CN111709220B CN202010828821.XA CN202010828821A CN111709220B CN 111709220 B CN111709220 B CN 111709220B CN 202010828821 A CN202010828821 A CN 202010828821A CN 111709220 B CN111709220 B CN 111709220B
Authority
CN
China
Prior art keywords
switching
unit
switching operation
sequence
standard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010828821.XA
Other languages
Chinese (zh)
Other versions
CN111709220A (en
Inventor
余音
叶梅贺
叶锡滔
熊浩南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN202010828821.XA priority Critical patent/CN111709220B/en
Publication of CN111709220A publication Critical patent/CN111709220A/en
Application granted granted Critical
Publication of CN111709220B publication Critical patent/CN111709220B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/177Editing, e.g. inserting or deleting of tables; using ruled lines
    • G06F40/18Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/186Templates
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Strategic Management (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Marketing (AREA)
  • Computational Linguistics (AREA)
  • General Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Artificial Intelligence (AREA)
  • Tourism & Hospitality (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Primary Health Care (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a distribution network power supply switching operation system and a distribution network power supply switching operation method, wherein the distribution network power supply switching operation system comprises a switching process splitting unit, a switching process selecting unit and a switching process selecting unit, wherein the switching process splitting unit is used for self-defining selection of a standard module to form a set of switching operation steps, and splitting the switching operation steps into a plurality of switching sets in sequence; the switching process generating unit is used for generating a process table of a single switching set in sequence; after the flow form in the front of the sequence of the trigger control unit is filled and submitted, the switching flow generation unit is triggered to generate a flow form in the back of the sequence; the flow table arrangement unit is used for splicing and arranging all the flow tables into a complete table in sequence; the filling content comparison unit is used for verifying the filling content of the complete form and the standard operation content one by one in sequence; the alarm unit is used for alarming the process table with the filling content not in accordance with the standard data; the storage unit is used for storing a complete table submitted by each switching operation; the scheme avoids the situation that switching operation steps are disordered due to too many data items displayed at one time.

Description

Distribution network power supply switching operation system and method
Technical Field
The invention relates to the technical field of distribution network power supply, in particular to a distribution network power supply switching operation system and a distribution network power supply switching operation method.
Background
The electrical equipment is divided into three states of operation, standby (cold standby and hot standby) and maintenance. The process of changing a device from one state to another is called switching, and the operation performed is switching operation. The electrical equipment is converted from one state to another state or the system changes the operation mode by operating the disconnecting switch, the breaker and hanging and disconnecting the ground wire, the operation is called switching operation, the requirement of the switching operation on the safety is very high, a plurality of electricians are required to cooperate to work at present, the common supervision is carried out to form an early warning thinking mode and a good working habit on a switching working site, and a safety mechanism for effectively controlling unsafe behaviors of people is formed.
The front-back sequence of the operation items is crucial to the safety of the switching operation, and in the existing situation, a worker completes each operation item in sequence according to a switching operation ticket of a paper version, but the switching operation has the following defects:
the switching operation has numerous operation items and long lists, and when workers work on the site, the operation sequence of the operation items is easy to be mistaken, so that the safety of the power distribution and supply network and the safety of the workers are dangerous; and the switching operation ticket of the paper edition has high requirements on the working environment, the switching operation sequence is more prone to making mistakes for the work site with dark light, the switching operation efficiency is low, and the switching operation ticket of the paper edition is not easy to store.
Disclosure of Invention
Therefore, the invention provides a distribution network power supply switching operation system and a distribution network power supply switching operation method, and aims to solve the problems that in the prior art, a plurality of switching operation tickets of paper edition have numerous operation items, the operation sequence of the operation items is easy to see wrongly, so that danger is caused, the requirement of the switching operation tickets of the paper edition on a working environment is high, the switching operation efficiency is low, and the switching operation tickets of the paper edition are difficult to store.
In order to achieve the above purpose, the invention provides the following technical scheme:
a distribution network power supply switching operation system comprises:
the switching process splitting unit selects a plurality of standard templates according to actual switching operation requirements, formulates the sequence of the standard templates to form a set of switching operation steps, and sequentially splits the switching operation steps into a plurality of switching sets;
the flow table generating unit correspondingly generates a flow table of each switching set in sequence and displays the flow tables in a laminated covering mode;
the triggering control unit triggers the switching process generating unit to display the process table in the later sequence after the process table in the earlier sequence is filled and submitted;
the flow splicing unit is used for splicing all the filled and submitted flow forms in sequence and sorting the flow forms into a complete form;
the filling content comparison unit is used for verifying the filling content of the complete form and the standard operation content one by one in sequence and identifying the flow form with the filling content not in accordance with the standard data;
the alarm unit is used for alarming the process table with the filling content not in accordance with the standard data;
and the storage unit is used for storing the complete table submitted by each switching operation.
As a preferred scheme of the present invention, the system further includes a database unit, where the database unit is configured to store a standard template representing each switching operation step, the standard template is a minimum unit of the switching operation step, and the number of data items of the standard template is less than or equal to the number of data items of the switching set.
As a preferred scheme of the present invention, the present invention further includes a filling completion degree verification unit, and when each flow form is submitted for filling, the filling completion degree verification unit performs a filling content verification operation on each data item of the flow form in a deep traversal manner, so as to check whether there are missing filled data items in the flow form.
As a preferred embodiment of the present invention, after the completion check unit checks that there are no missing data items in the process table, the trigger control unit regulates and controls the switching process generating unit to generate the next process table in sequence.
As a preferable aspect of the present invention, the storage unit stores therein the standard operation contents corresponding to each item of data of each flow form, and the filling content comparison unit calls the standard operation contents and performs one-to-one comparison verification on the standard operation contents and the filling contents of the complete form.
In addition, the invention also provides a distribution network power supply switching operation method, which comprises the following steps:
step 100, selecting a plurality of standard modules in a user-defined mode according to switching operation requirements, and arranging the standard modules in sequence to form a set of switching operation steps;
200, dividing the switching operation step into a plurality of switching sets, and setting a triggering relation between two switching sets in sequence;
step 300, filling and submitting the data item contents of each switching set in sequence, and performing traversal inspection on the submitted data item filling contents of the switching sets to ensure that all the data items of each switching set are operated completely;
step 400, splicing the filled switching sets in sequence to form a complete form for completing the switching operation;
step 500, comparing the switching operation result of each data item of the complete table with standard data, alarming the data item which is not qualified in the inspection, and storing the complete table in a storage unit.
As a preferred aspect of the present invention, in step 100, the standard modules are stored in a database unit, the database unit has a read-write function, a plurality of the standard modules are selected from the database unit by a user-defined manner through a read operation, and the standard modules meeting a switching operation are added to the database unit again through a write operation.
As a preferred scheme of the present invention, in step 300, the commit work of a single switching set is divided into two steps, which are respectively traversal check during commit and triggering display of the next switching set after commit, and the specific implementation steps are as follows:
301, performing switching operation on a power supply site according to the content of each data item in the switching set, and filling an operation result into a corresponding data item;
step 302, submitting the switching set, performing traversal type inspection on the submitted switching set, and detecting whether missing items exist in data items of the switching set or not;
step 303, after the switching set without missing items is submitted, automatically generating a next switching set;
and step 304, repeating the operations of the steps 301 to 303 until all switching sets are completely switched to corresponding switching operations.
As a preferred solution of the present invention, in step 302, for the switching set with missing entries, the switching set is intercepted and an operator is reminded to perform a supplementary operation.
In a preferred embodiment of the present invention, in step 500, the complete tables stored in the storage unit include a complete table with the same switching operation result as the standard data and a complete table with a different switching operation result from the standard data.
The invention has the following advantages:
according to the invention, each operation step is regulated and controlled by using an automatic switching operation system, the switching distribution network detection work can be completed on software only by a mobile phone or a tablet computer, the detection result can be stored and backed up in real time, and the problem of loss of the switching operation step result is prevented; and a plurality of operation steps can be displayed in sequence respectively, the condition that switching operation steps are disordered due to too many data items displayed at one time is avoided, and the problem that the switching sequence is operated by a worker by mistake due to too many data items of a paper operation ticket in the prior art is solved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.
Fig. 1 is a block diagram of the structure in the embodiment of the present invention.
In the figure: 1-switching process splitting unit; 2-switching flow generating unit; 3-triggering a control unit; 4-a flow table arrangement unit; 5-fill content comparison unit; 6-an alarm unit; 7-a storage unit; 8-a database unit; and 9-filling the completion degree check unit.
Detailed Description
The present invention is described in terms of particular embodiments, other advantages and features of the invention will become apparent to those skilled in the art from the following disclosure, and it is to be understood that the described embodiments are merely exemplary of the invention and that it is not intended to limit the invention to the particular embodiments disclosed. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1, the present invention provides a distribution network power supply switching operation system and method, in the present embodiment, an automatic switching operation system is used to regulate and control each operation step, and display a plurality of operation steps in sequence, so as to avoid a situation that switching operation steps are disordered due to too many data items displayed at one time, and solve a problem that a worker mistakenly operates a switching sequence due to too many data items of a paper operation ticket in the prior art.
Distribution network power supply switching operating system includes: the system comprises a switching process splitting unit 1, a switching process generating unit 2, a trigger control unit 3, a process table sorting unit 4, a filling content comparison unit 5, an alarm unit 6, a storage unit 7, a database unit 8 and a filling completion degree checking unit 9.
Wherein the database unit 8 is used for storing a standard template representing each switching operation step.
The switching process splitting unit 1 selects the standard template according to actual switching requirements, formulates the sequence of the standard template to form a set of operation steps, and sequentially splits the switching operation steps into a plurality of switching sets.
It should be added that the standard template is the minimum unit of the switching operation step, and the number of data items of the standard template is less than or equal to the number of data items of the switching set.
The switching process generating unit 2 correspondingly generates a process table of each switching set in sequence, and displays the process tables in a stacked covering mode; a flow table corresponds to each data item of the switching set, and the items of the flow table include, but are not limited to, "operation order", "operation item", and "operation result".
In addition, the content of the electronic version of the switching operation ticket is substantially the same as the content of the existing paper version of the switching operation ticket, and the electronic version of the switching operation ticket further includes header information and footer information, where the header information is specifically an issuer, an acquirer, an issuing time, an operation start time, and an operation end time, and the footer information is specifically an operator, a guardian, and the like, and generally, the header information and the footer information are set in a switching set.
The operation items contained in the operation content are split into a plurality of switching sets according to the same quantity, that is to say, the quantity of the operation items in each switching set is basically the same.
The filling completion degree checking unit 9 performs filling content checking operation on each data item of each flow form in a deep traversal manner when each flow form is submitted for filling, so as to check whether the flow form has the data item which is missed to be filled.
In order to ensure the information integrity of each flow form, in the embodiment, when each flow form is submitted, the completion degree check unit 9 is used for checking whether each piece of information of each flow form is completely filled, and when the completion degree check unit 9 detects that the flow form lacks information, a data item lacking information is automatically located to remind a worker, so as to ensure the integrity of the flow form, that is, the detection result of the completion degree check unit 9 is divided into the following two cases:
1. after the completion check unit 9 checks that the flow form has no missing data items, the trigger control unit 3 regulates and controls the switching flow generating unit 2 to generate the next flow form in sequence.
Further, the triggering control unit 3 is mainly configured to trigger the switching process generating unit to display the process table after the process table before the sequence is filled and submitted.
2. After the completion check unit 9 checks that the flow table has missing data items, the trigger control unit 3 locates the missing data items of the flow table to remind the worker to completely supplement the content of the data items.
When each operation step is submitted, data item omission detection is needed, switching operation of the next operation step can be continued only after all data items in one operation step are completed, otherwise, a worker is reminded to fill in the inspection result of each data item in the operation step, so that the stability and integrity of each switching operation step are ensured, and the safety of the switching operation is improved.
The flow form collating unit 4 is configured to sequentially splice all the filled and submitted flow forms, and collate the flow forms into a complete form, where the form of the complete form is the same as the format of the paper switching operation ticket, that is, a switching operation ticket of an electronic file is generated.
The filling content comparison unit 5 is used for verifying the filling content of the complete form and the standard operation content one by one in sequence, identifying the flow form with the filling content not in accordance with the standard data, the storage unit 7 stores the standard operation content corresponding to each item of data of each flow form, the filling content comparison unit 5 calls the standard operation content and verifies the standard operation content and the filling content of the complete form one by one
The alarm unit 6 is used for alarming the process table with the filling content not in accordance with the standard data; the storage unit 7 is used for saving the complete table submitted by each switching operation.
In addition, the invention also provides a distribution network power supply switching operation method, which comprises the following steps:
step 100, selecting a plurality of standard modules in a user-defined mode according to switching operation requirements, and arranging the standard modules in sequence to form a set of switching operation steps.
The standard modules are stored in a database unit, the database unit has a read-write function, a plurality of standard modules are selected from the database unit in a user-defined mode through read operation, and the standard modules meeting switching operation are added to the database unit again through write operation.
200, dividing the switching operation step into a plurality of switching sets, and setting a triggering relation between two switching sets in sequence;
and 300, filling and submitting the data item contents of each switching set in sequence, and performing traversal inspection on the submitted data item filling contents of the switching sets to ensure that all the data items of each switching set are operated completely.
In step 300, the commit work of a single switching set is divided into two steps, which are respectively traversal check during commit and triggering display of the next switching set after commit, and the specific implementation steps are as follows:
301, performing switching operation on a power supply site according to the content of each data item in the switching set, and filling an operation result into a corresponding data item;
step 302, submitting the switching set, performing traversal inspection on the submitted switching set, and detecting whether missing items exist in data items of the switching set, wherein for the switching set with the missing items, the switching set is intercepted and an operator is reminded to perform supplementary operation
Step 303, after the switching set without missing items is submitted, automatically generating a next switching set;
and step 304, repeating the operations of the steps 301 to 303 until all switching sets are completely switched to corresponding switching operations.
Step 400, splicing the filled switching sets in sequence to form a complete form for completing the switching operation;
step 500, comparing the switching operation result of each data item of the complete table with standard data, alarming the data item which is not qualified in the inspection, and storing the complete table in a storage unit, wherein the complete table stored in the storage unit comprises a complete table with the same switching operation result as the standard data and a complete table with different switching operation results from the standard data.
In summary, in the embodiment, each operation step is regulated and controlled by using an automated switching operation system, and a plurality of operation steps are respectively displayed in sequence, so that the situation that the switching operation steps are disordered due to too many data items displayed at one time is avoided, and the problem that the switching sequence is mistakenly operated by a worker due to too many data items of a paper operation ticket in the prior art is solved.
In addition, when each operation step of the embodiment is submitted, data item omission detection is required, switching operation of the next operation step can be continued only after all data items in one operation step are completed, otherwise, a worker is reminded to fill in a check result of each data item in the operation step, so that stability and integrity of each switching operation step are ensured, and safety of the switching operation is improved.
Although the invention has been described in detail above with reference to a general description and specific examples, it will be apparent to one skilled in the art that modifications or improvements may be made thereto based on the invention. Accordingly, such modifications and improvements are intended to be within the scope of the invention as claimed.

Claims (10)

1. A distribution network power supply switching operation system is characterized by comprising:
the switching process splitting unit (1) is used for selecting a standard template according to actual switching requirements, formulating the sequence of the standard template to form a set of operation steps, and splitting the switching operation steps into a plurality of switching sets in sequence;
a flow table generating unit (2) for generating a flow table of each switching set in sequence and correspondingly, and displaying the flow table in a stacked covering manner;
the trigger control unit (3) is used for triggering the switching process generating unit to display the process forms in the later sequence after the process forms in the earlier sequence are filled and submitted;
the flow splicing unit (4) is used for splicing all the filled and submitted flow forms in sequence and arranging the flow forms into a complete form;
a filling content comparison unit (5) for verifying the filling content of the complete form and the pre-stored standard operation content one by one in sequence and identifying the flow form with the filling content not in accordance with the standard data;
the alarm unit (6) is used for alarming the process table with the filling content not in accordance with the standard data;
and the storage unit (7) is used for saving the complete form submitted by each switching operation.
2. Distribution network power supply switching operation system according to claim 1, further comprising a database unit (8), wherein the database unit (8) is configured to store a standard template representing each switching operation step, and the standard template is a minimum unit of the switching operation step.
3. The distribution network power supply switching operation system according to claim 1, further comprising a filling completion degree verification unit (9) configured to perform a filling content verification operation on each data item of the flow tables in a deep traversal manner when each flow table is submitted for filling so as to check whether there are missing filled data items in the flow tables.
4. The distribution network power supply switching operation system according to claim 3, wherein after the completion check unit (9) checks that the flow form has no missing data items, the trigger control unit (3) controls the flow form generation unit (2) to generate the next flow form in sequence.
5. The distribution network power supply switching operation system according to claim 1, wherein the storage unit (7) stores therein the standard operation content corresponding to each item of data of each flow form, and the filling content comparison unit (5) calls the standard operation content and performs one-to-one comparison verification on the standard operation content and the filling content of the complete form.
6. A distribution network power supply switching operation method is applied to the switching operation system of any one of claims 1 to 4, and is characterized by comprising the following steps:
step 100, selecting a plurality of standard modules in a user-defined mode according to switching operation requirements, and arranging the standard modules in sequence to form a set of switching operation steps;
200, dividing the switching operation step into a plurality of switching sets, and setting a triggering relation between two switching sets in sequence;
step 300, filling and submitting the data item contents of each switching set in sequence, and performing traversal inspection on the submitted data item filling contents of the switching sets to ensure that all the data items of each switching set are operated completely;
step 400, splicing the filled switching sets in sequence to form a complete form for completing the switching operation;
step 500, comparing the switching operation result of each data item of the complete table with standard data, alarming the data item which is not qualified in the inspection, and storing the complete table in a storage unit.
7. The distribution network power supply switching operation method according to claim 6, wherein in step 100, the standard modules are stored in a database unit, the database unit has a read-write function, a plurality of the standard modules are selected from the database unit in a user-defined manner through a read operation, and the standard modules meeting the switching operation are added to the database unit again through a write operation.
8. The distribution network power supply switching operation method according to claim 6, wherein in step 300, the submitting operation of a single switching set is divided into two steps, and the next switching set is respectively displayed for traversal check during submitting and triggering after submitting, and the specific implementation steps are as follows:
301, performing switching operation on a power supply site according to the content of each data item in the switching set, and filling an operation result into a corresponding data item;
step 302, submitting the switching set, performing traversal type inspection on the submitted switching set, and detecting whether missing items exist in data items of the switching set or not;
step 303, after the switching set without missing items is submitted, automatically generating a next switching set;
and step 304, repeating the operations of the steps 301 to 303 until all switching sets are completely switched to corresponding switching operations.
9. The method according to claim 8, wherein in step 302, for the switching set with missing entries, the switching set is intercepted and an operator is reminded to perform supplementary operations.
10. The method according to claim 7, wherein in step 500, the complete tables stored in the storage unit include a complete table with the same switching operation result as the standard data and a complete table with a switching operation result different from the standard data.
CN202010828821.XA 2020-08-18 2020-08-18 Distribution network power supply switching operation system and method Active CN111709220B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010828821.XA CN111709220B (en) 2020-08-18 2020-08-18 Distribution network power supply switching operation system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010828821.XA CN111709220B (en) 2020-08-18 2020-08-18 Distribution network power supply switching operation system and method

Publications (2)

Publication Number Publication Date
CN111709220A CN111709220A (en) 2020-09-25
CN111709220B true CN111709220B (en) 2020-11-13

Family

ID=72547019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010828821.XA Active CN111709220B (en) 2020-08-18 2020-08-18 Distribution network power supply switching operation system and method

Country Status (1)

Country Link
CN (1) CN111709220B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006092044A (en) * 2004-09-21 2006-04-06 Toshiba Corp Method, device and program for displaying bid and order for electricity transaction
CN102201009A (en) * 2011-06-21 2011-09-28 深圳市凯立德科技股份有限公司 Form generating method and device
CN110991152A (en) * 2019-12-02 2020-04-10 厦门悦讯信息科技股份有限公司 Method and system for step-by-step data acquisition and automatic summarization
CN111104783A (en) * 2019-12-17 2020-05-05 珠海格力电器股份有限公司 Data verification method and device, electronic equipment and storage medium

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110738037B (en) * 2019-10-15 2021-02-05 深圳逻辑汇科技有限公司 Method, apparatus, device and storage medium for automatically generating electronic form

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006092044A (en) * 2004-09-21 2006-04-06 Toshiba Corp Method, device and program for displaying bid and order for electricity transaction
CN102201009A (en) * 2011-06-21 2011-09-28 深圳市凯立德科技股份有限公司 Form generating method and device
CN110991152A (en) * 2019-12-02 2020-04-10 厦门悦讯信息科技股份有限公司 Method and system for step-by-step data acquisition and automatic summarization
CN111104783A (en) * 2019-12-17 2020-05-05 珠海格力电器股份有限公司 Data verification method and device, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN111709220A (en) 2020-09-25

Similar Documents

Publication Publication Date Title
CN107045663B (en) Visual online checking system and method for secondary safety measure operation ticket
CN103389705B (en) Operation supervise and control system and operation supervise and control method
GB2287558B (en) Supervising system in a computer network
CN103049770A (en) SMT (Surface Mount Technology) anti-false material detection system and method
CN110490523A (en) Generation method, device and the electronic equipment of stock inventory
CN110829595A (en) Intelligent power station relay protection equipment maintenance safety isolation measure execution method and system
CN109902106B (en) Construction project supervision management system
CN109782724B (en) Control method for preventing misoperation-locking and terminal equipment
CN111737045A (en) Method and device for achieving fault self-recovery of Insight management platform
CN111709220B (en) Distribution network power supply switching operation system and method
CN107170218B (en) Remote assistance method and system for debugging fire alarm system
CN213934941U (en) Management system of wisdom fire control warehouse based on RFID technique
CN102262402A (en) A method and apparatus for providing industrial plant information
CN112104075B (en) Sequential control operation order uninterrupted checking method and system based on remote control message comparison of measurement and control device
CN112330128A (en) Production operation management method, device, equipment and storage medium
CN110956283B (en) Method and system for matching SCD file with soft pressing plate
CN114078252A (en) Intelligent work ticket checking method and system
CN105911452A (en) Testing circuit, testing device, and testing method for multi-SAM card module
CN104777808A (en) Recording method for operating condition debugging of power station as well as record reading methods
CN110598527A (en) Machine learning-based claims insurance policy number identification method and related equipment
CN105467849B (en) The monitoring method and system of intelligent air switch
CN110716454B (en) Method and device for generating scheduling switching operation ticket
CN116737041A (en) Bill generation method and device, electronic equipment and storage medium
CN115484297B (en) Interactive system and method based on energy storage equipment
CN113887997A (en) Intelligent management and control system for operation tickets

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant