CN206815165U - Track traffic steel reinforced concrete combines trough girder - Google Patents
Track traffic steel reinforced concrete combines trough girder Download PDFInfo
- Publication number
- CN206815165U CN206815165U CN201720510696.1U CN201720510696U CN206815165U CN 206815165 U CN206815165 U CN 206815165U CN 201720510696 U CN201720510696 U CN 201720510696U CN 206815165 U CN206815165 U CN 206815165U
- Authority
- CN
- China
- Prior art keywords
- steel
- girder
- track
- connector
- girder steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses support and connector, steel beam web plate, steel beam web plate stiffening construction, girder steel bottom plate and stiffening construction and girder steel and track structure connecting structure on a kind of track traffic steel reinforced concrete combination trough girder, including concrete top flange, girder steel.Girder steel bottom plate and stiffening construction are connected by connector with girder steel with track structure connecting structure, and girder steel and track structure connecting structure are concrete structure, lay solid concrete roabed plummer or ballast bed thereon;Steel beam web plate is fixed with by connector in girder steel bottom plate and stiffening construction both sides;The upper end of steel beam web plate is fixedly connected with support and connector on girder steel, and concrete top flange and steel beam web plate are connected to become entirety by support and connector on girder steel.Technical problem that loss of weight, span ability that the utility model can solve track traffic steel reinforced concrete combination trough girder are big, comprehensive cost is cheap etc..
Description
Technical field
It the utility model is related to a kind of track traffic facility.More particularly to a kind of track girder technology.
Background technology
With the national economic development and social progress, the trip of big city people is increasingly relied in track traffic, and right
Rail line in connection city and suburb, overhead section is inevitable, and the track girder for being used to carry train is overhead
The most important component of structure.
Trough girder has the following advantages that:
1) building height is low, Bridge Landscape is good:Trough girder is base-supporting structure, and the more general beam type of building height reduces about
1.3m (by 30m exemplified by), Bridge Landscape effect is good, and is arranged beneficial to track profile.
2) excellent noise reduction effect:When rail traffic vehicles travel on beam channel, its wheel track walking system noise is by both sides master
Beam top flange and the barrier of web, reduce influence of the vehicle noise to surrounding environment to a certain extent;And relative box-girder,
Beam channel is without casing resonance noise.
3) functionals:Using web top surface as emergency evacuation, access path, cable is used as by the use of web inner side
Passage.
4) have a safety feature:There is prevention effect to the derailing situation being likely to occur:Twice abutment wall can ensure that train security row
Sail, prevent derailing and overturn accident.
5) comprehensive economy is excellent:Due to saving side shield and escape platform outside conventional beam type, and simplify sound barrier
Set, compound material dosage is few, low engineering cost.
Because trough girder has many advantages, such as above-mentioned, it is used widely in urban rail transit in China.But due to
Standard channel beam is both designed as prestressed reinforced concrete construction at present, and general span is no more than in 30m, it is difficult to adapt to line crossing road
Road, the needs in river, therefore it is excessive that Cast-in-situ Beam need to be set to carry out at node, constrains the mark of line construction to a certain extent
Standardization and mechanization, and it is connected the overall landscape effect that also have impact on bridge between Standard Beam and node bridge.
The content of the invention
The purpose of this utility model is to provide a kind of track traffic steel reinforced concrete combination trough girder, to solve track traffic steel reinforced concrete group
Technical problem that the loss of weight, the span ability that close trough girder are big, comprehensive cost is cheap etc..
In order to realize foregoing invention purpose, technical scheme is as follows used by the utility model:
Support and connector (2), girder steel on track traffic steel reinforced concrete combination trough girder, including concrete top flange (1), girder steel
Web (3), steel beam web plate stiffening construction (4), girder steel bottom plate and stiffening construction (5) and girder steel and track structure connecting structure (6);
It is characterized in that:Track girder is undertaken by the girder steel bottom plate and stiffening construction (5) of curved caused tension by connector and girder steel
It is connected with track structure connecting structure (6), girder steel and track structure connecting structure (6) are concrete structure, and laying is overall thereon
Railway roadbed plummer is ballast bed;Girder steel bottom plate and stiffening construction (5) both sides be fixed with by connector undertake track girder by
The steel beam web plate (3) of curved shear stress;The upper end of steel beam web plate (3) is fixedly connected with support and connector (2) on girder steel, on girder steel
Concrete top flange (1) and steel beam web plate (3) are connected to become entirety by support and connector (2);Steel beam web plate stiffening construction (4)
The steel beam web plate stiffening construction (5) for also serving as track girder cable bearer of inner side is arranged as required to vertically put more energy into or/and level
Put more energy into.
Connector is as needed using a kind of type of attachment in WELDING STUDS, PBL shear connectors or welding U-shaped muscle.
Described steel beam web plate (3) is made using general steel plate or setback steel plate.
Bottom plate longitudinal stiffener uses board-like rib or inverted T-shaped rib as needed for described girder steel bottom plate and stiffening construction (5),
Transverse stiffener uses inverted T-shaped rib.
The utility model has the following advantages that:
Track traffic steel reinforced concrete combination trough girder uses section top flange of the concrete material as simply supported beam, can give full play to
Its compressive property;Steel construction is used in tensile zone, while material tensile property is given full play to, has effectively evaded steel construction
Resistance to compression stable problem.Steel reinforced concrete combination groove profile girder span gets over ability and is better than conventional Pre-stress Concrete U-Shaped Beam, can further expand groove
The use range of type beam;Equal across footpath steel reinforced concrete combination trough girder is only conventional Pre-stress Concrete U-Shaped Beam weight simultaneously
60%, and prestressed setting is eliminated, reduce difficulty of construction and construction period.Although steel reinforced concrete combination trough girder is more pre- in itself
Prestressed concrete groove profile deck-molding, but with cast-in-place node bridge integrate essential, its economy still has some superiority, and meets state
Family goes the requirement of production capacity on green and steel.
Brief description of the drawings
Fig. 1 is structure section figure of the present utility model.
Numbered in figure:1st, concrete top flange, 2, support and connector on girder steel, 3, steel beam web plate, 4, steel beam web plate adds
Strength constructs, 5, girder steel bottom plate and stiffening construction, 6, girder steel and track structure connecting structure, 7, solid concrete roabed, 8, ballast bed, 9,
Cable bearer, 10, line of symmetry.
Embodiment
The utility model is shown in Figure 1.Track traffic steel reinforced concrete combines trough girder, including concrete top flange (1), girder steel
Upper support and connector (2), steel beam web plate (3), steel beam web plate stiffening construction (4), girder steel bottom plate and stiffening construction (5) and girder steel
With track structure connecting structure (6);Girder steel bottom plate and stiffening construction (5) pass through connector and girder steel and track structure connecting structure
(6) connect, girder steel and track structure connecting structure (6) are concrete structure, lay solid concrete roabed plummer or rubble road thereon
Bed;Steel beam web plate (3) is fixed with by connector in girder steel bottom plate and stiffening construction (5) both sides;The upper end of steel beam web plate (3) is consolidated
Surely support and connector (2) on girder steel are connected, support and connector (2) are by concrete top flange (1) and steel beam web plate on girder steel
(3) it is connected to become entirety.
Concrete top flange mainly undertakes track girder by curved caused compression, while still sound barrier, electrical control are strong
Deng basis, escape platform when can also also serve as emergency evacuation uses.Conventional concrete or high-strength coagulation can be used as needed
Soil;According to execution conditions, may be selected simultaneously prefabricated with girder steel in factory;It is prefabricated in the factory, in-site installation or scene are poured
Build.
Support and connector are that contact concrete top flange and steel beam coupling device, connector can be adopted as needed on girder steel
With forms such as WELDING STUDS, PBL shear connectors or welding U-shaped muscle.
Steel beam web plate is the main member for undertaking track girder shearing, and general steel plate or setback steel plate can be used to make.
Steel beam web plate stiffening construction is to ensure steel beam web plate by cutting stable and web transverse strength, the main member of rigidity,
Track girder cable bearer can be also also served as, it is settable vertical as needed to put more energy into and sash.
Girder steel bottom plate and stiffening construction mainly undertake track girder by curved caused tension, and it is laterally strong to be also to provide bottom plate
Degree, the main member of rigidity, bottom plate longitudinal stiffener as needed can use board-like rib or inverted T-shaped rib, and transverse stiffener uses
Inverted T-shaped rib.
Girder steel and track structure connecting structure are solid concrete roabed track or ballast bed supporting construction, are concrete knot
Structure, connected by WELDING STUDS, PBL shear connectors or welding U-shaped muscle and girder steel bottom plate reinforcing construction.According to execution conditions, may be selected
It is simultaneously prefabricated with girder steel in factory;It is prefabricated in the factory, in-site installation or scene are poured.
Method for bridge construction:
Girder steel construction part prefabrication, on-site hoisting are constructed, and are poured after concrete flange plate, need to be taken measures to prevent when pouring
Only building materials drop.Substructure cast-in-site is constructed.
Main girder construction technological process:
Factory process girder steel construction part, welding top flange concrete connector, girder steel and track structure connector.
Factory completes girder steel construction part and all connector preservative treatments.
On-site hoisting girder steel construction part.
The live colligation edge of a wing and girder steel and track structure connecting portion reinforcing bar.
Pour into a mould top flange concrete.
Pour into a mould girder steel and track structure connecting portion concrete.
Construction waterproof layer and protective layer, construction track structure, installation expansion joint, cable bearer etc..
Claims (4)
1. support and connector (2), girder steel abdomen on track traffic steel reinforced concrete combination trough girder, including concrete top flange (1), girder steel
Plate (3), steel beam web plate stiffening construction (4), girder steel bottom plate and stiffening construction (5) and girder steel and track structure connecting structure (6);Its
It is characterised by:Undertake track girder by curved caused tension girder steel bottom plate and stiffening construction (5) by connector and girder steel with
Track structure connecting structure (6) connects, and girder steel and track structure connecting structure (6) are concrete structure, lay overall road thereon
Bed plummer or ballast bed;It is fixed with by connector in girder steel bottom plate and stiffening construction (5) both sides and undertakes track girder by curved
Shear stress steel beam web plate (3);The upper end of steel beam web plate (3) is fixedly connected with support and connector (2) on girder steel, is held on girder steel
Concrete top flange (1) and steel beam web plate (3) are connected to become entirety by support and connector (2);In steel beam web plate stiffening construction (4)
The steel beam web plate stiffening construction (4) for also serving as track girder cable bearer of side is arranged as required to vertically put more energy into or/and level adds
Strength.
2. track traffic steel reinforced concrete as claimed in claim 1 combines trough girder, it is characterised in that connector uses cut as needed
A kind of type of attachment in power nail, PBL shear connectors or welding U-shaped muscle.
3. track traffic steel reinforced concrete as claimed in claim 1 combines trough girder, it is characterised in that described steel beam web plate (3) is adopted
Made of general steel plate or setback steel plate.
4. track traffic steel reinforced concrete as claimed in claim 1 combines trough girder, it is characterised in that described girder steel bottom plate and puts more energy into
Bottom plate longitudinal stiffener uses board-like rib or inverted T-shaped rib to construction (5) as needed, and transverse stiffener uses inverted T-shaped rib.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720510696.1U CN206815165U (en) | 2017-05-10 | 2017-05-10 | Track traffic steel reinforced concrete combines trough girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720510696.1U CN206815165U (en) | 2017-05-10 | 2017-05-10 | Track traffic steel reinforced concrete combines trough girder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206815165U true CN206815165U (en) | 2017-12-29 |
Family
ID=60755543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720510696.1U Active CN206815165U (en) | 2017-05-10 | 2017-05-10 | Track traffic steel reinforced concrete combines trough girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206815165U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374316A (en) * | 2018-02-07 | 2018-08-07 | 湖南省交通规划勘察设计院有限公司 | Medium-and low-speed maglev traffic combination beam element, medium-and low-speed maglev traffic combination beam, rail system and construction method |
CN112921784A (en) * | 2021-01-27 | 2021-06-08 | 中铁大桥勘测设计院集团有限公司 | Rail transit steel-concrete composite beam with sound insulation function |
CN113272496A (en) * | 2018-11-30 | 2021-08-17 | 维拉萨米·塔瓦马尼 潘迪 | Construction system for double-U-shaped and single-U-shaped reinforced concrete composite structure of bridge |
CN114232462A (en) * | 2021-12-29 | 2022-03-25 | 哈尔滨工业大学 | Urban rail transit corrugated steel-concrete U-shaped combination beam and construction method thereof |
-
2017
- 2017-05-10 CN CN201720510696.1U patent/CN206815165U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374316A (en) * | 2018-02-07 | 2018-08-07 | 湖南省交通规划勘察设计院有限公司 | Medium-and low-speed maglev traffic combination beam element, medium-and low-speed maglev traffic combination beam, rail system and construction method |
CN113272496A (en) * | 2018-11-30 | 2021-08-17 | 维拉萨米·塔瓦马尼 潘迪 | Construction system for double-U-shaped and single-U-shaped reinforced concrete composite structure of bridge |
CN112921784A (en) * | 2021-01-27 | 2021-06-08 | 中铁大桥勘测设计院集团有限公司 | Rail transit steel-concrete composite beam with sound insulation function |
CN114232462A (en) * | 2021-12-29 | 2022-03-25 | 哈尔滨工业大学 | Urban rail transit corrugated steel-concrete U-shaped combination beam and construction method thereof |
CN114232462B (en) * | 2021-12-29 | 2024-05-03 | 哈尔滨工业大学 | Urban rail transit corrugated steel-concrete U-shaped composite beam and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206815165U (en) | Track traffic steel reinforced concrete combines trough girder | |
CN102926299B (en) | Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device | |
CN110582609B (en) | Construction system and method for combined U-shaped reinforcing beam bridge floor | |
CN207891661U (en) | A kind of medium-and low-speed maglev traffic track beam and rail system | |
CN104594173B (en) | One kind embraces rail magnetic levitation track traffic box beam | |
US20130264394A1 (en) | Pre-stressed concrete track slab of slab-type ballast-less track | |
CN108867310A (en) | The short rib T beam bridge of pretensioning prestressed concrete and its construction method | |
CN105178164B (en) | Prefabrication and lifting fish belly Wavelike steel webplate prestressing with bond combined box beam and its construction method | |
US4905896A (en) | Railroad roadway for high speed rail-mounted vehicles | |
CN206328642U (en) | A kind of board-like track structure of framework in tunnel | |
CN208293453U (en) | In a kind of railway beam plus the anti-fall stone structure of vault hangar tunnel | |
CN109868721A (en) | A kind of integrated precast bridge floor affiliated facility | |
CN203065950U (en) | Railway bridge composed of simply-supported T-shaped beams | |
CN204849562U (en) | Little box girder bridge roof beam | |
CN105888281A (en) | Method for utilizing jacking storey-adding technique to promote integrated function of community | |
CN201891068U (en) | U-shaped prestressed concrete continuous beam bridge | |
CN105803923B (en) | Inter-city passenger rail Simple T-Girders pavement combining structure and combined method | |
CN106812244A (en) | The preparation method of the continuous superposed floor of precast beam, prefabricated PC and superstructure | |
CN208328660U (en) | The U-shaped girder construction of the Two bors d's oeuveres of combined bridge | |
CN103911948B (en) | Be applied to horizontal purlin formula steel work and the construction method thereof of wide concrete rib plate-girder | |
CN110258633A (en) | A kind of Underground Station section of track well with prestressed concrete beam | |
CN208009170U (en) | Plate-type ballastless track on a kind of steel truss girder bridge | |
CN212337358U (en) | Connection structure of evacuation platform in shield zone at interconnection channel | |
CN109024266B (en) | Central separation belt concrete wall type guardrail connecting structure meeting double-bridge settlement difference and construction method | |
CN211947900U (en) | Railway steel structure channel beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |