CN213062070U CN202021506796.5U CN202021506796U CN213062070U CN 213062070 U CN213062070 U CN 213062070U CN 202021506796 U CN202021506796 U CN 202021506796U CN 213062070 U CN213062070 U CN 213062070U
Authority
CN
China
Prior art keywords
steel casing
pile foundation
pipeline
stratum
upper soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021506796.5U
Other languages
Chinese (zh)
Inventor
唐清华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN202021506796.5U priority Critical patent/CN213062070U/en
Application granted granted Critical
Publication of CN213062070U publication Critical patent/CN213062070U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a closely arrange structure of synthesizing pipeline and pile foundation relates to engineering construction technical field. The device comprises an upper soft stratum, a lower hard stratum and a steel casing; the middle part of the steel casing is positioned in the upper soft stratum, the lower part of the steel casing is positioned in the lower hard stratum, and a pile foundation is poured in the steel casing; the upper soft stratum is provided with a comprehensive pipeline. The utility model discloses the construction cost has greatly been reduced to effectively reduced owing to excavate the influence to environmental quality repeatedly.

Description

Structure for closely arranging comprehensive pipeline and pile foundation
Technical Field
The utility model relates to an engineering construction technical field, the more specifically it is a closely arrange structure of synthesizing pipeline and pile foundation that says so.
Background
In some special sections, due to the limitation of arrangement space, urban comprehensive pipelines and structural pile foundations are often in a short distance. The existing urban comprehensive pipelines and the structural pile foundations which are relatively close to each other are usually constructed in stages, one structural object is constructed, the other structural object is constructed, the construction period is long, repeated excavation and repeated protection exist, the construction process is complex, great waste is caused, and the constructed structural object is damaged when the construction process is repeated.
Therefore, it is necessary to provide a structure for arranging the integrated pipeline and the pile foundation at a short distance.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the weak point of above-mentioned background art, and provide a closely arrange structure of synthesizing pipeline and pile foundation.
In order to realize the purpose, the technical scheme of the utility model is that: closely arrange the structure of synthesizing pipeline and pile foundation, its characterized in that: comprises an upper soft stratum, a lower hard stratum and a steel casing; the middle part of the steel casing is positioned in the upper soft stratum, the lower part of the steel casing is positioned in the lower hard stratum, and a pile foundation is poured in the steel casing; and a comprehensive pipeline is arranged in the upper soft stratum.
In the technical scheme, the comprehensive pipelines are positioned on two sides of the steel casing.
The utility model discloses take effective measure to make comprehensive pipeline and pile foundation be under construction smoothly simultaneously, effectively shorten engineering construction period, avoided comprehensive pipeline and pile foundation construction in stages, avoid ground to be excavated repeatedly, simplified engineering construction process to avoided excavating repeatedly to the impaired risk of the structure of having under construction thing, greatly reduced construction cost, and effectively reduced because the influence of excavating repeatedly to environmental quality.
Drawings
Fig. 1 is a schematic structural diagram of a steel sheet pile and a steel casing inserted into a lower hard stratum.
Fig. 2 is a schematic structural diagram of excavation of a foundation pit and drilling of a steel casing.
FIG. 3 is a schematic structural diagram of a steel casing for construction of a comprehensive pipeline and drilling.
Fig. 4 is a schematic structural diagram of the present invention.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings, which are not intended to limit the present invention, but are merely exemplary. While the advantages of the invention will be apparent and readily appreciated by the description.
With reference to the accompanying drawings: closely arrange the structure of synthesizing pipeline and pile foundation, its characterized in that: comprises an upper soft stratum 11, a lower hard stratum 12 and a steel casing 2; the middle part of the steel casing 2 is positioned in the upper soft stratum 11, the lower part of the steel casing 2 is positioned in the lower hard stratum 12, and a pile foundation 21 is poured in the steel casing 2; the upper soft stratum 11 is internally provided with a comprehensive pipeline 3.
The comprehensive pipelines 3 are positioned on two sides of the steel casing 2; a plurality of the steel casing 2 are arranged at intervals.
The method for simultaneously constructing the comprehensive pipeline and the pile foundation in close distance arrangement is characterized by comprising the following steps,
step 1: determining the positions of the comprehensive pipeline 3 and the pile foundation 21, inserting and driving a steel sheet pile 4 between the pile foundation 21 and the comprehensive pipeline 3, and simultaneously inserting and driving a steel casing 2 at the position of the pile foundation 21; the steel sheet pile 4 and the steel casing 2 are inserted into the lower hard stratum 12 and exceed the elevation of the comprehensive pipeline 3;
step 2: excavating a foundation pit 5 at the position of the comprehensive pipeline 3, and simultaneously drilling a hole in the steel casing 2;
and step 3: constructing a comprehensive pipeline 3, and simultaneously drilling the steel casing 2;
and 4, step 4: after the construction of the comprehensive pipeline 3 is finished, backfilling the foundation pit 5, pulling out the steel sheet pile 4 and pouring a pile foundation 21;
and 5: and after the foundation pit 5 is filled and the pile foundation 21 is constructed, the steel casing 2 is not recovered and is permanently reserved.
In step 2, the pile foundation 21 is drilled while the impact drill with large vibration is forbidden, and the rotary drilling drill with small vibration or manual drilling is selected.
The utility model discloses a steel sheet pile 4 and steel protect a section of thick bamboo 2 and keep apart, use to the less digging soon of stratum disturbance bore or the artifical hole construction method construction pile foundation 21 drilling reduces the influence to synthesizing the pipeline construction, and pile foundation 21 drilling adopts the mud of special configuration to guarantee that pile foundation drilling does not collapse the hole simultaneously, guarantees that the stratum is stable to ensure to synthesize pipeline 3 and construct smoothly.
Other parts not described belong to the prior art.

Claims (2)

1. Closely arrange the structure of synthesizing pipeline and pile foundation, its characterized in that: comprises an upper soft stratum (11), a lower hard stratum (12) and a steel casing (2); the middle part of the steel casing (2) is positioned in an upper soft stratum (11), the lower part of the steel casing is positioned in a lower hard stratum (12), and a pile foundation (21) is poured in the steel casing (2); and a comprehensive pipeline (3) is arranged in the upper soft stratum (11).
2. The structure of close-spaced complex pipeline and pile foundation of claim 1, wherein: the comprehensive pipelines (3) are positioned on two sides of the steel casing (2).
CN202021506796.5U 2020-07-27 2020-07-27 Structure for closely arranging comprehensive pipeline and pile foundation Active CN213062070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021506796.5U CN213062070U (en) 2020-07-27 2020-07-27 Structure for closely arranging comprehensive pipeline and pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021506796.5U CN213062070U (en) 2020-07-27 2020-07-27 Structure for closely arranging comprehensive pipeline and pile foundation

Publications (1)

Publication Number Publication Date
CN213062070U true CN213062070U (en) 2021-04-27

Family

ID=75577869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021506796.5U Active CN213062070U (en) 2020-07-27 2020-07-27 Structure for closely arranging comprehensive pipeline and pile foundation

Country Status (1)

Country Link
CN (1) CN213062070U (en)

Similar Documents

Publication Publication Date Title
CN101328712A (en) Construction method of interlocking pile for soft soil and soil layer with obstacle
BR112021004781A2 (en) GROUTING CONSOLIDATION METHOD FOR PREFABRICATED POLE OF FULL ENVELOPE WELL GUIDE AND PREFABRICATED POLE FOR THE SAME
CN110735600B (en) Mechanical pore-forming pile construction process for karst geology
CN102660955B (en) Quick construction method for foundation pit slope support
CN102776884B (en) In stir and rotate prestressed centrifugally pile tube pile-sinking device and pile-sinking method thereof
CN201762702U (en) Drilling bitten pile
KR20080027481A (en) Ground boring method using multi-point rock boring
CN105909262B (en) A kind of bored tunnel driving method
CN105442614A (en) Construction method for foundation pit support
KR100543727B1 (en) Ground boring method using double rock excavation
CN114482099A (en) Steel sheet pile cofferdam construction method
JP2013147926A (en) Tubular pile installation method, excavation method, inner digger device and gripping device
CN213062070U (en) Structure for closely arranging comprehensive pipeline and pile foundation
CN211113714U (en) Thin-wall full-surrounding embedded foundation suitable for rock foundation
CN112726627A (en) Cast-in-situ bored pile structure in area with intense karst and construction method
JP2001336149A (en) Taper pile for civil engineering and building work foundation construction, foundation construction equipment therefor, and embedding method therefor
CN209669900U (en) Tunnel construction cofferdam structure in water-bed highly permeable sandy soil layer
CN111877321A (en) Cast-in-place pile applied to underground reinforced concrete structure and construction method thereof
CN111809644A (en) Structure for closely arranging comprehensive pipeline and pile foundation and simultaneous construction method thereof
CN114411745A (en) Post-grouting device for pile end of steel pipe pile and construction method thereof
CN110185046B (en) Ground source well-digging horizontal connecting pipe construction method
CN203321523U (en) Large-span high-side-wall underground space building
CN206034466U (en) Foundation ditch or basic groove precipitation system for construction
CN115110518B (en) Method for constructing underwater strong weathered rock stratum steel sheet pile by using rotary drilling rig
CN217870557U (en) Cofferdam structure located on bias water-approaching slope

Legal Events