CN112330128A - Production operation management method, device, equipment and storage medium - Google Patents

Production operation management method, device, equipment and storage medium Download PDF

Info

Publication number
CN112330128A
CN112330128A CN202011181960.4A CN202011181960A CN112330128A CN 112330128 A CN112330128 A CN 112330128A CN 202011181960 A CN202011181960 A CN 202011181960A CN 112330128 A CN112330128 A CN 112330128A
Authority
CN
China
Prior art keywords
type
production
voucher
production operation
equipment set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011181960.4A
Other languages
Chinese (zh)
Inventor
刘飘
罗金满
刘丽媛
尹稚玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN202011181960.4A priority Critical patent/CN112330128A/en
Publication of CN112330128A publication Critical patent/CN112330128A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The embodiment of the invention discloses a method, a device, equipment and a storage medium for managing production operation, wherein the method comprises the following steps: when a first type of production operation voucher is obtained, extracting a first operation time period and a first operation equipment set, and extracting a third type of production operation voucher from a second type of production operation voucher according to the first operation time period; extracting a second operation equipment set from the third type production operation voucher, and comparing the second operation equipment set with the first operation equipment set; acquiring a fourth type of production operation certificate corresponding to the first target equipment, and extracting a third operation equipment set from the fourth type of production operation certificate; and judging whether to send out operation risk early warning according to the third operation equipment set and the preset risk check rule list, thereby realizing comprehensive management and control of production operation, early warning of potential danger and hidden danger, and reducing the risk of life casualties and property loss.

Description

Production operation management method, device, equipment and storage medium
Technical Field
The embodiment of the invention relates to the technical field of electric power, in particular to a management method, a management device and a storage medium for production operation.
Background
For the electric power production operation with high risk coefficient, especially the multi-task cooperative operation on the associated equipment, the handling of the production operation certificate is beneficial to the orderly development of the field work and the specification of the operation flow, and is also an important means for ensuring the life safety of the operating personnel.
At present, for the handling and the verification of the production operation voucher related to the collaborative operation, the handling and the verification are usually carried out on a production operation voucher platform manually, and a plurality of production operation vouchers may correspond to a plurality of verifiers. The existing production operation management method cannot realize standardized management and fine control of a plurality of associated production operation vouchers, is low in management efficiency, cannot realize early warning of potential dangers and hidden dangers, and is easy to cause personal injuries and property losses.
Disclosure of Invention
The embodiment of the invention provides a management method, a management device and a storage medium for production operation, so as to realize standardized management and fine control of the production operation and early warning of potential danger and hidden danger.
In a first aspect, an embodiment of the present invention provides a method for managing production operations, including:
when a first type of production operation voucher is obtained, extracting a first operation time period and a first operation equipment set, and extracting a third type of production operation voucher from a second type of production operation voucher according to the first operation time period; the first type of production operation voucher comprises a production operation voucher to be audited, the second type of production operation voucher comprises an audited production operation voucher which is not completed by operation, and the starting operation time and/or the ending operation time of the third type of production operation voucher are/is located in the first operation time period; the first set of work devices includes at least one first work device;
extracting a second operation equipment set from the third type production operation voucher, and comparing the second operation equipment set with the first operation equipment set;
if the second operation equipment set and the first operation equipment set have the same first target equipment, acquiring a fourth type of production operation certificate corresponding to the first target equipment from the third type of production operation certificate, and extracting a third operation equipment set from the fourth type of production operation certificate;
and judging whether to send out operation risk early warning or not according to the third operation equipment set and a preset risk check rule list.
In a second aspect, an embodiment of the present invention further provides a management apparatus for production operations, including:
the first operation equipment set extraction module is used for extracting a first operation time period and a first operation equipment set when the first type of production operation voucher is obtained, and extracting a third type of production operation voucher from the second type of production operation voucher according to the first operation time period; the first type of production operation voucher comprises a production operation voucher to be audited, the second type of production operation voucher comprises an audited production operation voucher which is not completed by operation, and the starting operation time and/or the ending operation time of the third type of production operation voucher are/is located in the first operation time period; the first set of work devices includes at least one first work device;
a second operation equipment set extraction module, configured to extract a second operation equipment set from the third type of production operation credential, and compare the second operation equipment set with the first operation equipment set;
a third operation device set extraction module, configured to, if the second operation device set and the first operation device set have the same first target device, obtain, in the third type of production job credential, a fourth type of production job credential corresponding to the first target device, and extract, in the fourth type of production job credential, a third operation device set;
and the first operation risk early warning judgment module is used for judging whether to send out operation risk early warning or not according to the third operation equipment set and a preset risk check rule list.
In a third aspect, an embodiment of the present invention further provides a management device, where the management device includes:
one or more processors;
storage means for storing one or more programs;
when the one or more programs are executed by the one or more processors, the one or more processors implement the method for managing the production job according to any embodiment of the present invention.
In a fourth aspect, the embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the computer program implements the method for managing a production job according to any embodiment of the present invention.
According to the technical scheme provided by the embodiment of the invention, the third operation equipment set is extracted from the obtained production operation certificate, and whether operation risk early warning is sent or not is judged according to the third operation equipment set and the preset risk check rule list, so that standardized management and fine control of cooperative production operation are realized, early warning of potential risks and hidden dangers before cooperative operation is carried out is realized, and the risks of accidents such as personal injuries, property loss and the like caused by failure in manual handling and audit management and control are reduced.
Drawings
FIG. 1 is a flowchart of a method for managing a manufacturing operation according to an embodiment of the present invention;
FIG. 2 is a flowchart of another method for managing production jobs according to the second embodiment of the present invention;
fig. 3 is a block diagram of a management apparatus for a production job according to a third embodiment of the present invention;
fig. 4 is a schematic structural diagram of a management device according to a fourth embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. It should be further noted that, for the convenience of description, only some of the structures related to the present invention are shown in the drawings, not all of the structures.
Example one
Fig. 1 is a flowchart of a method for managing a production job according to an embodiment of the present invention, where the embodiment is applicable to verifying a submitted production job credential under a multitask collaborative production job, and the method may be executed by a device for managing a production job according to an embodiment of the present invention, where the device may be implemented by software and/or hardware and is integrated on a production job management device, and typically, may be integrated on a terminal device that manages an electric power production job, and the method specifically includes the following steps:
s110, when the first type of production operation voucher is obtained, extracting a first operation time period and a first operation equipment set, and extracting a third type of production operation voucher from the second type of production operation voucher according to the first operation time period; the first type of production operation voucher comprises a production operation voucher to be audited, the second type of production operation voucher comprises an audited production operation voucher which is not completed by operation, and the starting operation time and/or the ending operation time of the third type of production operation voucher are/is located in the first operation time period; the first set of work devices includes at least one first work device.
The first type of production operation voucher comprises a production operation voucher to be audited and is a production operation voucher submitted but not audited in the production operation voucher management platform, wherein the production operation voucher management platform is used for submitting, managing and auditing work tickets and/or operation tickets. The production job voucher includes a job time period describing the start time and the end time of the job task, and the first job time period is the job time period in the first type production job voucher, for example, if a switching operation task is executed in the time period [ t1, t2], the job time period is [ t1, t2], the job start time is t1, and the end time is t 2. The production operation voucher further includes an operation equipment set, where the operation equipment set includes one or more operation equipment, and describes the equipment name and number of the operation task, which need to be operated, for example, in the above technical solution, the operation equipment in the switching operation task is a switch, and the specific number of the switch equipment can be determined to locate it; the first set of work devices is all work devices involved in the first type of production job voucher.
And the second type of production operation voucher comprises a production operation voucher which is verified and not completed, wherein the production operation voucher which is verified and not completed is the production operation voucher which passes the verification in the production operation voucher management platform and does not complete the production operation task at the current moment.
The third type of production operation voucher comprises a production operation voucher with the initial operation time within the first operation time period and/or a production operation voucher with the end operation time within the first operation time period, namely the third type of production operation voucher, is a production operation voucher with the operation time period and the operation time period of the first type of production operation voucher in the second type of production operation voucher and with the overlapped time period; for example, the first job time period is [ 2: 00,2: 30] there is a second type of production job voucher, the job contents being in [ 2: 15,3: 00] executing a closing operation task in a time period, and determining the second type production operation certificate as a third type production operation certificate when the initial operation time is within the first operation time period; or a second type of production job voucher exists, and the job content is represented by a value in [ 1: 15,2: and 15, executing a closing operation task in a time period, wherein the time for finishing the operation is positioned in the first operation time period, and determining the second type production operation certificate as a third type production operation certificate.
Optionally, in an embodiment of the present invention, the production job certificate includes a work ticket and/or an operation ticket, where the work ticket is a written command that permits work on the electrical device and the system software, and is also a written basis for executing a safety technical measure, and the main contents include: the working ticket number, the working responsible person, the working class member, the working place and the working content, the planned working time, the working ending time, the power failure range, the safety measures, the working licensor, the working ticket issuer, the working ticket approver, the post-power-transmission comment and the like; the operation ticket refers to a written basis for performing electrical operation in the power system, and comprises a scheduling instruction ticket and a power transformation operation ticket, and the main contents of the operation ticket comprise: operation order number, operation task, operation sequence, command sender, command receiver, operator, guardian, operation time and the like. The handling of the production operation certificate is beneficial to the orderly development of field work and the specification of operation flow, and is an important means for ensuring the life safety of operators.
Optionally, in an embodiment of the present invention, the production job credential includes an operation mode of a job device. The operation modes of the working equipment are operation modes of how the working equipment related to the working task in the production work voucher operates, for example, switching on and off the knife brake equipment, and the corresponding operation modes of different working equipment are different.
Optionally, in the embodiment of the present invention, the types of the devices include a switch, a disconnecting link, and a grounding switch. A switch, which is a device capable of closing, carrying and opening/closing a current under a normal circuit condition and a current under an abnormal circuit condition within a predetermined time in an electric power working site, and has a principle that "closed" of a contact indicates that an electronic contact is turned on and allows a current to flow; an "open circuit" (open) means that the electronic contact is not conductive, creating an open circuit, and does not allow current to flow. The knife switch is a switching device which is used for isolating a power supply and switching off, is used for connecting and cutting off a small current circuit and has no arc extinguishing function, is generally used for low voltage electricity, is divided into a single-phase knife switch and a three-phase knife switch, has various specifications according to different applications, is generally marked with voltage and current, such as 220V, 16A, and represents that the knife switch is suitable for 220V voltage, and the current does not exceed 16A; the ground knife is a safety interlocking mechanism which is arranged in a high-voltage switch cabinet to replace a grounding wire, is usually closed when equipment maintenance and a circuit breaker and a disconnecting switch are disconnected, and is in a disconnected state when in normal operation.
And S120, extracting a second operation equipment set from the third type production operation voucher, and comparing the second operation equipment set with the first operation equipment set.
The second set of work devices is a set of all work devices involved in the third type of production job voucher, including at least one second work device, the start job time and/or the end job time of which is located within the first job time period.
And S130, if the second operation equipment set and the first operation equipment set have the same first target equipment, acquiring a fourth type production operation certificate corresponding to the first target equipment from the third type production operation certificate, and extracting the third operation equipment set from the fourth type production operation certificate.
The fourth type production operation voucher is extracted on the basis of the third type production operation voucher, and specifically, if the second operation equipment set and the first operation equipment set have the same first target equipment, the third type production operation voucher corresponding to the first target equipment is selected as the fourth type production operation voucher; and the third operation equipment set is a set of all the operation equipment related to the production task in the fourth type production operation certificate and comprises at least one third operation equipment.
And S140, judging whether to send out operation risk early warning or not according to the third operation equipment set and a preset risk check rule list.
Acquiring risk information (for example, a preset risk check rule list shown in table 1) in a preset risk check rule list, and judging whether an operation risk early warning needs to be sent according to an equipment type of third operation equipment and a corresponding equipment operation mode, wherein the equipment type of the third operation equipment is included in a third operation equipment set; specifically, whether a switch, a disconnecting link and a grounding switch exist in the set of the third operation equipment is searched, and if any one of the switch, the disconnecting link and the grounding switch does not exist, the alarm information is not sent; when any one of the switch, the disconnecting link and the grounding switch is operated, but the opening and closing state of the corresponding operation equipment in the production operation certificate is unknown, or opening and closing operations exist in different production operation certificates; or if different opening and closing states exist in the two or more production operation vouchers, sending high-risk alarm information to prompt the checking of the states of the operation equipment in the corresponding production operation vouchers; if any one of the switch, the knife switch and the grounding knife has no switching-off and switching-on operations in different production operation vouchers, and the states of all the related production operation vouchers are also consistent, general alarm information is sent to prompt attention to the corresponding operation equipment states in the corresponding production operation vouchers.
Table 1 list of preset risk checking rules
Figure BDA0002750427570000081
Figure BDA0002750427570000091
Optionally, in the embodiment of the present invention, after determining whether to send out the operation risk early warning, the method further includes: if the operation risk early warning is determined to be sent out, the operation risk early warning is sent to a provider of the first type production operation certificate, and the first type production operation certificate is determined to be invalid; or if the operation risk early warning is determined to be sent out, the first type production operation certificate and the operation risk early warning are sent to an auditing party, so that the auditing party can judge whether the first type production operation certificate is effective or not according to the operation risk early warning. Specifically, after judging whether to send out an operation risk early warning, if the risk early warning is determined to be needed, directly rejecting the application (namely, the application of the first type of production operation certificate), and sending the risk early warning to a provider of the first type of production operation certificate, so that the provider can know the reject reason and the potential risk of the application; after the risk early warning is determined to be needed, the application is not directly rejected, but the application and the corresponding risk early warning are sent to an auditing party to be manually audited or other auditing procedures, so that the auditing party can know the potential risk of the application. The provider of the first type production operation certificate is a filler of the first type production operation certificate; the auditing party is used for auditing the operation risk early warning and judging whether the first type of production operation certificate is effective or not; if the auditor determines that the first-type production job voucher is invalid, the first-type production job voucher will be returned.
According to the technical scheme provided by the embodiment of the invention, the third operation equipment set is extracted from the obtained production operation certificate, and whether operation risk early warning is sent or not is judged according to the third operation equipment set and the preset risk check rule list, so that standardized management and fine control of cooperative production operation are realized, early warning of potential risks and hidden dangers before cooperative operation is carried out is realized, and the risks of accidents such as personal injuries, property loss and the like caused by failure in manual handling and audit management and control are reduced.
Example two
Fig. 2 is a flowchart of another management method for a production job according to a second embodiment of the present invention, which is supplemented by the second embodiment of the present invention, and the present embodiment is applicable to management of associated devices related to a first operating device in a production job, where the method specifically includes the following steps:
s210, if the second operation equipment set and the first operation equipment set do not have the same first target equipment, acquiring associated equipment related to at least one first operation equipment based on a power grid topological structure, and constructing a fourth operation equipment set.
And based on the power grid topology structure, retrieving all non-first operation equipment in a current path section where the first operation equipment is located, and using the retrieved non-first operation equipment as associated equipment related to the first operation equipment, wherein the current path section refers to a current branch section which has a current path with at least one first operation equipment in the power grid topology and has no other switch equipment in the path. And a fourth set of work devices, i.e., a set of work devices formed by all the associated devices related to the first work device.
Optionally, in an embodiment of the present invention, the association device includes a non-first operation device located in the same current path segment as at least one of the first operation devices, wherein the association device further includes: a first switching device encountered by the at least one first work device within the current path segment.
And S220, if the second operation equipment set and the fourth operation equipment set have the same second target equipment, acquiring a fifth type of production operation certificate matched with the second target equipment from the third type of production operation certificate, and extracting a fifth operation equipment set from the fifth type of production operation certificate.
The fifth type production operation voucher is obtained by judging whether a second target device identical to the fourth operation device set exists in the second operation device set or not on the basis of the third type production operation voucher; and a fifth set of work devices, which is a set of all work devices involved in the fifth type of production job voucher.
And S230, judging whether to send out operation risk early warning or not according to the fifth operation equipment set and a preset risk checking rule list.
According to the technical scheme provided by the embodiment of the invention, the associated equipment related to at least one first operation equipment is selected, and the fifth type production operation certificate and the fifth operation equipment set are obtained according to the third type production operation certificate, so that standardized management and fine control of the associated equipment of the first operation equipment are realized, early warning of potential risks and hidden dangers before cooperative operation is carried out is realized, and the risks of accidents such as personal injury, property loss and the like caused by manual handling and auditing that are not in place are reduced.
EXAMPLE III
Fig. 3 is a block diagram of a management apparatus for a production job according to a third embodiment of the present invention, where the apparatus specifically includes: a first operating device set extraction module 310, a second operating device set extraction module 320, a third operating device set extraction module 330, and a first operating risk early warning judgment module 340.
A first operation device set extracting module 310, configured to, when a first type of production operation credential is obtained, extract a first operation time period and a first operation device set, and extract a third type of production operation credential from a second type of production operation credential according to the first operation time period; the first type of production operation voucher comprises a production operation voucher to be audited, the second type of production operation voucher comprises an audited production operation voucher which is not completed by operation, and the starting operation time and/or the ending operation time of the third type of production operation voucher are/is located in the first operation time period; the first set of work devices includes at least one first work device;
a second operation device set extracting module 320, configured to extract a second operation device set from the third type of production job voucher, and compare the second operation device set with the first operation device set;
a third operation device set extracting module 330, configured to, if the second operation device set and the first operation device set have the same first target device, obtain, in the third type of production job credential, a fourth type of production job credential corresponding to the first target device, and extract, in the fourth type of production job credential, a third operation device set;
and the first operation risk early warning judgment module 340 is configured to judge whether to send out an operation risk early warning according to the third operation device set and a preset risk checking rule list.
According to the technical scheme provided by the embodiment of the invention, the third operation equipment set is extracted from the obtained production operation certificate, and whether operation risk early warning is sent or not is judged according to the third operation equipment set and the preset risk check rule list, so that standardized management and fine control of cooperative production operation are realized, early warning of potential risks and hidden dangers before cooperative operation is carried out is realized, and the risks of accidents such as personal injuries, property loss and the like caused by failure in manual handling and audit management and control are reduced.
Optionally, on the basis of the above technical solution, the management apparatus for production operation further includes:
a fourth operation device set extraction module, configured to, if there is no first target device that is the same as the first operation device set in the second operation device set, obtain, based on a power grid topology structure, associated devices related to at least one first operation device, and construct a fourth operation device set;
a fifth operation device set extraction module, configured to, if a second target device exists in the second operation device set and the fourth operation device set, obtain, in the third type of production operation credential, a fifth type of production operation credential that matches the second target device, and extract, in the fifth type of production operation credential, a fifth operation device set;
and the second operation risk early warning judgment module is used for judging whether to send out operation risk early warning or not according to the fifth operation equipment set and a preset risk check rule list.
Optionally, on the basis of the above technical solution, the production job voucher includes a work ticket and/or an operation ticket.
Optionally, on the basis of the above technical solution, the production job voucher includes an operation mode of a job device.
Optionally, on the basis of the above technical solution, the associated device includes a non-first work device located in the same current path segment as at least one of the first work devices.
Optionally, on the basis of the above technical solution, the device types include a switch, a disconnecting link, and a grounding switch.
Optionally, on the basis of the above technical solution, the management apparatus for production operation further includes:
the first operation risk early warning sending module is used for sending the operation risk early warning to a provider of the first type of production operation certificate and determining that the first type of production operation certificate is invalid if the operation risk early warning is determined to be sent;
and the second operation risk early warning sending module is used for sending the first type of production operation certificate and the operation risk early warning to an auditing party if the operation risk early warning is determined to be sent out, so that the auditing party judges whether the first type of production operation certificate is effective or not according to the operation risk early warning.
The device can execute the management method of the production operation provided by any embodiment of the invention, and has corresponding functional modules and beneficial effects of the execution method. For technical details not described in detail in this embodiment, reference may be made to the method provided in any embodiment of the present invention.
Example four
Fig. 4 is a schematic structural diagram of a management device according to a fourth embodiment of the present invention. Fig. 4 illustrates a block diagram of an exemplary device 12 suitable for use in implementing embodiments of the present invention. The device 12 shown in fig. 4 is only an example and should not bring any limitation to the function and scope of use of the embodiments of the present invention.
As shown in FIG. 4, device 12 is in the form of a general purpose computing device. The components of device 12 may include, but are not limited to: one or more processors or processing units 16, a system memory 28, and a bus 18 that couples various system components including the system memory 28 and the processing unit 16.
Bus 18 represents one or more of any of several types of bus structures, including a memory bus or memory controller, a peripheral bus, an accelerated graphics port, and a processor or local bus using any of a variety of bus architectures. By way of example, such architectures include, but are not limited to, Industry Standard Architecture (ISA) bus, micro-channel architecture (MAC) bus, enhanced ISA bus, Video Electronics Standards Association (VESA) local bus, and Peripheral Component Interconnect (PCI) bus.
Device 12 typically includes a variety of computer system readable media. Such media may be any available media that is accessible by device 12 and includes both volatile and nonvolatile media, removable and non-removable media.
The system memory 28 may include computer system readable media in the form of volatile memory, such as Random Access Memory (RAM)30 and/or cache memory 32. Device 12 may further include other removable/non-removable, volatile/nonvolatile computer system storage media. By way of example only, storage system 34 may be used to read from and write to non-removable, nonvolatile magnetic media (not shown, but commonly referred to as a "hard drive"). Although not shown, a magnetic disk drive for reading from and writing to a removable, nonvolatile magnetic disk (e.g., a "floppy disk") and an optical disk drive for reading from or writing to a removable, nonvolatile optical disk (e.g., a CD-ROM, DVD-ROM, or other optical media) may be provided. In these cases, each drive may be connected to bus 18 by one or more data media interfaces. System memory 28 may include at least one program product having a set (e.g., at least one) of program modules that are configured to carry out the functions of embodiments of the invention.
A program/utility 40 having a set (at least one) of program modules 42 may be stored, for example, in system memory 28, such program modules 42 including, but not limited to, an operating system, one or more application programs, other program modules, and program data, each of which examples or some combination thereof may comprise an implementation of a network environment. Program modules 42 generally carry out the functions and/or methodologies of the described embodiments of the invention.
Device 12 may also communicate with one or more external devices 14 (e.g., keyboard, pointing device, display 24, etc.), with one or more devices that enable a user to interact with device 12, and/or with any devices (e.g., network card, modem, etc.) that enable device 12 to communicate with one or more other computing devices. Such communication may be through an input/output (I/O) interface 22. Also, the device 12 may communicate with one or more networks (e.g., a Local Area Network (LAN), a Wide Area Network (WAN), and/or a public network, such as the Internet) via the network adapter 20. As shown, the network adapter 20 communicates with the other modules of the device 12 via the bus 18. It should be understood that although not shown in the figures, other hardware and/or software modules may be used in conjunction with device 12, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems, among others.
The processing unit 16 executes various functional applications and data processing by running a program stored in the system memory 28, for example, to implement a management method of a production job provided by any of the embodiments of the present invention. Namely: when a first type of production operation voucher is obtained, extracting a first operation time period and a first operation equipment set, and extracting a third type of production operation voucher from a second type of production operation voucher according to the first operation time period; the first type of production operation voucher comprises a production operation voucher to be audited, the second type of production operation voucher comprises an audited production operation voucher which is not completed by operation, and the starting operation time and/or the ending operation time of the third type of production operation voucher are/is located in the first operation time period; the first set of work devices includes at least one first work device; extracting a second operation equipment set from the third type production operation voucher, and comparing the second operation equipment set with the first operation equipment set; if the second operation equipment set and the first operation equipment set have the same first target equipment, acquiring a fourth type of production operation certificate corresponding to the first target equipment from the third type of production operation certificate, and extracting a third operation equipment set from the fourth type of production operation certificate; and judging whether to send out operation risk early warning or not according to the third operation equipment set and a preset risk check rule list.
EXAMPLE five
Fifth, an embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored, where the computer program, when executed by a processor, implements a method for managing a production job according to any embodiment of the present invention; the method comprises the following steps:
when a first type of production operation voucher is obtained, extracting a first operation time period and a first operation equipment set, and extracting a third type of production operation voucher from a second type of production operation voucher according to the first operation time period; the first type of production operation voucher comprises a production operation voucher to be audited, the second type of production operation voucher comprises an audited production operation voucher which is not completed by operation, and the starting operation time and/or the ending operation time of the third type of production operation voucher are/is located in the first operation time period; the first set of work devices includes at least one first work device;
extracting a second operation equipment set from the third type production operation voucher, and comparing the second operation equipment set with the first operation equipment set;
if the second operation equipment set and the first operation equipment set have the same first target equipment, acquiring a fourth type of production operation certificate corresponding to the first target equipment from the third type of production operation certificate, and extracting a third operation equipment set from the fourth type of production operation certificate;
and judging whether to send out operation risk early warning or not according to the third operation equipment set and a preset risk check rule list.
Computer storage media for embodiments of the invention may employ any combination of one or more computer-readable media. The computer readable medium may be a computer readable signal medium or a computer readable storage medium. A computer readable storage medium may be, for example, but not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination of the foregoing. More specific examples (a non-exhaustive list) of the computer readable storage medium would include the following: an electrical connection having one or more wires, a portable computer diskette, a hard disk, a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing. In the context of this document, a computer readable storage medium may be any tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device.
A computer readable signal medium may include a propagated data signal with computer readable program code embodied therein, for example, in baseband or as part of a carrier wave. Such a propagated data signal may take many forms, including, but not limited to, electro-magnetic, optical, or any suitable combination thereof. A computer readable signal medium may also be any computer readable medium that is not a computer readable storage medium and that can communicate, propagate, or transport a program for use by or in connection with an instruction execution system, apparatus, or device.
Program code embodied on a computer readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wireline, optical fiber cable, RF, etc., or any suitable combination of the foregoing.
Computer program code for carrying out operations for aspects of the present invention may be written in any combination of one or more programming languages, including an object oriented programming language such as Java, Smalltalk, C + + or the like and conventional procedural programming languages, such as the "C" programming language or similar programming languages. The program code may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a Local Area Network (LAN) or a Wide Area Network (WAN), or the connection may be made to an external computer (for example, through the Internet using an Internet service provider).
It is to be noted that the foregoing is only illustrative of the preferred embodiments of the present invention and the technical principles employed. It will be understood by those skilled in the art that the present invention is not limited to the particular embodiments described herein, but is capable of various obvious changes, rearrangements and substitutions as will now become apparent to those skilled in the art without departing from the scope of the invention. Therefore, although the present invention has been described in greater detail by the above embodiments, the present invention is not limited to the above embodiments, and may include other equivalent embodiments without departing from the spirit of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims (10)

1. A management method for production operation is characterized by comprising the following steps:
when a first type of production operation voucher is obtained, extracting a first operation time period and a first operation equipment set, and extracting a third type of production operation voucher from a second type of production operation voucher according to the first operation time period; the first type of production operation voucher comprises a production operation voucher to be audited, the second type of production operation voucher comprises an audited production operation voucher which is not completed by operation, and the starting operation time and/or the ending operation time of the third type of production operation voucher are/is located in the first operation time period; the first set of work devices includes at least one first work device;
extracting a second operation equipment set from the third type production operation voucher, and comparing the second operation equipment set with the first operation equipment set;
if the second operation equipment set and the first operation equipment set have the same first target equipment, acquiring a fourth type of production operation certificate corresponding to the first target equipment from the third type of production operation certificate, and extracting a third operation equipment set from the fourth type of production operation certificate;
and judging whether to send out operation risk early warning or not according to the third operation equipment set and a preset risk check rule list.
2. The method of claim 1, wherein after comparing the second set of work devices to the first set of work devices, further comprising:
if the second operation equipment set and the first operation equipment set do not have the same first target equipment, acquiring associated equipment related to at least one first operation equipment based on a power grid topological structure, and constructing a fourth operation equipment set;
if the second operation equipment set and the fourth operation equipment set have the same second target equipment, acquiring a fifth type of production operation certificate matched with the second target equipment from the third type of production operation certificate, and extracting a fifth operation equipment set from the fifth type of production operation certificate;
and judging whether to send out operation risk early warning or not according to the fifth operation equipment set and a preset risk checking rule list.
3. The method of claim 1, wherein the production job voucher comprises a work ticket and/or an operation ticket.
4. The method of claim 1, wherein the production job credential includes a mode of operation of a work tool.
5. The method of claim 2, wherein the associated device comprises a non-first work device located in a same current path segment as at least one of the first work devices.
6. The method of claim 1, wherein the device types include switches, knife switches, and ground switches.
7. The method of claim 4, after determining whether to issue the pre-warning for operational risk, comprising:
if the operation risk early warning is determined to be sent out, the operation risk early warning is sent to a provider of the first type production operation certificate, and the first type production operation certificate is determined to be invalid;
or if the operation risk early warning is determined to be sent out, the first type production operation certificate and the operation risk early warning are sent to an auditing party, so that the auditing party can judge whether the first type production operation certificate is effective or not according to the operation risk early warning.
8. A management device for production work, comprising:
the first operation equipment set extraction module is used for extracting a first operation time period and a first operation equipment set when the first type of production operation voucher is obtained, and extracting a third type of production operation voucher from the second type of production operation voucher according to the first operation time period; the first type of production operation voucher comprises a production operation voucher to be audited, the second type of production operation voucher comprises an audited production operation voucher which is not completed by operation, and the starting operation time and/or the ending operation time of the third type of production operation voucher are/is located in the first operation time period; the first set of work devices includes at least one first work device;
a second operation equipment set extraction module, configured to extract a second operation equipment set from the third type of production operation credential, and compare the second operation equipment set with the first operation equipment set;
a third operation device set extraction module, configured to, if the second operation device set and the first operation device set have the same first target device, obtain, in the third type of production job credential, a fourth type of production job credential corresponding to the first target device, and extract, in the fourth type of production job credential, a third operation device set;
and the first operation risk early warning judgment module is used for judging whether to send out operation risk early warning or not according to the third operation equipment set and a preset risk check rule list.
9. A management device, characterized in that the management device comprises:
one or more processors;
storage means for storing one or more programs;
when executed by the one or more processors, cause the one or more processors to implement the method of managing production jobs of any one of claims 1-7.
10. A computer-readable storage medium on which a computer program is stored, the program, when executed by a processor, implementing a method of managing a production job as claimed in any one of claims 1 to 7.
CN202011181960.4A 2020-10-29 2020-10-29 Production operation management method, device, equipment and storage medium Pending CN112330128A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011181960.4A CN112330128A (en) 2020-10-29 2020-10-29 Production operation management method, device, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011181960.4A CN112330128A (en) 2020-10-29 2020-10-29 Production operation management method, device, equipment and storage medium

Publications (1)

Publication Number Publication Date
CN112330128A true CN112330128A (en) 2021-02-05

Family

ID=74296306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011181960.4A Pending CN112330128A (en) 2020-10-29 2020-10-29 Production operation management method, device, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN112330128A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112884385A (en) * 2021-04-28 2021-06-01 国网浙江省电力有限公司 Power system standard cost operation data processing method based on proportioning model
CN117148795A (en) * 2023-08-15 2023-12-01 无锡禹龙工业自动化有限公司 Industrial equipment automatic management system and method based on big data

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101976617A (en) * 2010-09-14 2011-02-16 华北电网有限公司北京十三陵蓄能电厂 Method for preventing accidents in mechanical cross operations by utilizing anti-misoperation locking system
CN108573342A (en) * 2018-03-30 2018-09-25 广州供电局有限公司 State evaluating method, device, computer equipment and the storage medium of power equipment
CN111049263A (en) * 2019-11-29 2020-04-21 广东电网有限责任公司 Power dispatching anti-error checking device and system
CN111539696A (en) * 2020-05-29 2020-08-14 南京华盾电力信息安全测评有限公司 Two-ticket omnibearing electronic monitoring method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101976617A (en) * 2010-09-14 2011-02-16 华北电网有限公司北京十三陵蓄能电厂 Method for preventing accidents in mechanical cross operations by utilizing anti-misoperation locking system
CN108573342A (en) * 2018-03-30 2018-09-25 广州供电局有限公司 State evaluating method, device, computer equipment and the storage medium of power equipment
CN111049263A (en) * 2019-11-29 2020-04-21 广东电网有限责任公司 Power dispatching anti-error checking device and system
CN111539696A (en) * 2020-05-29 2020-08-14 南京华盾电力信息安全测评有限公司 Two-ticket omnibearing electronic monitoring method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘丽媛等: "分布式综合供能系统发展综述", 《电力需求侧管理》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112884385A (en) * 2021-04-28 2021-06-01 国网浙江省电力有限公司 Power system standard cost operation data processing method based on proportioning model
CN117148795A (en) * 2023-08-15 2023-12-01 无锡禹龙工业自动化有限公司 Industrial equipment automatic management system and method based on big data
CN117148795B (en) * 2023-08-15 2024-02-27 无锡禹龙工业自动化有限公司 Industrial equipment automatic management system and method based on big data

Similar Documents

Publication Publication Date Title
CN107045663B (en) Visual online checking system and method for secondary safety measure operation ticket
CN109962443B (en) SCD-based protection, overhaul and safety measure automatic generation system and method
CN112330128A (en) Production operation management method, device, equipment and storage medium
CN111106671B (en) Five-prevention management control method and system for substation coded lock
Li et al. Probability‐based seismic reliability assessment method for substation systems
US20140114638A1 (en) Handheld device for preventing misoperations in an electric power system
CN111949718A (en) Data anomaly analysis method based on cloud computing
CN111769638B (en) Operation ticket checking method, device, equipment and storage medium
CN111680975B (en) Method, device, equipment and medium for auditing operation ticket
CN112288503A (en) Bill generation method and device, mobile terminal equipment and storage medium
CN114076894B (en) Detection method and device for disconnecting link operation, electronic equipment and storage medium
JP5111025B2 (en) System planning support system
CN113884943B (en) Leakage fault analysis method, device, equipment and medium
CN115392722A (en) Operation ticket generation method and device, electronic equipment and storage medium
CN115617579A (en) Power utilization information control platform and control method for power distribution equipment
CN105467233B (en) Intelligent substation local reaying protection test system
CN113691019A (en) One-key sequential control operation and maintenance method, system, computer equipment and medium thereof
CN115099670A (en) Battery replacement station management method and device, electronic equipment and storage medium
CN109861393B (en) Processing method for preventing error locking and execution terminal
CN112542892A (en) Transformer substation regulation and control integrated control method and control device
CN111415077A (en) Intelligent distribution network fault diagnosis positioning method
CN113702758B (en) Voltage loss detection method and related device for substation bus
CN113219292B (en) Bus accident diagnosis method, device, equipment and storage medium
CN112202604B (en) Emergency configuration method, device and system of electric power monitoring safety system switch
CN115865557B (en) Network coupling system based on data identification

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210205

RJ01 Rejection of invention patent application after publication