the auxiliary roads; filling a main road on one side of the retaining wall far away from the auxiliary road; and pouring the anti-collision wall at the top end of the retaining wall.
The intelligent rail train road structure and the construction method thereof are characterized in that a main road, an auxiliary road, a retaining wall and an anti-collision wall are arranged. Wherein, the lateral part butt of the retaining wall face and the main road of retaining wall, the retaining wall one side that deviates from retaining wall face and the lateral part butt of auxiliary road. The height of the road surface of the auxiliary road is lower than that of the road surface of the main road, so that the auxiliary road and the main road are separated from each other, and vehicles are prevented from being mixed in. The top of retaining wall upwards extends to the position that is not less than the road surface height of main road, and the top at retaining wall is fixed to the anticollision wall, effectively protects the current intelligent rail train on the main road, and intelligent rail train is out of control to hit on the anticollision wall, and the anticollision wall can transmit the retaining wall with assaulting again to pass the road bed between bottom auxiliary road and the main road on, effectively prevents that intelligent rail train from falling into the auxiliary road on the main road next door, ensures safety. In addition, the retaining wall and the anti-collision wall are arranged between the main road and the auxiliary road, and on the premise of ensuring safety, the main road can not intrude into the limit lines of the auxiliary roads on two sides, so that the appearance can be considered, and the main road can be coordinated with surrounding buildings.
Drawings
FIG. 1 is a schematic cross-sectional view of a smart rail train road structure according to an embodiment of the present application;
FIG. 2 is a schematic cross-sectional view of a smart rail train road structure according to an embodiment of the present application;
FIG. 3 is a schematic view illustrating an assembly relationship of a main road, an auxiliary road, a retaining wall and an anti-collision wall according to an embodiment of the present application;
FIG. 4 is a partial view of C of FIG. 3;
FIG. 5 is a schematic view illustrating an assembly relationship of a main road, an auxiliary road, a retaining wall and a crash wall according to an embodiment of the present application;
FIG. 6 is a partial view D of FIG. 5;
FIG. 7 is a schematic view illustrating an assembly relationship of a main road, an auxiliary road, a retaining wall and a crash wall according to an embodiment of the present application;
FIG. 8 is a schematic view of the assembly of the main road, the sub road, the retaining wall and the anti-collision wall according to an embodiment of the present application;
FIG. 9 is a partial view E of FIG. 7;
fig. 10 is a flowchart of a construction method of an intelligent rail train road structure according to an embodiment of the present application.
Detailed Description
It should be noted that, in the case of conflict, the technical features in the examples and examples of the present application may be combined with each other, and the detailed description in the specific embodiments should be interpreted as an explanation of the present application and should not be construed as an improper limitation of the present application.
In the description of the embodiments of the present application, the "up", "down", "left", "right", "front", "back" orientation or positional relationship is based on the orientation or positional relationship shown in fig. 1, it is to be understood that these orientation terms are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be considered as limiting the present application.
As shown in fig. 1 to 10, a smart rail train road structure includes: main road 1, auxiliary road 2, retaining wall 3 and crashproof wall 4. Wherein, the lateral part butt of retaining wall surface 31 and main road 1 of retaining wall 3, the one side that deviates from retaining wall surface 31 of retaining wall 3 and the lateral part butt of auxiliary road 2.
The height of the road surface of the sub road 2 is lower than that of the road surface of the main road 1 to form a separation therebetween, thereby preventing the vehicles from mixing in. The bottom end of the retaining wall 3 extends downwards to be embedded between the main road 1 and the auxiliary road 2, namely the bottom end of the retaining wall 3 is lower than the road surface height of the auxiliary road 2, so that the retaining wall 3 is fixed between the auxiliary road 2 and the main road 1.
The main road 1 is used for the intelligent rail train to pass according to a preset virtual rail, and the auxiliary road 2 is used for social vehicles and pedestrians to pass. The long-term virtual track operation of following of intelligence rail train normal driving state down, can be in the effect of bottom surface heap load that plays that main road one side lasts, the gravity transformation of intelligence rail train is to 1 lateral part extrusion force on main road, through the lateral part butt of retaining wall surface 31 with main road 1, bear by retaining wall 3 and come from this extrusion force, and on transmitting the road bed between bottom auxiliary road 2 and main road 1, effectively improve the stability of 1 both sides slope on main road, main road side slope unstability destruction's possibility has been reduced.
The top of retaining wall 3 upwards extends to the position that is not less than main road 1's road surface height, the top at retaining wall 3 is fixed to anticollision wall 4, from this can make anticollision wall 4 and retaining wall 3 be connected as an organic whole, anticollision wall 4 exceeds main road 1's road surface height, and then effectively protect main road 1 goes up current intelligent rail train, hit on anticollision wall 4 when intelligent rail train out of control, anticollision wall 4 will strike and transmit retaining wall 3 and pass on the road bed between bottom auxiliary road 2 and the main road 1 again, effectively prevent that intelligent rail train from falling into on the auxiliary road 2 on main road 1 next door, ensure safety.
In addition, arrange retaining wall 3 and crashproof wall 4 between main road 1 and auxiliary road 2 to need to make up retaining wall 3 and crashproof wall 4 with reasonable form, under the prerequisite of guaranteeing safety, main road 1 also can not invade in the boundary limit of both sides auxiliary road 2, consequently can also compromise beautifully and coordinate with peripheral building.
It can be understood that, as shown in fig. 1 and fig. 2, the auxiliary road 2 may be arranged on one side of the main road 1, or the auxiliary roads 2 may be arranged on both sides of the main road 1, specifically based on actual engineering construction.
In one possible embodiment, as shown in fig. 1, the number of the side roads 2 is two, the number of the retaining walls 3 is two, and the number of the impact walls 4 is two. The retaining wall surfaces 31 of two rows of retaining walls 3 are respectively abutted against the side parts of two sides of the main road 1, the two auxiliary roads 2 are correspondingly arranged on one side, far away from the main road 1, of the corresponding retaining wall 3, and the two rows of anti-collision walls 4 are correspondingly fixed at the top ends of the retaining walls 3; and then make the both sides of main road 1 all can receive the protection of retaining wall 3, and the intelligence rail train moves about in the region that two lines of anticollision walls 4 formed, avoids social vehicle to mix into wherein, improves the security.
It should be understood that, in the actual construction process, different retaining wall 3 structure embodiments can be adopted according to the difference in height between the main road 1 and the auxiliary road 2, so as to ensure safety on one hand and reasonably optimize cost on the other hand.
In the first embodiment, as shown in fig. 1 to 4, the retaining wall 3 includes a vertical wall body 32 and a drainage hole 321 penetrating the vertical wall body 32 in a horizontal direction; the water discharge hole 321 facilitates the timely discharge of water permeating into the main path 1. The top end of the vertical wall 32 is fixedly connected to the impact wall 4, and the retaining wall surface 31 is a side wall surface of the vertical wall 32 facing the side of the main road 1.
The bottom of vertical wall 32 extends downwards and imbeds between main road 1 and the auxiliary road 2 to accomplish fixedly, because the difference in height is little, consequently can satisfy the stability protection to main road 1 both sides slope and prevent effectively that the smart rail train from falling into on the auxiliary road 2 on main road 1 next door through vertical wall 32 embedding is fixed, both ensured safety and make with low costs.
The present embodiment is applicable to the case where the height difference between the main road 1 and the auxiliary road 2 is less than 0.5 m. The concrete dimensions of the retaining wall 3 and the anti-collision wall 4, the attached facilities and the like can be determined according to the field conditions and inspection and calculation.
In a second embodiment, as shown in fig. 1, 2, 5 and 6, the retaining wall 3 includes a vertical wall 32, a horizontal plate 33, and a drainage hole 321 penetrating the vertical wall 32 in a horizontal direction; the water discharge hole 321 facilitates the timely discharge of water permeating into the main path 1. The top end of the vertical wall 32 is fixedly connected to the impact wall 4, and the retaining wall surface 31 is a side wall surface of the vertical wall 32 facing the side of the main road 1.
The bottom end of the vertical wall 32 extends downwards to be embedded between the main road 1 and the auxiliary road 2, the bottom end of the vertical wall 32 extends downwards until being fixedly connected with the transverse plate 33, the first end of the transverse plate 33 is embedded in the main road 1, and the second end of the transverse plate 33 is embedded in the auxiliary road 2; from this through realizing that horizontal plate body 33 lays in under main road 1 and auxiliary road 2 to obtain better fixed strength, thereby satisfy the stability protection to main road 1 both sides slope and effectively prevent that the smart rail train from falling into on the auxiliary road 2 of main road 1 next door, both guaranteed safety and the cost is reduced.
The present embodiment is applicable to the case where the height difference between the main road 1 and the auxiliary road 2 is 0.5m to 1.5 m.
The concrete dimensions of the retaining wall 3 and the anti-collision wall 4, the attached facilities and the like can be determined according to the field conditions and inspection and calculation.
It will be appreciated that in the first and second embodiments, as shown in fig. 4 and 6, the retaining wall 3 includes pre-formed rebar heads 36, and the impact wall 4 may be a cast-in-place reinforced concrete structure. One end of the reserved steel bar head 36 is embedded at the top end of the vertical wall 32, and the reserved steel bar head 36 is connected with the steel bars in the anti-collision wall 4 in a welding mode. Specifically, because main road 1 and the difference in height of auxiliary road 2 are in the within range of design, retaining wall 3 can be concrete placement structure, and inside not arrangement of reinforcement to reduce cost, retaining wall 3 sets up reserved reinforcement head 36 alone again at regular intervals along the direction that main road 1 extends, can carry out the cement of crashproof wall 4 again and pour with the reinforcing bar welding in reserved reinforcement head 36 and crashproof wall 4 earlier usually, thereby realize retaining wall 3 and crashproof wall 4's an organic whole and be connected.
The shape of the reserved steel bar head 36 can be linear or inverted L-shaped to increase the adhesive force.
In the third embodiment, as shown in fig. 1, 2, 7, 8 and 9, the retaining wall 3 includes a vertical wall body 32, a lateral plate body 33, a reinforcing plate 35, and a drainage hole 321 penetrating the vertical wall body 32 in a horizontal direction.
The water discharge hole 321 facilitates the timely discharge of water permeating into the main path 1.
The top end of the vertical wall 32 is fixedly connected to the impact wall 4, and the retaining wall surface 31 is a side wall surface of the vertical wall 32 facing the side of the main road 1. The bottom end of the vertical wall 32 extends downwards to be embedded between the main road 1 and the auxiliary road 2, the bottom end of the vertical wall 32 extends downwards until being fixedly connected with the transverse plate 33, the first end of the transverse plate 33 is embedded in the main road 1, and the second end of the transverse plate 33 is embedded in the auxiliary road 2; therefore, the transverse plate body 33 is horizontally arranged under the main road 1 and the auxiliary road 2, so that better fixing strength is obtained; in addition, reinforcing plate 35 sets up in the junction of vertical wall 32 and horizontal plate body 33, and reinforcing plate 35 respectively with vertical wall 32 and horizontal plate body 33 fixed connection for reinforcing plate 35 forms firm triangular structure with vertical wall 32 and horizontal plate body 33, and the additional strengthening rigidity, thereby satisfy the stability protection to main road 1 both sides slope and effectively prevent that the smart rail train from falling into on the auxiliary road 2 of main road 1 next door, effectively ensure safety.
The present embodiment is applicable to a case where the difference in height between the main road 1 and the sub road 2 is 1.5m or more. The concrete dimensions of the retaining wall 3 and the anti-collision wall 4, the attached facilities and the like can be determined according to the field conditions and inspection and calculation.
It will be appreciated that in the third embodiment, as shown in fig. 9, the retaining wall 3 and the impact wall 4 are both of reinforced concrete in-situ construction, and the reinforcing bars in the retaining wall 3 extend upward until they penetrate the end of the vertical wall 32 remote from the transverse plate 33 to form the pre-formed reinforcing heads 36. Specifically, the retaining wall 3 selects the arrangement of reinforcement according to the intensity needs, usually adopts earlier to implant the reinforcing bar, and pour retaining wall 3 after setting up reserved reinforcing bar head 36, the direction that reserved reinforcing bar head 36 of retaining wall 3 extends along main road 1 is arranged at certain intervals, when crashproof wall 4 was pour, can carry out the cement of crashproof wall 4 again after reserving reinforcing bar head 36 and the reinforcing bar welding in the crashproof wall 4 earlier usually, thereby realize retaining wall 3 and crashproof wall 4's an organic whole and be connected.
The shape of the reserved steel bar head 36 can be linear or inverted L-shaped to increase the adhesive force.
Furthermore, as shown in fig. 8, the reinforcing plate 35 has a triangular shape, wherein a first side of the reinforcing plate 35 is fixedly connected with the transverse plate body 33 and extends to the end of the second end of the transverse plate body 33; the second side edge of the reinforcing plate 35 is fixedly connected with the vertical wall 32 and extends to the end part of one end, far away from the transverse plate body 33, of the vertical wall 32, so that a rib supporting structure is formed, the reinforcing plate 35, the vertical wall 32 and the transverse plate body 33 have a good rigid structure and deformation resistance, the reinforcing plate is suitable for an area with a large height difference value, the requirement for stability protection of slopes on two sides of the main road 1 is met, and the intelligent rail train is effectively prevented from falling into the auxiliary road 2 beside the main road 1.
In one possible embodiment, the smart rail train road structure includes a signal transceiver. Signal transceiver (not marked) buries underground in crashproof wall 4, and signal transceiver can include position inductor, and the signal with the mode of signal of telecommunication behind the position inductor senses the intelligence rail train passes through the total control room of signal transmission cable transmission to the intelligence rail train to confirm current intelligence rail train and crashproof wall 4's relative position, avoid both to collide, finally realize intelligent control. Of course, the position sensor can also be connected with a master control room of the smart rail train in a wireless transmission mode, specifically based on field arrangement.
One possible implementation way is that the level of the middle part of the main road 1 is higher than the level of the two sides, as shown in fig. 1, so as to form a drainage slope with an inclination angle a of 1-5 degrees, and the main road 1 is enabled to drain rainwater to the auxiliary road 2 at the side part through the drainage slope, so as to avoid seeper leakage.
One possible implementation way is that as shown in fig. 1, the height of the side of the auxiliary road 2 far away from the main road 1 is lower than the height of the side of the auxiliary road 2 close to the main road 1, so as to form a drainage slope with an inclination angle B of 1-5 °, and the auxiliary road 2 is drained to the side far away from the main road 1 through the drainage slope, so as to avoid the accumulated water from causing leakage in the transition area between the main road 1 and the auxiliary road 2.
In one possible embodiment, as shown in fig. 1 and 8, the height of the end of the drainage hole 321 far from the main road 1 is lower than the height of the end of the drainage hole 321 close to the main road 1, so as to form a drainage angle with an inclination angle F of 1-5 ° to drain excess water leaking from the surface of the main road 1 into the interior in time.
In one possible embodiment, as shown in fig. 1, 2 and 8, the main road 1 includes a base 11 and a reverse filter layer 12, the reverse filter layer 12 is provided on a side portion of the base 11, and a retaining wall surface 31 of the retaining wall 3 abuts against the reverse filter layer 12. The inverted filter 12 may be a sand-pebble layer, which can effectively filter the soil of the substrate 11 and prevent the soil from losing with water.
In one possible embodiment, as shown in fig. 1 to 9, the main road 1 comprises a pavement 13, the pavement 13 being disposed on the top end of the base 11, the top end of the retaining wall 3 extending upwardly to a position not lower than the height of the pavement 13; the pavement layer 13 is coated with traffic marks (not marked) for intelligent train identification, the traffic marks can form virtual rails on the main road 1, corresponding sensors, such as color sensors, light sensors and the like, are arranged at the bottoms of the intelligent rail trains or other positions on the train, and the corresponding sensors are matched with a steering system to realize that the intelligent rail trains are in a given track form according to the traffic marks without additionally laying special tracks, so that the intelligent rail train pavement structure is low in cost and easy to maintain.
A construction method of a smart rail train road structure, as shown in fig. 1 to 10, comprising:
and S10, constructing the auxiliary road 2 on the roadbed.
S20, the retaining wall 3 is poured on the side of the sub road 2.
And S30, filling the main road 1 on the side of the retaining wall 3 far away from the auxiliary road 2.
And S40, pouring the anti-collision wall 4 on the top end of the retaining wall 3.
The various embodiments/implementations provided herein may be combined with each other without contradiction.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (13)

1. Intelligent rail train road structure, its characterized in that includes:
a main road (1) for intelligent rail train passage;
a retaining wall (3), wherein a retaining wall surface (31) of the retaining wall (3) is abutted against the side part of the main road (1), and the top end of the retaining wall (3) extends upwards to a position not lower than the road surface height of the main road (1);
the side, which is far away from the retaining wall surface (31), of the retaining wall (3) abuts against the side part of the auxiliary road (2), the road surface height of the auxiliary road (2) is lower than that of the main road (1), and the bottom end of the retaining wall (3) extends downwards to be embedded between the main road (1) and the auxiliary road (2);
and the anti-collision wall (4) is fixed at the top end of the retaining wall (3).
2. The smart rail train road structure of claim 1, wherein: the number of the auxiliary roads (2) is two, the number of the retaining walls (3) is two, and the number of the anti-collision walls (4) is two;
two rows of retaining wall surfaces (31) of the retaining walls (3) are respectively abutted against the side parts of the two sides of the main road (1), the two auxiliary roads (2) are correspondingly arranged on one side, away from the main road (1), of the retaining walls (3), and two rows of the anti-collision walls (4) are correspondingly fixed on the top ends of the retaining walls (3).
3. The smart rail train road structure of claim 1, wherein: the retaining wall (3) comprises a vertical wall body (32) and a drainage hole (321) which penetrates through the vertical wall body (32) along the horizontal direction; the top end of the vertical wall body (32) is fixedly connected with the anti-collision wall (4), and the retaining wall surface (31) is a side wall surface of the vertical wall body (32) facing to the side part of the main road (1);
the bottom end of the vertical wall (32) extends downwards and is embedded between the main road (1) and the auxiliary road (2).
4. A smart rail train road structure as claimed in claim 3, wherein: the retaining wall (3) comprises a transverse plate body (33);
the first end of the transverse plate body (33) is embedded in the main road (1), and the second end of the transverse plate body (33) is embedded in the auxiliary road (2);
the bottom end of the vertical wall body (32) extends downwards until being fixedly connected with the transverse plate body (33).
5. A smart rail train road structure as claimed in claim 3 or 4, wherein: the retaining wall (3) comprises reserved steel bar heads (36), and the anti-collision wall (4) is of a reinforced concrete structure poured in situ; one end of the reserved steel bar head (36) is buried at the top end of the vertical wall body (32), and the other end of the reserved steel bar head (36) is welded and fixed with the steel bars in the anti-collision wall (4).
6. The smart rail train road structure of claim 4, wherein: the retaining wall (3) comprises a reinforcing plate (35);
the reinforcing plate (35) is arranged at the joint of the vertical wall (32) and the transverse plate body (33) and is fixedly connected with the vertical wall (32) and the transverse plate body (33) respectively.
7. A smart rail train road structure as claimed in claim 6, wherein: the retaining wall (3) and the anti-collision wall (4) are both of reinforced concrete structures, and reinforcing steel bars in the retaining wall (3) extend upwards until penetrating out of one end of the vertical wall body (32) far away from the transverse plate body (33) to form a reserved reinforcing steel bar head (36); and the steel bars in the anti-collision wall (4) are welded and fixed with the reserved steel bar heads (36).
8. A smart rail train road structure as claimed in claim 6, wherein: the reinforcing plate (35) is triangular, wherein a first side edge of the reinforcing plate (35) is fixedly connected with the transverse plate body (33) and extends to the end part of a second end of the transverse plate body (33); the second side edge of the reinforcing plate (35) is fixedly connected with the vertical wall body (32) and extends to the end part of one end, far away from the transverse plate body (33), of the vertical wall body (32).
9. The smart rail train road structure of claim 1, wherein: the intelligent rail train road structure comprises a signal transceiver; the signal transceiver is buried in the anti-collision wall (4) to determine the relative position of the intelligent rail train and the anti-collision wall (4) at present.
10. The smart rail train road structure of claim 1, wherein: the horizontal height of the middle part of the main road (1) is higher than the horizontal heights of the two sides; and/or the presence of a gas in the gas,
the height of one side of the auxiliary road (2) far away from the main road (1) is lower than that of one side of the auxiliary road (2) close to the main road (1).
11. The smart rail train road structure of claim 1, wherein: the main road (1) comprises a base (11) and a reverse filtering layer (12), wherein the reverse filtering layer (12) is arranged on the side part of the base (11), and a retaining wall surface (31) of the retaining wall (3) is abutted to the reverse filtering layer (12).
12. The smart rail train road structure of claim 1, wherein: the main road (1) comprises a pavement layer (13), the pavement layer (13) is arranged at the top end of the base (11), and the top end of the retaining wall (3) extends upwards to a position which is not lower than the height of the pavement layer (13); the pavement layer (13) is coated with traffic marks for intelligent train identification.
13. A construction method of a smart rail train road structure as claimed in any one of claims 1 to 12, comprising:
constructing a side road (2) on the roadbed;
pouring retaining walls (3) on the side parts of the auxiliary roads (2);
filling a main road (1) on one side of the retaining wall (3) far away from the auxiliary road (2);
and pouring an anti-collision wall (4) at the top end of the retaining wall (3).
CN202010637339.8A 2020-07-03 2020-07-03 Intelligent rail train road structure and construction method thereof Pending CN111827025A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010637339.8A CN111827025A (en) 2020-07-03 2020-07-03 Intelligent rail train road structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010637339.8A CN111827025A (en) 2020-07-03 2020-07-03 Intelligent rail train road structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN111827025A true CN111827025A (en) 2020-10-27

Family

ID=72900120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010637339.8A Pending CN111827025A (en) 2020-07-03 2020-07-03 Intelligent rail train road structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN111827025A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900485A (en) * 2021-01-25 2021-06-04 广东粤路勘察设计有限公司 Improved cantilever type retaining wall structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900485A (en) * 2021-01-25 2021-06-04 广东粤路勘察设计有限公司 Improved cantilever type retaining wall structure
CN112900485B (en) * 2021-01-25 2022-02-18 广东粤路勘察设计有限公司 Improved cantilever type retaining wall structure

Similar Documents

Publication Publication Date Title
CN102071813B (en) Method for constructing underground garage under old building
CN102182332B (en) Seam type intercepting drain system on ground in front of garage door with track
KR100768777B1 (en) Earth reinforcement method for railway track on the concrete base
CN111827025A (en) Intelligent rail train road structure and construction method thereof
CN206815165U (en) Track traffic steel reinforced concrete combines trough girder
CN110820471A (en) Crossing plate, level crossing structure and laying method
CN212533574U (en) Intelligent rail train road structure
CN206828906U (en) A kind of temporary pavement bedding structure for Metro Deep Excavation
CN105270119A (en) Dual-purpose traveling mechanism capable of traveling on pavement and track
KR101187282B1 (en) Railway bridge constructing method using 2 post type abutment structure
KR100840406B1 (en) Environmentally friendly pavement having a track
CN106320352B (en) Construction method of multifunctional steel sheet pile cofferdam
EP0881332A1 (en) Bearing element for supporting infrastructure such as roads, railways, runways and airports, and a method for the manufacture thereof
CN211713557U (en) Reinforced concrete crossing plate and level crossing structure
CN202658487U (en) Improved intersection of channel under highway
CN201962983U (en) Seam type intercepting drain system on ground in front of railway garage door
CN211848641U (en) Light roadbed structure of high-speed railway
CN212533541U (en) Pile plate roadbed structure and railway roadbed
CN104234734A (en) Novel air crossing construction method of deep mine and highland pressure impact coal seam
CN210066407U (en) Road side stone structure
CN208009177U (en) High-Grade Highway Subgrade system suitable for windy and sandy area
CN111395084A (en) Highway subgrade reinforcing structure and construction method
CN217174339U (en) Cross transportation bridge and culvert for strip mine and cross transportation system for strip mine
CN205062590U (en) Dual purpose traffic operational system
CN213508561U (en) Inclined overhanging type supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination