CN111809644A - Structure for closely arranging comprehensive pipeline and pile foundation and simultaneous construction method thereof - Google Patents
Structure for closely arranging comprehensive pipeline and pile foundation and simultaneous construction method thereof Download PDFInfo
- Publication number
- CN111809644A CN111809644A CN202010733724.2A CN202010733724A CN111809644A CN 111809644 A CN111809644 A CN 111809644A CN 202010733724 A CN202010733724 A CN 202010733724A CN 111809644 A CN111809644 A CN 111809644A
- Authority
- CN
- China
- Prior art keywords
- pile
- pile foundation
- comprehensive pipeline
- steel
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/18—Making embankments, e.g. dikes, dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Abstract
The invention discloses a structure for closely arranging a comprehensive pipeline and a pile foundation, and relates to the technical field of engineering construction. The device comprises an upper soft stratum, a lower hard stratum and a steel casing; the middle part of the steel casing is positioned in the upper soft stratum, the lower part of the steel casing is positioned in the lower hard stratum, and a pile foundation is poured in the steel casing; the upper soft stratum is provided with a comprehensive pipeline. The invention greatly reduces the construction cost and effectively reduces the influence on the environmental quality due to repeated excavation. The invention also relates to a method for simultaneously constructing the structure for arranging the comprehensive pipeline and the pile foundation in a short distance.
Description
Technical Field
The invention relates to the technical field of engineering construction, in particular to a structure for closely arranging a comprehensive pipeline and a pile foundation. The invention also relates to a method for simultaneously constructing the structure for arranging the comprehensive pipeline and the pile foundation in a short distance.
Background
In some special sections, due to the limitation of arrangement space, urban comprehensive pipelines and structural pile foundations are often in a short distance. The existing urban comprehensive pipelines and the structural pile foundations which are relatively close to each other are usually constructed in stages, one structural object is constructed, the other structural object is constructed, the construction period is long, repeated excavation and repeated protection exist, the construction process is complex, great waste is caused, and the constructed structural object is damaged when the construction process is repeated.
Therefore, it is necessary to provide a structure for arranging the integrated pipeline and the pile foundation at a short distance.
Disclosure of Invention
A first object of the present invention is to overcome the above-mentioned disadvantages of the background art and to provide a structure for arranging a complex pipeline and a pile foundation in a close distance.
A second object of the present invention is to provide a method for simultaneously constructing a structure in which a composite pipeline and a pile foundation are arranged in a short distance, in order to overcome the disadvantages of the background art described above.
In order to achieve the first object, the technical scheme of the invention is as follows: closely arrange the structure of synthesizing pipeline and pile foundation, its characterized in that: comprises an upper soft stratum, a lower hard stratum and a steel casing; the steel pile casings are arranged at intervals, the middle parts of the steel pile casings are positioned in an upper soft stratum, the lower parts of the steel pile casings are positioned in a lower hard stratum, and pile foundations are poured in the steel pile casings; a comprehensive pipeline is arranged in the upper soft stratum; the comprehensive pipeline is positioned on two sides of the steel casing cylinders.
In order to achieve the second object, the invention has the technical scheme that: the method for simultaneously constructing the comprehensive pipeline and the pile foundation in close distance arrangement is characterized by comprising the following steps,
step 1: determining the positions of the comprehensive pipeline and the pile foundation, inserting and driving a steel sheet pile between the pile foundation and the comprehensive pipeline, and inserting and driving a steel casing at the position of the pile foundation; inserting and driving the steel sheet piles and the steel casing to the lower hard stratum and exceed the elevation of the comprehensive pipeline;
step 2: excavating a foundation pit at the position of the comprehensive pipeline, and simultaneously drilling a hole in the steel casing;
and step 3: constructing a comprehensive pipeline, and simultaneously drilling a steel casing;
and 4, step 4: after the construction of the comprehensive pipeline is finished, backfilling the foundation pit, pulling out the steel sheet pile and pouring a pile foundation;
and 5: and finishing foundation pit filling and pile foundation construction.
In the above technical scheme, in the step 2, a rotary drilling rig or a manual drilling rig is selected for drilling the pile foundation.
The invention adopts effective measures to ensure that the comprehensive pipeline and the pile foundation are simultaneously and smoothly constructed, effectively shortens the construction period of the project, avoids the staged construction of the comprehensive pipeline and the pile foundation, avoids the repeated excavation of the ground, simplifies the construction process of the project, avoids the risk of damaging the constructed structure by the repeated excavation, greatly reduces the construction cost and effectively reduces the influence on the environmental quality due to the repeated excavation.
Drawings
Fig. 1 is a schematic structural diagram of a steel sheet pile and a steel casing inserted into a lower hard stratum.
Fig. 2 is a schematic structural diagram of excavation of a foundation pit and drilling of a steel casing.
FIG. 3 is a schematic structural diagram of a steel casing for construction of a comprehensive pipeline and drilling.
Fig. 4 is a schematic structural diagram of the present invention.
Detailed Description
The embodiments of the present invention will be described in detail with reference to the accompanying drawings, which are not intended to limit the present invention, but are merely exemplary. While the advantages of the invention will be apparent and readily appreciated by the description.
With reference to the accompanying drawings: closely arrange the structure of synthesizing pipeline and pile foundation, its characterized in that: comprises an upper soft stratum 11, a lower hard stratum 12 and a steel casing 2; the steel casing 2 is arranged at intervals, the middle part of the steel casing 2 is positioned in an upper soft stratum 11, the lower part of the steel casing 2 is positioned in a lower hard stratum 12, and a pile foundation 21 is poured in the steel casing 2; a comprehensive pipeline 3 is arranged in the upper soft stratum 11; the comprehensive pipeline 3 is positioned on two sides of the steel casing 2.
The method for simultaneously constructing the comprehensive pipeline and the pile foundation in close distance arrangement is characterized by comprising the following steps,
step 1: determining the positions of the comprehensive pipeline 3 and the pile foundation 21, inserting and driving a steel sheet pile 4 between the pile foundation 21 and the comprehensive pipeline 3, and simultaneously inserting and driving a steel casing 2 at the position of the pile foundation 21; the steel sheet pile 4 and the steel casing 2 are inserted into the lower hard stratum 12 and exceed the elevation of the comprehensive pipeline 3;
step 2: excavating a foundation pit 5 at the position of the comprehensive pipeline 3, and simultaneously drilling a hole in the steel casing 2;
and step 3: constructing a comprehensive pipeline 3, and simultaneously drilling the steel casing 2;
and 4, step 4: after the construction of the comprehensive pipeline 3 is finished, backfilling the foundation pit 5, pulling out the steel sheet pile 4 and pouring a pile foundation 21;
and 5: and after the foundation pit 5 is filled and the pile foundation 21 is constructed, the steel casing 2 is not recovered and is permanently reserved.
In step 2, the pile foundation 21 is drilled while the impact drill with large vibration is forbidden, and the rotary drilling drill with small vibration or manual drilling is selected.
According to the invention, the steel sheet pile 4 and the steel casing 2 are isolated, the pile foundation 21 is drilled by a rotary drilling or manual hole digging construction method with less disturbance to the stratum, so that the influence on the construction of the comprehensive pipeline is reduced, and meanwhile, the pile foundation 21 is drilled by specially-configured slurry to ensure that the pile foundation is not collapsed, so that the stratum is stable, and the smooth construction of the comprehensive pipeline 3 is ensured.
Other parts not described belong to the prior art.
Claims (3)
1. Closely arrange the structure of synthesizing pipeline and pile foundation, its characterized in that: comprises an upper soft stratum (11), a lower hard stratum (12) and a steel casing (2); the steel pile casings (2) are arranged at intervals, the middle parts of the steel pile casings (2) are positioned in an upper soft stratum (11), the lower parts of the steel pile casings (2) are positioned in a lower hard stratum (12), and pile foundations (21) are poured in the steel pile casings (2); a comprehensive pipeline (3) is arranged in the upper soft stratum (11); the comprehensive pipeline (3) is positioned on two sides of the steel casing cylinders (2).
2. The method for simultaneously constructing the comprehensive pipeline and the pile foundation in close distance arrangement is characterized by comprising the following steps,
step 1: determining the positions of the comprehensive pipeline (3) and the pile foundation (21), inserting and driving a steel sheet pile (4) between the pile foundation (21) and the comprehensive pipeline (3), and inserting and driving a steel casing (2) at the position of the pile foundation (21); the steel sheet pile (4) and the steel casing (2) are inserted into the lower hard stratum (12) and exceed the elevation of the comprehensive pipeline (3);
step 2: excavating a foundation pit (5) at the position of the comprehensive pipeline (3), and simultaneously drilling a hole in the steel casing (2);
and step 3: constructing the comprehensive pipeline (3), and simultaneously drilling the steel casing (2);
and 4, step 4: after the construction of the comprehensive pipeline (3) is finished, backfilling the foundation pit (5) while pulling out the steel sheet pile (4) and pouring a pile foundation (21);
and 5: the foundation pit (5) is completely filled and the pile foundation (21) is completely constructed.
3. The method for simultaneously constructing a close-spaced integrated pipeline and a pile foundation according to claim 2, wherein: in the step 2, a rotary drilling rig or a manual drilling rig is selected when the pile foundation (21) is drilled.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010733724.2A CN111809644A (en) | 2020-07-27 | 2020-07-27 | Structure for closely arranging comprehensive pipeline and pile foundation and simultaneous construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010733724.2A CN111809644A (en) | 2020-07-27 | 2020-07-27 | Structure for closely arranging comprehensive pipeline and pile foundation and simultaneous construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111809644A true CN111809644A (en) | 2020-10-23 |
Family
ID=72862682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010733724.2A Pending CN111809644A (en) | 2020-07-27 | 2020-07-27 | Structure for closely arranging comprehensive pipeline and pile foundation and simultaneous construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111809644A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2162123C2 (en) * | 1998-11-10 | 2001-01-20 | Кубанский государственный аграрный университет | Device for protecting pipelines against landslides |
CN204298862U (en) * | 2014-12-01 | 2015-04-29 | 中铁上海工程局集团第二工程有限公司 | A kind of boring vibration damping arrangement of neighboringly buried pipeline |
CN110158649A (en) * | 2019-06-05 | 2019-08-23 | 浙江交工集团股份有限公司 | The construction method of Adjacent Underground Pipeline when a kind of caisson sinking construction |
CN110424454A (en) * | 2019-07-10 | 2019-11-08 | 中铁第四勘察设计院集团有限公司 | Build together method and the structure of building together of pipe gallery and subway station |
CN110685290A (en) * | 2019-10-12 | 2020-01-14 | 上海市政工程设计研究总院(集团)有限公司 | Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof |
-
2020
- 2020-07-27 CN CN202010733724.2A patent/CN111809644A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2162123C2 (en) * | 1998-11-10 | 2001-01-20 | Кубанский государственный аграрный университет | Device for protecting pipelines against landslides |
CN204298862U (en) * | 2014-12-01 | 2015-04-29 | 中铁上海工程局集团第二工程有限公司 | A kind of boring vibration damping arrangement of neighboringly buried pipeline |
CN110158649A (en) * | 2019-06-05 | 2019-08-23 | 浙江交工集团股份有限公司 | The construction method of Adjacent Underground Pipeline when a kind of caisson sinking construction |
CN110424454A (en) * | 2019-07-10 | 2019-11-08 | 中铁第四勘察设计院集团有限公司 | Build together method and the structure of building together of pipe gallery and subway station |
CN110685290A (en) * | 2019-10-12 | 2020-01-14 | 上海市政工程设计研究总院(集团)有限公司 | Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110219654B (en) | Advanced construction method for side pilot tunnel of mud-rock arch tunnel | |
CN101328712A (en) | Construction method of interlocking pile for soft soil and soil layer with obstacle | |
CN104947690B (en) | Grooving construction method for embedding underground continuous wall into rock | |
CN110735600B (en) | Mechanical pore-forming pile construction process for karst geology | |
CN102660955B (en) | Quick construction method for foundation pit slope support | |
CN102776884B (en) | In stir and rotate prestressed centrifugally pile tube pile-sinking device and pile-sinking method thereof | |
CN104963346A (en) | Support construction method for deep foundation pit in complex geological condition | |
CN101982614A (en) | Method for drilling rocks into pile by utilizing all casing drill | |
CN201762702U (en) | Drilling bitten pile | |
CN105442614A (en) | Construction method for foundation pit support | |
KR100543727B1 (en) | Ground boring method using double rock excavation | |
KR20080027481A (en) | Ground boring method using multi-point rock boring | |
CN105200994A (en) | Construction method for reserved shield crossing composite foundation pit support device | |
CN101481913A (en) | Construction method of rock-socketed underground continuous wall punching slot section | |
CN105909262A (en) | Subsurface tunnel driving method | |
CN104695478B (en) | Ultra-deep underground diaphragm wall built-in buried pipe structure and construction method thereof | |
JP2001336149A (en) | Taper pile for civil engineering and building work foundation construction, foundation construction equipment therefor, and embedding method therefor | |
CN207878472U (en) | Solid matter step type rotary digging pile supporting system | |
CN111809644A (en) | Structure for closely arranging comprehensive pipeline and pile foundation and simultaneous construction method thereof | |
CN213062070U (en) | Structure for closely arranging comprehensive pipeline and pile foundation | |
CN205742191U (en) | A kind of piling wall constructing device continuously | |
CN205100226U (en) | Underground continuous wall goes into rock grooving construction equipment | |
CN109555127A (en) | A kind of construction for the flush type multimedium built pile that drills | |
CN113481971A (en) | Construction method for forming hole of cast-in-place pile under complex geological condition | |
CN102383429B (en) | Digging pile-sinking device in the middle of a kind of heavy caliber pile tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201023 |
|
RJ01 | Rejection of invention patent application after publication |