CN111703338A - BIM-based catenary cantilever pre-configuration method and device - Google Patents

BIM-based catenary cantilever pre-configuration method and device Download PDF

Info

Publication number
CN111703338A
CN111703338A CN202010408345.6A CN202010408345A CN111703338A CN 111703338 A CN111703338 A CN 111703338A CN 202010408345 A CN202010408345 A CN 202010408345A CN 111703338 A CN111703338 A CN 111703338A
Authority
CN
China
Prior art keywords
cantilever
contact network
data
preset
measurement data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010408345.6A
Other languages
Chinese (zh)
Inventor
张平
西穷
杨斌
王振文
安蕾
樊涛
邵晓威
郝爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Group Co Ltd
China Railway Construction Electrification Bureau Group Co Ltd
Original Assignee
China State Railway Group Co Ltd
China Railway Construction Electrification Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Railway Group Co Ltd, China Railway Construction Electrification Bureau Group Co Ltd filed Critical China State Railway Group Co Ltd
Priority to CN202010408345.6A priority Critical patent/CN111703338A/en
Publication of CN111703338A publication Critical patent/CN111703338A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/12Trolley lines; Accessories therefor
    • B60M1/28Manufacturing or repairing trolley lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/12Trolley lines; Accessories therefor
    • B60M1/13Trolley wires

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • General Factory Administration (AREA)

Abstract

The embodiment of the invention relates to a BIM-based catenary cantilever pre-configuration method and device. Wherein, the method comprises the following steps: acquiring measurement data of a contact network cantilever, and generating cantilever pre-configuration data of the contact network cantilever according to the measurement data; according to a building information model of a contact network cantilever in the BIM platform, checking measurement data of the contact network cantilever and cantilever preset data; and under the condition that the verification of the measurement data and the cantilever preset data is qualified, the cantilever preset data is sent to a preset production system so as to produce the contact network cantilever according to the cantilever preset data. The invention solves the technical problems of low production efficiency and high cost due to the adoption of manual pre-preparation in the related technology.

Description

BIM-based catenary cantilever pre-configuration method and device
Technical Field
The invention relates to the field of construction engineering, in particular to a contact network cantilever pre-configuration method and device based on BIM.
Background
The professional cantilever of railway contact net is mostly pre-prepared in a manual pre-prepared mode, the production efficiency is low, the labor cost is high, the working strength is high, the information capable of being processed is less, and the tracing of the production process of the cantilever of the contact net is not facilitated.
In view of the above problems, no effective solution has been proposed.
Disclosure of Invention
The embodiment of the invention provides a method and a device for pre-assembling a cantilever of a contact network, which at least solve the technical problems of low production efficiency and high cost due to manual pre-assembling adopted in the related technology.
According to one aspect of the embodiment of the invention, a BIM-based catenary cantilever pre-preparation method is provided, and comprises the following steps: acquiring measurement data of a contact network cantilever, and generating cantilever pre-configuration data of the contact network cantilever according to the measurement data; according to a building information model of a contact network cantilever in a building information model BIM platform, checking measurement data of the contact network cantilever and cantilever preset data; and under the condition that the measurement data and the cantilever preset data are qualified through verification, the cantilever preset data are sent to a preset production system so as to produce the contact network cantilever according to the cantilever preset data.
Further, according to the building information model of the catenary cantilever in the building information model BIM platform, the checking of the measurement data and the cantilever pre-configuration data of the catenary cantilever comprises: generating a building information model of the contact network cantilever according to a design drawing corresponding to the contact network cantilever; and checking the measurement data and the cantilever preset data according to the construction information model of the contact network cantilever.
Further, after the sending the wrist arm provisioning data to a preset production system, the method further includes: calculating parts required for assembling the contact network cantilever according to the cantilever pre-configuration data; and under the condition that the required parts meet preset conditions, producing the contact network cantilever according to the required parts and the cantilever preset data.
Further, still include: and spraying a preset code on the contact network cantilever, wherein the preset code comprises a network link corresponding to the information for inquiring the contact network cantilever.
Further, the preset code comprises a two-dimensional code; or, the information of the contact network cantilever at least comprises one of the following information: processing batch, processing time, required part parameters.
Further, under the condition that the required parts meet preset conditions, producing the contact network cantilever according to the required parts and the cantilever pre-configuration data comprises: judging whether the stock quantity of the required parts reaches a preset quantity threshold value or not; if yes, generating the contact network cantilever according to the required parts and the cantilever preset data; and if not, sending an alarm prompt, wherein the alarm prompt is used for prompting that the number of the required parts does not meet the preset condition.
According to another aspect of the embodiments of the present invention, there is also provided a device for preparing a cantilever of a contact line based on BIM, including: the acquisition unit is used for acquiring measurement data of the cantilever of the contact network and generating cantilever pre-configuration data of the cantilever of the contact network according to the measurement data; the verification unit is used for verifying the measurement data of the contact network cantilever and the cantilever pre-prepared data according to the building information model of the contact network cantilever in the building information model BIM platform; and the sending unit is used for sending the cantilever preset data to a preset production system under the condition that the measurement data and the cantilever preset data are qualified through verification so as to produce the contact network cantilever according to the cantilever preset data.
Further, the verification unit includes: the processing module is used for generating a building information model of the contact network cantilever according to a design drawing corresponding to the contact network cantilever; and the verification module is used for verifying the measurement data and the cantilever preset data according to the construction information model of the contact network cantilever.
Further, still include: the processing unit is used for calculating parts required for assembling the contact network cantilever according to the cantilever pre-configuration data after the cantilever pre-configuration data are sent to a preset production system; and the production unit is used for producing the contact network cantilever according to the required parts and the cantilever pre-configuration data under the condition that the required parts meet preset conditions.
According to another aspect of the embodiments of the present invention, there is also provided an electronic apparatus, including a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor executes the method for provisioning of the BIM-based catenary cantilever as described above through the computer program.
In the embodiment of the invention, the cantilever pre-configuration data of the cantilever of the overhead line system is generated by acquiring the measurement data of the cantilever of the overhead line system and according to the measurement data; according to a building information model of a contact network cantilever in the BIM platform, checking measurement data of the contact network cantilever and cantilever preset data; and under the condition that the verification of the measurement data and the cantilever preset data is qualified, the cantilever preset data is sent to a preset production system so as to produce the contact network cantilever according to the cantilever preset data. Thereby realized improving the technical effect of contact net cantilever production efficiency, can reduce the human cost, and then solved because adopt artifical pre-prepared in the correlation technique, production efficiency is low and with high costs technical problem.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without inventive labor.
Fig. 1 is a schematic diagram of an alternative BIM-based catenary cantilever provisioning method according to an embodiment of the present invention;
fig. 2 is a schematic diagram of an alternative BIM-based catenary cantilever provisioning apparatus according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
It is noted that, in this document, relational terms such as "first" and "second," and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions.
Example 1
According to an embodiment of the invention, a BIM-based catenary cantilever pre-assembly method is provided, as shown in FIG. 1, the method comprises the following steps:
s102, acquiring measurement data of the contact network cantilever, and generating cantilever preset data of the contact network cantilever according to the measurement data;
s104, checking the measurement data of the contact network cantilever and the cantilever preset data according to the building information model of the contact network cantilever in the building information model BIM platform;
and S106, under the condition that the verification of the measurement data and the cantilever preset data is qualified, the cantilever preset data is sent to a preset production system so as to produce the contact network cantilever according to the cantilever preset data.
In this embodiment, building information model BIM platform, as a novel platform of the important applied computer application technology BIM of mainly being applied to the engineering construction field, use digital modeling software, can carry out visual simulation and data information centralized management to the contact network cantilever pre-arrangement, promote the efficiency of cantilever pre-arrangement management, guarantee the orderly circulation of pre-arrangement data, concentrate standard management, bring very big value for construction unit and operation unit.
In this embodiment, through the measured data that obtains the contact net cantilever, utilize measured data to generate cantilever pre-configured data through the correlation technique software, this cantilever pre-configured data can be arranged in the production system that the contact net cantilever corresponds, and production system can produce the corresponding contact net cantilever according to cantilever pre-configured data.
In this embodiment, after the measurement data and the cantilever provisioning data of the contact network cantilever are acquired, the measurement data and the cantilever provisioning data of the contact network cantilever are verified according to the building information model corresponding to the contact network cantilever in the BIM platform. The building information model corresponding to the contact network cantilever is generated according to a drawing of the contact network.
In another embodiment, the cantilever pre-configuration data includes data of all contact network cantilevers in the construction area, wherein the required part number of all contact network cantilevers in the construction area is included, and the specification size of the contact network cantilever, the number of parts required for production and the like are checked according to the building information model of all contact network cantilevers in the construction area in the BIM platform.
It should be noted that, according to the embodiment, the measurement data of the catenary cantilever is obtained, and the cantilever pre-configuration data of the catenary cantilever is generated according to the measurement data; according to a building information model of a contact network cantilever in the BIM platform, checking measurement data of the contact network cantilever and cantilever preset data; and under the condition that the verification of the measurement data and the cantilever preset data is qualified, the cantilever preset data is sent to a preset production system so as to produce the contact network cantilever according to the cantilever preset data. Thereby realized improving the technical effect of contact net cantilever production efficiency, can reduce the human cost.
Optionally, in this embodiment, according to the building information model of the contact network cantilever in the BIM platform, the verifying the measurement data of the contact network cantilever and the cantilever provisioning data includes: generating a building information model of the catenary cantilever according to a design drawing corresponding to the catenary cantilever; and checking the measurement data and the cantilever preset data according to the building information model of the contact network cantilever.
In a specific application scene, a design drawing corresponding to a construction area where the contact network cantilever is located is obtained, relevant data and the design drawing are input into the BIM platform, and then the building information model of the contact network cantilever can be generated according to the design drawing. In one example, verifying the measurement data and the cantilever provisioning data according to the construction information model of the contact network cantilever comprises: and checking the measurement data of the contact network cantilever and the cantilever preset data according to a single contact network cantilever model. In yet another example, the measurement data of the contact network cantilever and the preset data of the cantilever can be verified according to the building model of all contact network cantilevers in the construction area, and the verification contents include but are not limited to the number of the contact network cantilevers, the number of required parts and the specifications of the cantilever.
Optionally, in this embodiment, after sending the cantilever provisioning data to the pre-set production system, the method further includes: calculating parts required for assembling the cantilever of the contact network according to the cantilever preset data; and under the condition that the required parts meet the preset conditions, producing the contact network cantilever according to the required parts and the cantilever pre-configuration data.
In a specific application scene, after the preset data of the cantilever is sent to a preset production system, required parts for assembling the cantilever are added in the preset production system, batch numbers of various required parts which are currently produced and processed are set, whether the inventory of the required parts for assembling the cantilever of the contact network has balance or not is calculated according to the preset data of the cantilever, and if the required parts are used up or not, an alarm is sent. And if the required parts have balance in stock, producing the corresponding contact net cantilever according to the cantilever pre-prepared data.
Optionally, in this embodiment, the method further includes: and spraying a preset code on the contact network cantilever, wherein the preset code contains a network link corresponding to the information for inquiring the contact network cantilever. In a specific application scenario, a preset code is sprayed on the contact network cantilever, and the preset code is code information containing network links, such as a two-dimensional code. The information contacting the network wrist arm can be accessed and inquired according to the preset code. In another example, a preset code may be sprayed on a required part of the overhead line system wrist arm, and the network link corresponding to the preset code on the required part is used for accessing information corresponding to the required part.
Optionally, in this embodiment, the preset code includes a two-dimensional code; or, the information of the contact network cantilever at least comprises one of the following information: processing batch, processing time, required part parameters.
Optionally, in this embodiment, in a case that the required part satisfies the preset condition, producing the catenary cantilever according to the required part and the cantilever pre-configuration data includes: judging whether the stock quantity of the required parts reaches a preset quantity threshold value or not; if yes, generating a contact network cantilever according to the required parts and the cantilever pre-prepared data; if not, an alarm prompt is sent, and the alarm prompt is used for prompting that the number of the required parts does not meet the preset condition.
In a specific application scene, required parts for assembling the cantilever of the contact network are calculated according to the preset data of the cantilever, wherein the required parts comprise the specification, the number and the like of the required parts. And then judging whether the inventory quantity of the required parts meets a preset quantity threshold value, wherein the quantity threshold value can be determined according to the preset data of the cantilever, can be the quantity of the required parts of a single contact network cantilever, and can also be the quantity of the required parts of all contact network cantilevers in a construction area. And under the condition that the stock quantity of the required parts meets the preset quantity threshold, producing the contact network cantilever according to the cantilever pre-configuration data, and under the condition that the stock quantity of the required parts does not meet the preset quantity threshold, sending an alarm prompt to prompt that the stock of the required parts is insufficient.
According to the embodiment, the measurement data of the contact network cantilever is obtained, and the cantilever pre-configuration data of the contact network cantilever is generated according to the measurement data; according to a building information model of a contact network cantilever in the BIM platform, checking measurement data of the contact network cantilever and cantilever preset data; and under the condition that the verification of the measurement data and the cantilever preset data is qualified, the cantilever preset data is sent to a preset production system so as to produce the contact network cantilever according to the cantilever preset data. Thereby realized improving the technical effect of contact net cantilever production efficiency, can reduce the human cost.
It should be noted that, for simplicity of description, the above-mentioned method embodiments are described as a series of acts or combination of acts, but those skilled in the art will recognize that the present invention is not limited by the order of acts, as some steps may occur in other orders or concurrently in accordance with the invention. Further, those skilled in the art should also appreciate that the embodiments described in the specification are preferred embodiments and that the acts and modules referred to are not necessarily required by the invention.
Through the above description of the embodiments, those skilled in the art can clearly understand that the method according to the above embodiments can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware, but the former is a better implementation mode in many cases. Based on such understanding, the technical solutions of the present invention may be embodied in the form of a software product, which is stored in a storage medium (e.g., ROM/RAM, magnetic disk, optical disk) and includes instructions for enabling a terminal device (e.g., a mobile phone, a computer, a server, or a network device) to execute the method according to the embodiments of the present invention.
Example 2
According to an embodiment of the present invention, there is also provided a BIM-based catenary cantilever provisioning apparatus for implementing the BIM-based catenary cantilever provisioning method, as shown in fig. 2, the apparatus including:
1) the acquiring unit 20 is configured to acquire measurement data of a cantilever of a contact network, and generate cantilever pre-configuration data of the cantilever of the contact network according to the measurement data;
2) the verification unit 22 is used for verifying the measurement data of the catenary cantilever and the cantilever pre-configuration data according to the building information model of the catenary cantilever in the building information model BIM platform;
3) and the sending unit 24 is configured to send the cantilever provisioning data to a preset production system under the condition that the measurement data and the cantilever provisioning data are qualified through verification, so as to produce the contact network cantilever according to the cantilever provisioning data.
Optionally, in this embodiment, the verification unit 22 includes: the processing module is used for generating a building information model of the contact network cantilever according to a design drawing corresponding to the contact network cantilever; and the verification module is used for verifying the measurement data and the cantilever preset data according to the construction information model of the contact network cantilever.
Optionally, in this embodiment, the method further includes: the processing unit is used for calculating parts required for assembling the contact network cantilever according to the cantilever pre-configuration data after the cantilever pre-configuration data are sent to a preset production system; and the production unit is used for producing the contact network cantilever according to the required parts and the cantilever pre-configuration data under the condition that the required parts meet preset conditions.
Optionally, the specific example in this embodiment may refer to the example described in embodiment 1 above, and this embodiment is not described again here.
Example 3
According to an embodiment of the present invention, there is also provided an electronic apparatus, including a memory, a processor, and a computer program stored in the memory and executable on the processor, where the processor executes the BIM-based catenary cantilever provisioning method as described above through the computer program.
Optionally, in this embodiment, the memory is configured to store program code for performing the following steps:
s1, acquiring measurement data of the cantilever of the overhead line system, and generating cantilever pre-configuration data of the cantilever of the overhead line system according to the measurement data;
s2, checking the measurement data of the contact network cantilever and the cantilever pre-prepared data according to the building information model of the contact network cantilever in the building information model BIM platform;
and S3, under the condition that the measurement data and the cantilever preset data are qualified through verification, the cantilever preset data are sent to a preset production system, so that the contact network cantilever is produced according to the cantilever preset data.
Optionally, the memory is further configured to store program codes for executing the steps included in the method in embodiment 1, which is not described in detail in this embodiment.
Optionally, in this embodiment, the memory may include, but is not limited to: a U-disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a removable hard disk, a magnetic or optical disk, and other various media capable of storing program codes.
Optionally, the specific example in this embodiment may refer to the example described in embodiment 1 above, and this embodiment is not described again here.
The above-mentioned serial numbers of the embodiments of the present invention are merely for description and do not represent the merits of the embodiments.
The integrated unit in the above embodiments, if implemented in the form of a software functional unit and sold or used as a separate product, may be stored in the above computer-readable storage medium. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for causing one or more computer devices (which may be personal computers, servers, network devices, etc.) to execute all or part of the steps of the method according to the embodiments of the present invention.
In the above embodiments of the present invention, the descriptions of the respective embodiments have respective emphasis, and for parts that are not described in detail in a certain embodiment, reference may be made to related descriptions of other embodiments.
In the several embodiments provided in the present application, it should be understood that the disclosed client may be implemented in other manners. The above-described embodiments of the apparatus are merely illustrative, and for example, the division of the units is only one type of division of logical functions, and there may be other divisions when actually implemented, for example, a plurality of units or components may be combined or may be integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, units or modules, and may be in an electrical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (10)

1. A contact network cantilever pre-preparation method based on BIM is characterized by comprising the following steps:
acquiring measurement data of a contact network cantilever, and generating cantilever pre-configuration data of the contact network cantilever according to the measurement data;
according to a building information model of a contact network cantilever in a building information model BIM platform, checking measurement data of the contact network cantilever and cantilever preset data;
and under the condition that the measurement data and the cantilever preset data are qualified through verification, the cantilever preset data are sent to a preset production system so as to produce the contact network cantilever according to the cantilever preset data.
2. The method of claim 1, wherein verifying the measurement data of the catenary cantilever and the cantilever provisioning data according to the building information model of the catenary cantilever in the building information model BIM comprises:
generating a building information model of the contact network cantilever according to a design drawing corresponding to the contact network cantilever;
and checking the measurement data and the cantilever preset data according to the construction information model of the contact network cantilever.
3. The method of claim 1, further comprising, after said sending said wrist arm provisioning data into a pre-set production system:
calculating parts required for assembling the contact network cantilever according to the cantilever pre-configuration data;
and under the condition that the required parts meet preset conditions, producing the contact network cantilever according to the required parts and the cantilever preset data.
4. The method of claim 1, further comprising:
and spraying a preset code on the contact network cantilever, wherein the preset code comprises a network link corresponding to the information for inquiring the contact network cantilever.
5. The method of claim 4, wherein the predetermined code comprises a two-dimensional code; or, the information of the contact network cantilever at least comprises one of the following information: processing batch, processing time, required part parameters.
6. The method of claim 3, wherein producing the catenary cantilever from the required part and the cantilever provisioning data if the required part meets a preset condition comprises:
judging whether the stock quantity of the required parts reaches a preset quantity threshold value or not;
if yes, generating the contact network cantilever according to the required parts and the cantilever preset data;
and if not, sending an alarm prompt, wherein the alarm prompt is used for prompting that the number of the required parts does not meet the preset condition.
7. The utility model provides a pre-prepared device of contact net cantilever based on BIM which characterized in that includes:
the acquisition unit is used for acquiring measurement data of the cantilever of the contact network and generating cantilever pre-configuration data of the cantilever of the contact network according to the measurement data;
the verification unit is used for verifying the measurement data of the contact network cantilever and the cantilever pre-prepared data according to the building information model of the contact network cantilever in the building information model BIM platform;
and the sending unit is used for sending the cantilever preset data to a preset production system under the condition that the measurement data and the cantilever preset data are qualified through verification so as to produce the contact network cantilever according to the cantilever preset data.
8. The apparatus of claim 7, wherein the verification unit comprises:
the processing module is used for generating a building information model of the contact network cantilever according to a design drawing corresponding to the contact network cantilever;
and the verification module is used for verifying the measurement data and the cantilever preset data according to the construction information model of the contact network cantilever.
9. The apparatus of claim 7, further comprising:
the processing unit is used for calculating parts required for assembling the contact network cantilever according to the cantilever pre-configuration data after the cantilever pre-configuration data are sent to a preset production system;
and the production unit is used for producing the contact network cantilever according to the required parts and the cantilever pre-configuration data under the condition that the required parts meet preset conditions.
10. An electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, wherein the processor executes the method for provisioning a BIM-based catenary cantilever as claimed in any one of claims 1 to 6 by the computer program.
CN202010408345.6A 2020-05-14 2020-05-14 BIM-based catenary cantilever pre-configuration method and device Pending CN111703338A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010408345.6A CN111703338A (en) 2020-05-14 2020-05-14 BIM-based catenary cantilever pre-configuration method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010408345.6A CN111703338A (en) 2020-05-14 2020-05-14 BIM-based catenary cantilever pre-configuration method and device

Publications (1)

Publication Number Publication Date
CN111703338A true CN111703338A (en) 2020-09-25

Family

ID=72536999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010408345.6A Pending CN111703338A (en) 2020-05-14 2020-05-14 BIM-based catenary cantilever pre-configuration method and device

Country Status (1)

Country Link
CN (1) CN111703338A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101327748A (en) * 2008-06-18 2008-12-24 中铁十一局集团电务工程有限公司 Method for calculating and installing high-speed rail electrification catenary wrist-arm
CN203995752U (en) * 2014-08-26 2014-12-10 中国铁建电气化局集团第二工程有限公司 Contact system is located prewired dedicated
CN105740539A (en) * 2016-01-29 2016-07-06 中铁第一勘察设计院集团有限公司 Bracket preassembling method based on parameterized parametric constraint model
CN106004529A (en) * 2016-06-24 2016-10-12 邓凌燕 Automatic catenary cantilever pre-assembling device and assembling method thereof
CN206703998U (en) * 2017-05-03 2017-12-05 中铁武汉电气化局集团有限公司 A kind of simplation examination device for analog detection bracket installation parameter
CN108197356A (en) * 2017-12-20 2018-06-22 中国铁路总公司 A kind of four electric facility location optimization method and devices based on BIM technology
CN208322270U (en) * 2018-06-26 2019-01-04 中铁十一局集团电务工程有限公司 Bracket process equipment and bracket Provisioning System for bracket Provisioning System
CN208992182U (en) * 2018-09-17 2019-06-18 中国铁建电气化局集团有限公司 The prewired center of high-speed railway intelligence contact network cantilever
CN209581203U (en) * 2019-01-31 2019-11-05 中国铁路设计集团有限公司 A kind of contact net system based on composite wrist-arm
CN110962695A (en) * 2019-11-29 2020-04-07 中船重工海为郑州高科技有限公司 Automatic installation equipment and installation method for high-speed rail contact network cantilever
CN210335117U (en) * 2018-11-30 2020-04-17 中铁第四勘察设计院集团有限公司 Intelligent production line equipment system for high-speed railway contact net cantilever

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101327748A (en) * 2008-06-18 2008-12-24 中铁十一局集团电务工程有限公司 Method for calculating and installing high-speed rail electrification catenary wrist-arm
CN203995752U (en) * 2014-08-26 2014-12-10 中国铁建电气化局集团第二工程有限公司 Contact system is located prewired dedicated
CN105740539A (en) * 2016-01-29 2016-07-06 中铁第一勘察设计院集团有限公司 Bracket preassembling method based on parameterized parametric constraint model
CN106004529A (en) * 2016-06-24 2016-10-12 邓凌燕 Automatic catenary cantilever pre-assembling device and assembling method thereof
CN206703998U (en) * 2017-05-03 2017-12-05 中铁武汉电气化局集团有限公司 A kind of simplation examination device for analog detection bracket installation parameter
CN108197356A (en) * 2017-12-20 2018-06-22 中国铁路总公司 A kind of four electric facility location optimization method and devices based on BIM technology
CN208322270U (en) * 2018-06-26 2019-01-04 中铁十一局集团电务工程有限公司 Bracket process equipment and bracket Provisioning System for bracket Provisioning System
CN208992182U (en) * 2018-09-17 2019-06-18 中国铁建电气化局集团有限公司 The prewired center of high-speed railway intelligence contact network cantilever
CN210335117U (en) * 2018-11-30 2020-04-17 中铁第四勘察设计院集团有限公司 Intelligent production line equipment system for high-speed railway contact net cantilever
CN209581203U (en) * 2019-01-31 2019-11-05 中国铁路设计集团有限公司 A kind of contact net system based on composite wrist-arm
CN110962695A (en) * 2019-11-29 2020-04-07 中船重工海为郑州高科技有限公司 Automatic installation equipment and installation method for high-speed rail contact network cantilever

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金光: "BIM技术在接触网腕臂预配中的应用研究", 《铁路计算机应用》 *

Similar Documents

Publication Publication Date Title
CN108734028B (en) Data management method based on block chain, block chain link point and storage medium
CN103383768A (en) Agricultural product tracking service system based on mobile terminals
CN111667279A (en) Product source tracing method and system based on double block chains
CN107807891A (en) Information collecting method and terminal device
CN107862352A (en) A kind of Quick Response Code sharing method and Quick Response Code share equipment
CN104133765B (en) The test case sending method of network activity and test case server
CN112052111A (en) Processing method, device and equipment for server abnormity early warning and storage medium
CN108459944A (en) System operation monitoring method, device and server
CN110335111A (en) Data processing method, system, terminal and server
CN109241357A (en) Chain structure model and its construction method, system and terminal device
CN110825807A (en) Data interaction conversion method, device, equipment and medium based on artificial intelligence
CN110033278A (en) Risk Identification Method and device
CN111159897A (en) Target optimization method and device based on system modeling application
CN110135814A (en) The correlating method of BIM and project data, system and terminal device
CN111586660A (en) Information display method and device, storage medium and electronic equipment
CN108343315A (en) Key management method and terminal device
CN111703338A (en) BIM-based catenary cantilever pre-configuration method and device
CN110673507A (en) Data simulation method and device for Internet of things equipment
CN108647139B (en) System test method, device, storage medium and electronic device
CN113434190B (en) Data processing method and device, storage medium and electronic equipment
CN111327487A (en) Power communication network running state monitoring method and device based on deep learning
CN115423030A (en) Equipment identification method and device
CN109688174A (en) A kind of virtual service implementation method and device based on more agents service
CN110264383B (en) Electronic contract filing method and device, readable storage medium and server
CN113888340A (en) Docking processing method, device, equipment and storage medium for configured insurance products

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200925

RJ01 Rejection of invention patent application after publication