CN110685290A - Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof - Google Patents

Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof Download PDF

Info

Publication number
CN110685290A
CN110685290A CN201910965941.1A CN201910965941A CN110685290A CN 110685290 A CN110685290 A CN 110685290A CN 201910965941 A CN201910965941 A CN 201910965941A CN 110685290 A CN110685290 A CN 110685290A
Authority
CN
China
Prior art keywords
steel
steel sheet
sheet piles
temporary
cofferdam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910965941.1A
Other languages
Chinese (zh)
Inventor
王璐璐
仲云飞
邬显晨
董学刚
马如彬
母冬青
周佳毅
朱世贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201910965941.1A priority Critical patent/CN110685290A/en
Publication of CN110685290A publication Critical patent/CN110685290A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a cofferdam combining a permanent structure pile foundation and a temporary steel sheet pile, which comprises double rows of steel sheet piles consisting of a front row of steel sheet piles and a rear row of steel sheet piles and a permanent structure pile foundation, and is characterized in that connecting beams are arranged between the double rows of steel sheet piles, and the double rows of steel sheet piles, the connecting beams between the double rows of steel sheet piles and filling soil form a waterproof curtain; the upper part of the permanent structure pile foundation is provided with a steel cross beam, a steel longitudinal beam and a horizontal shear support, the permanent structure pile foundation, the upper steel cross beam, the steel longitudinal beam and the horizontal shear support form a supporting structure, and the supporting structure is also used as a temporary construction steel platform; and a steel purlin is welded between the steel platform and the double rows of steel sheet piles to form the temporary cofferdam. The invention adopts the permanent structure pile foundation to be integrally connected with the temporary steel sheet pile, better controls the displacement of the temporary cofferdam, has little influence on the existing buildings around, reasonably utilizes the permanent structure pile foundation and reduces the construction cost.

Description

Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof
Technical Field
The invention relates to the technical field of cofferdam engineering, wharf engineering and flood control walls, in particular to a cofferdam combining a permanent structure pile foundation and a temporary steel sheet pile and a construction method thereof, which are suitable for simultaneously constructing a flood control wall and a wharf engineering.
Background
At present, cofferdams in wharfs and flood wall projects mainly comprise earth cofferdams and steel sheet pile cofferdams. For the environment with larger water depth and poorer construction conditions, the construction cost of the earth cofferdam is high, and the influence on the surrounding environment and buildings is large. Meanwhile, in recent years, the standard of flood prevention wall engineering is further improved, the soil retaining height is continuously increased, and the common steel sheet pile structure is difficult to meet the requirements of displacement and other control. Especially, when the wharf project and the flood prevention wall project are built simultaneously, due to the reasons of profession, coordination and the like, the wharf project and the flood prevention wall project are always built separately, a large amount of manpower and material resources are wasted, a good construction platform is not provided, and good temporary flood prevention measures are not provided.
Along with the improvement of the environmental awareness of people and the requirement of cost reduction, the temporary cofferdam is required to be applicable to a deep water area, and can be used as a construction platform and a temporary flood prevention structure.
Disclosure of Invention
The invention aims to design a cofferdam combining a permanent structure pile foundation and a temporary steel sheet pile aiming at the defects of the prior art, the permanent structure pile foundation and the temporary steel sheet pile are integrally connected, the displacement of the temporary cofferdam is well controlled, the influence on the existing buildings around is small, the permanent structure pile foundation is reasonably utilized, and the construction cost is reduced; the device is suitable for the environment that the rear field is small and only the construction of the water platform can be utilized; the method is also suitable for the conditions of deeper water depth and high cofferdam requirement; the construction method is particularly suitable for building front open type structures and rear water-stop structures (such as wharfs, flood walls and the like) in areas with high environmental protection requirements and limited construction sites.
The purpose of the invention is realized as follows: a cofferdam combining a permanent structure pile foundation and a temporary steel sheet pile comprises double rows of steel sheet piles consisting of the temporary steel sheet piles and the permanent steel sheet piles and a permanent structure pile foundation, and is characterized in that connecting beams are arranged between the double rows of steel sheet piles, and the connecting beams and the filling soil between the double rows of steel sheet piles form a waterproof curtain; the upper part of the permanent structure pile foundation is provided with a steel cross beam, a steel longitudinal beam and a horizontal shear support, the permanent structure pile foundation, the upper steel cross beam, the steel longitudinal beam and the horizontal shear support form a supporting structure, and the supporting structure is also used as a temporary construction steel platform; and a steel purlin is welded between the steel platform and the double rows of steel sheet piles to form the temporary cofferdam.
Further, the steel purlin is welded between the steel cross beam and the front row of steel sheet piles.
Further, the pile tips of the double-row steel sheet piles are driven into a dense sand layer with low permeability and a standard penetration higher than 50 strokes.
Furthermore, the temporary steel sheet piles are front row steel sheet piles, the permanent steel sheet piles are rear row steel sheet piles, and the elevation of the temporary steel sheet piles is not lower than that of the permanent steel sheet piles.
The distance between the permanent steel sheet pile and the temporary steel sheet pile is determined by calculating the needed rigidity, and considering the influence factors such as pile pulling, the distance between the permanent steel sheet pile and the temporary steel sheet pile is not less than 1.5 m. The design elevation of the permanent steel sheet pile is determined by the demand of a shore side structure; the designed elevation of the temporary steel sheet pile can be consistent with the designed elevation of the permanent steel sheet pile if the temporary steel sheet pile has no special purpose; if the flood prevention wall has other purposes, such as serving as a temporary flood prevention wall, the temporary flood prevention requirement needs to be met.
Further, the cofferdam construction method combining the permanent structure pile foundation and the temporary steel sheet pile is characterized by comprising the following steps:
(1) constructing double rows of steel sheet piles, namely driving permanent steel sheet piles and temporary steel sheet piles in staggered arrangement, connecting the double rows of steel sheet piles by using connecting beams, and backfilling soil between the double rows of steel sheet piles to form a temporary waterproof curtain;
(2) constructing a permanent pile foundation, namely constructing the permanent pile foundation to a designed elevation according to the requirement of the permanent structure pile foundation;
(3) constructing a steel platform, namely installing a steel cross beam, a steel longitudinal beam and a horizontal shear brace on the upper part of a permanent pile foundation to form a temporary steel platform, and forming a support structure which is also used as the temporary construction steel platform;
(4) constructing a steel purlin, welding the steel purlin between a steel platform and double rows of steel sheet piles, and reliably connecting the steel platform and the steel sheet piles to form a temporary cofferdam;
(5) removing the temporary cofferdam, and pouring a structure behind the cofferdam and backfilling the site after the cofferdam is formed; then, removing the temporary steel sheet piles, the connecting beams, the steel cross beams, the steel longitudinal beams, the horizontal shear supports and the steel purlins in the double rows of steel sheet piles; and finally, constructing a permanent structure.
Compared with the prior art, the invention can better control the displacement of the temporary cofferdam, has little influence on the existing buildings around, reasonably utilizes the permanent structure pile foundation and reduces the construction cost; the device is suitable for the environment that the rear field is small and only the construction of the water platform can be utilized; the method is also suitable for the conditions of deeper water depth and high cofferdam requirement; the construction method is particularly suitable for building front open type structures and rear water-stop structures (such as wharfs, flood walls and the like) in areas with high environmental protection requirements and limited construction sites.
Drawings
FIG. 1 is a schematic view of the structure of the present invention.
Detailed Description
The invention is described in detail below with reference to the figures and specific embodiments of the invention.
Referring to the attached figure 1, the waterproof curtain comprises a permanent steel sheet pile 1, a temporary steel sheet pile 2, a connecting beam 3 for connecting two rows of steel sheet piles and filling 4 between the two rows of steel sheet piles; the permanent open type structure pile foundation 5, the upper steel cross beam 6, the steel longitudinal beam 7 and the horizontal shear brace 8 form a temporary steel platform and a supporting structure, and can be used as a temporary construction steel platform; the steel purlin 9 connects the steel platform and the double-layer steel sheet pile to form the temporary cofferdam.
A cofferdam construction method combining a permanent structure pile foundation and a temporary steel sheet pile is characterized in that the double-row steel sheet pile structure can be used as a temporary flood control wall in a construction period, and a steel platform structure can be used as a construction platform, and the method comprises the following steps:
(1) double-row steel sheet pile construction
The permanent steel sheet piles 1 and the temporary steel sheet piles 2 are driven in staggered rows, the pile tips are driven into a dense sand layer with low permeability and the standard penetration is higher than 50 strokes or the penetration diameter meets the required depth; the double rows of steel sheet piles are connected by a connecting beam 3 to form a temporary waterproof curtain and soil 4 is filled back in the temporary waterproof curtain.
(2) Permanent pile foundation construction
And (5) driving to a designed elevation according to the requirement of the permanent structure pile foundation 5.
(3) Construction of steel platforms
The steel cross beam 6, the steel longitudinal beam 7 and the horizontal shear brace 8 are arranged on the upper portion of the permanent pile foundation to form a temporary steel platform, and a supporting structure is formed and is also used as a temporary construction steel platform.
(4) Construction of steel purlin
And a steel surrounding purlin 9 is welded between the steel platform and the double rows of steel sheet piles, and the steel platform and the steel sheet piles form reliable connection to form a temporary cofferdam.
(5) Demolish interim cofferdam
After a cofferdam is formed, pouring a structure behind the cofferdam and backfilling a site; then, removing the temporary steel sheet piles 2, the connecting beams 3, the steel cross beams 6, the steel longitudinal beams 7, the horizontal shear supports 8 and the steel purlins 9 in the double rows of steel sheet piles; and finally, constructing a permanent structure.
While the present invention has been described in detail with reference to the preferred embodiments, it should be understood that the above description should not be taken as limiting the invention. Various modifications and alterations to this invention will become apparent to those skilled in the art upon reading the foregoing description. Accordingly, the scope of the invention should be determined from the following claims.

Claims (5)

1. A cofferdam combining a permanent structure pile foundation and a temporary steel sheet pile comprises double rows of steel sheet piles consisting of the temporary steel sheet piles and the permanent steel sheet piles and a permanent structure pile foundation, and is characterized in that connecting beams are arranged between the double rows of steel sheet piles, and the connecting beams and the filling soil between the double rows of steel sheet piles form a waterproof curtain; the upper part of the permanent structure pile foundation is provided with a steel cross beam, a steel longitudinal beam and a horizontal shear support, the permanent structure pile foundation, the upper steel cross beam, the steel longitudinal beam and the horizontal shear support form a supporting structure, and the supporting structure is also used as a temporary construction steel platform; and a steel purlin is welded between the steel platform and the double rows of steel sheet piles to form the temporary cofferdam.
2. Cofferdam according to claim 1, characterised in that said steel purlins are welded between the steel beams and the piles of the front row.
3. Cofferdam according to claim 1, characterized in that the pile tips of the double row of steel sheet piles are driven into a dense sand layer with low permeability, nominal penetration higher than 50 strokes.
4. The cofferdam of claim 1, wherein the temporary steel sheet piles are front row steel sheet piles, the permanent steel sheet piles are rear row steel sheet piles, and the temporary steel sheet piles are not lower than the elevation of the permanent steel sheet piles.
5. A cofferdam construction method combining a permanent structure pile foundation and a temporary steel sheet pile is characterized by comprising the following steps:
(1) constructing double rows of steel sheet piles, namely driving permanent steel sheet piles and temporary steel sheet piles in staggered arrangement, connecting the double rows of steel sheet piles by using connecting beams, and backfilling soil between the double rows of steel sheet piles to form a temporary waterproof curtain;
(2) constructing a permanent pile foundation, namely constructing the permanent pile foundation to a designed elevation according to the requirement of the permanent structure pile foundation;
(3) constructing a steel platform, namely installing a steel cross beam, a steel longitudinal beam and a horizontal shear brace on the upper part of a permanent pile foundation to form a temporary steel platform, and forming a support structure which is also used as the temporary construction steel platform;
(4) constructing a steel purlin, welding the steel purlin between a steel platform and double rows of steel sheet piles, and reliably connecting the steel platform and the steel sheet piles to form a temporary cofferdam;
(5) removing the temporary cofferdam, and pouring a structure behind the cofferdam and backfilling the site after the cofferdam is formed; then, removing the temporary steel sheet piles, the connecting beams, the steel cross beams, the steel longitudinal beams, the horizontal shear supports and the steel purlins in the double rows of steel sheet piles; and finally, constructing a permanent structure.
CN201910965941.1A 2019-10-12 2019-10-12 Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof Pending CN110685290A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910965941.1A CN110685290A (en) 2019-10-12 2019-10-12 Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910965941.1A CN110685290A (en) 2019-10-12 2019-10-12 Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof

Publications (1)

Publication Number Publication Date
CN110685290A true CN110685290A (en) 2020-01-14

Family

ID=69112243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910965941.1A Pending CN110685290A (en) 2019-10-12 2019-10-12 Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof

Country Status (1)

Country Link
CN (1) CN110685290A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809644A (en) * 2020-07-27 2020-10-23 长江勘测规划设计研究有限责任公司 Structure for closely arranging comprehensive pipeline and pile foundation and simultaneous construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1837511A (en) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 Double-rowed cofferdam and method for manufacturing the same
CN201132960Y (en) * 2007-11-05 2008-10-15 上海勘测设计研究院 Composite batardeau of steel light structure
CN102877420A (en) * 2012-11-06 2013-01-16 中铁二十二局哈尔滨铁路建设集团有限责任公司 Construction method of large tube well fixed point precipitation, sealing bottom free concrete and steel sheet pile cofferdam deepwater bearing platform
CN204551500U (en) * 2015-03-23 2015-08-12 中建三局集团有限公司 Novel cofferdam in a kind of super thick soft foundation
CN211498893U (en) * 2019-10-12 2020-09-15 上海市政工程设计研究总院(集团)有限公司 Cofferdam combining permanent structure pile foundation and temporary steel sheet pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1837511A (en) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 Double-rowed cofferdam and method for manufacturing the same
CN201132960Y (en) * 2007-11-05 2008-10-15 上海勘测设计研究院 Composite batardeau of steel light structure
CN102877420A (en) * 2012-11-06 2013-01-16 中铁二十二局哈尔滨铁路建设集团有限责任公司 Construction method of large tube well fixed point precipitation, sealing bottom free concrete and steel sheet pile cofferdam deepwater bearing platform
CN204551500U (en) * 2015-03-23 2015-08-12 中建三局集团有限公司 Novel cofferdam in a kind of super thick soft foundation
CN211498893U (en) * 2019-10-12 2020-09-15 上海市政工程设计研究总院(集团)有限公司 Cofferdam combining permanent structure pile foundation and temporary steel sheet pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809644A (en) * 2020-07-27 2020-10-23 长江勘测规划设计研究有限责任公司 Structure for closely arranging comprehensive pipeline and pile foundation and simultaneous construction method thereof

Similar Documents

Publication Publication Date Title
CN103074898B (en) Multi-row pile foundation pit support structure and construction method thereof
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN206800412U (en) The foundation pit enclosure structure that a kind of steel-pipe pile is combined with Larsen steel sheet pile fore shaft
CN103603358B (en) A kind of multi-platform building enclosure and constructional method
CN203905018U (en) Supporting and protecting system with combined double-row piles in combination with oblique anchors
CN212641473U (en) Foundation pit supporting structure adjacent to existing building
CN210439302U (en) Foundation structure formed by basement and supporting piles
CN110258582A (en) Bearing diagonal foundation pit supporting construction and construction method based on steel-pipe pile Yu Larsen steel plate
AU2016203186A1 (en) Retaining wall
CN103603357B (en) A kind of multi-platform without inner support self waterproofing foundation pit enclosure structure and constructional method thereof
CN211498893U (en) Cofferdam combining permanent structure pile foundation and temporary steel sheet pile
CN109403349A (en) A kind of upper flexible and lower rigid system of deep foundation pit support and its construction method
CN110685290A (en) Cofferdam combining permanent structure pile foundation and temporary steel sheet pile and construction method thereof
CN210737572U (en) Foundation ditch stagnant water curtain structure
CN107326896A (en) One kind combination steel construction support pile and construction method
CN108411934B (en) Floating tubular pile, dam retaining structure and construction method thereof
JP4088871B2 (en) Impermeable wall structure and impermeable wall structure using the impermeable wall
CN1088487C (en) Method for forming retaining wall
CN215715012U (en) Bank protection structure
CN204875811U (en) Combined type multirow stake underground structure
CN111911183B (en) Tunnel hole entering construction method based on end wall type guide wall structure
CN209323534U (en) A kind of upper flexible and lower rigid system of deep foundation pit support
CN201883449U (en) Sea wall structure of compound pile
CN209538198U (en) Abnormity draining friction pile
CN111827307A (en) Pile supporting structure in combined construction method and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination