CN203321523U - Large-span high-side-wall underground space building - Google Patents

Large-span high-side-wall underground space building Download PDF

Info

Publication number
CN203321523U
CN203321523U CN2013203674670U CN201320367467U CN203321523U CN 203321523 U CN203321523 U CN 203321523U CN 2013203674670 U CN2013203674670 U CN 2013203674670U CN 201320367467 U CN201320367467 U CN 201320367467U CN 203321523 U CN203321523 U CN 203321523U
Authority
CN
China
Prior art keywords
underground space
hole
space building
boundary line
yumao
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013203674670U
Other languages
Chinese (zh)
Inventor
刘要来
赵一航
乔净净
赵红敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Hydrochina Zhongnan Engineering Corp
Original Assignee
Hydrochina Zhongnan Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Zhongnan Engineering Corp filed Critical Hydrochina Zhongnan Engineering Corp
Priority to CN2013203674670U priority Critical patent/CN203321523U/en
Application granted granted Critical
Publication of CN203321523U publication Critical patent/CN203321523U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a large-span high-side-wall underground space building and aims to solve the problems that a conventional underground space building is large in tunneling surface, complex in construction process, long in construction period and high in excavation and support cost, and doesn't adapt to deformation characteristics of soft strata. The large-span high-side-wall underground space building comprises an underground space building body, wherein a plurality of side boundary prestressing anchor holes are formed in the position of a side wall boundary line of the underground space building body; a plurality of boundary line outside prestressing anchor holes are formed in the outer side of the side wall boundary line of the underground space building body; the side boundary prestressing anchor holes and the boundary line outside prestressing anchor holes are communicated through corresponding through prestressing anchor holes; and through prestressing anchor rods or cables are arranged in the through prestressing anchor holes. According to the large-span high-side-wall underground space building, small hole cavities dug in the soft strata are formed easily; anchoring is performed firstly, and then digging is performed; and the large-span high-side-wall underground space building is dug according to the prior art. The excavation and support are simple, and the building is stable.

Description

A kind of large span high side wall underground space building
Technical field
The utility model relates to excavation supporting field, a kind of underground structure, is specially a kind of large span high side wall underground space building, is mainly used in soft stratum large span, high side wall underground space building.
Background technology
21 century, development along with Chinese national economy, the needs of the adjustment of national strategy, national defense construction and urban infrastructure development, underground large span high side wall space structures increases gradually, as large span pumped storage underground power house, underground military storage, antiaircraft facility, subway tunnel etc., and rock weakness in the region that requires to build often, the cavitation condition is poor.Adopt existing excavation supporting technology, i.e. layer and section, limit excavation limit supporting, excavation construction difficulty is large, cost is high, often excavation is afterwards not as good as supporting, just produce distortion and collapse, causing personnel, equipment, property loss, occurring yielding and the phenomenon of addressing again.
The utility model content
Large in order to overcome existing large span high side wall underground space building excavation supporting development end, complicated construction technique, long in time limit, incompatible with the deformation characteristic of soft stratum, the excavation supporting expense is high not enough, the utility model aims to provide a kind of large span high side wall underground space building, utilize the small-sized cavern of excavation in soft stratum easily to form, by digging after first anchor, after the soft stratum of crown and high side wall certain limit being reinforced in advance, by prior art, large span high side wall underground space building is excavated again, excavation supporting is simple, building is firm.
To achieve these goals, the technical scheme that the utility model adopts is: a kind of soft stratum large span high side wall underground space building, comprise underground space structure trunk, its design feature is, the place, side edge boundary line of described underground space structure trunk offers Chu Yumao hole, a plurality of sideline, and the outside, side edge boundary line of this underground space structure trunk offers Wai Yumao hole, a plurality of boundary line; Between described Chu Yumao hole, a plurality of sideline and Wai Yumao hole, a plurality of boundary line, by being communicated with wearing pre-anchor hole accordingly, each is provided with wearing prestressed anchor or rope wearing in pre-anchor hole.
Further, the bearing of trend in Wai Yumao hole, Chu Yumao Dong He boundary line, described sideline is consistent with the bearing of trend of underground space structure trunk hole.
Excavation supporting method of the present utility model comprises the steps:
Chu Yumao hole, a plurality of sideline is excavated at the place, sideline of the underground space structure trunk 1) designed the next-door neighbour in advance; The outside, sideline at underground space structure trunk offers Wai Yumao hole, a plurality of boundary line;
2) bore wearing pre-anchor hole, by the corresponding connection in Wai Yumao hole, Chu Yumao Dong He boundary line, sideline, and install wearing prestressed anchor or rope wearing in pre-anchor hole at brill, before large span high side wall underground space building excavation, implement prestress anchoraging;
3) the large span high side wall underground space building of design carried out to excavation supporting.
Large span high side wall underground space building described in the utility model is the underground space building be arranged in soft stratum, has solved prior art and has met with soft stratum and yield and the problem of addressing again.
By said structure, the utility model at next-door neighbour sideline, underground structure and sideline periphery certain limit place, excavate in advance series as anchoring, use hold, implement bore operation duck eye (being called pre-anchor hole); Utilize pre-anchor hole to implement bore operation, UNICOM, with layer and corresponding pre-anchor hole, utilizes pre-anchor hole, boring to implement prestress anchoraging before the longspan underground structure excavation; After above-mentioned first anchor measure is implemented, then use conventional method to carry out the excavation supporting of longspan underground structure.
Compared with prior art, the beneficial effects of the utility model are:
1) soft rock mass in longspan underground structure top, abutment wall certain limit has been carried out reinforcing in advance before excavation, safeguarded and improved the mechanical property of soft rock mass, for the safety of underground structure excavation and follow-up conventional supporting provides assurance.
2) the first pre-anchor hole of excavation, next-door neighbour building sideline as construction period temporary drainage hole, the permanent drainage tunnel of conduct of periphery, can effectively reduce construction period and runtime groundwater level, reduces the water ballast(ing) effect, reduces follow-up support engineering amount.
The pre-anchor hole of 3) first excavating, as the Supplementary Exploration hole of construction period, more be conducive to accurately hold geological condition, for follow-up underground structure excavation provides the foundation.
4) next-door neighbour De Yumao hole, building sideline is arranged in the sideline, underground structure, as the part of permanent section, without increasing in addition investment.
In sum, the shortcomings such as the utility model has overcome that the prior art development end is large, complicated construction technique, long in time limit, incompatible with the deformation characteristic of soft stratum, excavation supporting expense height, and simple in structure, economical rationality, easy construction, be applicable to the excavation construction of the longspan underground structure under different geological conditions, especially soft stratum large span high retaining wall underground structures.
Below in conjunction with drawings and Examples, the utility model is further elaborated.
The accompanying drawing explanation
Fig. 1 is the structure principle chart of an embodiment of the utility model;
The schematic cross-sectional view that Fig. 2 is Fig. 1.
In the drawings
1-underground space structure trunk; Chu Yumao hole, 2-sideline; Wai Yumao hole, 3-boundary line;
4-is to wearing pre-anchor hole; 5-is to wearing prestressed anchor or rope.
The specific embodiment
A kind of soft stratum large span high side wall underground space building, as illustrated in fig. 1 and 2, comprise underground space structure trunk 1, Chu Yumao hole, sideline 2, Wai Yumao hole, boundary line 3, to wearing pre-anchor hole 4, to wearing prestressed anchor or rope 5.
The concrete steps of large span high side wall underground space building excavation supporting method are:
At first, near design underground space structure trunk 1 structure sideline reaches, the corresponding pre-anchor hole 2,3 that can hold, implement bore operation is excavated respectively at the certain limit place;
Secondly, the pre-anchor hole 2 of correspondence with bore and dig wearing anchor hole 4 between anchor hole 3 in advance; Then, utilize and implement wearing prestressed anchor or rope 5 in pre-anchor hole 2,3 wearing anchor hole 4, to before the longspan underground structure excavation, implementing pre-anchoring;
Finally, utilize pre-anchor hole 2,3 drainage, to wear prestressed anchor or rope 5 and anchorage effect, form under metastable wall rock condition, use conventional excavation technology to carry out the excavation supporting work of underground structure.
The double construction period temporary drainage hole of doing, Chu Yumao hole, sideline described in the utility model 2, Wai Yumao hole 3, sideline is as the permanent draining in underground structure 1 and deformation observation gallery, to wearing prestressed anchor or rope 5 as the permanent supporting measure in underground structure 1, with the excavation supporting measure of follow-up underground structure 1, form rationally, efficient system excavation supporting structure, guaranteed the safety and stability of 1 construction period of underground structure and runtime.
The content that above-described embodiment is illustrated should be understood to these embodiment only for being illustrated more clearly in the utility model, and be not used in the restriction scope of the present utility model, after having read the utility model, those skilled in the art all fall within the application's claims limited range to the modification of the various equivalent form of values of the present utility model.

Claims (2)

1. a large span high side wall underground space building, comprise underground space structure trunk (1), it is characterized in that, the place, side edge boundary line of described underground space structure trunk (1) offers Chu Yumao hole, a plurality of sideline (2), and the outside, side edge boundary line of this underground space structure trunk (1) offers Wai Yumao hole, a plurality of boundary line (3); Between described Chu Yumao hole, a plurality of sideline (2) and Wai Yumao hole, a plurality of boundary line (3), by being communicated with wearing pre-anchor hole (4) accordingly, each is provided with wearing prestressed anchor or rope (5) wearing in pre-anchor hole (4).
2. large span high side wall underground space building according to claim 1, is characterized in that, the bearing of trend in Chu Yumao hole, described sideline (2) and Wai Yumao hole, boundary line (3) is consistent with the bearing of trend of underground space structure trunk (1) hole.
CN2013203674670U 2013-06-26 2013-06-26 Large-span high-side-wall underground space building Expired - Lifetime CN203321523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203674670U CN203321523U (en) 2013-06-26 2013-06-26 Large-span high-side-wall underground space building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203674670U CN203321523U (en) 2013-06-26 2013-06-26 Large-span high-side-wall underground space building

Publications (1)

Publication Number Publication Date
CN203321523U true CN203321523U (en) 2013-12-04

Family

ID=49660885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203674670U Expired - Lifetime CN203321523U (en) 2013-06-26 2013-06-26 Large-span high-side-wall underground space building

Country Status (1)

Country Link
CN (1) CN203321523U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306682A (en) * 2013-06-26 2013-09-18 中国水电顾问集团中南勘测设计研究院 Long-span and high-side-wall underground space building and excavation support method thereof
CN103306248A (en) * 2013-07-01 2013-09-18 中国水电顾问集团中南勘测设计研究院 High dam spillway foundation drainage system and excavation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306682A (en) * 2013-06-26 2013-09-18 中国水电顾问集团中南勘测设计研究院 Long-span and high-side-wall underground space building and excavation support method thereof
CN103306682B (en) * 2013-06-26 2015-03-25 中国电建集团中南勘测设计研究院有限公司 Long-span and high-side-wall underground space building and excavation support method thereof
CN103306248A (en) * 2013-07-01 2013-09-18 中国水电顾问集团中南勘测设计研究院 High dam spillway foundation drainage system and excavation method

Similar Documents

Publication Publication Date Title
CN103306682B (en) Long-span and high-side-wall underground space building and excavation support method thereof
CN102155232B (en) Construction method of large-span asymmetrical double-arch railway tunnel under terrain bias pressure condition
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN104165056A (en) Construction method for excavating water-rich shallow underground excavation tunnel
CN103775110A (en) Underground excavation construction method for multilayer underground space of soft soil area
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN109056810A (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction and its construction method
CN105155548A (en) Cable double-row pile (wall) supporting structure
CN104653188A (en) Method for arranging large-diameter shield receiving and originating well in underground-excavated air duct
CN105780806A (en) Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN203229955U (en) Foundation pit enclosure structure allowing supporting while excavating
CN103306248A (en) High dam spillway foundation drainage system and excavation method
CN103939115A (en) Semi-subsurface excavation method construction shed tunnel method and structure
CN203321523U (en) Large-span high-side-wall underground space building
CN204311456U (en) Foundation ditch strengthening structure
CN208815566U (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction
CN205188976U (en) Drag -line double row pile supporting construction
CN211900659U (en) Shallow-buried large-span underground cavern excavation supporting arrangement structure
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN104389609A (en) No-blasting mechanical digging method
CN209780906U (en) Tunnel hole-entering structure
CN204457784U (en) Large-diameter shield in a kind of tunneling air channel receives and starting well
CN103711115B (en) A kind of ground stabilization of overall transportation by driving formula water-fetching head and joint and construction method
CN203924043U (en) A kind of bamboo concrete stake

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN +

Free format text: FORMER NAME: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

Owner name: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

Free format text: FORMER NAME: ZHONGNAN PROSPECTING DESIGN INST. CHINA HYDRAUELECTRIC CONSULTANT GROUP

CP01 Change in the name or title of a patent holder

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd.

Address before: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee before: HYDROCHINA ZHONGNAN ENGINEERING Corp.

CP03 Change of name, title or address

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: HYDROCHINA ZHONGNAN ENGINEERING Corp.

Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Patentee before: Mid-South Hydroelectric Investigation & Design Institute of China Hydropower Engineering Consulting Group

AV01 Patent right actively abandoned

Granted publication date: 20131204

Effective date of abandoning: 20150325

AV01 Patent right actively abandoned

Granted publication date: 20131204

Effective date of abandoning: 20150325

RGAV Abandon patent right to avoid regrant